




版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、 GIA Engineers (S) Pte LtdEngineering Overview of MRT Circle Line Projects In Singapore Dr. Zhang Q.H. Oct 2006, China, NanningPossible Topics for TodayGeneral Overview of MRT CCL projects in SingaporeEngineering Challenges and Main Construction Method Design Code and Software used for MRT projects
2、Technical Brief of Incident Nicoll HighWay SGP MRT Protection Code and Instrumentation Work. GIA EngineersMRT Circle Line in Singapre The CCL (Circle line) will be 33.3 km long with 29 stations. Costing $6.7 billion. A fully underground orbital line will interchange with North-South Line, East-West
3、Line and North East Line. The project will be in five stages and to complete in 2021. GIA EngineersCircle Line 1 to 5 mapGIA EngineersBenefits and ChallengesBenefits - Using the CCL, will be able to bypass the busy major interchanges.Challenges -Traffic diversions.Soft soil conditions at the Milleni
4、a and Nicoll Highway stations.Boring tunnels under the Kallang Basin. Interface of tunnels with proposed KPE, DTSS tunnels Upper Paya Lebar/ Airport Road.GIA Engineers$1.39b; 5.4km; 6 Stations; Starting March 2002GIA EngineersCircle Line 1 $1.55b; 5.6km; 5 Stations; Starting August 2002GIA Engineers
5、Circle Line 2 $1.2b; 5.7km; 5 Stations; Starting Oct. 2003GIA EngineersCircle Line 3 $2.5b; 17km; 13 Stations; Starting Oct. 2004GIA EngineersCircle Line 4 &5 1$2.5b; 17km; 13 Stations; Starting Oct. 2004GIA EngineersCircle Line 4 &5 2Construction Method Top-down Construction - Dhoby Ghaut, Museum,
6、Convention Centre, Millenia, Nicoll Highway, Lorong Chuan and Holland stations.Construction of Secant Pile Wall.Construction of Contiguous Bored Pile Wall.Construction of Diaphram WallConstruction of Sheet Pile WallGIA EngineersTop Down ConstructionGIA EngineersTop Down & Diaphram Wall GIA Engineers
7、StrutSlabStrutStrutOpeningDeckingContiguous Bored Pile WallGIA EngineersStruttingSlabSecant Pile Wall GIA EngineersStruttingSlabSheet Pile Wall StruttingSlabGIA EngineersDesign Code & SoftwareBased on British Code. BS5950 &CP65 Structural Use of Steelwork in BuildingBS8004 FoundationBS 8002 Earth Re
8、taining StructureBS 8110 PT The Structure Use of ConcreteBS6399 PT Design Loading for BuildingCommon Used Geotechnical SoftwarePlaxis, Excave97, Wallap, RIDO and Slope/W GIA EngineersGeotechnical Software - Plaxis 2D &3D FEM software for Soil and Rock. Developed in 1987 by Technical University of De
9、lft.Used by 30 over European Country for more than 20 years.GIA EngineersMRT Protection Code 1of 3 GIA EngineersMRT Protection Code 2of 3 GIA EngineersMRT Protection Code 3 of 3Allowable Engineering Parameter:Structure/track Movement in any Plane -15mm Differential movement /Twist 3mm in 6m (1:2000)
10、Peak Particle Velocities (Vibration) 15mm/secChange in Pore Water Pressure 10KN/m2GIA EngineersIncident Nicoll Highway CCL Stage 1 - C824 (1 of 8)GIA EngineersIncident:On 20 of April about 3:30pm Cut and Cover Tunnel Section 9th layer strutting (9 of 10), excavation depth 30mFirst layer of JPG was e
11、xcavated.100m Temporary D-wall collapse; Collapsed Area = 100m x130m of Nicoll Highway4 FatalitiesAffected nearby structure: Overhead Bridge, Canal, Golden Mile towerIncident Nicoll Highway CCL Stage 1 - C824 (2 of 8)GIA EngineersProject OverviewDesign & Build. 1.6Km C&C Tunnel, 800m Bored Tunnel, B
12、LV station.Tem. D-wall with “ bottom up methodSupporting : D-Wall Thx=800m, Depth =38 to 40 m deep, 10 layer struts 2 layer Jet Grouting, 1st 1.5m 28m, 2nd 3mformation levelGIA EngineersIncident Nicoll Highway (3 OF 8)RecoveryGIA EngineersIncident Nicoll Highway (4 OF 8)RecoveryGIA EngineersIncident
