1建筑基坑工程安全管理规范考试时长:15分钟,总分:10分,合格分数:6分======单选题部分======1.开挖深度达到或超过(D)m的基坑为深基坑.HTMLCONTROLForms.HTML:Option.1
A1HTMLCONTROLForms.HTML:Option.1
B2HTMLCONTROLForms.HTML:Option.1
C3HTMLCONTROLForms.HTML:Option.1
D52.对于开挖深度达到或超过(C)m的基坑应进行基坑工程设计HTMLCONTROLForms.HTML:Option.1
A1HTMLCONTROLForms.HTML:Option.1
B2HTMLCONTROLForms.HTML:Option.1
C3HTMLCONTROLForms.HTML:Option.1
D43.对开挖深度达到或超过()m的深基坑应进行设计方案论证DHTMLCONTROLForms.HTML:Option.1
A1HTMLCONTROLForms.HTML:Option.1
B3HTMLCONTROLForms.HTML:Option.1
C5HTMLCONTROLForms.HTML:Option.1
D104.深基坑安全专项施工方案论证专家组宜专业配套齐全,其中注册岩土工程师和注册建造师至少各(A)名HTMLCONTROLForms.HTML:Option.1
A1HTMLCONTROLForms.HTML:Option.1
B2HTMLCONTROLForms.HTML:Option.1
C3HTMLCONTROLForms.HTML:Option.1
D5======多选题部分======5.基坑开挖影响范围内包括(ABCD)。HTMLCONTROLForms.HTML:Checkbox.1
A既有建(构)筑物HTMLCONTROLForms.HTML:Checkbox.1
B道路HTMLCONTROLForms.HTML:Checkbox.1
C地下设施HTMLCONTROLForms.HTML:Checkbox.1
D地下管线6.建设单位应择优选择具有资质和经验的(ABCD)和监测单位承担基坑工程的相应工作。HTMLCONTROLForms.HTML:Checkbox.1
A勘察HTMLCONTROLForms.HTML:Checkbox.1
B设计HTMLCONTROLForms.HTML:Checkbox.1
C施工HTMLCONTROLForms.HTML:Checkbox.1
D监理7.基坑场地的(AB)、取样、原位测试和室内试验应符合国家有关技术标准的规定。HTMLCONTROLForms.HTML:Checkbox.1
A勘察范围HTMLCONTROLForms.HTML:Checkbox.1
B勘察深度HTMLCONTROLForms.HTML:Checkbox.1
C勘探点数量和间距HTMLCONTROLForms.HTML:Checkbox.1
D钻孔深度======判断题部分======8.在基坑施工及使用阶段,对基坑及周边环境实施的检查、量测和监控。对HTMLCONTROLForms.HTML:Option.1对HTMLCONTROLForms.HTML:Option.1错9.基坑周边有其他工程相继施工的,后施工工程的建设单位或施工单位应主动做好协调工作。对HTMLCONTROLForms.HTML:Option.1对HTMLCONTROLForms.HTML:Option.1错10.建设单位在申请领取施工许可证或办理建设工程安全监督手续时,向有关部门所提供的危险性较大分部分项工程清单和安全管理措施之中,应含基坑工程的内容。对HTMLCONTROLForms.HTML:Option.1对HTMLCONTROLForms.HTML:Option.1错2建设工程质量管理及质量管理体系考试时长:15分钟,总分:10分,合格分数:6分======单选题部分======1.工程质量的特点不包括(D)HTMLCONTROLForms.HTML:Option.1
A影响因素多HTMLCONTROLForms.HTML:Option.1
B质量波动大HTMLCONTROLForms.HTML:Option.1
C终检的局限性HTMLCONTROLForms.HTML:Option.1
D存在的质量问题显而易见2.过程的基本构成是:(D)HTMLCONTROLForms.HTML:Option.1
A输入HTMLCONTROLForms.HTML:Option.1
B输出HTMLCONTROLForms.HTML:Option.1
C相关活动HTMLCONTROLForms.HTML:Option.1
D外部影响3.质量成本的组成不包括(D)HTMLCONTROLForms.HTML:Option.1
A预防成本HTMLCONTROLForms.HTML:Option.1
B鉴定成本HTMLCONTROLForms.HTML:Option.1
C内部损失成本HTMLCONTROLForms.HTML:Option.1
D实际成本4.质量管理体系的建立和运行不包括(D):HTMLCONTROLForms.HTML:Option.1
A质量管理体系的确立HTMLCONTROLForms.HTML:Option.1
B质量管理体系文件的编制HTMLCONTROLForms.HTML:Option.1
C质量管理体系的实施运行HTMLCONTROLForms.HTML:Option.1
D质量管理体系的监督审查======多选题部分======5.质量管理的定义:在质量方面指挥和控制组织的协调的活动。这些相互协调的活动,通常包括质量方针(ABCD)和质量改进。HTMLCONTROLForms.HTML:Checkbox.1
A质量目标的建立HTMLCONTROLForms.HTML:Checkbox.1
B质量策划HTMLCONTROLForms.HTML:Checkbox.1
C质量控制HTMLCONTROLForms.HTML:Checkbox.1
D质量保证6.质量的定义:一组固有特性满足要求的程度,具体为:(BC)HTMLCONTROLForms.HTML:Checkbox.1
A产品质量、某项活动或过程的工作质量、质量管理体系运行的质量;HTMLCONTROLForms.HTML:Checkbox.1
B由一组固有特性组成,特性是指区分的特征;HTMLCONTROLForms.HTML:Checkbox.1
C应满足明示的、隐含的或必须履行的需要和期望;HTMLCONTROLForms.HTML:Checkbox.1
D顾客和其他相关方对产品、过程或体系的质量要求是动态的、发展的和相对的7.工程质量控制的原则(abc)HTMLCONTROLForms.HTML:Checkbox.1
A坚持质量第一的原则HTMLCONTROLForms.HTML:Checkbox.1
B坚持以人为核心的原则HTMLCONTROLForms.HTML:Checkbox.1
C坚持以预防为主的原则HTMLCONTROLForms.HTML:Checkbox.1
