下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、吸塑模具开发协议mold developing agreement 合同号/ contract no. xxxxxxx 购货单位: (以下简称甲方) xxxxxxxxxxxxxxxxx (hereinafter “party a”)供货单位: (以下简称乙方) xxxxxxxxxxxxxxxxxxxxxx (hereinafter “party b”)individually called party a and party b respectively and/or the “party” and together, called the “parties”.经过友好协商和在公平、平等的原则
2、基础上,双方约定如下:after friendly consultations and proceeding on principles of fairness and equality, the parties have agreed the following:一、 模具内容(包括材料)/mold info.(including materials)二、 模具价格表/mold price list产品型号 part no.模具规格 mold description计量单位 unit数量 quantity单价(人民币) unit price(rmb)总价(人民币)total price(rm
3、b)合计(大写)三、 模具开发周期及要求/work day & requirement1) 模具的开发周期/ mold work day首件样件完成时间/time of finishing first product of mold:从接到此模具订单到首件样品(透明色)完成需要 天/ days from building time aro (after receipt of order) to first pom (product of mold) sample pour;2) 铝模确认 mold confirm以甲方提供产品立体图样进行开发(允许公差在+-0.02mm),乙方提供铝模实物和p
4、vc成型吸塑由甲方确认。this mold production tolerances in drawings +-0.02mm,party b provided mold product and sample product give to party a confirm.3) 带印刷样品完成时间/ time of finishing printing product:从首件样品(透明色)到带印刷产品小样需要xx天/eleven days from time to printing product. 由甲方提供产品印刷平面图。party a provide printing plan。4)
5、甲方确认乙方的印刷打样后,再进行产品正式下单。party a agreement party b production. 5) 由于模具的开发周期和质量问题造成甲方项目延期,乙方将赔偿甲方的一切损失。if party as project delayed due to the work day and the quality of the mold, party b should compensate party a for all the losses.四、 模具的维护/mold maintenance正常使用寿命内的模具在生产过程中发生的损坏或磨损,相关的维修及保养等都由乙方负责。if t
6、he mold is within the normal working life but damaged or worn during the production process, party b should be responsible for the related repair and maintenance.五、 模具费用的支付/payment terms1. 因该模具的检验特殊性,需在完成制作后,印刷吸塑进行打样产品,后续才可检验。为了双方的合作更加通畅,由甲方先支付乙方壹万元整(10000元)的预付款,此付款包含模具制作列表中所有费用(伍仟伍佰元整),结余的费用在甲方向乙方进
7、行产品订购的吸塑费用中抵扣。due to the special nature of the mold inspection required after the completion of the production, printing blister proofing products, follow-up before testing. to become smoother cooperation by the party a to pay party b one million (10,000) prepayments, this payment includes abrasive
8、production list all costs, the balance of the cost of party a to party products ordered blister processing fees deduction.2. 乙方基于甲方的图纸提供模具加工,如第一次打样的产品未能满足甲方的产品要求,需要进行模具的重新制作,该模具费用由甲方承担。party b based on the drawings of the party a mold processing, the first proofing products failed to meet the produc
9、t requirements of the party, the re-production of the mold, the mold cost is borne entirely by the party.3. 以上模具价格不包含第二次开模(修改),第二次开模的单价为壹仟伍百元整(1500),网板修改按颜色计算,每色为叁百元整(300)。the the mold price above does not contain the second mold, the second mold unit price for one thousand five hundred (1500), sten
10、cil modified by color, each color three hundred (300).六、 模具所有权/ownership模具的所有权为甲方所有,甲方享有收回和处理的权利。molds ownership belongs to party a. party a enjoys the right to taking back and dealing with the mold.七、 保密责任/confidentiality 1) 未经甲方允许,乙方不得将甲方所提供的图纸及技术资料以口头、书面、出示和借用的方式转泄露给第三方。如有发生信息泄露,甲方有权追究其法律责任。witho
11、ut the permission of party a, party b should not disclose the drawings and technical information which are provided by party a in oral, written, showing and lending way to the third party. if party b revealed such information, party a has the right to pursue party bs legal responsibility.2) 当双方履行完该协
12、议后,乙方必须归还甲方所提供的用于开发该模具的所有保密信息及其全部副本(不论其是否是在计算机磁盘、光盘读取器、光盘、硬盘或软件中或硬拷贝载体上存储、保存或记录的);如果乙方退还上述保密信息及其全部副本为不可行,则应将其销毁,或者从计算机或其他电子系统中将其删除或抹除。after the parties fulfill the agreement, party b should return to party a all confidential information and all copies of developing the mould thereof whether or not t
13、he same are stored, maintained or recorded in computer disks, cd-rom drives, cd-roms, hard disks or software or in hard copy format and, to the extent that it is not feasible to return the same, shall destroy such confidential information or cause the same to be deleted or erased from any computer o
14、r other electronic system.八、 其他约定/others1) 本协议受中华人民共和国的法律法规管辖,并应依照中华人民共和国的法律法规解释。the agreement shall be governed by, and interpreted in accordance with, the laws and regulations of the peoples republic of china.2) 除非双方采用书面形式,否则对本协议的任何修正均属无效。any amendments to this agreement shall not be valid unless
15、made by the parties in writing.3) 本协议一式两份,每份皆具有同等法律效力。this agreement is made in two original copies, both of which are equally valid.4) 本协议在双方签订本协议之日立即生效。this agreement shall take effect immediately upon the date of execution by the parties.5) 凡涉及本协议或因本协议而发生的所有争执,都应通过友好协商解决。如果在书面要求协商的通知发出后的三十(30)天内不
16、能解决,则该争执应提交乙方所在地有管辖权的法院进行裁决。all the disputes and controversies of every kind and nature between the parties arising out of or in connection with the agreement or the execution hereof shall be settled by friendly negotiation between the parties. if no settlement can be reached within thirty (30) days after delivery of the written notice requesting the said negotiation, such dispute or controversy shall be submitted a competent court located in the business place of party a for judgment.6) 当本协议中文文本与英文
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 工程分包合同总公司与分公司协议(3篇)
- 鼓励孩子中考冲刺的话简单
- 25.1 锐角的三角比的意义(第1课时)同步练习
- 淋膜机买卖合同(3篇)
- 有关职业规划职业规划文档
- 高考地理二轮复习考前抢分专题识图技能专练图像七过程示意图含答案
- 劳动技术课教案范文(6篇)
- 年终获奖感言范文(35篇)
- 24.2 直角三角形的性质 同步练习
- 【鲁教54】第三次月考卷
- 音乐专业职业生涯规划书
- PBL教学模式在临床教学中的应用
- 中职院校学前教育专业学生职业认同现状调查研究
- join-in(三年级起点)五年级上册剑桥英语备课
- 第15课《诫子书》 统编版语文七年级上册
- 少林寺英文简介-演讲课件
- 2023年科研诚信理论知识考核试题及答案
- 历史(中职)PPT全套教学课件
- Unit 6 Understanding ideas Hot!Hot!Hot!课件高中英语外研版(2019)必修第三册
- 加油站加油机设备安全管理制度
- 医学影像技术专业(群)建设方案
评论
0/150
提交评论