施工现场安全环境标准化
图集
前言
落实住建委推进施工现场安全标准化和绿色施工的工作要求,提高公司绿色文明施工管理水平,编制本图集。本图集在满足遵守国家法律、法规、行业及地方规范、标准要求的同时,力求做到简单经济实用、便于维护、可周转、工具化。充分考虑到项目成本,在符合国家规范要求的前提下供项目执行,可依据工程的实际情况,科学、合理采用,在符合相关规范的前提下提倡技术创新,鼓励采用更科学、更安全、更具操作性的措施。本图集涉及的企业标识以实际施工资质企业标识为准。所选用防护实施的材料必须满足刚度、厚度及冲击力等规范要求。本图集应在施工实践过程中不断完善,请使用部门依据实际情况提出合理化建议,将在修订中予以采纳。安全生产部
目录第一章施工区·································································31基础设施······························································42安全防护·····························································153临时用电·····························································224材料存放·····························································295施工机械·····························································356脚手架································································517消防设施·····························································668安全标志、标识、标语、彩旗·································689垃圾站································································69第二章办公区································································70第三章生活区································································75第3页共87页第一章
施工区第4页共87页1.1大门1基础设施第一章施工区(1)施工现场设置固定的出入口,出入口设置大门。
(2)门柱:门柱为钢结构主体架,采用户外喷绘,颜色为蓝、白色,标识文字黑、蓝。
(3)大门:大门为两开四扇,总宽度为7.6m。基本要求logo第5页共87页基本要求1基础设施第一章施工区1.2旗杆(1)在施工现场内应设置升旗处,悬挂国旗、顺鑫控股旗、顺鑫天宇旗,各旗应保持干净整洁。(2)台座前面制作“顺鑫天宇”标识。旗帜摆设中间为国旗,右为顺鑫控股旗帜,左为顺鑫天宇旗帜。(3)台座高800mm,宽800mm。旗帜是展示企业形象的重要媒介之一,制作时应严格按照本页规范执行。logo第6页共87页1.3门禁系统、门卫室和大门1基础设施第一章施工区门禁系统通道此样式适用于施工现场与生活区独立分开的工程。施工现场和生活区在同一区域内的样式见1.1(1)大门旁设置门禁系统通道,通道采用轻钢装配式结构。(2)通道口设置实名制刷卡系统。(3)进口处设置标语及安全警示镜。(4)通道挂设展板及宣传画。
(5)门卫室设置门牌。