D坚持质量标准的原则======判断题部分======8.质量成本:就建筑施工企业来说,是为保证和提供建筑产品质量而进行的质量管理活动所花费的费用。即建筑企业为保证和提高工程质量所发生的一切费用和由于工程未达到规定的质量水平而造成的一切损失费用的总和。(错)HTMLCONTROLForms.HTML:Option.1对HTMLCONTROLForms.HTML:Option.1错9.内部损失成本:即为使建筑材料经过合理技术组合形成建筑产品过程中发生的一切费用主要包括不可修复的废品损失、可修复废品的返修损失、返工后或矫正后的产品重复检测和试验的复验费用、由于产品质量事故引起的停工损失及产品降级损失等。对HTMLCONTROLForms.HTML:Option.1对HTMLCONTROLForms.HTML:Option.1错10.质量管理的PDCA循环管理模式:策划(Plan)、实施(Do)、检查(Check)、处理(Act)。对HTMLCONTROLForms.HTML:Option.1对HTMLCONTROLForms.HTML:Option.1错完成提交3建设项目全寿命周期成本管理考试时长:15分钟,总分:10分,合格分数:6分======单选题部分======1.(B)又称建设项目寿命周期,是指建设项目从其寿命开始到寿命结束的时间。HTMLCONTROLForms.HTML:Option.1
A施工期HTMLCONTROLForms.HTML:Option.1
B建设项目全寿命周期HTMLCONTROLForms.HTML:Option.1
C停工期HTMLCONTROLForms.HTML:Option.1
D完工期2.(A)就是建设项目在其决策、实施、投入使用之后到其功能不能满足业主需要之间的期限。HTMLCONTROLForms.HTML:Option.1
A物理寿命HTMLCONTROLForms.HTML:Option.1
B法律寿命HTMLCONTROLForms.HTML:Option.1
C经济寿命HTMLCONTROLForms.HTML:Option.1
D功能寿命3.目前,在我国工程造价管理实践中的主导管理模式是以(A)为计价基础的全过程工程造价管理模式。HTMLCONTROLForms.HTML:Option.1
A定额HTMLCONTROLForms.HTML:Option.1
B定量HTMLCONTROLForms.HTML:Option.1
C工期HTMLCONTROLForms.HTML:Option.1
D完工量4.是通过相关的法律、法规、政策进行建设项目全寿命周期成本控制。CHTMLCONTROLForms.HTML:Option.1
A经济手段HTMLCONTROLForms.HTML:Option.1
B技术手段HTMLCONTROLForms.HTML:Option.1
C法律手段HTMLCONTROLForms.HTML:Option.1
D文化手段======多选题部分======5.对于建设项目的寿命周期的研究和界定,主要有(ABCD)四种。HTMLCONTROLForms.HTML:Checkbox.1
A物理寿命HTMLCONTROLForms.HTML:Checkbox.1
B功能寿命HTMLCONTROLForms.HTML:Checkbox.1
C法律寿命HTMLCONTROLForms.HTML:Checkbox.1
D经济寿命6.建设项目全寿命周期成本的特点中,复杂性是指(ABC)HTMLCONTROLForms.HTML:Checkbox.1
A建设项目全寿命周期成本的内容更加丰富HTMLCONTROLForms.HTML:Checkbox.1
B建设项目全寿命周期成本控制更加复杂HTMLCONTROLForms.HTML:Checkbox.1
C建设项目全寿命周期成本影响因素分析的对象范围更广,成本影响因素的类别更加丰富HTMLCONTROLForms.HTML:Checkbox.1
D计算更加复杂7.全寿命周期总成本包括(ABD)等。HTMLCONTROLForms.HTML:Checkbox.1
A初始投资HTMLCONTROLForms.HTML:Checkbox.1
B运营成本HTMLCONTROLForms.HTML:Checkbox.1
C维护成本HTMLCONTROLForms.HTML:Checkbox.1
D替换成本======判断题部分======8.在正常使用的情况下,从建设项目决策阶段到由于物理损坏而导致基本功能无法满足用户的正常使用的整段时间,被称为物理寿命期。对HTMLCONTROLForms.HTML:Option.1对HTMLCONTROLForms.HTML:Option.1错9.建设项目的寿命周期成本,即是建设项目在其寿命周期内发生的所有费用。对HTMLCONTROLForms.HTML:Option.1对HTMLCONTROLForms.HTML:Option.1错10.建设项目全寿命周期成本控制就是通过对组织、技术、经济等多方面的资源进行合理的分配和利用,实现成本控制的目标,其具有管理属性。对HTMLCONTROLForms.HTML:Option.1对HTMLCONTROLForms.HTML:Option.1错完成提交4建筑节能考试时长:15分钟,总分:10分,合格分数:6分======单选题部分======1.当今社会三大社会能耗不包括(D)HTMLCONTROLForms.HTML:Option.1
A工业HTMLCONTROLForms.HTML:Option.1
B交通HTMLCONTROLForms.HTML:Option.1
C建筑HTMLCONTROLForms.HTML:Option.1
D人才2.“节能”被称为煤炭、石油、天然气、核能之外的(A)HTMLCONTROLForms.HTML:Option.1
A第五大能源HTMLCONTROLForms.HTML:Option.1
B特殊能源HTMLCONTROLForms.HTML:Option.1
C绿色能源HTMLCONTROLForms.HTML:Option.1
D未来能源3.采用中央空调的大型商厦等绝大部分为高耗能建筑,其单位面积能耗大约是普通居住建筑的(B)HTMLCONTROLForms.HTML:Option.1
A5—10倍HTMLCONTROLForms.HTML:Option.1
B10—15倍HTMLCONTROLForms.HTML:Option.1
C15—20倍HTMLCONTROLForms.HTML:Option.1
D20—25倍4.项目监理机构应监督施工单位做好的施工过程记录不包括(A)HTMLCONTROLForms.HTML:Option.1
A地基处理HTMLCONTROLForms.HTML:Option.1
B屋顶各层隐蔽工程验收记录HTMLCONTROLForms.HTML:Option.1
C天窗安装工程验收记录HTMLCONTROLForms.HTML:Option.1
D墙体各层构造隐蔽工程的施工质量验收记录======多选题部分======5.EPS保温隔热板的特点(ABCD)HTMLCONTROLForms.HTML:Checkbox.1
A工厂化生产、产品质量稳定HTMLCONTROLForms.HTML:Checkbox.1
B施工简便、一次操作完成、周期短、效率高、减少湿作业HTMLCONTROLForms.HTML:Checkbox.1
C面层可据设计要求制作各种颜色花样、美观整洁HTMLCONTROLForms.HTML:Checkbox.1
D适用范围广、综合施工造价低6.在项目施工前,应按设计图纸要求组织实施对以下有关材料和产品的送检(ABCD)HTMLCONTROLForms.HTML:Checkbox.1
