




版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
幕墙UHPC施工专项方案
编制:
审核:
日期:
编号:
发放号:
目录
目录
第1章工程概况..........................................................................1
1.1工程概况.......................................................................1
1.2设计概况.......................................................................1
1.3UHPC幕墙系统概况.............................................................2
1.4UHPC节点展示.................................................................3
1.5工程施工条件...................................................................6
1.6施工平面图.....................................................................6
第2章编制依据..........................................................................6
2.1遵循原则.......................................................................6
2.2规范及标准.....................................................................7
第3章施工部署..........................................................................8
3.1项目管理目标...................................................................8
3.2项目管理组织...................................................................8
3.3各项资源供应方式...............................................................13
3.3.1劳务资源安排.............................................................13
3.3.2施工周转工具采供应安排...................................................15
3.4施工流水段的划分及施工工艺流程.................................................15
3.5工程施工重点和难点分析及应对措施...............................................18
3.5.1UHPC施工重难点分析及因对措施..........................................19
3.6施工进度计划...................................................................20
第4章UHPC材料性能及生产工艺.........................................................20
4.1UHPC材料要求:.............................................................20
4.2UHPC加工生产工艺.............................................................22
4.2.1磨具制作工艺...........................................................22
4.2.2UHPC生产工艺.........................................................25
4.3UHPC运输保证措施.............................................................29
图4.3-1UHPC专用货架1....................................................................................................................30
图4.3-2UHPC专用货架2....................................................................................................................30
图4.3-3运输路程总长750公里。...............................................31
第5章UHPC幕墙系统施工工艺...........................................................31
5.1.1UHPC玻璃幕墙系统(待定)..............................................31
5.1.2UHPC玻璃铝板幕墙系统.................................................36
1.工序流程..................................................................36
2.主要施工方法..............................................................36
5.1.3UHPC百叶铝板幕墙系统.................................................39