(6)室内整洁干净,悬挂门卫管理制度,制作方式和办公室制度牌统一。基本要求门禁系统及门卫室俯视示意图logo第7页共87页1.5围墙1基础设施第一章施工区logo
施工现场实行封闭式管理,围墙坚固、严密,高度不低于2.5米,围墙材质一般为彩钢板,采用装配式,围墙表面平整、清洁。基本要求(1)组合方式:从大门边的第二块板(白色)起,每隔八块蓝色板,设一块白色板。(2)白色板上制作相应企业标识(上下组合图形),图形组合尺寸为70×50cm(高×宽)。(3)围墙为2.5米。如为高度低于2.5米围挡板,在围挡下制作增加部分(底座)。市政工程围挡板,施工路口或拐弯处采用下段1米高处封闭板、上段1.5米高处使用钢丝网,保证拐弯人员车辆视线。第8页共87页1.6门卫室1基础设施第一章施工区(1)采用彩钢板板房,保持其本色,可设置遮阳伞。
(2)侧墙粘贴报警电话牌(火警“119”,匪警“110”,急救“120”的报警牌),图牌尺寸为:60×40cm。
(3)门卫室设置门牌。
(4)室内整洁干净,悬挂门卫管理制度,制作方式和办公室制度牌统一。基本要求logo第9页共87页1.7车辆冲洗设施1基础设施第一章施工区(1)施工区出入口设置冲洗车辆的洗车设施。
(2)泥浆应经流水槽或管道流到工地集水池统一沉淀处理,不得随意排放和污染施工区域以外的河道、路面。
(3)每日对出入口周边定时清扫、洒水。
基本要求logo自制洗车池北京建委要求,在土方施工阶段应安装使用高效洗轮机第10页共87页1.8图牌1基础设施第一章施工区logo基本要求(1)大门合适位置设置两张图板,包括:六板两图和工程效果图板;公示牌图板。(2)每半年见新一次。(3)板图材质为喷绘。六板两图和工程效果图板公示牌图板第11页共87页1.9主要道路1基础设施第一章施工区logo基本要求(1)主干路采用混凝土地面或其他硬化地面的措施,平整坚固,有良好的排水设施。(2)主干道两侧可设置宣传标语或教育栏。以企业口号、形象及质量安全等内容为主。(3)设置警示限速牌。(4)每日定时洒水降尘主干道两侧宣传栏,宜使用库存的原五板一图框架主干路大样图警示限速牌第12页共87页2.1安全通道防护2安全防护第一章施工区(1)安全通道防护棚一般用钢管扣件搭设,两侧搭设剪刀撑并满挂绿色密目安全网。
(2)多层建筑防护棚长度不小于4米,高层建筑防护棚长度不小于6米。
(3)防护棚采用双层顶棚形式,顶层满铺50mm厚脚手板,两层板之间应保持500mm间距。
(4)防护棚两侧应搭设钢管立柱,在进口处张挂安全警示标志牌和安全宣传标语。logo密目网立杆6号提示牌7号提示牌斜杆地坪基本要求第13页共87页2.2临边防护2安全防护第一章施工区logo基本要求(1)本图例为工具式防护栏杆,采用30X30X1.5方管制作,具体尺寸及作法见图所示。(2)本防护方式适用于所有临边防护。临边防护立面图临边防护节点图第14页共87页2.3临边防护(基坑防护)2安全防护第一章施工区logo基本要求(1)防护栏杆外侧应设置排水沟,采取有组织的排水。(2)防护栏杆外侧应悬挂警示标识。(3)临边夜间作业需设置足够的照明措施并设置警示灯。基坑、槽、沟、楼层临边、窗边、作业层警示标识2.3其他临边标识悬挂于施工现场楼层临边、窗口边、作业层等处,面向结构内悬挂于施工现场临边作业、高处作业等区域
第15页共87页2.5电梯井(管道井)防护2安全防护第一章施工区logo基本要求(1)使用强度符合要求的圆钢、方钢等材料,制作可周转、能重复使用的电梯井口防护门。(2)电梯井(管道井)口安装≮1500mm高工具式防护门。防护门底部安装200mm高木质踢脚板。防护门和踢脚板刷红白相间警戒色。防护门外侧悬挂安全警示牌。3、管道井口处必须设置固定式防护门,门高度不得低于1500mm,竖向钢筋间距不得大于150mm。4、防护门四角须固定。电梯井防护立面图电梯井防护节点电梯井立面防护示意图第16页共87页2.6边长<1500mm的预留洞防护2安全防护第一章施工区logo基本要求(1)楼板、屋面和平台等面上短边尺寸小于500mm的洞口,必须用坚实的盖板盖住洞口。短边尺寸在500-1500mm之间的洞口,采取预留钢筋网片加盖板方式防护。(2)盖板须保持四周搁置均衡,搭接长度不小于100mm,并用钉在盖板上的木方顶紧洞口边框,防止盖板移位。(3)盖板上表面刷红白相间警戒色和黑色“严禁挪移”字样。钉子钉牢洞口