A屋顶隔热材料的导热系数HTMLCONTROLForms.HTML:Checkbox.1
B天窗所使用的玻璃(普通平板玻璃除外)传热系数和遮阳系数HTMLCONTROLForms.HTML:Checkbox.1
C外墙隔热材料或填充墙材料的导热系数,必要时进行墙体传热系数检测HTMLCONTROLForms.HTML:Checkbox.1
D外墙或屋面外表面的太阳辐射吸收系数(如采用浅色处理)7.建筑节能分部工程质量验收合格,应符合下列规定(ABCD)HTMLCONTROLForms.HTML:Checkbox.1
A分项工程应全部合格HTMLCONTROLForms.HTML:Checkbox.1
B质量控制资料应完整HTMLCONTROLForms.HTML:Checkbox.1
C外墙节能构造现场实体检验结果应符合设计要求HTMLCONTROLForms.HTML:Checkbox.1
D严寒、寒冷和夏热冬冷地区的外窗气密性现场实体检验结果应合格======判断题部分======8.发展出一套解决中国实际问题的低能耗大型公共建筑技术,可大大缓解由于目前城市建设中大型公共建筑比例的增长将造成的城市电力供应紧张状况。对HTMLCONTROLForms.HTML:Option.1对HTMLCONTROLForms.HTML:Option.1错9.我国热力工程的应用中给保温材料下了这样一个定义:以减少热量损失为目的,在平均温度等于或小于623K(350℃)时,导热系数小于0.12W/m•K的材料(密度不大于350kg/m3),称之为保温材料(导热系数<0.05W/m•K的材料称为高效保温材料)。对HTMLCONTROLForms.HTML:Option.1对HTMLCONTROLForms.HTML:Option.1错10.居住建筑的外窗面积不应过大,各朝向的窗墙面积比,北向不应大于0.45;东、西向不应大于0.30;南向不应大于0.50。错HTMLCONTROLForms.HTML:Option.1对HTMLCONTROLForms.HTML:Option.1错完成提交5建设项目安全现状及风险分析考试时长:15分钟,总分:10分,合格分数:6分======单选题部分======1.以下不属于风险事件的是(D)HTMLCONTROLForms.HTML:Option.1
A非典HTMLCONTROLForms.HTML:Option.1
B台风HTMLCONTROLForms.HTML:Option.1
C矿难HTMLCONTROLForms.HTML:Option.1
D堵车2.风险最主要的特征是(A)HTMLCONTROLForms.HTML:Option.1
A不确定性HTMLCONTROLForms.HTML:Option.1
B不合法HTMLCONTROLForms.HTML:Option.1
C客观性HTMLCONTROLForms.HTML:Option.1
D不可控3.以下属于纯粹的风险的是(A)HTMLCONTROLForms.HTML:Option.1
A安全生产事故HTMLCONTROLForms.HTML:Option.1
B项目投资HTMLCONTROLForms.HTML:Option.1
C炒股HTMLCONTROLForms.HTML:Option.1
D炒房4.长期风险是指风险可能持续(D)年以上HTMLCONTROLForms.HTML:Option.1
A2HTMLCONTROLForms.HTML:Option.1
B3HTMLCONTROLForms.HTML:Option.1
C4HTMLCONTROLForms.HTML:Option.1
D5======多选题部分======5.建筑施工安全事故发生规律主要在哪几个方面ABCDHTMLCONTROLForms.HTML:Checkbox.1
A事故类型HTMLCONTROLForms.HTML:Checkbox.1
B空间HTMLCONTROLForms.HTML:Checkbox.1
C时间HTMLCONTROLForms.HTML:Checkbox.1
D分部分项工程6.以下属于建筑事故类型的是(ABCD)HTMLCONTROLForms.HTML:Checkbox.1
A高处坠落HTMLCONTROLForms.HTML:Checkbox.1
B坍塌HTMLCONTROLForms.HTML:Checkbox.1
C物体打击HTMLCONTROLForms.HTML:Checkbox.1
D中毒7.以下说法正确的是(ABD)HTMLCONTROLForms.HTML:Checkbox.1
A生产经营单位必须遵守本法和其他有关安全生产的法规、法律,加强安全生产管理,建立、健全安全生产责任制和安全生产规章制度;HTMLCONTROLForms.HTML:Checkbox.1
B生产经营单位的主要负责人对本单位的安全生产工作全面负责HTMLCONTROLForms.HTML:Checkbox.1
C不具备安全生产条件,可以从事生产经营活动HTMLCONTROLForms.HTML:Checkbox.1
D设置安全生产管理机构或者配备专职安全生产管理人员======判断题部分======8.建设单位未取得施工许可证即可开工建设错HTMLCONTROLForms.HTML:Option.1对HTMLCONTROLForms.HTML:Option.1错9.施工单位主要负责人依法对本单位的安全生产工作全面负责对HTMLCONTROLForms.HTML:Option.1对HTMLCONTROLForms.HTML:Option.1错10.施工单位的项目负责人应当有取得相应执业资格的人员担任对HTMLCONTROLForms.HTML:Option.1对HTMLCONTROLForms.HTML:Option.1错完成提交6BIM技术分析与应用考试时长:15分钟,总分:10分,合格分数:6分======单选题部分======1.BIM模型架构与建模主要有(A)两种HTMLCONTROLForms.HTML:Option.1
A集成式和分散式HTMLCONTROLForms.HTML:Option.1
B开放式和封闭式HTMLCONTROLForms.HTML:Option.1
C结构式和分散式HTMLCONTROLForms.HTML:Option.1
D合成式和拆分式2.(C)是工程管理的核心,也是BIM实施的主要价值和目前实践中的难点HTMLCONTROLForms.HTML:Option.1
A建筑施工环境管理HTMLCONTROLForms.HTML:Option.1
B建筑施工材料管理HTMLCONTROLForms.HTML:Option.1
C建筑质量安全管理HTMLCONTROLForms.HTML:Option.1
D建筑施工进度管理3.BIM作为一种建设工程项目的数据化技术,强调其在()内通过对数据的应用产生价值DHTMLCONTROLForms.HTML:Option.1
A设计阶段HTMLCONTROLForms.HTML:Option.1
B施工阶段HTMLCONTROLForms.HTML:Option.1
C竣工验收阶段HTMLCONTROLForms.HTML:Option.1
