版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、大体积混凝土结构测温记录大体积混凝土结构测温记录(实例) PAGE PAGE 2 / 19大体积混凝土测温记录表一、测温结果应在以下范围中才使砼不易产生裂缝:50C;25C;2.0C/d;20C。二、根据混凝土浇注时温度变化的特点,系统设备作以下配置,一台建筑电子测温仪(JDC-2) 。23 天214填写清楚、整洁,换班时要进行交底。四、测温时发现温度异常,应与时通知技术部门和项目技术负责人,以便与时采取相应措施。五、测温组共分三组,每组三个测点,三个测点分别为底 :距底部 100 150MM100150MM置见下面测点平面布置图片。大体积混凝土结构测温记录大体积混凝土结构测温记录(实例)大体
2、积混凝土结构测温记录 PAGE PAGE 5 / 19工程名称华侨城天鹅堡一期东区结构部位A-AW结构部位砼强度等级膨胀配合比编SXPB-2011-0681130砼浇灌日期217月1日 砼浇灌)29.734测温时间温1温123表中底表中底表中底各测点温度备注(00:003446.759.864.440.053.561.938.347.758.802:003347.860.344.854.362.343.149.559.504:003048.861.164.948.355.662.846.351.660.506:003049.161.465.049.456.363.147.752.661.108
3、:002949.361.665.150.057.263.348.353.862.110:002849.562.065.251.158.263.549.754.963.012:002812:002849.762.165.351.558.563.650.355.463.114:002750.562.965.552.359.364.051.856.663.216:0029.750.1 63.1 65.5 52.7 59.9 64.1 52.3 57.3 63.618:003351.063.365.652.960.464.252.458.063.820:003851.763.765.753.561.3
4、64.452.459.264.322:003751.963.765.753.861.664.452.559.564.400:003552.263.965.754.361.964.552.760.064.53152.764.065.754.962.364.552.860.464.704:002752.564.165.755.462.764.652.861.064.8施工负测温仪名称建筑电子测温仪技术负与计量编号 (JDC-2)工程名称华侨城天鹅堡一期东区结构部位A-AW结构部位砼强度等级膨胀配合比编SXPB-2011-0681130砼浇灌日期01月1日砼浇灌)29.734测温时间各测点温度气温(
5、1表中底表23备注中底表中底06:002706:002751.864.365.755.363.064.652.761.564.908:002751.564.365.755.163.264.652.762.065.010:002651.064.465.755.063.564.652.762.365.112:002650.564.665.754.963.764.652.662.965.22750.164.665.754.364.064.652.663.065.216:0030.550.064.665.754.364.064.652.663.065.218:003249.864.765.754.36
6、4.564.752.963.465.220:0035.349.664.765.754.164.664.753.163.665.322:0036.049.364.765.654.064.764.653.363.965.300:0035.049.464.765.654.164.764.653.364.065.302:0032.349.564.865.654.364.964.553.464.265.304:0030.049.364.865.554.265.064.553.364.365.206:0027.048.864.865.553.765.164.553.064.465.208:0027.048
7、.564.865.553.065.264.552.864.565.210:0026.048.164.865.452.565.264.452.664.765.2施工负与计量编号 (JDC-2)工程名称华侨城天鹅堡一期东区结构部位A-AW结构部位砼强度等级膨胀配合比编SXPB-2011-0681130日砼浇灌日期0月18砼浇灌)日29.734测温时间各测点温度气温123备注(表中底表中底表中底12:002747.964.865.452.065.364.452.564.765.214:002847.464.865.351.565.364.352.264.865.116:002947.264.865.
8、351.265.364.352.264.965.118:003018:003047.064.765.351.165.464.352.364.965.120:003446.164.764.950.965.464.352.064.965.122:003446.464.765.250.565.464.251.865.065.000:003546.464.665.250.765.464.251.465.065.002:003346.764.665.150.865.464.151.165.065.104:002946.464.565.050.665.464.050.565.164.906:002846.