A-A模板方木或原洞口模板俯视图第17页共87页2.7边长>1500mm的预留洞防护2安全防护第一章施工区logo(1)洞口临边采用临边防护标准化设施见2.2(2)主体结构施工阶段,洞口采用木模板和木枋封闭;安装及装修阶段,洞口采用水平安全网封闭。2.7验收牌基本要求(1)施工现场脚手架、起重机械、配电箱、防护棚等经过验收合格后应悬挂验收牌;(2)验收牌尺寸:宽×高﹦500×400mm;(3)验收牌为白底红字(标题)、蓝字(内容)黑体。第18页共87页3临时三用电第一章施工区lo三go分配三电箱开关三箱总配三电箱基本要求(1)施三工现三场配三电箱三粘贴三或喷三涂企三业标三识;(2)门三内侧三配箱三内系三统图三、电三器元三件、三线号三应标三识清三楚;(3)验三收合三格后三张贴三验收三标志【见3.三3配电三箱(三验收三标志三)】。3.三1配电三箱第19页共87页3.三2配电三箱(三手提三开关三箱)3临时三用电第一章施工区lo三go基本要求(1)使三用手三提式三电箱三必须三按照三“一三隔一三漏一三箱一三锁”三标准三设置三,严三禁一三个电三箱同三时接2台及三以上三用电三设备三。(2)箱三内采三用插三座连三接时三,单三相电三箱可三安装2P三3P插座三各一三个,三便于三使用2或3极插三头。(3)动三力电三箱可三安装三相序三相反三的2个插三座便三于动三力设三备改三变相三序。3.三3配电三箱(三验收三标志三)基本要求(1)施三工现三场使三用的三开关三箱、三分配三箱、三开关三箱应三进行三进场三验收三,验三收合三格后三张贴三验收三标志三。(2)配三电箱三管理三制度三牌采三用不三干胶三制作三,尺三寸:三宽×高﹦50三0×三40三0m三m。(3)验三收标三志上三要填三写配三电箱三编号三、责三任人三、电三话。第20页共87页3.三4配电三箱(三防护三棚)3临时三用电第一章施工区lo三go基本要求(1)配三电箱三防护三棚可三采用三方钢三或圆三钢制三作,三稳固三安置三在混三凝土三承台三上并三应接三地。(2)顶三部采三用双三层硬三防护三,底三层为三彩钢三板,三上层三为模三板,三并设三不小三于5%坡度三的排三水坡三。(3)双三层硬三防护三间的三防护三棚外三立面三挂蓝三底白三字的三安全三宣传三标语三:加三强安三全用三电,三防止三触电三伤害三。防三护棚三正面三安全三警示三牌,三侧面三挂相三应企三业标三识。(4)配三电箱三栏杆三刷红三白相三间警三戒色三。(5)配三电箱三与防三护棚三之间三的距三离如三节点三详图三所示三。一级三配电三箱防三护立三面详三图节点三详图安全三警示三牌第21页共87页3.三7楼层三配电3临时三用电第一章施工区lo三go基本要求(1)电三缆线三穿越三建筑三物、三构筑三物、三道路三、易三受机三械损三伤的三场所三及引三出地三面从2m高度三至地三下20三0m三m处,三应加三设防三护套三管;(2)电三缆垂三直敷三设的三位置三应充三分利三用在三建工三程的三竖井三、垂三直孔三洞等三,并三应靠三近负三荷中三心,三固定三点每三层不三得少三于一三点,三水平三向电三缆线三敷设三应在三墙体2.三5m以上三做支三架架三设,三固定三点应三绝缘三保护三;(3)水三平敷三设宜三采用三三角三支架三或钢三索进三行高三挂,三高度三不得三低于2.三5m,若三因作三业限三制无三法高三挂的三,可三沿墙三角、三地面三敷设三,但三应采三取防三机械三损伤三措施三,并三设警三示标三识;(4)楼三层内三固定三式配三电箱三应考三虑做三重复三接地三,接三地体三应预三埋,三重复三接地三竖向三距离三不大三于20三m(每5层)三做一三处。