D全寿命周期4.美国总承包商协会(AGC)定义BIM为一个面向对象的建筑开发工具,其利用5D建模概念、信息技术和软件的互可操作性去实现建设项目的设计、运营、维护,也实现信息的沟通;其中5D是指什么CHTMLCONTROLForms.HTML:Option.1
A3D空间HTMLCONTROLForms.HTML:Option.1
B3D空间4D进度HTMLCONTROLForms.HTML:Option.1
C3D空间4D进度5D造价HTMLCONTROLForms.HTML:Option.1
D3D空间4D进度5D安全======多选题部分======5.BIM工具主要包括(ABC)HTMLCONTROLForms.HTML:Checkbox.1
A建模软件HTMLCONTROLForms.HTML:Checkbox.1
B计算分析软件HTMLCONTROLForms.HTML:Checkbox.1
C应用软件HTMLCONTROLForms.HTML:Checkbox.1
D基础软件6.工具层主要有(ABCD)等HTMLCONTROLForms.HTML:Checkbox.1
A建筑工具HTMLCONTROLForms.HTML:Checkbox.1
B结构工具HTMLCONTROLForms.HTML:Checkbox.1
C机电工具HTMLCONTROLForms.HTML:Checkbox.1
D性能工具7.BIM环境主要包括(ABCD)等内容HTMLCONTROLForms.HTML:Checkbox.1
ABIM团队HTMLCONTROLForms.HTML:Checkbox.1
B网络(云)、服务器HTMLCONTROLForms.HTML:Checkbox.1
C工作站HTMLCONTROLForms.HTML:Checkbox.1
DBIM标准======判断题部分======8.设计阶段BIM应用的主要价值体现之一就是BIM协同设计与协同工作。协同设计需具备的功能有工作共享、内容复用、动态反馈对HTMLCONTROLForms.HTML:Option.1对HTMLCONTROLForms.HTML:Option.1错9.BIM是通过利用数字建模软件,把真实的建筑信息参数化、数字化以后形成一个模型,以此为平台,从设计师、工程师一直到施工单位和物业管理方,都可以在整个建筑项目的全生命周期进行信息的共享和改进对HTMLCONTROLForms.HTML:Option.1对HTMLCONTROLForms.HTML:Option.1错10.在建筑工程项目执行过程中,由于各参建单位之间的沟通不到位,往往容易出现各种专业之间以及阶段之间的碰撞问题BIM可在建筑物建造前期对各专业的碰撞问题进行协调,减少设计错误对HTMLCONTROLForms.HTML:Option.1对HTMLCONTROLForms.HTML:Option.1错完成提交7施工现场重大危险源识别与控制及注意事项考试时长:15分钟,总分:10分,合格分数:6分======单选题部分======1.在对于危险源的分类中,可能发生意外释放的能量或危险物质指的(A)HTMLCONTROLForms.HTML:Option.1
A第一类危险源HTMLCONTROLForms.HTML:Option.1
B第二类危险源HTMLCONTROLForms.HTML:Option.1
C第三类危险源HTMLCONTROLForms.HTML:Option.1
D第四类危险源2.长期地或临时地生产、搬运、使用或者储存危险物品,且危险物品的数量等于或者超过临界量的单元(包括场地和设施)指的是(A)HTMLCONTROLForms.HTML:Option.1
A重大危险源HTMLCONTROLForms.HTML:Option.1
B严重危险源HTMLCONTROLForms.HTML:Option.1
C特大危险源HTMLCONTROLForms.HTML:Option.1
D一般危险源3.下列不属于可能导致作业人员群死群伤或造成重大不良社会影响的事故类型的是(D)HTMLCONTROLForms.HTML:Option.1
A高空坠落HTMLCONTROLForms.HTML:Option.1
B触电HTMLCONTROLForms.HTML:Option.1
C物体打击HTMLCONTROLForms.HTML:Option.1
D铁钉扎伤4.在模板工程中导致坍塌的原因不包括(D)HTMLCONTROLForms.HTML:Option.1
A施工方案缺乏或不符合要求HTMLCONTROLForms.HTML:Option.1
B混凝土模板支撑系统不符合要求HTMLCONTROLForms.HTML:Option.1
C模板工程无验收与交底HTMLCONTROLForms.HTML:Option.1
D模板发生渗漏======多选题部分======5.根据多年的建筑事故来看,目前建设工程的三个重大危险源是:(ABC)HTMLCONTROLForms.HTML:Checkbox.1
A高模板A或B其中一个是深基坑HTMLCONTROLForms.HTML:Checkbox.1
B高模板HTMLCONTROLForms.HTML:Checkbox.1
C起重机械HTMLCONTROLForms.HTML:Checkbox.1
D钢筋加工机械6.隐患的识别方式有(ABCD)HTMLCONTROLForms.HTML:Checkbox.1
A通过重大危险源识别重大隐患HTMLCONTROLForms.HTML:Checkbox.1
B通过项目的施工特点识别隐患HTMLCONTROLForms.HTML:Checkbox.1
C日常的工作经验识别HTMLCONTROLForms.HTML:Checkbox.1
D各种技术规范、标准的技术识别7.对危险源的识别方法有(ABC)HTMLCONTROLForms.HTML:Checkbox.1
A安全检查表法HTMLCONTROLForms.HTML:Checkbox.1
B事故树分析法HTMLCONTROLForms.HTML:Checkbox.1
C作业安全分析法HTMLCONTROLForms.HTML:Checkbox.1
D目测法======判断题部分======8.历史发生事故统计案例,经验教训可以作为编制安全检查表的依据对HTMLCONTROLForms.HTML:Option.1对HTMLCONTROLForms.HTML:Option.1错9.危险源的识别要针对不同被检查区域、场所、工程实体、重大设备等要有所侧重,避免重复对HTMLCONTROLForms.HTML:Option.1对HTMLCONTROLForms.HTML:Option.1错10.安全技术交底应按施工工序、施工部位、施工栋号分部分项进行对HTMLCONTROLForms.HTML:Option.1对HTMLCONTROLForms.HTML:Option.1错完成提交8市政工程安全管理考试时长:15分钟,总分:10分,合格分数:6分======单选题部分======1.建设单位应当在拆除工程施工(A)前,将相关的资料报送建设工程所在地的县级以上政府建设行政主管部门或者其他相关部门备案。HTMLCONTROLForms.HTML:Option.1
A15日HTMLCONTROLForms.HTML:Option.1
B20日HTMLCONTROLForms.HTML:Option.1
C25日HTMLCONTROLForms.HTML:Option.1