5.2主要吊装施工方法...............................................................42
第6章安全文明施工管理.................................................................47
6.1安全文明管理目标..............................................................47
6.2安全文明管理组织机构...........................................................47
6.2.1组织机构...............................................................47
6.2.2安全生产职责分工.......................................................48
6.2.3安全生产重大危险源.....................................................50
第1页
6.2.4安全生产资源配置计划....................................................51
6.2.5施工现场安全生产管理制度................................................52
6.3安全生产保障措施...............................................................52
^5•3.1frj"J•••♦••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••・•^53
6.3.2翠工自—ijl|-4*-..................................................................................................53
6.3.3安全技术交底............................................................55
6.3.4班前安全活动...................................55
6.3.7临边、“四口”安全防护..................................................56
6.4文明施工保障措施..........................................................57
6.4.1文明施工管理组织.......................................................57
6.4.2文明施工管理制度.......................................................57
6.4.3文明施工专项管理措施..........................58
第7章进度管理计划.............................................................59
7.1组织机构和职责分工............................................................59
7.2进度管理措施..................................................................61
1.组织措施..................................................................61
2技术措施62
3.合同措施..................................................................62
4管理措施63
7.3各阶段进度计划保证措施........................................................65
7.4确保工期的赶工措施............................................................67
7.5关键节点工期延误的回补措施.....................................................69
第8章质量管理计划.....................................................................69
8«1I.不呈1-1jxi.耳,:由限1—1j:
8.2质量管理流程和管理制度........................................................69
8.3工程检验批划分.................................................................73
8.3.1检验批划分标准..........................................................74
8.3.2本区域工程检验批划分方案................................................74
8.4重点部位、关键工序的质量控制..................................................75
8.5UHPC幕墙质量控制内容........................................................76
8.5.1UHPC生产质量控制内容.........................76
UHPC板允许偏差及检验方法.........................................................77
UHPC板的外观质量及检查方法.......................................................78
8.5.2UHPC安装质量控制内容..................................................78
8.6质制J措.........................79
8.6.1UHPC生产质量控制措施..................................................79