第22页共87页3.三8电焊三机使三用3临时三用电第一章施工区lo三go基本要求(1)电三焊机三一侧三电源三线长三度不三得大三于5米,三二侧三焊把三线长三度不三得大三于30米。(2)电三焊机三外壳三应做三保护三接零三。(3)电三焊机三应配三装二三次侧三空载三降压三保护三器。(4)露三天冒三雨不三得从三事电三焊作三业。(5)电三焊机三一侧三、二三侧接三线处三防护三罩应三齐全三。第23页共87页4.三2钢筋三存放4材料三存放第一章施工区lo三go基本要求(1)设三置专三门的三存放三区,三地面三平整三夯实三或硬三化。(2)按三长度三方向三平行三间隔3.三8-三4米(三以实三际钢三筋长三度为三准)三平行三码放三砼梁三;宽三度方三向设三置坚三固的三槽钢三立柱三三个三,间三隔1.三2米,三高度0.三6米。(3)每三个立三柱间三分类三整齐三码放三,码三放高三度不三高于三立柱三。(4)三设置三钢筋三堆放三区标三识牌三。第24页共87页4.三4其他三材料三存放4材料三存放第一章施工区lo三go基本要求(1)设三置专三门的三存放三区,三地面三平整三夯实三或硬三化。(2)建三筑材三料、三构件三、料三具应三按总三平面三布局三分类三码放三,三零散三物料三设置三容器三或封三闭覆三盖。(3)材三料标三识牌三采用三铝塑三板制三作,三宽×高为45三0×三30三0m三m,蓝三边、三白底三、黑三字。(4)标三识牌三支架三采用三方钢三和槽三钢焊三接,三材料三标识三清楚三。第25页共87页4.三5气瓶三存放三及使三用第一章施工区lo三go基本要求(1)氧三气、三乙炔三瓶距三明火三间距三不得三小于10米。(2)氧三气、三乙炔三瓶存三放间三距不三得小三于5米。(3)氧三气、三乙炔三不得三平放三和曝三晒。(4)氧三气、三乙炔三瓶储三存室三应分三开存三放。4材料三存放第26页共87页5.三1加工三区设三置第一章施工区lo三go基本要求(1)设置三相应三加工三区域三区,三地面三硬化。(2)用防三护栏三杆进三行封三闭分三隔。三上道三栏杆12三00三mm下道三栏杆三高60三0m三m。立三杆间三距不三超过20三00三mm,栏三杆刷三红白三相间三警戒三色。(3)用三绿网三进行三封闭三,保三证整三洁完三好,三没有三破损三。5施工三机械第27页共87页5.三2加工三棚第一章施工区lo三go基本要求(1)在三塔吊三半径三范围三以内三必须三采取三双层三防护三,满三铺脚三手板三或模三板,三斜面三铺设三彩钢三瓦等三防雨三材料三。本三防护三方式三采用三方钢三、螺三丝连三接形三式的三工具三化防三护棚三。(2)居三民区三等敏三感区三域木三工加三工棚三四周三进行三全封三闭,三并设三门窗三,以三达到三降低三噪音三、扬三尘污三染的三要求三。(3)加三工区三出入三口设三置加三工区三标识三牌;三加工三棚顶三部设三置宣三传标三语和三相应三加工三棚(三正面三)字三样。三如存三在死三角面三则不三设置三标语三。(4)加三工棚三内设三置操三作规三程、三使用三责任三人牌三。(5)木三工加三工棚三设置三消防三重点三部位三标志三。5施工三机械钢筋三加工三棚效三果示三意图第28页共87页5.三2加工三棚第一章施工区lo三go基本要求(6)机三械的三安装三应坚三实稳三固,三固定三式机三械应三有可三靠基三础,三移动三式机三械作三业时三应楔三紧行三走轮三。(7)三应堆三放好三成品三和半三成品三;作三业完三成后三清理三场地三,切三断电三源,三锁好三开关三箱,三机械三做好三润滑三工作三。(8)开三关箱三安装三在同三一高三度,三电箱三中心三距离三地面三。5施工三机械第29页共87页5.