1、MEMORANDUM备忘录Commodity :商品名称 Machine m机床型号CNC Bevel Gear Grinding Machine数控螺伞齿轮磨齿机:G80Contract No. :合同号 Location :地点RIEC/I-081/12Machine S /No. :机床292410BeiJingParticipant / 参与者: End user / 最终用户:Name /ition / 职位Duration / 时间25.04.12 to 06.05.12.Li ShuaiEngineer of Gear :技术部工程师: Operator :操作工Beijing
2、TransitNouRailwayry Co.李帅南口轨道交通机械有限公司Nidai KaraServ. Engineer维修工程师25.04.12 to 06.05.12.OEM / 设备制造厂商:Klingelnberg公司Seller: Siber Hegner ChinaServ. Engineer维修工程师25.04.12 to 06.05.12.Mr.Gary Nian年卖方()Mr.FrWang 王 雷In accordance with the captioned contract, during the above and last service period the fo
3、llowing work for the contract goods has been done:按以上合同,在上述和上次服务期内就合同货物已完成以下工作:1 Installation and function inspection for machine 机床安装和功能检查The machine has been installed been checked correctly.he workshop ofuser, and the machine functions have机床已安装在最终用户的车间里,机床功能检查正确。2 Accuracy of the machine 机床精度2.1
4、The geometrical accuracy 几何精度The geometrical accuracy of the machine has been inspectedin last service period according to thetest protocol using the measuring devisent from Klingelnberg. The checking results for all itemsare with使用从he permissible tolerance (see attached of test protocol), and it is
5、 accepted byuser.运来的测量装置在服务期内按检验协议检测了机床几何精度。所有检测项目的检测结果在可允许的公差内(见附件检验协议),最终用户接受了上述检测结果。ation, machine acsories & spare parts文件,机床附件和备件ation 文件3.3.1All of machines have been checked according to the contract, and it is compleyaccordant with the contract and accepted byuser.按合同检查了全部机床文件,结果完全符合并被最终用户接受
6、。3.2Machine acsories & spare parts 机床附件和备件All of the acsories and spare parts have been checked according to the packing list, and it iscompley accordant with the contract and accepted byuser (see attached packing list).按照装箱单检查了全部机床附件和备件,与合同符合并被最终用户接受。(见附件装箱单)。4. Acceptance work piece and miscellane
7、ous matters 验收工件和其他事宜4.1 The grinded gears reached quality 1 at the pre-acceptance. But when measuring them on customersP100-machine they only get quality 3-4. For Final acceptance Quality 2 is required.预验收磨齿达到 1 级精度,在客户P100 测量机实测 3-4 级精度。而客户需要终验收能达到 2 级精度。4.2 Beijing Nou Railway Transit Machinery C
8、o. onlyd 2 sets of Gears, which has alreadybeen grinded 0,75 mm to “0” at the pre-acceptance. After grinding and making a correction, the tooththickness reached -0,5 mm, so reached the soft core. As result there was no further grindingsible.So the Customer need to prepareeast another 2 set of gears
9、frinding before final acceptance.南口轨道交通仅提供了两套齿轮,用于调试及终验收验收,该两套齿轮在预验收时齿厚已经磨削至 0,磨削量为 0.75. 经过在客户工厂修正磨削后齿厚接近-0.5,已经达到热处理层极限,没有进一步磨削的可能性。因此南口轨道交通公司需另外准备至少两套齿轮用于终验收。4.3 Beijing N acceptance :ou Railway Transit Machinery Co. need to prepare the following items for final南口轨道交通还需准备如下事项:- The P100 must be c
10、onnected to theP100 测量机需与KIMoS 计算机及 G80 磨床联网puter and the G80- A computer on which KIMoS and KOMET software have been installed and can be used normally.一台安装有KIMoS 和 KoMet的电脑,两个可以正常使用。- All of the hardware for Network connection。Is been finished.联网所需全部硬件。已经完成。- Since the old software of P100 has not
11、 comple y alignment (without pitch measuring alignment)function of eccentricity, This direct lead to the wrong measuring result compare to KL manufacturing standard (or need to buy the option).The old P100 has not Komet software ,this lead togetting correction data and transmit correction data imsib
12、ly . The old P100 has not USBerface ,thislead to error happens frequently when importing or exporting the database data, it will cause great risks to the normal use in the future.For the above reasons , customer need to update the old P100.we will connect with KL and inform customer.由于 P100 测量机旧版本制造
13、标准. 该旧版本没有完整的找正补偿(齿距测量找正)功能,这直接导致测量结果错误而不符合也没有修正Komet,导致测量机无法计算以获取修正值并通过网络传输该修正值。该旧版电脑主机没有 Usb 接口,导致数据库数据导入及导出经常出错,给将来正常使用造成极大隐患。基于以上原因客户需对其 P100 测量机进行升级。具体时间将同沟通另行通知。- Measuring reports of the P100(software updated) of the heat-treated parts which will be used for final acceptance. Reports must be
14、send to Klingelnberg in advance.用于终验收的热处理工件需预先在 P100(升级)上测量,并将测量提前发送至 Klingelnberg 公司。4.4 Networks software configuration f80 should be done by KL engineer.网络连接的配置由工程师完成4.5 If the customer demands new requirements regarding to G-machine application, contact with DKSH sale department.客户关于G 磨床应用方面新需求与
15、DKSH 销售部门具体协商解决。Training on the machine 在机培训Operating training 操作培训The practical operating training for the machine has been provided to the operators of为最终用户的操作者提供了机床的实际操作培训。-user.6Fire extinguishing system 灭火系统Fire extinguishing system have been check and activated. Bottle of the CO2 have been fill in from customer.Some training have been provided to maenance engineers and operator of End user.灭火系统已经检查和激活,客户
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 改进工作方式提案3篇
- 政府项目采购合同方3篇
- 文化传承责任状3篇
- 新版个人银行借款合同3篇
- 地铁站绿化施工合同协议书
- 汽车零部件仓储租赁协议
- 企业旅游贷款还款协议
- 药品生产厂供配电工程合同
- 城市绿化带级配碎石施工协议
- 垃圾处理场防水工程承包协议
- 微短剧制作手册专业版
- 酒店前台消防安全培训
- 2021-2022学年河北省唐山市高一上学期期末语文试题
- 【期末复习提升卷】浙教版2022-2023学年八年级上学期数学期末压轴题综合训练试卷1(解析版)
- 山东省临沂市费县2023-2024学年八年级上学期1月期末生物试题
- PDCA血液透析水循环案例汇报
- 岩石钻机施工方案
- 山东省烟台市2023-2024学年七年级上学期期末数学试题(含答案)
- 2024年贵州省铜仁市四年级数学第一学期期末教学质量检测模拟试题含解析
- 2024年贵阳市小河区四上数学期末教学质量检测模拟试题含解析
- 北京社区食堂招商方案
评论
0/150
提交评论