1、i2生产计划与排程2022/7/23i2生产计划与排程AgendaWhat Is Rhythm Factory Planner (FP)Rhythm FP ArchitectureRhythm Factory Planner (FP) Planning ConceptRhythm FP featuresi2生产计划与排程What Is Rhythm Factory Planner (FP) ?i2生产计划与排程What Is Rhythm Factory Planner (FP)Factory Planner uses the information from the existing tra
2、nsaction system (ERP) to provide intelligent decision support capability in Planning and SchedulingFactory Planner provides a global integrated view PurchasingOrder EntryShippingMRPFactory PlannerFloor ControlDataDecisions & Datai2生产计划与排程What Can Rhythm FP Do?Factory Planner provides a systematic an
3、d constraint-based planning conceptFactory Planner can help to minimize the current ad-hoc planning processFactory Planner can quickly reveal the production constraint, which is almost impossible for traditional planning processi2生产计划与排程Rhythm FP Architecturei2生产计划与排程Rhythm FP ArchitectureClient-Ser
4、ver ArchitectureBoth server and client processes can run on Windows NT machinesMay run server and client on separate machinesUse existing data (from Triton and SFCS)Memory ResidentMulti-User capabilityi2生产计划与排程Rhythm FP Architecture (cont.)Rhythm FP ClientRhythm FP ClientRhythmFP ClientData FilesRhy
5、thm FP ServerRhythmFP ServerProduction PlannerMaterialPlannerReport ReaderProduction ServerWhat-ifServeri2生产计划与排程Rhythm FP Framework (Input & Output)RhythmFP ServerDemandProduct Structure:Part numberBOMRoutingsFactory Model:ResourcesResource CalendarMaterial Availability:Unassigned InventoryP.O./ Ve
6、ndor Info.WIPOther Information:Tools.Production Plan:CapacityMateriali2生产计划与排程Rhythm FP Framework (cont.)FP requires ACCURATE and SUFFICIENT data input (garbage in & garbage out)Open loop planning process in the first phasePlanners execute the production plan based on FPs suggestioni2生产计划与排程Basic FP
7、 Data ObjectsBOM dataDemand order dataPart number dataUnassigned inventory dataSupplier part data Resource dataRouting datai2生产计划与排程More FP Data ObjectsWip dataOperation resource dataResource calendar dataVendor calendar dataVariable capacity bucket size datai2生产计划与排程FP Output FilesCritical delivery
8、 dataPurchase order EDC recommendationsManufacturing order dataPlanned start timesProcurement dataProcurement by part dataetc.i2生产计划与排程FP Data Objects RelationshipDemand Orders & Forecast OrdersBOMUnassignedinventoryRouting dataVendor Info Resource dataResource calendar dataWIP dataFinished GoodsPar
9、t NumbersMfg Ordersi2生产计划与排程Rhythm FP Planning Concepti2生产计划与排程FP Planning ConceptBTO (Build-to-order) engine: use Demands as the driver to create planConsider both material and capacity constraints at the same timeConsider both Sales Orders and Forecasts as the demand input with different prioritie
10、sStart as an Infinite Capacity Plan and progress to a Finite Capacity Plani2生产计划与排程FP Planning Concept (cont.)Materials are assigned according to the BOM explosion from the finish good levelalso consider Time factorsRaw Materials (Procured Parts) are supplied by on-hand inventory or P.O. from vendor
11、s.Manufactured parts (finish goods and intermediate parts) are supplied by WIP or manufacturing orders (work orders).i2生产计划与排程Process Flow in FPInfinite Capacity PlanningFinite Capacity PlanningCAO (constraint anchor optimization)Detail SchedulingIdentify Material and Capacity ProblemsFix Material P
12、roblemsAttempt to fix Capacity ProblemsCreate detailed schedulesi2生产计划与排程FP Infinite Capacity Planning (ICP)Build factory model phaseInventory Assignment phasePlanned start time phaseCapacity utilization phasePresents plan through user interface (client)i2生产计划与排程ICP - Build Factory ModelRead files i
13、nto memory and create resident memory modelFile formats in Spec FilesDo consistency checkingi2生产计划与排程ICP - Inventory AssignmentExplore Bill of MaterialsDetermines BOM configuration and routing assignmentsCreates manufacturing orders to satisfy demandsNet requirements for raw materials and sub-assemb