9、464.665.050.665.464.150.265.064.965.164.910:002746.464.565.050.665.464.150.265.164.912:002846.464.565.050.665.464.065.164.914:002846.064.364.850.065.363.848.965.064.728 46.5 64.6 65.0 50.6 65.4 64.150.116:0027.546.1 64.2 64.8 49.9 65.3 63.8 48.8 65.0 64.6施工负测温仪名称建筑电子测温仪技术负责人:周文清 测温员:周文清与计量编号 (JDC-2)
10、大体积混凝土结构测温记录大体积混凝土结构测温记录(实例)大体积混凝土结构测温记录 PAGE PAGE 7 / 19工程名称华侨城天鹅堡一期东区结构部位A-AW结构部位砼强度等级膨胀配合比编SXPB-2011-0681130砼浇灌日期0月1日砼浇灌)29.734测温时间各测点温度气温(1表中底表3备注中底表中底18:0030.646.118:0030.646.164.264.749.865.363.848.765.064.63346.164.164.749.765.363.748.665.064.622:003446.064.064.649.765.263.748.465.064.600:003
11、244.262.162.546.762.160.746.563.261.302: 003342.160.359.844.760.858.744.560.859.804:0032.843.060.860.045.161.359.345.161.260.306:0032.743.561.261.345.861.859.945.761.960.861.861.846.562.360.246.362.561.410:0032.344.762.762.346.962.960.846.862.961.912:0032.045.163.062.847.663.761.647.363.362.314:0032
12、.045.463.463.148.164.262.147.663.962.916:0031.845.663.663.848.664.862.747.964.263.318:0031.745.963.863.949.065.063.048.264.563.820:0031.645.964.064.449.565.163.448.564.964.222:0031.046.264.264.749.865.363.848.765.064.6施工负宏斌技术负海军测温仪名称建筑电子测温仪测温员:周文清与计量编号 (JDC-2)工程名称华侨城天鹅堡一期东区结构部位A-AW结构部位砼强度等级膨胀配合比编SXP
13、B-2011-0681130砼浇灌日期21月1日 砼浇灌)29.734测温时间各测点温度气温(1表中底表2中底表备注中底00:0030.646.164.264.749.865.363.848.765.064.602:003346.164.164.749.765.363.748.665.064.604:003446.064.064.649.765.263.748.465.064.606:003244.262.162.546.762.160.746.563.261.308:0031.543.2 60.5 60.5 44.3 60.1 58.7 44.3 61.3 59.910:0032.341.2
14、58.759.143.658.957.643.760.758.72012.7.2412:0033.540.357.957.842.157.255.342.358.756.356.354.340.156.554.341.956.355.316:0033.938.954.352.339.755.453.740.855.254.918:0032.837.652.150.938.752.651.738.953.653.320:0033.837.750.148.738.850.350.238.851.651.722:0032.936.848.747.237.648.748.536.549.550.900
15、:0032.837.652.150.938.752.651.738.953.653.333.736.947.645.337.550.949.637.351.350.504:0032.836.745.243.337.347.546.337.549.847.7施工负:王宏斌技术负海军 测温员:周文与计量编号 (JDC-2)大体积混凝土结构测温记录大体积混凝土结构测温记录(实例) PAGE PAGE 9 /19大体积混凝土结构测温记录工程名称华侨城天鹅堡一期东区结构部位A-AW结构部位砼强度等级膨胀配合比编SXPB-2011-0681130砼浇灌日期21月1日 砼浇灌)29.734测温时间各测点温度
16、气温(1表中底表23备注中底表中底06:0033.636.743.241.535.844.344.536.746.745.808:00 33 35.7 41.140.334.242.841.436.344.543.710:00 34 35.9 40.239.735.041.340.436.742.341.612:0032.436.138.938.735.340.439.836.440.340.637.837.635.838.337.836.838.637.916:0033.135.637.337.035.838.337.836.837.637.918:0033.436.137.537.335.