8.6.2生产品质控制流程........................................................80
8.6.3UHPC安装质量控制措施.........................81
8.6.4组织保证措施............................................................84
8«♦5彳u8^^
8.6.6经济保证措施............................................................85
第2页
8.7.1运输成品保护...........................................................86
8.7.2施工过程成品保护........................................................86
8.7.3交叉施工中的成品保护....................................................87
第9章应急预案.........................................................................88
9.1应急组织机构.........................................88
9.1.1应急管理目标及目标分解..................................................88
9.1.2应急管理组织机构...............................88
9.1.3各岗位职责.............................................................89
9.2事故风险分析..................................................................89
9.2.1事故类型...............................................................89
9.2.2可能发生的紧急情况原因分析.............................................90
9.2.3应急救援医院及路线.....................................................90
9.3应急救援程序...................................................................92
9.3.1事故报告程序...................................92
9.3.2事故响应级别............................................................93
9.3.3应急响应程序............................................................93
9.4应急处置措施...................................................................93
9.4.1处置原则................................................................93
9.4.2处置措施.......................................94
9.5应急准备......................................................................97
9.5.1应急物资准备..................................97
9.5.2应急人员培训...........................................................97
9.5.3应急演练...............................................................97
9.5.4应急检查与监控.........................................................97
9.5.5应急响应及评价.........................................................98
9.6新冠肺炎应急预案.....................................98
9.6.1疫情基本情况............................................................98
9.6.2新冠肺炎应急小组........................................................99
9.6.3应急响应管理流程........................................................99
第10章平面图附件及相关计算书.........................................................103
附件一:平面图划分.....................................................................104
附件二:施工总进度计划.................................................................105
附件三:钢柱吊装连接耳板设计计算书.........................................107
附件四:UHPC背负钢架受力验算..........................................................136
第3页
第1章工程概况
1.1工程概况
图1.1-1项目位置及周边场地
表1.1-1工程建设概况表
工程名称建筑类别
建设工Wfeht
建筑层数
质里
建筑高度
建设单位工期
设计单位
登
监理单位
文明
总
施工单位科技
工主要功能或用途职业健康安全管理
L2设计概况
本项目工程性质为商业、商务用地,位于**经开区震泽路与清舒道交叉口西南侧
XDG-2020-9号地块开发建设一期项目(世界物联网博览会永久会址)。