三3加工三棚相三应标三志第一章施工区lo三go基本要求(1)按三要求三悬挂三、张三贴警三示标三志5施工三机械悬挂三在机三械设三备使三用相三应部三位悬挂三在消三防设三施集三中存三放处悬挂三于木三工加三工区三、木三材存三放区三以及三库房三等重三点防三火区三域依据三设备三类型三悬挂三操作三规程第30页共87页5.三4施工三机具第一章施工区lo三go基本三要求5施工三机械小型三机械三加工三棚侧三立面木工三机具三防护三示意三图小型三机械三加工三棚效三果示三意图(1)圆三盘锯三锯片三防护三罩、三传动三防护三罩、三分料三器完三整并三标注三红白三警戒三色。(2)其三他机三具防三护设三施齐三全。塔吊三作业三半径三内小三型机三械作三业必三须安三装双三层防三护棚三,防三护方三式采三用钢三筋棚三做法三,材三质及三规格三不变三(见5.三2)。基本要求5.三5小型三施工三机械三防护三棚第31页共87页5.三8塔式三起重三机(三防护三栏杆三)第一章施工区lo三go基本要求5施工三机械(1)塔三吊用三防护三栏杆三进行三封闭三,栏三杆各三边大三于塔三吊标三准节三半径0.三5米。(2)上三道栏三杆高1.三60三0米,三中间三栏杆三高0.三9米,三下道三栏杆三高0.三2米。三出入三口设三置四三道立三杆,三出入三口宽1.三0米,三其他三三面三设置三三道三立杆三。栏三杆刷三红白三相间三警戒三色。第32页共87页5.三8塔式三起重三机(三防护三栏杆三)第一章施工区lo三go基本要求5施工三机械(1)塔三吊用三防护三栏杆三进行三封闭三,栏三杆各三边大三于塔三吊标三准节三半径0.三5米。(2)上三道栏三杆高1.三60三0米,三中间三栏杆三高0.三9米,三下道三栏杆三高0.三2米。三出入三口设三置四三道立三杆,三出入三口宽1.三0米,三其他三三面三设置三三道三立杆三。栏三杆刷三红白三相间三警戒三色。第33页共87页5.三9塔式三起重三机(三验收三牌)第一章施工区lo三go基本要求5施工三机械(1)施三工现三场塔三式起三重机三安装三验收三合格三后应三在塔三吊防三护栏三杆明三显一三侧悬三挂塔三式起三重机三验收三牌;(2)验三收牌三内容三包括三:塔三吊编三号、三安全三操作三规程三及十三不吊三、设三备产三权登三记牌三、设三备使三用登三记牌三、操三作人三员操三作证三、验三收时三间及三其它三;(3)验三收牌三宽×高≥16三00三mm三x1三20三0m三m;(4)验三收牌三为白三底,字体三为黑三体。第34页共87页5.三11塔式三起重三机(吊装三器具)第一章施工区lo三go基本要求5施工三机械1、现三场吊三运零三散材三料需三要使三用吊三装器三具(三吊斗三)吊三运;三砂浆三使用三专用三吊斗三。2、制三作吊三斗可三采用三螺纹三钢焊三接,三尺寸三≥15三00三mm见方三,高三度≥10三00三mm。3、吊三斗的三吊耳三必须三使用16号以三上的三圆钢三焊接三,焊三接采三取≥30三0m三m的间三断焊三,一三个吊三斗需三要设三置4个吊三耳。4、在三吊斗三内侧三用竹三胶板三全封三闭,三并在三钢筋三处刷三间隔40三0m三m的红三白警三示色三。专用三吊斗散件三吊斗三(示三意图三,以三说明三文字三为准三)第35页共87页5.三12施工三升降三机第一章施工区lo三go基本要求5施工三机械(1)施三工升三降机三首层三出料三口防三护棚三同安三全通三道防三护棚三。(2)施三工升三降机三楼层三运料三平台三应自三成一三体,三并与三结构三进行三可靠三有效三的连三接;(3)运三料平三台按三照图三示要三求搭三设。(4)运三料平三台两三侧应三采用三双道三防护三栏杆三进行三防护三,上三栏杆三高12三00三mm,下三栏杆三高60三0m三m。立三杆内三侧满三挂绿三色密三目安三全网三,下三设20三0m三m高挡三脚板三,平三台下三方满三挂双三层水三平大三眼网三。防三护栏三杆、三挡脚三板刷三涂红三白相三间警三示色三。(5)提三升机三与升三降机三设置三相同三。施工三升降三机侧三立面三示意三图第36页共87页5.三13施工三升降三机(三防护三门)第一章施工区lo三go基本要求5施工三机械(1)施三工电三梯平三台出三口安三装18三00三mm高对三开式三防护三门。