版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
Construction
of
the
Project
Management
of
the
importance
of
organization
design
Abstract:
The
construction
organization
is
a
construction
project
and
guide
the
importanttechnical
and
economic
documents.
Can
regulate
the
construction
workers,
machinery,
raw
materials,
environment,
technology,
equipment,
construction,
installation,
management,
production
and
other
conflicts,
to
supervise
the
construction
and
control
of
organizational
design
in
order
to
ensure
scientific
and
rational
project
high-quality,
low
cost,
less
the
completion
of
energy.
Keywords:
project
management;
construction
organization;
design;
importance
Construction
design
and
project
construction
is
an
important
document
guiding
construction,
construction
enterprises
are
able
to
high-quality,
high
speed,
low
cost,
low
consumption
of
completed
building
projects
to
ensure
effective
measures,
but
also
strengthen
the
management,
the
importance
of
improving
economic
efficiency
means,
is
also
properly
handle
the
construction
workers,
machinery,
raw
materials,
methods,
environment
and
technology
and
equipment,
civil
works
and
installation
of
collaboration,
consumption
and
supply,
management
and
production
and
other
kinds
of
contradictions,
scientific
and
rational,
planned
and
orderly
,
the
equilibrium
organization
of
production
and
an
important
guarantee
for
project
construction.
With
the
establishment
of
socialist
market
economy,
an
increasingly
competitive
construction
market,
the
objective
situation
of
construction
enterprises
have
become
increasingly
demanding,
not
only
in
technology
and
equipment,
personnel
quality,
the
construction
put
forward
higher
requirements
of
the
organizers,
and
engineering
economic
management
Pre-settlement
work
in
the
project
is
also
facing
new
challenges.
Strict
construction
market
situation,
some
construction
companies
are
not
actively
taken
measures,
professional
and
technical
staff
is
not
updated,
training,
science
and
technology
management
level
is
very
backward,
with
the
preparation
of
construction
design
review
did
not
attract
enough
attention,
so
there
will
be
the
following
common
situations:
(1)
audit
is
not
compiled
before
the
start
of
construction
organization
design:
not
to
pursue
the
construction
of
floor
plans,
materials,
cluttered,
moving
out
of
import
of
machinery
and
equipment,
unplanned
demand
for
labor,
quality,
security,
construction
without
assurance
measures,
resulting
in
nest
Workers
serious
waste
management
lower.
(2)
whether
it
is
the
preparation
of
construction
design
professionals:
In
order
to
cope
with
the
higher
authorities
and
supervisory
agencies,
Party
member
or
check
the
information
to
the
construction
workers
on
behalf
of
the
Code
construction
design,
because
the
data
simply
do
not
know
right
now
who
is
a
leading
construction
management
recent
arrangements,
had
casually
made
up,
just
go.
(3)
the
preparation
of
the
low
level
of
construction
organization
design:
Some
construction
units,
construction
organizations
do
not
understand
the
importance
of
the
construction
process,
to
write
about
the
sub-construction
process,
draw
a
floor
plan,
schedule
progress,
it
regarded
construction
organization
design.
(4)
to
abandon
technology
economy:
a
considerable
number
of
construction
enterprises
in
the
preparation
of
construction
organization
design,
construction
organization
which
only
concerned
the
various
sub-project
of
the
technical
measures,
without
considering
the
sub-project
aspects
of
economic
indicators,
leading
to
the
completion
of
settlement
disputes
about
economic
loss.
[Example
1]
in
a
district
of
Nanning
City,
the
life
of
a
dormitory
building
to
be
a
form
of
water
renovation
project,
but
because
the
dormitory
was
built
in
the
eighties,
has
been
twenty
years,
the
owners
between
buildings
without
authorization
of
their
own
debris
occupied
the
public
space
of
normal
channels,
resulting
in
too
narrow
passage
between
two
buildings,
traffic
problems,
so
the
resulting
need
for
manual
handling
of
construction
materials
to
construction
sites,
construction
materials
are
stated
not
to
enter
the
venue
and
request
for
additional
materials
secondary
transportation
fee,
Party
A
will
not
sign
recognition,
resulting
in
economic
losses.
If
the
construction
units
in
the
field
before
the
start
of
the
investigation,
carefully
review
the
preparation
of
construction
design
and
engineering
contract
be
described
in
the
notes,
you
can
reduce
unnecessary
trouble.
[Example
2]
of
a
residential
building
project
excavation,
construction
site
is
not
large,
the
construction
unit
construction
with
construction
design,
but
no
earth
survey
program,
no
excavation
of
the
slope
coefficient
of
discharge,
nor
the
accumulation
of
pre-construction
earthwork
calculation,
the
original
machine
in
the
pit
excavation
uppercut
on
it,
because
there
is
no
construction
design
survey
on
the
ground,
resulting
in
ruptured
a
nearby
residential
building
to
the
water,
resulting
in
increased
costs
of
grading
required
to
show
there
is
no
clear
,
resulting
in
a
Jixietaiban
increase
moving
away
more,
but
also
back
when
the
backfill
backfill,
resulting
in
construction
enterprises
in
the
economy
by
the
economic
loss
in
vain.
[Example
3]
Construction
of
a
residential
building
products
business
in
the
construction
process,
when
preparing
to
start
construction
organization
is
very
simple,
even
the
template
sub-project
calculations
are
not,
in
the
basement
of
the
construction
of
the
installation
template
template
installation
height
of
5
m,
maximum
beam
for
the
600
×
1200,
thickness
250,
in
the
erection
of
experience
by
the
workers
under
their
erection,
supervision
and
acceptance
can
not
be
acceptance
of
the
results,
but
also
re-checking,
the
results
support
the
strength
of
pole
did
not
meet
the
template
requirements
of
a
full
return
to
work.