D30日2.非开挖顶管作业应有防毒、防燃、防暴、防水措施,顶进长度超过(A)时,应有通风供氧措施。啊HTMLCONTROLForms.HTML:Option.1
A50mHTMLCONTROLForms.HTML:Option.1
B100mHTMLCONTROLForms.HTML:Option.1
C150mHTMLCONTROLForms.HTML:Option.1
D200m3.施工前应对地下各类设施进行详细勘察,确认地下管线的埋置深度、位置等有关情况,制定防护措施方案,经(A)审批签字后,在确保安全的前提下方可进行施工。HTMLCONTROLForms.HTML:Option.1
A项目负责人HTMLCONTROLForms.HTML:Option.1
B总监HTMLCONTROLForms.HTML:Option.1
C业主代表HTMLCONTROLForms.HTML:Option.1
D安全员4.《施工现场临时用电安全技术规范》中规定,施工现场用电线路必须采用(C)接零保护系统。HTMLCONTROLForms.HTML:Option.1
ATTHTMLCONTROLForms.HTML:Option.1
BTN-CHTMLCONTROLForms.HTML:Option.1
CTN-SHTMLCONTROLForms.HTML:Option.1
DTN-C-S======多选题部分======5.建设单位应当将拆除建设工程具有相应资质等级的施工单位,并应将下列资料(ABCD)报送建设工程所在地的县级以上地方人民政府建设行政主管部门或其他有关部门备案。HTMLCONTROLForms.HTML:Checkbox.1
A施工单位资质等级证明HTMLCONTROLForms.HTML:Checkbox.1
B拟拆除建、构筑物极有可能危及毗邻建筑的说明HTMLCONTROLForms.HTML:Checkbox.1
C拆除施工组织方案HTMLCONTROLForms.HTML:Checkbox.1
D堆放、清除废弃物的措施6.总分包单位在签订分包合同的同时要签订安全生产合同(协议),签订合同前要检查分包单位的(ACD)等。HTMLCONTROLForms.HTML:Checkbox.1
A营业执照HTMLCONTROLForms.HTML:Checkbox.1
B职业资格证HTMLCONTROLForms.HTML:Checkbox.1
C企业资质证HTMLCONTROLForms.HTML:Checkbox.1
D安全资格证7.工伤认定申请应当提交下列材料(ACD)。HTMLCONTROLForms.HTML:Checkbox.1
A医疗诊断证明或者职业病诊断证明书HTMLCONTROLForms.HTML:Checkbox.1
B生产班组情况证明HTMLCONTROLForms.HTML:Checkbox.1
C工伤认定申请表HTMLCONTROLForms.HTML:Checkbox.1
D与用人单位存在劳动关系的证明======判断题部分======8.安全生产管理包括对人的安全管理和对环境的安全管理两个方面。(对)HTMLCONTROLForms.HTML:Option.1对HTMLCONTROLForms.HTML:Option.1错9.确保安全生产,基坑(槽)开挖和开挖中必须做好排水工作,保证土体的干燥才能保障安全,挖至设计深度经检查验收后可停止排水。(错)HTMLCONTROLForms.HTML:Option.1对HTMLCONTROLForms.HTML:Option.1错10.管道检查井开启井盖后,必须立即在井口周围设置安全防护栏,夜间挂红灯警示,在井下管道内作业必须使用供压缩空气的隔离式供氧面具和供压缩器全隔绝式防护装具。(对)HTMLCONTROLForms.HTML:Option.1对HTMLCONTROLForms.HTML:Option.1错完成提交9模板工程安全通病防治考试时长:15分钟,总分:10分,合格分数:6分======单选题部分======1.木立柱宜选用整料,立柱底部可采用垫块垫高,垫高高度不宜超过(b)mm。HTMLCONTROLForms.HTML:Option.1
A200HTMLCONTROLForms.HTML:Option.1
B300HTMLCONTROLForms.HTML:Option.1
C400HTMLCONTROLForms.HTML:Option.1
D5002.模板支架的立杆应采用(b)接长。HTMLCONTROLForms.HTML:Option.1
A扣接HTMLCONTROLForms.HTML:Option.1
B对接HTMLCONTROLForms.HTML:Option.1
C搭接HTMLCONTROLForms.HTML:Option.1
D焊接3.当立柱采用对接拉长时,相邻两立柱的接头不得在同步内,且对接接头沿竖向错开的距离不宜小于(a)mm。HTMLCONTROLForms.HTML:Option.1
A500HTMLCONTROLForms.HTML:Option.1
B400HTMLCONTROLForms.HTML:Option.1
C300HTMLCONTROLForms.HTML:Option.1
D2004.当采用扣件式钢管作立柱支撑时,(D)将上段的钢管立柱与下段钢管立柱错开固定在水平杆上。HTMLCONTROLForms.HTML:Option.1
A可以HTMLCONTROLForms.HTML:Option.1
B不宜HTMLCONTROLForms.HTML:Option.1
C不应HTMLCONTROLForms.HTML:Option.1
D严禁======多选题部分======5.符合以下条件之一者为高大模板或高大作业平台:(ABCDE)。符合以下条件之一者为高大模板或高大作业平台:——支撑体系高度达到或超过8m;——结构跨度达到或超过18m的模板;2——按JGJ162-2008进行荷载组合之后的施工面荷载达到或超过15kN/m;——按JGJ162-2008进行荷载组合之后的施工线荷载达到或超过20kN/m;——按JGJ162-2008进行荷载组合之后的施工单点集中荷载达到或超过7kN的作业平台HTMLCONTROLForms.HTML:Checkbox.1
A支撑体系高度达到或超过8m;HTMLCONTROLForms.HTML:Checkbox.1
B结构跨度达到或超过18m的模板;HTMLCONTROLForms.HTML:Checkbox.1
C按JGJ162进行荷载组合之后的施工面荷载达到或超过15kN/m2;HTMLCONTROLForms.HTML:Checkbox.1
D按JGJ162进行荷载组合之后的施工线荷载达到或超过20kN/m;HTMLCONTROLForms.HTML:Checkbox.1
E按JGJ162进行荷载组合之后的施工单点集中荷载达到或超过7kN的作业平台。6.扣件式钢管支架,当截面高度达到或超过1m的梁的支承时(bcde)。HTMLCONTROLForms.HTML:Checkbox.1
A支承立杆可少于2排;HTMLCONTROLForms.HTML:Checkbox.1
B支承立杆应不少于2排;HTMLCONTROLForms.HTML:Checkbox.1
C承托梁底模的水平杆与立杆的扣接应使用双扣件;HTMLCONTROLForms.HTML:Checkbox.1