三防护三门可三采用三钢管三和钢三网焊三接而三成,三门的三下沿三距平三台不三应超三过10三0m三m。(2)防三护门三朝向三梯笼三一侧三设置三门闩三或自三动锁三扣。施工三升降三机(三接料三平台三)防三护门三示意三图第37页共87页5.三14施工三升降三机(三楼层三标识三牌)第一章施工区lo三go基本要求5施工三机械(1)楼三层标三识牌三应用三于外三用电三梯、三物料三提升三机、三建筑三结构三内等三现场三。(2)楼三层标三识牌三为正三方形三,宽×高=4三00三×4三00三mm。(3)标三识牌三为蓝三底白三字,三字体三为黑三体。(4)内三楼层三安全三提示三牌分三两部三分组三成,三左侧三为安三全小三提示三,右三侧为三楼层三号。内楼三层安三全提三示牌楼层三标识三牌第38页共87页5.三15施工三升降三机(三验收三牌)第一章施工区lo三go基本要求5施工三机械(1)设三置于三施工三升降三机首三层出三料口三防护三棚内三侧左三上方三。(2)验三收牌三尺寸三不小三于16三00三×1三20三0m三m,验三收牌三应包三括:三安全三操作三规程三、设三备产三权登三记牌三、设三备使三用登三记牌三、操三作人三员操三作证三、验三收时三间及三其它三。(3)在三每个三梯笼三的明三显位三置,三悬挂三限载三标志三牌。施工三升降三机限三载标三志牌施工三电梯三验收三牌第39页共87页6.三2悬挑三式脚三手架第一章施工区lo三go基本要求6脚手三架(1)钢三梁截三面尺三寸应三经设三计计三算确三定,三不小三于16号工三字钢三;(2)脚三手架三钢管三表面三涂刷三黄色三油漆三,剪三刀撑三和警三示带三表面三涂刷三红白三警示三漆,三脚手三架内三侧满三挂绿三色密三目安三全网三,安三全网三封闭三严密三,张三紧、三无破三损,三颜色三新亮三;(3)脚三手架三架体三及悬三挑梁三固定三符合三规范三要求三,架三体底三层应三采用三硬质三防护三封闭三,每三隔3层或10三m设置三一道20三0m三m高警三示带三,固三定于三立杆三外侧三,横三杆露三出架三体外三立面三长度三为10三0-三50三0m三m。悬挑三梁U型螺三栓固三定示三意图三(1.木楔三子、2.预埋三螺栓三)侧立三面图悬挑三工字三钢钢筋三拉环三锚固第40页共87页6.三5脚手三架拉三结、三连墙三件第一章施工区lo三go基本要求6脚手三架(1)连三墙件三是承三受脚三手架三的荷三载、三保证三架体三整体三稳定三的重三要杆三件,三必须三采用三可承三受拉三力和三压力三的构三造。(2)连三墙件三应靠三近主三节点三设置三,偏三离主三节点三的距三离不三应大三于30三0m三m。(3)对三高度24三m以上三的双三排脚三手架三,应三采用三刚性三连墙三件与三建筑三物连三接。三开口三型脚三手架三的两三端必三须设三置连三墙件三,连三墙件三的垂三直间三距不三应大三于建三筑物三的层三高,三并且三不应三大于4m,水三平距三离不三得超三过6m。(4)连三墙件三设置三必须三经过三设计三计算三,固三定方三法应三优先三采用三抱柱三和预三埋钢三管的三形式三。10018009001800100连墙杆1500洞口1500洞口连墙杆100900150
洞口拉结平面图
洞口拉结剖面图洞口拉结三维效果图第41页共87页6.三5脚手三架拉三结、三连墙三件第一章施工区lo三go6脚手三架100180090018001001800≥2001001001500连墙杆连墙杆100900150柱子拉结平面图100
柱子拉结剖面图连墙杆 双扣件柱子拉结三维效果图100900150预埋钢管拉结大样图预埋钢管拉结三维效果图第42页共87页6.三6脚手三架休三息平三台及三斜道第一章施工区lo三go6脚手三架700100150015001500180015001500200500150015005001500500700700180015005002001500700180015001500休息平台及斜道均用100×50木枋(平放)上钉18mm厚木胶合板板铺设木质防滑条20×30@300mm 1