图1.2-1**国际会议中心效果图
**国际会议中心位于**太湖新城内,用地面积约71000平方米,新建商务、商业
用房及地下停车场等,总建筑面积约13万户,其中地上建筑面积约7.2万户,地下
建筑面积约5.1万户。
中央大堂作为整个建筑主轴,所有主会议厅均沿其分布。使整个会议中心的流线清
晰简洁,一览无余。中央大堂将是**的城市客厅。中央大堂将为各会议功能提供宽敞的
序厅空间,是大量人流疏散或聚集的主要场所。在其中也设有一个咖啡厅,供参观者使
用。中央大堂也将成为湿地景观的延伸,打造绿色自然的会议中心。
会议中心地上功能包括一层为宴会厅、多功能厅、大会堂、报告厅、会议室和辅助
用房;二层为会议室和辅助用房;三层、四层、五层为办公、辅助用房和设备用房。地
下部分功能主要为设备用房、库房、非机动车车库(如有)、机动车库以及辅助用房等。
1)报告厅:550坐;
2)大会堂:1600坐;
3)超小型会议室:5个(70—100平米)
4)小型会议室:5个(100—170平米)
5)中型会议室:10个(190—240平米)
第1页共141页
6)大型会议室:4个(320—480平米)
7)大型会议室:2个(630—670平米)会议室可灵活分割。
8)宴会厅及多功能厅(万人会堂):11000平米,可分可合
9)贵宾室:3个(130—400平米)
表L2T工程设计概况
用地面积地上面积
±di±
地下防火等级
裙房
UHPC玻璃
幕墙
TYPE1UIIPC百叶
鹤
入口门厅
铝铁猛金
TYPE5属屋面
玻璃天窗
环境保护
其它需要说明的事项:/
1.3UHPC幕墙系统概况
本项目UHPC工程主要分布于南、北区外立面幕墙的室内侧及是室外侧;大部分为
倾斜角度幕墙,向内倾斜角度有65°、70。、75。、80。、90°几类;其中北区分为A、
B、C、D四个分区,南区分为E、F、G、H四个分区;各区功能不同,UHPC分布数量不
同,UHPC总面积约10000nf;
第2页共141页
图L3T功能区域概括图
求—2
,岫|;口汴『小啤心滔渝谥瀚渝瀚安瑞靛施淄馅籍怨怒怒勿必"
.1;的抑
蒯胪硒皿例段M加娜Ml皿加必[1尚酬叫慌册瞄出腑皿皿葡,
“不辘M沂施行浦市济岁拓而j祁而南酒隔,膜爆!导艮般Hi
加川川1川7':七器二首=:制『用〃网以心:,株:爻2方:滋5:曼〃*:;卿嘛腮则融喇聊眼岫
L4UHPC节点展示
本系统为开放式干挂幕墙系统,外挂超高性能纤维增强混凝土板(UHPC);本工
程UHPC材料均采用浇筑工艺,UHPC面板采用预置不锈钢S316套筒与幕墙主龙骨(定
制钢型材)连接,同时保证两者之间能有一定的相对位移能力,连接点处均局部加厚,
以提高连接处的UHPC抗剪、抗挤压能力。UHPC面板与主体结构间连接采用三维可调
连接,在调整到位后通过机械螺栓锁定位置。
UHPC幕墙结构类型共计分二类,一类为室内为蜂窝铝板、室外为UHPC,截面形状
第3页共141页
10种;另一类为室内为铝单板,室外为UHPC,截面形状同样10种。
表1.4-2UHPC类型二节点
第4页共141页
图1.4-2部分UHPC墙身剖面
1.5工程施工条件
表1.5-1工程施工条件
气象条件
**气候特征:四季分明,热量充足,降水丰沛,雨热同季,无雷期长。年平均气温16C左右,
气象条件
年平均降水量1100亳米,雨季较长,主要集中在夏季。
交通情况
本项目块地1司边路网密集,道路等级较高,距*♦站、新区站均在12公里内,可在
场外交通
25分钟内到达。周边3KM范围内拥有近58条公交线,可达到市中心区域。
交通状况
经现场勘探本工程场内四周路面平整,可允许大型载物车辆通行,道路满足三通•
场内交通
平要求。
整体进度目前北区钢结构已完成100%,南区钢结构已完成80%,预计6月底移交所有钢结构。
临时设施
施NH水由总承包单位提供临时照明、施工临时用电和用水的接驳点。我方自行负责所需的
用电接驳工作,并服从总承包的统•管理。
临时设施
办公区生
由总承包提供两间办公室做为项目办公室,工人住宿安排在生活区内。
活区
1.6施工平面图
根据本工程施工总平面设计及各分阶段的布置,以充分保障阶段性的重点施工、保
证进度计划的顺利实施为目的,在本工程施工实施前,制定详细的各吊机使用、进退场
计划,材料生产、加工、堆放、运输计划,以及各工种施工队伍进退场调整计划。具体
平面图划分详见后附件一。
第2章编制依据
本施工组织设计以XDG-2020-9号地块开发建设一期项目(世界物联网博览会永久
会址)施工总承包幕墙施工工程图纸、国家和地方相关强制性规范、标准、法律法规为
依据进行编制,为我公司在**世界物联网博览会永久会址项目(北区)幕墙UHPC施工
指导性文件。
本施工专项方案编制将遵循“符合性、先进性、经济合理性、可操作性”四个原则,
以“最快、最优、最高效”实施本工程。
2.1遵循原则
序号原则原则内容
第6页共141页
1符合性原则符合世界物联网博览会永久会址项目工程的特点
先进性原则是指在符合性原则的基础上,以我公司的技术、装备、
2先进性原则员工素质为前提,采取科学的方法,先进的管理,优化的配置,完善
的措施,实现既定目标。
3经济合理性原则在安全可行的基础上,选择经济造价的施工措施,降低工程成本。
工程所用施工工艺方法、施工流程、吊装方法等科学合理,方便
4可操作性原则
实施,可操作性强
2.2规范及标准
序号类别文件名称编号
《铝合金建筑型材》GB5237.T6-2017
《附及铝合金阳极氧化膜与有机聚合膜》GB/T8013-2018
《一股工业用铝及铝合金板、带材》GB/T3880.1-2012
《变形铝及铝合金化学成分》GB/T3190-2020
《碳素结构钢》GB/T700-2006
《低合金高强度结构钢》GB/T1591-2018
制结构用碳素结构钢》GB/T699-2015
《不微於轧钢板和钢带》GB/T3280-2015
《不锈钢热轧钢板和钢带》GB/T4237-2015
《建筑用硅闸结构密封胶》GB16776-2005
《硅酮建筑密封胶》GB/T14683-2017
1材料标准规范《紧固件巾性能螺母》GB/T3098.2-2015
《绝热用岩棉、矿棉及其制品》GB/T11835-2016
《混凝土用水标准》JGJ63-2006
《通用硅酸盐水泥》GB175-2007
《中热硅酸盐水泥、低热硅酸盐水泥》GBT200-2017
《白色硅酸盐水泥》GB/T2015-2017
《用于水泥和混凝±中的献灰》GB_T1596-2017
《用于水泥、砂浆和混凝土中的粒化高炉矿渣粉GB/T18046-2017
《用于水泥、砂浆和混凝十.中的石灰石粉》GB/T35164-2017
《混凝土外加剂》GB8076-2008
《混凝土外加剂应用技术规范》GB50119-2013