17、838.337.836.837.237.937.137.135.938.336.936.836.937.922:0032.635.836.836.535.338.336.736.836.837.9施工负测温仪名称建筑电子测温仪技术负责人:周文测清温员:周文清与计量编号 (JDC-2)大体积混凝土结构测温记录工程名称华侨城天鹅堡一期东区14W砼强度等级膨胀配合比编SXPB-2011-067987砼浇灌日期212日 砼浇灌)29.734测温时间各测点温度气温(1表中底表23备注中底表中底16:0025.449.860.463.250.763.160.044.350.45818:0024.050.2
18、61.663.951.464.562.146.852.858.62012.7.2220:0024.150.462.464.451.665.261.648.554.459.022:0022.750.967.665.052.166.161.651.156.959.700: 63.865.452.366.461.851.357.260.002:0022.451.364.365.552.366.761.952.558.360.504:0021.950.865.565.352.166.962.053.559.960.365.865.752.367.562.355.061.760.908:0022.450
19、.266.165.652.368.362.756.363.261.127.350.366.265.653.168.562.756.864.461.312:0029.550.566.265.553.468.763.156.965.361.314:0032.750.566.565.553.568.863.257.865.861.616:0031.351.166.565.453.568.962.858.065.961.618:0029.951.066.365.453.768.862.758.165.861.520:0029.551.266.365.253.768.863.057.966.161.3施
20、工负测温仪名称建筑电子测温仪测温员:周文清与计量编号 (JDC-2)大体积混凝土结构测温记录大体积混凝土结构测温记录(实例)大体积混凝土结构测温记录 PAGE PAGE 11 / 19工程名称华侨城天鹅堡一期东区14W砼强度等级膨胀配合比编SXPB-2011-067987砼浇灌日期2122日 砼浇灌)30.134测温时间各测点温度气温(1表中底表23备注中底表中底28.151.028.151.066.265.153.168.362.657.766.161.300:0028.351.166.065.052.962.563.057.766.161.302:0027.951.065.964.852.
21、562.662.855.866.161.304:0026.349.365.864.552.067.762.155.766.261.106: 65.564.651.167.462.355.866.261.108:0025.647.565.564.550.067.462.255.866.261.010:0030.547.365.565.650.367.362.155.566.261.12012.7.2465.564.350.167.362.255.766.161.114:0033.147.065.164.249.267.062.154.766.160.916:0032.046.264.664.24
22、8.166.662.053.866.160.818:0031.546.364.364.048.166.261.853.265.460.620:0031.646.564.264.248.566.562.053.766.260.622:0029.745.464.163.847.666.162.053.166.060.600:0028.545.863.763.248.065.961.952.465.860.302:0027.344.763.363.547.565.761.851.965.160.5施工负宏斌技术负海军测温仪名称建筑电子测温仪测温员:周文清与计量编号 (JDC-2)工程名称华侨城天鹅堡
23、一期东区14W砼强度等级膨胀配合比编SXPB-2011-067987砼浇灌日期212日 砼浇灌)30.134测温时间各测点温度气温(1表中底表23备注中底表中底04:0025.444.063.063.147.165.161.551.764.860.206:0024.847.862.563.246.764.761.650.564.460.308:0023.543.862.263.046.364.661.549.864.260.210:0025.843.561.962.846.164.361.349.364.360.312:0026.743.661.362.846.164.361.349.364.
24、360.32012.7.2514:0028.043.461.162.645.463.361.049.064.560.416:0028.343.461.062.645.363.160.948.664.859.961.052.145.362.860.548.563.759.620:0027.743.560.862.545.462.360.548.362.159.622:0026.5 43.560.762.045.362.460.448.162.359.600:0025.360.643.861.845.362.060.347.961.859.502:0025.844.060.061.745.361.