下 上 防滑条20×30@300mm
斜道及休息平台均用 木枋上钉模板铺设
1
外架1509001200120010010015001500150015001500100平面图1-1剖面三维效果图第43页共87页6.三7卸料三平台三(落三地式三)第一章施工区lo三go基本要求6脚手三架(1)平三台应三与结三构主三体拉三结,三不得三与结三构外三架连三接,三平台三应设三纵、三横向三剪刀三撑,三平台三上的三脚手三板应三铺严三绑牢三,平三台周三围应三设置三不低三于1.三5m高防三护围三栏,三栏杆三内侧三设置三硬质三材料三挡板三,平三台以三下每三隔10三m设置三一道三水平三安全三网;(2)平三台应三在明三显处三设置三限载三标识三牌;(3)架三体刷三黄色三油漆三,剪三刀撑三涂刷三红白三警示三漆。落地三式卸三料平三台搭三设示三意图第44页共87页6.三7卸料三平台三(悬三挑式三)第一章施工区lo三go基本要求6脚手三架(1)主三梁应三使用三整根三槽钢三(或三工字三钢)三,型三号不三得小三于[20,锚三固端三预埋Φ2三0U型环三;(2)两三侧应三分别三设置三前后三两道三斜拉三钢丝三绳,三钢丝三绳直三径应三根据三计算三确定三且不三小于Φ2三1.三5,每三个吊三点的三受力三钢丝三绳应三独立三设置三;(3)平三台底三部应三满铺三脚手三板,三固定三牢固三,与三外架三之间三封闭三良好三;第45页共87页6.三7卸料三平台三(悬三挑式三)第一章施工区lo三go基本要求6脚手三架(4)临三边设三置不三低于1.三5m的防三护栏三杆,三栏杆三内侧三设置三硬质三挡板三,挂三限载三标识三牌、三警示三牌。第46页共87页6.三8移动三式作三业平三台第一章施工区lo三go基本要求6脚手三架(1)操三作平三台的三面积三不宜三超过10三㎡,高三度不三宜超三过5m。(2)移三动式三操作三平台三的轮三子与三平台三的接三合处三应牢三固可三靠,三立柱三底端三离地三面不三超过80三mm。(3)操三作平三台可三采用三钢管三以扣三件连三接,三也可三以采三用门三架或三承插三式钢三管脚三手架三部件三组成三。平三台的三次梁三间距三不大三于40三cm;台三面应三满铺三厚的三木板三。(4)操三作平三台四三周按三临边三要求三设置三防护三栏杆三,并三布置三登高三扶梯三,设三置警三示牌三。第47页共87页7.三1消防三(火三)栓第一章施工区lo三go7消防三设施(1)消三火栓三间距三不应三大于10三0m,消三防栓三周边三要设三有防三压、三防占三、维三护措三施;(2)消三防栓三处均三应配三齐消三防箱三、消三防水三带、三消防三水枪三,消三防栓三应配三备警三示标三志,三夜间三设置三警示三灯;(3)消三防临三时管三线铺三设应三有防三冻措三施;(4)设三置室三内消三防给三水系三统的三在建三工程三,应三设置三消防三水泵三接合三器,三消防三水泵三接合三器应三设置三在室三外便三于消三防车三取水三的部三位,三如大三门口三,道三路两三边合三适的三位置三。7.三2消防三竖管(1)消三防竖三管的三管径三应该三根据三在建三工程三临时三消防三用水三量、三竖管三内水三流计三算速三度计三算确三定,三且不三应小三于DN三10三0;(2)消三防竖三管栓三口每三层均三应留三有,三配齐三消防三箱、三消防三水带三(一三般2盘,25三m/盘)三、消三防水三枪2只;(3)多三层消三防栓三保护三半径三不应三大于50三m,高三层消三防栓三辐射三面不三得大三于30三m;(4)在三建工三程高三度超三过10三0m的,三应在三适当三楼层三增设三临时三中转三水池三及加三压水三泵,三确保三消防三用水三,超三高层三二次三蓄水三池、三二次三加压三应在90三m左右三实施三,二三次加三压泵三宜设三置自三动启三动装三置;(5)消三防竖三管及三配套三设施三应定三期检三查、三维护三和补三充、三更换三,消三防水三不得三他用三。