13、 Nicoll Highway (5 OF 8)RecoveryGIA EngineersIncident Nicoll Highway (6 OF 8)RecoveryGIA EngineersIncident Nicoll Highway (7 OF 8)RecoveryGIA EngineersIncident Nicoll Highway (8 OF 8)RecoveryReal Time Instrumentation CCL MRT ProjectStrutting Monitoring System VWSG and Load CellStructure Monitoring E
14、L Sensor, VW Cracking, VibrationGround Monitoring In Place Inclinometer, Piezometer Rod ExtensometerMRT Structure Monitoring ATM Survey, Vibration, EL track MonitoringEnvironmental Monitoring Corrosion & VWSG GIA EngineerMonitoring ResultsThe monitoring results consist of ground, structural and envi
15、ronmental monitoring results. All results presented in the real time display and report includes:Horizontal, vertical and lateral deformationsPore pressure changes / Water level changeRotational tilting of structuresVibration and Noise levelSOIL & FOUNDATION PTE LTDInstrumentation Database ServerWeb
16、 ServerReal Time Data VisualizationGround InstrumentStructural InstrumentEnvironmental MonitoringAutomated Survey SystemAcquisition Logging SystemNetwork PrinterGSM ModemGSM ModemAlarm messages sent by emailsAlarm messages on mobile phone or pagersGW Web ClientsService Network Management SystemFirew
17、allAlarm messages sent by emailsAlarm messages on mobile phone or pagersAllow Client to View / Download Data, Report and Method Statement AnytimeAcquisition Logging SystemAcquisition Data SystemAcquisition Logging SystemReal Time Monitoring SystemGIA EngineersGround Monitoring SystemInclinometerVibr
18、ating Wire PiezometerBorehole Rod ExtensometerVW Settlement CellAlarm messages sent by emailsAlarm messages on mobile phone or pagersAlarm Alert SystemAcquisition Logging SystemReal Time VisualizationGIA EngineersStructure Monitoring SystemEL Beam SensorVibrating Wire Crack MeterVibrating Wire Strai
19、n GaugeAlarm messages sent by emailsAlarm messages on mobile phone or pagersAlarm Alert SystemAcquisition Logging SystemVibrating Wire Strain Gauge (Concrete)Real Time VisualizationEL Tilt SensorGIA EngineersCorrosion Monitoring SystemCorrosion SensorAlarm messages sent by emailsAlarm messages on mo
20、bile phone or pagersAlarm Alert SystemReal Time VisualizationCorrosion SensorCorrosion SensorCorrosion SensorAcquisition Logging SystemVibration Monitoring SystemVibration MonitorAlarm messages sent by emailsAlarm messages on mobile phone or pagersAlarm Alert SystemVibration MonitorVibration Monitor
21、Vibration MonitorReal Time VisualizationGIA EngineersAutomated Survey Monitoring SystemAlarm messages sent by emailsAlarm messages on mobile phone or pagersAlarm Alert SystemAcquisition Data SystemReal Time Data VisualizationTarget (Prisms)Target (Prisms)Target (Prisms)Radio / Cable NetworkRadio / C
22、able NetworkGIA EngineersProject PicturesGIA EngineersPictures of CCL Line -1GIA EngineersPictures of CCL Line -2GIA EngineersPictures of CCL Line -3GIA EngineersPictures of CCL Line -4GIA EngineersPictures of CCL Line -5GIA EngineersPictures of CCL Line -6GIA EngineersPictures of CCL Line -7GIA EngineersPict
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 决算补充合同范例
- 10类采购合同样本
- 会场租赁合同样本
- 2025年何时签订租房合同
- 消防岗亭换岗方案范本
- 养殖基地合作合同标准文本
- 养殖金蝉售卖合同样本
- 农村院落收购合同样本
- 职业技能提升的长远规划计划
- 农村流动养殖合同范例
- 一年级上册劳动《各种各样的职业》课件
- 【互联网企业并购中的财务风险探析与防范:以阿里巴巴并购饿了么为例12000字(论文)】
- 第九届全国大学生测井技能大赛备赛试题库-下(判断题)
- DB32T-职业性尘肺病数字化诊断标准片使用指南编制说明
- icu手册第一部分-常见病诊疗规范
- GB/T 4706.17-2024家用和类似用途电器的安全第17部分:电动机-压缩机的特殊要求
- 河湖生态系统保护与修复工程技术导则
- 食品工厂机械与设备第二版许学勤课后习题答案
- 省级一网统管网格化社会治理指挥手册(含事项清单)
- 高中数学选修一(人教A版2019)课后习题答案解析
- 总体国家安全观全民教育模板
评论
0/150
提交评论