D梁底水平杆抗弯及梁底水平杆与立杆相扣的扣件抗滑移应按有关标准另行计算;HTMLCONTROLForms.HTML:Checkbox.1
E截面高度达到或超过1.2m的梁,应在其底模两侧并支承梁的立杆上,沿梁长方向全高全长各设置一道竖直剪刀撑(竖直剪刀撑如上端达到封顶杆位置,可兼作剪刀撑体系中的竖直剪刀撑,否则应在原剪刀撑体系中增设)。7.拆除梁、板模板应遵守下列规定:(ABCDE)HTMLCONTROLForms.HTML:Checkbox.1
A梁、板模板应先拆梁侧模,再拆板底模,最后拆除梁底模,并应分段分片进行,严禁成片撬落或成片拉拆;HTMLCONTROLForms.HTML:Checkbox.1
B拆除时,作业人员应站在安全的地方进行操作,严禁站在已拆或松动的模板上进行拆除作业;HTMLCONTROLForms.HTML:Checkbox.1
C拆除模板时,严禁用铁棍或铁锤乱砸,已拆下的模板应妥善传递或用绳钩放至地面;HTMLCONTROLForms.HTML:Checkbox.1
D严禁作业人员站在悬臂结构边缘敲拆下面的底模;HTMLCONTROLForms.HTML:Checkbox.1
E待分片、分段的模板全部拆除后,方允许将模板、支架、零配件等按指定地点运出堆放,并进行拔钉、清理、整修、刷防锈油或脱模剂,入库备用。======判断题部分======8.当模板安装高度超过3.0m时,不用搭设脚手架,可以站在钢筋骨架上安装模板。(错)HTMLCONTROLForms.HTML:Option.1对HTMLCONTROLForms.HTML:Option.1错9.根据JGJ162-2008,剪刀撑应采用搭接,搭接长度不得小于500mm,用两个旋转扣件分别在离杆端不小于100mm处进行固定。(对)HTMLCONTROLForms.HTML:Option.1对HTMLCONTROLForms.HTML:Option.1错10.可以将上段的钢管立柱与下段钢管立柱错开固定于水平拉杆上。(错)HTMLCONTROLForms.HTML:Option.1对HTMLCONTROLForms.HTML:Option.1错完成提交10建设项目投融资与承包模式考试时长:15分钟,总分:10分,合格分数:6分======单选题部分======1.贷款的数量、贷款期限、融资成本的高低以及融资结构设计都与项目的预期预期现金流量和资本价值及项目生命周期直接联系在一起。描述的是建设项目投资与融资特点的(A)HTMLCONTROLForms.HTML:Option.1
A项目导向性HTMLCONTROLForms.HTML:Option.1
B追索权的有限性HTMLCONTROLForms.HTML:Option.1
C项目风险的分散性HTMLCONTROLForms.HTML:Option.1
D项目信用的多样性2.确定各方参与者所能承受的最大风险及合作的可能性,利用一切优势条件,设计出最有利的融资方案。描述的是建设项目投资与融资特点的(C)HTMLCONTROLForms.HTML:Option.1
A项目导向性HTMLCONTROLForms.HTML:Option.1
B追索权的有限性HTMLCONTROLForms.HTML:Option.1
C项目风险的分散性HTMLCONTROLForms.HTML:Option.1
D项目信用的多样性3.将多样性的信用支持分配到项目未来的各个风险点,从而规避和化解不确定项目风险。描述的是建设项目投资与融资特点的(D)HTMLCONTROLForms.HTML:Option.1
A项目导向性HTMLCONTROLForms.HTML:Option.1
B追索权的有限性HTMLCONTROLForms.HTML:Option.1
C项目风险的分散性HTMLCONTROLForms.HTML:Option.1
D项目信用的多样性4.从企业内部来讲,过早融资会造成资金闲置,而如果过完融资又会造成投资机会的丧失,讲的是投资管理的(A)原则HTMLCONTROLForms.HTML:Option.1
A时机得当原则HTMLCONTROLForms.HTML:Option.1
B规模适度原则HTMLCONTROLForms.HTML:Option.1
C结构合理原则HTMLCONTROLForms.HTML:Option.1
D依法融资原则======多选题部分======5.建设项目投资与融资的特点包括:(ABCD)HTMLCONTROLForms.HTML:Checkbox.1
A项目导向性HTMLCONTROLForms.HTML:Checkbox.1
B追索权的有限性HTMLCONTROLForms.HTML:Checkbox.1
C项目风险的分散性HTMLCONTROLForms.HTML:Checkbox.1
D项目信用的多样性6.建设项目投资管理的原则有()规模、时机、经济效益、结构合理HTMLCONTROLForms.HTML:Checkbox.1
A依法融资原则HTMLCONTROLForms.HTML:Checkbox.1
B依法融资原则HTMLCONTROLForms.HTML:Checkbox.1
C结构合理原则HTMLCONTROLForms.HTML:Checkbox.1
D成本效益原则7.新设法人融资的特点(CD)HTMLCONTROLForms.HTML:Checkbox.1
A项目发起人做出投资决策HTMLCONTROLForms.HTML:Checkbox.1
B发起人与项目公司并非一体HTMLCONTROLForms.HTML:Checkbox.1
C项目公司承担融资责任与风险HTMLCONTROLForms.HTML:Checkbox.1
D项目还款能力取决于项目资产和项目财务效益======判断题部分======8.从企业内部来讲,过早融资会造成资金闲置,而如果过完融资又会造成投资机会的丧失对HTMLCONTROLForms.HTML:Option.1对HTMLCONTROLForms.HTML:Option.1错9.BOT融资的主体由某个或者几个公司发起,其他公司参与,向当地政府提出。对HTMLCONTROLForms.HTML:Option.1对HTMLCONTROLForms.HTML:Option.1错10.BOT融资的对象是基础设施建设和公共设施建设错HTMLCONTROLForms.HTML:Option.1对HTMLCONTROLForms.HTML:Option.1错完成提交11大型桥梁承台施工案例考试时长:15分钟,总分:10分,合格分数:6分======单选题部分======1.重力式墩台主要是依靠()来平衡外力HTMLCONTROLForms.HTML:Option.1
A自身材料强度HTMLCONTROLForms.HTML:Option.1
B自身重量HTMLCONTROLForms.HTML:Option.1
C流水压力HTMLCONTROLForms.HTML:Option.1
D土压力2.属于柔性护栏的是()HTMLCONTROLForms.HTML:Option.1
A金属制护栏HTMLCONTROLForms.HTML:Option.1
B钢筋混凝土墙式护栏HTMLCONTROLForms.HTML:Option.1
C缆索护栏HTMLCONTROLForms.HTML:Option.1
D波形梁护栏3.装配式钢筋混凝土板桥的块件之间设置横向连接,其目的是()HTMLCONTROLForms.HTML:Option.1
