施工组织设计英文文献翻译_第1页
施工组织设计英文文献翻译_第2页
施工组织设计英文文献翻译_第3页
施工组织设计英文文献翻译_第4页
施工组织设计英文文献翻译_第5页
已阅读5页,还剩1页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

Construction

of

the

Project

Management

of

the

importance

of

organization

design

Abstract:

The

construction

organization

is

a

construction

project

and

guide

the

importanttechnical

and

economic

documents.

Can

regulate

the

construction

workers,

machinery,

raw

materials,

environment,

technology,

equipment,

construction,

installation,

management,

production

and

other

conflicts,

to

supervise

the

construction

and

control

of

organizational

design

in

order

to

ensure

scientific

and

rational

project

high-quality,

low

cost,

less

the

completion

of

energy.

Keywords:

project

management;

construction

organization;

design;

importance

Construction

design

and

project

construction

is

an

important

document

guiding

construction,

construction

enterprises

are

able

to

high-quality,

high

speed,

low

cost,

low

consumption

of

completed

building

projects

to

ensure

effective

measures,

but

also

strengthen

the

management,

the

importance

of

improving

economic

efficiency

means,

is

also

properly

handle

the

construction

workers,

machinery,

raw

materials,

methods,

environment

and

technology

and

equipment,

civil

works

and

installation

of

collaboration,

consumption

and

supply,

management

and

production

and

other

kinds

of

contradictions,

scientific

and

rational,

planned

and

orderly

,

the

equilibrium

organization

of

production

and

an

important

guarantee

for

project

construction.

With

the

establishment

of

socialist

market

economy,

an

increasingly

competitive

construction

market,

the

objective

situation

of

construction

enterprises

have

become

increasingly

demanding,

not

only

in

technology

and

equipment,

personnel

quality,

the

construction

put

forward

higher

requirements

of

the

organizers,

and

engineering

economic

management

Pre-settlement

work

in

the

project

is

also

facing

new

challenges.

Strict

construction

market

situation,

some

construction

companies

are

not

actively

taken

measures,

professional

and

technical

staff

is

not

updated,

training,

science

and

technology

management

level

is

very

backward,

with

the

preparation

of

construction

design

review

did

not

attract

enough

attention,

so

there

will

be

the

following

common

situations:

(1)

audit

is

not

compiled

before

the

start

of

construction

organization

design:

not

to

pursue

the

construction

of

floor

plans,

materials,

cluttered,

moving

out

of

import

of

machinery

and

equipment,

unplanned

demand

for

labor,

quality,

security,

construction

without

assurance

measures,

resulting

in

nest

Workers

serious

waste

management

lower.

(2)

whether

it

is

the

preparation

of

construction

design

professionals:

In

order

to

cope

with

the

higher

authorities

and

supervisory

agencies,

Party

member

or

check

the

information

to

the

construction

workers

on

behalf

of

the

Code

construction

design,

because

the

data

simply

do

not

know

right

now

who

is

a

leading

construction

management

recent

arrangements,

had

casually

made

up,

just

go.

(3)

the

preparation

of

the

low

level

of

construction

organization

design:

Some

construction

units,

construction

organizations

do

not

understand

the

importance

of

the

construction

process,

to

write

about

the

sub-construction

process,

draw

a

floor

plan,

schedule

progress,

it

regarded

construction

organization

design.

(4)

to

abandon

technology

economy:

a

considerable

number

of

construction

enterprises

in

the

preparation

of

construction

organization

design,

construction

organization

which

only

concerned

the

various

sub-project

of

the

technical

measures,

without

considering

the

sub-project

aspects

of

economic

indicators,

leading

to

the

completion

of

settlement

disputes

about

economic

loss.

[Example

1]

in

a

district

of

Nanning

City,

the

life

of

a

dormitory

building

to

be

a

form

of

water

renovation

project,

but

because

the

dormitory

was

built

in

the

eighties,

has

been

twenty

years,

the

owners

between

buildings

without

authorization

of

their

own

debris

occupied

the

public

space

of

normal

channels,

resulting

in

too

narrow

passage

between

two

buildings,

traffic

problems,

so

the

resulting

need

for

manual

handling

of

construction

materials

to

construction

sites,

construction

materials

are

stated

not

to

enter

the

venue

and

request

for

additional

materials

secondary

transportation

fee,

Party

A

will

not

sign

recognition,

resulting

in

economic

losses.

If

the

construction

units

in

the

field

before

the

start

of

the

investigation,

carefully

review

the

preparation

of

construction

design

and

engineering

contract

be

described

in

the

notes,

you

can

reduce

unnecessary

trouble.