25、960.448.060.959.425.143.859.860.845.361.160.347.860.659.506:0024.644.059.560.745.861.360.248.060.359.508:0024.244.759.061.745.561.060.747.859.759.4与计量编号大体积混凝土结构测温记录大体积混凝土结构测温记录(实例) PAGE PAGE 19 / 19工程名称大体积混凝土结构测温记录砼强度等级膨胀配合比编号SXPB-2011-06砼)9872 22日测温时间砼浇灌) 30.1各测点温度34温1表 中2底表中底3表中底备注58.961.545.560.8
26、60.258.961.545.560.860.247.759.459.512:0031 45.256.558.747.657.858.848.356.557.455.858.647.357.958.048.556.457.754.958.546.857.559.548.255.856.818: 53.857.846.057.259.447.955.255.853.557.345.357.558.747.354.054.353.157.044.856.557.346.853.253.100:024.42.552.155.844.654.356.345.652.352.451.453.743.25
27、3.255.744.851.351.850.252.142.652.354.643.249.850.950.051.842.152.853.842.648.949.348.650.841.650.951.341.647.949.047.648.640.748.950.740.346.747.846.247.539.846.348.738.944.545.444.645.639.445.647.637.843.744.72012.7.27测温员:周文清建筑电测温仪名施工负:宏斌技术负海军测温员:周文清建筑电与计量编号大体积混凝土结构测温记录工程名称华侨城天鹅堡一期东区14W砼强度等级8配合比编号
28、SXPB-2011-07砼987砼浇灌日期22砼浇灌30.134测温时间气温1各测点温度23备注(表中底表中底表中底00:0023.538.243.244.739.144.746.537.842.143.532.102:0024.238.041.442.538.941.944.337.841.241.330.504:0023.738.840.441.538.640.843.137.940.140.329.806:0024.538.739.840.438.539.641.637.739.739.729.82012.7.2808: 39.739.838.438.840.137.739.639.72
29、9.710:0025.638.938.938.938.538.739.838.039.439.530.112:0026.438.738.738.638.738.939.338.139.039.132.138.738.638.738.839.038.139.039.132.1施工负宏斌技术负海军测温员:周文清与计量编号 (JDC-2)大体积混凝土结构测温记录工程名称华侨城天鹅堡一期东区5/AA-AW 轴砼强度等级膨胀配合比编SXPB-2011-068960砼浇灌日期2172日 砼浇灌)29开始养度 34测温时间温1温123表中底表中底表中底各测点温度备注(00:003441.051.260.74
30、6.057.644.440.053.561.902:003343.952.261.247.658.244.544.854.362.304:003046.453.361.747.959.044.748.355.662.806:003047.662.047.759.544.949.456.363.108:002948.454.862.447.359.844.950.057.263.3201.2710:0012:00282849.255.749.456.162.562.847.447.460.560.845.145.251.151.558.258.563.563.614:002750.057.063
31、.047.261.545.552.359.364.016:0029.750.9 57.6 63.1 47.6 61.8 45.7 52.7 59.9 64.118:003351.358.163.348.062.045.952.960.464.220:003852.259.263.447.662.546.353.561.364.422:003752.559.463.547.462.646.453.861.664.400:003552.959.863.646.762.846.554.361.964.53153.360.263.644.962.946.654.962.364.504:002753.6
32、60.763.642.663.146.755.462.764.6施工负:宏斌技术负:海军测温仪名称建筑电子测温仪测温员:周文清与计量编号 (JDC-2)大体积混凝土结构测温记录工程名称华侨城天鹅堡一期东区5/AA-AW 轴砼强度等级膨胀配合比编SXPB-2011-068960砼浇灌日期222日 砼浇灌)29开始养度 34测温时间各测点温度气温(1表中底表23备注中底表中底06:0064.953.606:0064.953.661.263.741.063.255.363.064.608:0065.053.661.563.740.563.346.955.163.264.610:0065.153.56
33、1.863.739.663.346.955.063.564.612:0065.253.562.063.839.663.547.054.963.764.665.253.562.563.839.563.547.054.364.064.616:0065.253.562.563.839.463.547.054.364.064.618:0065.253.562.963.839.263.647.154.364.564.720:0065.353.263.063.839.063.647.254.164.664.722:0065.352.963.363.839.163.647.354.064.764.600:0