A减少车辆振动HTMLCONTROLForms.HTML:Option.1
B增加板桥的整体性HTMLCONTROLForms.HTML:Option.1
C增加行车道美观HTMLCONTROLForms.HTML:Option.1
D方便安装4.制作后张法预应力混凝土构件,需要抽拔的制孔器为()HTMLCONTROLForms.HTML:Option.1
A铁皮管HTMLCONTROLForms.HTML:Option.1
B金属波纹管HTMLCONTROLForms.HTML:Option.1
C橡胶管HTMLCONTROLForms.HTML:Option.1
D都需要======多选题部分======5.桥梁承台施工方案应包括HTMLCONTROLForms.HTML:Checkbox.1
A混凝土套箱的施工HTMLCONTROLForms.HTML:Checkbox.1
B钢筋施工HTMLCONTROLForms.HTML:Checkbox.1
C模板施工HTMLCONTROLForms.HTML:Checkbox.1
D混凝土施工6.桥梁墩台主要有()几部分组成HTMLCONTROLForms.HTML:Checkbox.1
A墩台帽HTMLCONTROLForms.HTML:Checkbox.1
B墩台身HTMLCONTROLForms.HTML:Checkbox.1
C基础HTMLCONTROLForms.HTML:Checkbox.1
D护栏7.质量保证系统应包括HTMLCONTROLForms.HTML:Checkbox.1
A管理机构图HTMLCONTROLForms.HTML:Checkbox.1
B质量岗位职责HTMLCONTROLForms.HTML:Checkbox.1
C测量监督体系HTMLCONTROLForms.HTML:Checkbox.1
D质检体系======判断题部分======8.套箱分为混凝土套箱和钢套箱HTMLCONTROLForms.HTML:Option.1对HTMLCONTROLForms.HTML:Option.1错9.施工方案应符合有关设计、质量、安全、工期及工程管理等方面的规范,规程及法律法规等HTMLCONTROLForms.HTML:Option.1对HTMLCONTROLForms.HTML:Option.1错10.先张法预应力混凝土构件,预应力筋的放松可采用千斤顶放松、和砂筒放松。HTMLCONTROLForms.HTML:Option.1对HTMLCONTROLForms.HTML:Option.1错完成提交12桥梁工程质量通病与防治考试时长:15分钟,总分:10分,合格分数:6分======单选题部分======1.桥梁工程质量通病与防治AHTMLCONTROLForms.HTML:Option.1
A水头高度不够HTMLCONTROLForms.HTML:Option.1
B泥浆浓度大HTMLCONTROLForms.HTML:Option.1
C砂层中进尺过慢HTMLCONTROLForms.HTML:Option.1
D清孔后停留时间过长2.以下属于桩孔倾斜率过大原因的是(B)HTMLCONTROLForms.HTML:Option.1
A钻孔中遇到许多碎石HTMLCONTROLForms.HTML:Option.1
B扩孔较小处钻头摆动偏向一方HTMLCONTROLForms.HTML:Option.1
C钻杆弯曲,接头不正HTMLCONTROLForms.HTML:Option.1
D钻杆过长3.以下属于钻孔漏浆原因的是()HTMLCONTROLForms.HTML:Option.1
A护筒内水位过低HTMLCONTROLForms.HTML:Option.1
B钻头起落时碰撞护筒HTMLCONTROLForms.HTML:Option.1
C护筒埋设过深HTMLCONTROLForms.HTML:Option.1
D周围填土过于密实4.以下属于导管进水原因的是()HTMLCONTROLForms.HTML:Option.1
A机械或停电故障HTMLCONTROLForms.HTML:Option.1
B混凝土离析HTMLCONTROLForms.HTML:Option.1
C首盘的隔水栓卡管HTMLCONTROLForms.HTML:Option.1
D首盘料不足======多选题部分======5.支架倾斜、压弯、折断的原因可能是(ABCD)HTMLCONTROLForms.HTML:Checkbox.1
A设计荷载偏小HTMLCONTROLForms.HTML:Checkbox.1
B杆件设计不合理HTMLCONTROLForms.HTML:Checkbox.1
C计算缺失HTMLCONTROLForms.HTML:Checkbox.1
D节点设计不合理6.钢筋曲折变形常见原因有(ABD)HTMLCONTROLForms.HTML:Checkbox.1
A吊装位置不合理HTMLCONTROLForms.HTML:Checkbox.1
B运输车辆过短HTMLCONTROLForms.HTML:Checkbox.1
C运输车辆过长HTMLCONTROLForms.HTML:Checkbox.1
D堆放不合理7.钢筋保护层不足,露筋的常见原因有(BD)HTMLCONTROLForms.HTML:Checkbox.1
A未能严格按图施工HTMLCONTROLForms.HTML:Checkbox.1
B钢筋绑扎顺序不对HTMLCONTROLForms.HTML:Checkbox.1
C质检人员未能及时进行检查HTMLCONTROLForms.HTML:Checkbox.1
D工艺不当======判断题部分======8.运输漏浆会导致坍落度过大、离析HTMLCONTROLForms.HTML:Option.1对HTMLCONTROLForms.HTML:Option.1错9.水泥搅拌不充分容易导致砂浆不饱满HTMLCONTROLForms.HTML:Option.1对HTMLCONTROLForms.HTML:Option.1错10.混凝土浇筑未按照施工方案进行会导致模板变形支架移位变形等现象HTMLCONTROLForms.HTML:Option.1对HTMLCONTROLForms.HTML:Option.1错完成提交13大跨度拱桥上部结构施工方案考试时长:15分钟,总分:10分,合格分数:6分======单选题部分======1.钢桥所用的连接方式有HTMLCONTROLForms.HTML:Option.1
A铆接、焊接、栓接HTMLCONTROLForms.HTML:Option.1
B绑接、焊接HTMLCONTROLForms.HTML:Option.1
C栓接、铆接HTMLCONTROLForms.HTML:Option.1
D栓接、绑接2.钢筋混凝土简支梁的跨中预拱度设置方向是HTMLCONTROLForms.HTML:Option.1
A向上HTMLCONTROLForms.HTML:Option.1
B向下HTMLCONTROLForms.HTML:Option.1
C向左HTMLCONTROLForms.HTML:Option.1
D向右3.拱桥的承重结构以()为主HTMLCONTROLForms.HTML:Option.1
A受压HTMLCONTROLForms.HTML:Option.1