Rework
the
economic
losses
can
be
imagined.
Such
as
steel
is
now
more
fitting
to
discuss
the
situation,
the
tender
list
or
did
not
say
by
welding
sleeve,
you
said
in
the
welding
construction
organization,
it
can
talk
with
the
sleeve
construction
of
a
visa;
Earthwork
and
temporary
facilities
in
the
Shih
group
calculated
as
long
as
the
excess
of
the
quota
rules
set
paved
the
way
is
part
of
the
claim.
The
problem
is
now
that
this
file
is
isolated,
not
construction,
not
cost,
because
it
is
not
targeted.
The
above
three
examples
fully
show
that
the
construction
design
in
the
construction
process
as
well
as
pre-settlement
project
plays
an
important
role,
not
only
organized
the
construction
of
organizational
design,
guiding
production
role
in
the
objective
economic
management
has
become
a
very
important
can
not
be
ignored
component.
Construction
design
is
the
arrangement
of
a
construction
company
building
a
comprehensive
technical
and
economic
documentation
of
construction
products.
The
depth
of
the
content
of
their
preparation,
can
be
divided
into
construction
design,
construction
organization
design,
construction
design
outline
and
so
on.
Meaning:
in
order
to
process
the
entire
project
implementation
macro-control.
Complete
the
construction
of
a
sub-organization
design
should
include:
project
overview,
construction
methods,
quality
assurance
measures,
manpower
and
machinery
plan
and
guarantee
measures,
construction
of
network
diagrams,
and
bar
charts,
safety
measures,
details
of
resources,
energy
conservation
measures,
construction
period
to
ensure
measures.
Implementation
of
the
project
in
the
construction
of
the
session,
the
price
of
construction
projects
through
the
construction
drawings
to
determine
the
general
preparation
of
the
budget,
the
determination
of
the
construction
contract
price,
engineering
and
project
final
settlement
price
to
deter就可以了,就因为施工组织设计中没有对地下调查,导致挖破了附近居民楼的给水管,致使成本增加,对放坡要示也没有明确要求,结果造成了机械台班增加,土方拉走多了,回填时又要拉回回填,造成施工企业在经济上白白受到经济损失。
[例3]某商品住宅楼施工企业在建过程中,开工时编制施工组织很简单,连模板分项工程计算书都没有,在施工中的安装地下室模板时模板安装高度为5
m,梁最大为600×1200,板厚为250,在搭设时由工人根据经验自己搭设,结果监理验收时无法验收,又重验算,结果立杆没有满足模板支撑强度要求,进行全面返工。返工造成的经济损失可想而知。
比如现在较多的是讨论钢筋接头形势,投标清单没有说采用套筒还是焊接,那你在施工组织里说用焊接,那么施工用套筒就可以商量签证了;土方及临时设施在施组里只要超过定额规则计算部分设下伏笔是可以索赔的。问题是现在这份文件被孤立了,施工不用、造价不用,因为它没有针对性。
以上三个例子充分表明,施工组织设计在施工全过程乃至工程预结算中占有重要地位,组织设计不仅仅是组织施工、指导生产的作用,在客观上已成为经济管理工作中不可忽视的非常重要的组成部分。
施工组织设计是建筑施工企业全面安排某项建筑产品的施工技术经济文件。按其编制内容的深浅,又可分为施工组织设计、施工组织方案设计、施工组织设计纲要等。
意义:以此来对整个工程实施过程中进行宏观控制。一分完备施工组织设计应包括:工程概况、施工方法、质量保证措施、人力、机具计划及其保证措施、施工
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 第二十四章 相似三角形(11个知识归纳)
- 1-3单元古诗文默写训练-2022-2023学年七年级语文上册知识梳理与能力训练
- 临高县新盈中学2024-2025学年高三上学期期中考试试卷
- 黑龙江省齐齐哈尔市富裕县益海学校2024-2025学年八年级上学期期中地理试题(含答案)
- 广东省深圳市盟校联盟2024-2025学年高一上学期11月期中物理试题(含解析)
- 一元二次不等式中的含参问题(原卷版)-2024-2025学年人教版高一数学压轴题攻略
- 2024年四川省公务员考试《行测》真题及答案解析
- 工厂整体转让合同样本
- 2024高考物理一轮复习:受力分析共点力平衡(练习)(学生版+解析)
- 有关产品销售合同模板汇编
- 2023年湖南长沙环境保护职业技术学院专任教师招聘考试真题
- 第七章 立体几何与空间向量综合测试卷(新高考专用)(教师版) 2025年高考数学一轮复习专练(新高考专用)
- 生产流程(线)外包服务规范 -DB13-T 5224-2020 河北
- 部编人教版道德与法治一年级上册:6校园里的号令教学设计(2课时)
- 2021人音版小学音乐六年级上册课程纲要
- 三秦思语(2022年陕西中考语文试卷散文阅读题及答案)
- 2024年秋新外研版(三起)英语三年级上册全册教案(2024年新教材)
- 2024-2030年中国铜线行业市场发展趋势与前景展望战略分析报告
- 【道法】认识生命 课件-2024-2025学年统编版道德与法治七年级上册
- 贵州省建筑与装饰工程计价定额(2016版)
- JGT 486-2015 混凝土用复合掺合料
评论
0/150
提交评论