第48页共87页7.三3消防三器材第一章施工区lo三go7消防三设施(1)临三时设三施总三面积三大于12三00㎡三,至三少设三置一三处灭三火器三材集三中点三。灭三火器三材集三中点三要设三置消三防水三池、三沙箱三、灭三火器三、消三防斧三、消三防锹三、消三防桶三等器三材。(2)施三工作三业区三设置三定点三消防三箱(三内装三灭火三器,三至少2具/箱)三。作三业区三不少三于1个/1三00㎡三;办三公区三、生三活区三不少三于1个/2三00㎡三。动三火作三业设三置看三火人三和移三动消三防箱三(或三灭火三器)三。消三防箱三为红三色。在主三要道三路两三侧显三目位三置设三置消三防集三中点消防三柜效三果图第49页共87页第一章施工区lo三go8安全三标志三、标三识、三标语三、彩三旗(1)安全三标志三、标三识应在三施工三现场三的作三业区三、加三工区三、生三活区三等醒三目位三置设三置,三且满三足数三量和三警示三要求三。不三得将三安全三标志三不分三部位三、集三中悬三挂。(2)禁三止标三志牌三、警三告标三志牌三、指三令标三志牌三尺寸三均为30三0×三40三0m三m,消三防安三全提三示标三志牌三尺寸三为35三0×三25三0m三m;(3)标三识牌三具体三作法三参照三原标三准(三企业三标识三识别三系统三)(5)不三同类三型标三志牌三同时三设置三时,三应按三警告三、禁三止、三指令三、提三示的三顺序三,先三左后三右,三先上三后下三的排三列。基本要求第50页共87页第二三章办公三区第51页共87页第二章办公区lo三go1办公三区(1)材三料:三彩钢三板活三动房三;设三置旗三杆,三旗帜三以相三应企三业为三准。(2)蓝三腰带三:二三层/三三层三走道三外墙三制作三的专三用标三语,三高度三为1m,底三色为三蓝,三文字三反白三,标三语前三设置三相应三企业三标识三。内三容融三入公三司理三念等三及安三全专三用标三语等三相关三内容三:“三精品三出自三精心三品三牌源三于人三品三质量三重于三泰山三诚三信高三于一三切”三、“三艰苦三奋斗三雷厉三风行三善打三硬仗三协三作共三赢”三等。基本要求办公三室(三楼)三效果三图1.三2办公三室(三楼)第52页共87页第三三章生活三区第53页共87页第三章生活区lo三go1生活三区(1)生三活区三应统三筹安三排,三合理三布局三,满三足安三全、三消防三、卫三生防三疫、三环境三保护三、防三汛、三防洪三等要三求;(2)生三活区三与施三工区三应明三确划三分,三实施三封闭三管理三;(3)生三活区三用房三应安三全、三牢固三、美三观,三生活三区临三建用三房的三建筑三层数三不应三超过3层,三每栋三单层三建筑三面积三不应三大于30三0㎡。基本要求
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 游泳馆勘察技术标投标
- 环保工程招投标委托书模板
- 农药原料招投标专员操作指南
- 本溪市供热服务用户体验优化
- 亲子活动中心租赁
- 新能源汽车项目保函策略
- 旅游服务提升工程中心管理办法
- 老旧小区改造评估师招聘协议
- 医疗资源区二手房买卖范本
- 交通运输枢纽站房租赁合同
- 咯血的介入治疗
- 教师专业成长概述教师专业发展途径PPT培训课件
- 球磨机安装专项施工方案
- 阀门压力等级对照表优质资料
- GMP质量管理体系文件 中药材干燥SOP
- YY/T 0874-2013牙科学旋转器械试验方法
- GB/T 25217.10-2019冲击地压测定、监测与防治方法第10部分:煤层钻孔卸压防治方法
- GB/T 21010-2007土地利用现状分类
- 下库大坝混凝土温控措施(二次修改)
- 医药代表初级培训课程课件
- SAT长篇阅读练习题精选14篇(附答案)
评论
0/150
提交评论