14、lies against on-hand inventory and WIP (Work-In-Process)Creates material requirementsi2生产计划与排程ICP - Inventory Assignment (cont.)Backward Schedule Definition: Latest Possible Start Time (LPST) - the latest date a manufacturing task can begin and still complete on timeLPST = Task Due Date - Task Proce
15、ssing timeCalculates the LPST for each manufacturing taskEach manufacturing task will have a LPSTSoft constraint: violate LPST constraint will deteriorate the order-fulfillment performancei2生产计划与排程ICP - Inventory Assignment (cont.)Backward ScheduleSubassembly 1R.W. #1R.W. #2Sub assembly 2Computer Or
16、der Due DateTask Due Date (LPST)LPSTLPSTMfg order #1Mfg order #3Mfg order #2i2生产计划与排程ICP - Inventory Assignment (cont.)Inventory AssignmentPrioritize demand orders (due date, priority, quantity)Sort prioritized demand ordersSort parts from end-item to raw materialsCalculate demandsAllocate supplies
17、i2生产计划与排程ICP - Inventory Assignment (cont.)Forward ScheduleDefinition: Earliest Possible Start Time (EPST) - the earliest date that a manufacturing task can begin (constrained by materials)EPST = max (Server Start Time, Material Available Time)Calculates the EPST for each manufacturing taskEach manu
18、facturing task will have an EPSTHard constraint: production cannot be started without materials availablei2生产计划与排程ICP - Inventory Assignment (cont.)Sub assembly 1R.W. #1R.W. #2ComputerOrder CompletionTimeMaterial AvailableTime (EPST)EPSTEPSTMfg order #1Mfg order #3Mfg order #2Forward ScheduleSub ass
19、embly 2i2生产计划与排程ICP - Planned Start TimeAssign PST for each taskDefinition: Planned Start Time (PST) is the expected start date that a task will begin taking material availability into considerationCalculation: PST= max (EPST, LPST)Each manufacturing task will have a PSTPST values may be overriden t
20、hrough the user interfacei2生产计划与排程ICP - Capacity UtilizationDetermine bucket (operation time interval) configuration - from variable capacity bucket size dataCalculate capacity for each bucket - from resource calendar dataCalculate work load in each bucket based on PST and run time of each taski2生产计
21、划与排程FP Finite Capacity PlanningIdentify the constrained resourcesBalance and offload loads for constrained resources in a GLOBAL view (Global optimization)Plan based on flexible strategy options (e.g. Minimize WIP)Respond quicklyi2生产计划与排程FP Detail SchedulingSchedule based on flexible strategy option
22、s (e.g. FIFO) Able to specify the scheduling horizonAble to generate a global optimized production scheduleGenerate the dispatch list for executionIntelligent scheduling algorithm and resultsi2生产计划与排程How to make it successfulUser-own projectTrust and CooperationWhat are our game rules?Forecast/Accep
23、tance, S/O, P/O, etc.Thinking of future, reasonable proceduresData Clean-up Should be started from the very beginningWhere, when, who, how, etc.etc.i2生产计划与排程Rhythm FP Featuresi2生产计划与排程List of Some FeaturesTransfer BatchingManufacturing Lot Sizing (CMO)Procurement Lot SizingWIP ReportingAdvanced Scheduler (AS)Due Date QuotingBatch ClientAlternatesAlternate PartsAlternate ResourcesAlternate RoutingECN EffectivityDate effectivityUse-up effectivitySequence-Dependent SetupsR
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年PCM脉码调制终端设备项目发展计划
- 2025年银盐型CTP版项目合作计划书
- 物流行业的未来发展方向试题及答案
- 2024年CPSM生动案例分析试题及答案
- 植物的光敏反应机制研究试题及答案
- 生物体内代谢过程试题及答案
- 山西省忻州市第二中学2025届高三第四次模拟考试化学试卷含解析
- 常见问题解答:2024年CPMM试题及答案
- 通辽市重点中学2025年高三第二次联考化学试卷含解析
- 装饰工程电焊安全施工方案
- 建筑工程竣工验收消防设计质量检查报告(表格填写模板)
- 《ipf诊治共识》课件
- 项目施工-三级动火许可证(范本)
- 2024年辽宁省第二届职业技能大赛(信息网络布线赛项)理论参考试题库(含答案)
- 二零二四年商务考察团组织合同
- 《汤姆叔叔的小屋》课件
- 《超限运输管理》课件
- 《大学生劳动教育》课件第一章 新时代大学生的劳动价值观
- 紫色插画风毛南族介绍模板
- 机械制造产品质量可追溯性管理制度
- (完整版)临建施工方案
评论
0/150
提交评论