34、065.352.963.663.739.063.647.354.164.764.602:0065.352.963.663.838.963.547.454.364.964.504:0065.253.063.863.738.963.447.454.265.064.506:0065.253.063.963.738.863.447.453.765.164.508:0065.253.064.063.738.963.347.453.065.264.510:0065.253.064.163.738.863.347.452.565.264.4施工负宏斌技术负:袁海军测温仪名称建筑电子测温仪测温员:周文清与计量
35、编号 (JDC-2)大体积混凝土结构测温记录工程名称华侨城天鹅堡一期东区5/AA-AW 轴砼强度等级膨胀配合比编SXPB-2011-068960砼浇灌日期02日砼浇灌)29开始养度 34测温时间各测点温度气温(1表中底表23备注中底表中底12:002753.064.263.738.863.147.552.065.364.414:002852.964.263.638.763.047.551.565.364.316:002952.864.363.638.862.847.651.265.364.318:003018:003052.764.363.538.762.847.651.165.464.320
36、:003452.564.363.538.962.547.650.965.464.322:003452.164.463.538.962.547.650.565.464.200:003552.064.463.438.862.347.750.765.464.202:003352.164.563.438.762.247.750.865.464.104:002952.164.563.338.561.947.750.665.464.006:002852.164.463.338.662.047.750.665.464.165.464.110:002752.164.563.338.662.147.750.66
37、5.464.112:002852.164.463.338.562.047.650.665.464.014:002851.464.463.238.561.147.850.065.363.828 52.1 64.5 63.3 38.7 62.1 47.750.616:0027.551.3 64.4 63.1 38.5 60.9 47.8 49.9 65.3 63.8施工负测温仪名称建筑电子测温仪技术负责人:周文清测温员:周文清与计量编号 (JDC-2)大体积混凝土结构测温记录工程名称华侨城天鹅堡一期东区5/AA-AW 轴砼强度等级膨胀配合比编SXPB-2011-068960砼浇灌日期2172日 砼
38、浇灌)29开始养度 34测温时间各测点温度气温(1表中底表3备注中底表中底18:0030.651.218:0030.651.264.463.138.460.847.849.865.363.83351.064.463.138.360.647.849.765.363.722:003450.964.463.038.360.447.849.765.263.700:003248.962.561.736.258.345.746.762.160.702: 003346.860.359.734.756.343.244.760.858.704:0032.847.560.960.434.957.243.845.1
39、61.359.306:0032.747.961.260.935.357.844.645.861.859.961.861.535.858.344.946.562.360.210:0032.348.962.361.836.258.845.346.962.960.812:0032.049.362.862.336.759.245.747.663.761.614:0032.049.862.962.536.959.846.348.164.262.116:0031.850.063.462.837.359.946.948.664.862.718:0031.750.463.963.037.860.147.249.065.063.020:0031.650.864.263.438.160.547.649.565.163.422:0031.051.264.463.138.460.847.849.865.363.8施工负宏斌技术负海军测温员:周文清测温仪名建筑电子测温仪与计量编号 (JDC-2)大体积混凝土结构测温记录工程名称华侨城天鹅堡一期东区轴砼强度等
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 银行资金调配指南
- 防水工程维护设计合同
- 环保设施三方施工合同
- 医疗保健中心租赁合同模板
- 2024年资产托管经营合同3篇
- 2024年防水工程培训分包协议3篇
- 山东省农业设施装修工程合同模板
- 2025油漆采购合同2
- 2025年度环境风险评估与监测合同书模板
- 2024年度工程贷款担保合同3篇
- GB/T 33322-2016橡胶增塑剂芳香基矿物油
- GB/T 15905-1995硫化橡胶湿热老化试验方法
- GB/T 10183-2005桥式和门式起重机制造及轨道安装公差
- 中央空调空调年度维保报价单
- (新平台)国家开放大学《工程数学(本)》形成性考核作业1-5参考答案
- ommaya囊的护理教学课件
- 统计与概率的教材梳理讲稿
- 关节错缝术的技术操作规程
- 幼儿园幼儿心理健康档案
- 《试验设计》课件
- 110kV架空改电缆工程停电施工方案
评论
0/150
提交评论