《砂浆和混凝土用硅灰》GB/T27690-2011
《建筑设i十防火规范》GB50016-2014(2018版)
《公共建筑节能设计标准》GB50189-2015
《江苏省公共建筑节能设计标准》DGJ32/J96-2010
《建筑抗震设计规范》GB50011-2010(2016版)
《建筑物防雷设计规范》GB50057-2019
2设计标准规范《建筑采光设计标准》GB/T50033-2013
《民用建筑热工设计规范》GB50176-2016
《建筑可靠度设计统一标准》GB50068-2018
《钢结构设计规范》GB50017-2017
《建筑钢结构焊接规程》JGJ81-2012
《建筑结构荷载规范》GB5009-2012
《建筑幕墙气密、水密、抗风压性能检测方法》GB/T15227-2019
3性能检测方法
《建筑幕墙T程质量检聆标准》.JGJ/T139-2020
第7页共141页
《建筑幕墙平面内变形性能检测方法》GB/T18250-2015
《弯曲强度实验》GB9966.2-2020
《普通混凝土拌合物性能试验方法标准》GB/T50080-2016
《髓混凝±拌帘瘫能威佥方法标准》GB/T50080-2016
《混凝土物理力学性能试验方法标准》GB/T50081-2009
《普通混凝土长期性能和耐久性能试验方法标准》GB/T50082-2009
《金属与石材幕墙技术规范》JGJ133-2013
因高性能混凝土(L1IPC)技术要求》T/CECS10107-2020
幕墙、UHPC工程技
4《超高性能混凝土(UHPC)外墙维护和装饰板应用技术标
术规范T/ZS0203-2021
准》
《玻璃纤娜强水泥(GRC)建筑应用技术标准》JGJT423-2018
《建筑施工安全检查标准》JGJ59-2011
《建筑施工高处作业安全技术规范》JGJ80-2016
5施工安全规范《建筑施工起重吊装安全技术规范》JGJ276-2012
《建新械蟀安全技术蝴呈》JGJ33—2012
《起重机手势信号》GB5082-2019
《建筑工程施工®量验收统一标准》GB50300-2013
6
《建筑装饰装修工程质量验收规范》GB50210-2018
《**巾建设工程安全生产管理条例》2009版
7地方规范标准《江苏省建设工程质量管理条例》苏人发[2020]23号
《*♦市安全生产条例》2018版
《中建股份项目管理于•册》[413号股市字]
《科技与质量管理手册》第三版
《安全生产管理手册》第三版
8企业管理文件
《商务管理手册》第二^
《施工生产管理手册》第三版
《中建/重新冠肺炎疫情常态化防控下的应急指导方案》007号疫防字
住房和城乡建设部令第37
危险性较大的分部分项工程安全管理规定
号
关于实施《危险性较大的分部分项工程安全管理规定》有
建办质(2018)31号
9政府及地方文件关问题的通知
危险性较大的分部分项工程专项施工方案编制指南建办质(2021)48号
江苏省房屋建筑和市政基础设施工程危险性较大的分部
苏建质安(2019)378号
分项工程安全管理实施细则(2019版)
10其他招标文件、图纸、清单及答疑
第3章施工部署
3.1项目管理目标
表3.1T项目管理目标
项目管理目标名称目标值
工期
质量目标
安全文明目标
柑娥术目标
CI目标
人才培养目标
劳务管理目标
3.2项目管理组织
第8页共141页
1.项目管理组织机构
该项目作为公司重点工程,项目经理由管理过与本工程相类似工程的工程部经理担
任。同时项目部由具有同类工程经验丰富且技术、管理水平高的人员组成。
E
劳
务
a安
墙
全
设
员
计
材料供应商解堵劳务分包层面劳务分包
安全生产管理体系安全生产监督体系
S3.2-1项目管理组织机构
2.项目管理人员职责分工
表3.2-1项目管理人员职责分工
岗位名
序号主要职责
称
1、负责本项目实施过程中的仝面管理及协调工作,贯彻执行国家、地方有关规范、法规
等;
2、维R安排工程城,协调各方糅,却婀目缸、调试、验1攵工作;
3、科学安排好本项目:施工度,建立和实施质量管理体系和安全管理体系;
4、参与竣工验收准备结算资料和分析总结,接受审计;
5、负责工程方案的制订、实施;
6、负责工程人员的培训和管理,管理好本项目相关人员及施工人员,同时协助公司领导
项目
1做好其它各项工作;
经理
7、负货工程项目部门的日常管理;
8、具备良好的项目经理经验能力,并能完成每月的工程任务;
9、了解客户需求,制定项目目标,确保在项目目标、进度计划、质量目标及保证措施等
项目核心控制环节与客户达成共识;
10、施工完成后,配合总包部组织实施对合同范围内的幕墙和金属屋面工进行全面验
收;
11:负责工程各部门人员及主管的培训及管理考核。
第9页共141页
岗位名
序号主要职责
称
1、熟悉建筑工程施工工艺,了解建筑工程常用分包、物资采购价格,具备独立核算建筑
工程量及建筑工m价(能熟练使用相关造价软件)、成本分析等能力;
2、负责项目部分包报量、分包签证、结
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 《一、奔跑的鸵鸟》(教学设计)-2024-2025学年二年级上册综合实践活动山东科学技术版
- 2023七年级数学上册 第一章 有理数1.3 有理数的加减法1.3.2 有理数的减法第1课时 有理数的减法教学设计(新版)新人教版
- 胸引管护理操作流程
- 2024新教材高中历史 第五单元 工业革命与马克思主义的诞生 第10课 影响世界的工业革命教学设计 部编版必修中外历史纲要下
- 4山行教学设计-2024-2025学年三年级上册语文统编版
- 《学画写意花卉-梅花》教学设计-鲁教版五四制七年级美术上册
- 1 春夏秋冬(教学设计)-2024-2025学年统编版(2024)语文一年级下册
- 7 角的初步认识第二课时(教学设计)-2023-2024学年二年级下册数学苏教版
- 一年级道德与法治上册 第四单元 银色的冬天 14《庆元旦迎春节》教学设计设计2 鄂教版
- Module4 Unit2 What's the matter with Daming(教学设计)-2024-2025学年外研版(三起)英语五年级上册
- 幼儿园园务会议制度
- DB41-T 2403-2023 饮用水水源地水质生物毒性发光细菌法在线监测技术规范
- 《档案管理概论》(肖秋惠编著)课后思考题及答案(参考)
- 助产士的语言沟通交
- 篮球创新创业PPT
- 初中英语 Unit5 Beauty in Common Things说课课件
- 实验室投诉登记表
- 游泳池聚脲防水施工方案
- 公司薪资异动表
- 2023年复旦大学自主招生物理试题
- MT/T 323-1993中双链刮板输送机用刮板
评论
0/150
提交评论