[Example

2]

of

a

residential

building

project

excavation,

construction

site

is

not

large,

the

construction

unit

construction

with

construction

design,

but

no

earth

survey

program,

no

excavation

of

the

slope

coefficient

of

discharge,

nor

the

accumulation

of

pre-construction

earthwork

calculation,

the

original

machine

in

the

pit

excavation

uppercut

on

it,

because

there

is

no

construction

design

survey

on

the

ground,

resulting

in

ruptured

a

nearby

residential

building

to

the

water,

resulting

in

increased

costs

of

grading

required

to

show

there

is

no

clear

,

resulting

in

a

Jixietaiban

increase

moving

away

more,

but

also

back

when

the

backfill

backfill,

resulting

in

construction

enterprises

in

the

economy

by

the

economic

loss

in

vain.

[Example

3]

Construction

of

a

residential

building

products

business

in

the

construction

process,

when

preparing

to

start

construction

organization

is

very

simple,

even

the

template

sub-project

calculations

are

not,

in

the

basement

of

the

construction

of

the

installation

template

template

installation

height

of

5

m,

maximum

beam

for

the

600

×

1200,

thickness

250,

in

the

erection

of

experience

by

the

workers

under

their

erection,

supervision

and

acceptance

can

not

be

acceptance

of

the

results,

but

also

re-checking,

the

results

support

the

strength

of

pole

did

not

meet

the

template

requirements

of

a

full

return

to

work.

Rework

the

economic

losses

can

be

imagined.

Such

as

steel

is

now

more

fitting

to

discuss

the

situation,

the

tender

list

or

did

not

say

by

welding

sleeve,

you

said

in

the

welding

construction

organization,

it

can

talk

with

the

sleeve

construction

of

a

visa;

Earthwork

and

temporary

facilities

in

the

Shih

group

calculated

as

long

as

the

excess

of

the

quota

rules

set

paved

the

way

is

part

of

the

claim.

The

problem

is

now

that

this

file

is

isolated,

not

construction,

not

cost,

because

it

is

not

targeted.

The

above

three

examples

fully

show

that

the

construction

design

in

the

construction

process

as

well

as

pre-settlement

project

plays

an

important

role,

not

only

organized

the

construction

of

organizational

design,

guiding

production

role

in

the

objective

economic

management

has

become

a

very

important

can

not

be

ignored

component.

Construction

design

is

the

arrangement

of

a

construction

company

building

a

comprehensive

technical

and

economic

documentation

of

construction

products.

The

depth

of

the

content

of

their

preparation,

can

be

divided

into

construction

design,

construction

organization

design,

construction

design

outline

and

so

on.

Meaning:

in

order

to

process

the

entire

project

implementation

macro-control.

Complete

the

construction

of

a

sub-organization

design

should

include:

project

overview,

construction

methods,

quality

assurance

measures,

manpower

and

machinery

plan

and

guarantee

measures,

construction

of

network

diagrams,

and

bar

charts,

safety

measures,

details

of

resources,

energy

conservation

measures,

construction

period

to

ensure

measures.

Implementation

of

the

project

in

the

construction

of

the

session,

the

price

of

construction

projects

through

the

construction

drawings

to

determine

the

general

preparation

of

the

budget,

the

determination

of

the

construction

contract

price,

engineering

and

project

final

settlement

price

to

deter就可以了,就因为施工组织设计中没有对地下调查,导致挖破了附近居民楼的给水管,致使成本增加,对放坡要示也没有明确要求,结果造成了机械台班增加,土方拉走多了,回填时又要拉回回填,造成施工企业在经济上白白受到经济损失。

[例3]某商品住宅楼施工企业在建过程中,开工时编制施工组织很简单,连模板分项工程计算书都没有,在施工中的安装地下室模板时模板安装高度为5

m,梁最大为600×1200,板厚为250,在搭设时由工人根据经验自己搭设,结果监理验收时无法验收,又重验算,结果立杆没有满足模板支撑强度要求,进行全面返工。返工造成的经济损失可想而知。

比如现在较多的是讨论钢筋接头形势,投标清单没有说采用套筒还是焊接,那你在施工组织里说用焊接,那么施工用套筒就可以商量签证了;土方及临时设施在施组里只要超过定额规则计算部分设下伏笔是可以索赔的。问题是现在这份文件被孤立了,施工不用、造价不用,因为它没有针对性。

以上三个例子充分表明,施工组织设计在施工全过程乃至工程预结算中占有重要地位,组织设计不仅仅是组织施工、指导生产的作用,在客观上已成为经济管理工作中不可忽视的非常重要的组成部分。

施工组织设计是建筑施工企业全面安排某项建筑产品的施工技术经济文件。按其编制内容的深浅,又可分为施工组织设计、施工组织方案设计、施工组织设计纲要等。

意义:以此来对整个工程实施过程中进行宏观控制。一分完备施工组织设计应包括:工程概况、施工方法、质量保证措施、人力、机具计划及其保证措施、施工

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

最新文档

评论

0/150

提交评论