B受拉HTMLCONTROLForms.HTML:Option.1
C受剪HTMLCONTROLForms.HTML:Option.1
D受扭4.悬索桥的承重结构以()为主HTMLCONTROLForms.HTML:Option.1
A受压HTMLCONTROLForms.HTML:Option.1
B受拉HTMLCONTROLForms.HTML:Option.1
C受剪HTMLCONTROLForms.HTML:Option.1
D受扭======多选题部分======5.桥梁施工方案的编制依据HTMLCONTROLForms.HTML:Checkbox.1
A桥梁的施工图HTMLCONTROLForms.HTML:Checkbox.1
B桥梁施工技术规范HTMLCONTROLForms.HTML:Checkbox.1
C有关设计规范HTMLCONTROLForms.HTML:Checkbox.1
D相关法律法规6.工程管理目标有HTMLCONTROLForms.HTML:Checkbox.1
A质量目标HTMLCONTROLForms.HTML:Checkbox.1
B工期目标HTMLCONTROLForms.HTML:Checkbox.1
C安全目标HTMLCONTROLForms.HTML:Checkbox.1
D文明施工目标7.拱桥总体施工方案包括哪些内容HTMLCONTROLForms.HTML:Checkbox.1
A吊装施工方案的选择HTMLCONTROLForms.HTML:Checkbox.1
B吊装设备的选择HTMLCONTROLForms.HTML:Checkbox.1
C管线桥施工顺序的确定HTMLCONTROLForms.HTML:Checkbox.1
D管线桥钢结构分段方案======判断题部分======8.选择吊装方案时受周边环境,施工进度,施工质量及施工安全的制约HTMLCONTROLForms.HTML:Option.1对HTMLCONTROLForms.HTML:Option.1错9.浮吊的组成由扒杆,船体,浮箱等组成HTMLCONTROLForms.HTML:Option.1对HTMLCONTROLForms.HTML:Option.1错10.根据桥梁传力的要求,桥梁施工的顺序应根据现场条件、起吊设备等因素来选择施工顺序。HTMLCONTROLForms.HTML:Option.1对HTMLCONTROLForms.HTML:Option.1错完成提交14建筑施工安全管理及事故案例分析考试时长:15分钟,总分:10分,合格分数:6分======单选题部分======1.楼板、屋面和平台等面上短边尺寸()的孔口,必须用坚实的盖板盖没。HTMLCONTROLForms.HTML:Option.1
A小于22CM大于2.8CMHTMLCONTROLForms.HTML:Option.1
B小于23CM大于2.7CMHTMLCONTROLForms.HTML:Option.1
C小于24CM大于2.6CMHTMLCONTROLForms.HTML:Option.1
D小于25CM大于2.5CM2.开挖坑(槽)沟深度超过()时,必须根据上质和深度放坡或加可靠支撑HTMLCONTROLForms.HTML:Option.1
A1.5mHTMLCONTROLForms.HTML:Option.1
B1.6mHTMLCONTROLForms.HTML:Option.1
C1.7mHTMLCONTROLForms.HTML:Option.1
D1.8m3.事故情形是外墙双排脚手架直接搭设在自然土壤上,因不均匀沉降,脚手架倾斜、歪倒。这种事故情形叫做()HTMLCONTROLForms.HTML:Option.1
A施工用双排脚手架坍塌HTMLCONTROLForms.HTML:Option.1
B不均匀沉降导致建筑物整体坍塌HTMLCONTROLForms.HTML:Option.1
C不均匀沉降导致建筑物整体坍塌HTMLCONTROLForms.HTML:Option.1
D零时围墙坍塌4.零时围墙坍塌HTMLCONTROLForms.HTML:Option.1
A随意施工HTMLCONTROLForms.HTML:Option.1
B持证上岗HTMLCONTROLForms.HTML:Option.1
C培训上岗HTMLCONTROLForms.HTML:Option.1
D戴安全帽上岗======多选题部分======5.以下哪些是属于防止高处坠落、物体打击的十项基本安全要求()HTMLCONTROLForms.HTML:Checkbox.1
A高处作业时,不准往下或向上乱抛材料和工具等物件HTMLCONTROLForms.HTML:Checkbox.1
B高处作业人员严禁相互打闹,以免失足发生坠落危险HTMLCONTROLForms.HTML:Checkbox.1
C在进行攀登作业时,攀登用具结构必须牢固可靠,使用必须正确HTMLCONTROLForms.HTML:Checkbox.1
D在进行攀登作业时,攀登用具结构必须牢固可靠,使用必须正确6.预防土方坍塌事故的安全措施有()HTMLCONTROLForms.HTML:Checkbox.1
A施工人员必须按安全技术交底要求进行挖掘作业HTMLCONTROLForms.HTML:Checkbox.1
B土方开挖前必须作好降(排)水HTMLCONTROLForms.HTML:Checkbox.1
C挖土应从上而下逐层挖掘,严禁掏挖HTMLCONTROLForms.HTML:Checkbox.1
D坑(槽)沟必须设置人员上下坡道或爬梯,严禁在坑壁上掏坑攀登上下7.在施工现场,当发现身边的人不能咳嗽、呼吸、说话和哭泣,应立即拨打急救电话或告诉周围的人打电话。接着开始进行紧急救助。以下是救助的方法的是()HTMLCONTROLForms.HTML:Checkbox.1
A不要试图取出患者咽喉内的异物,因为这样可能导致异物更深入地嵌入气道HTMLCONTROLForms.HTML:Checkb
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025中国化学工程集团限公司招聘45人高频重点提升(共500题)附带答案详解
- 2025中国交通建设集团限公司招聘高频重点提升(共500题)附带答案详解
- 2025中交第二航务工程局限公司招聘【23人】高频重点提升(共500题)附带答案详解
- 2025下半年福建省漳州市事业单位招聘163人历年高频重点提升(共500题)附带答案详解
- 2025上海市知识产权保护中心事业编制人员公开招聘31人高频重点提升(共500题)附带答案详解
- 2025上半年江苏省南京市社会科学院招聘高层次人才1人历年高频重点提升(共500题)附带答案详解
- 学校图书室管理办法
- 节庆活动租赁经营合同
- 宠物店店长招聘合同模板
- 药材储存防虫害
- 《无线局域网》课件
- 慢性胃炎的康复治疗
- 北京市通州区2023-2024学年七年级上学期期末数学试题
- 健康养肾补肾知识讲座
- 《体育概论》期末考试复习题库及答案
- 项目竞标市场拓展与渠道合作策略
- 雨污分流管网工程施工重点难点分析及解决方案
- 职业指导师四级-一-真题-无答案
- 单人心肺复苏操作评分标准
- 大学生心理健康教育-课件-第7章-学会用心交往-人际交往
- 民宿经营四邻协议书范本
评论
0/150
提交评论