




版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、1 F&T Inc. 2 OVERHEAD AND GANTRY CRANE OPERATION Hoist operators must inspect equipment daily before use. Do not operate a crane or hoist if limit switches, steel ropes, chains or other components are worn or in disrepair. Replace nylon or web slings immediately if excessively worn. 3 OVERHEAD AND G
2、ANTRY CRANE OPERATION Associates in the direction of travel should be warned to move and remain clear of a lifted load at all times. Loads should not be suspended over personnel below. Under no circumstances may anyone ride the hook or load. Directional movement should be made smoothly and deliberat
3、ely. Avoid rapid movements in any direction. 4 OVERHEAD AND GANTRY CRANE OPERATION Do not exceed the rated load capacity of the crane, hoist, chain, cable, slings, or other component. Slings, load chains and other lifting devices must be fully and securely seated in the hook before moving a load. Re
4、move slack from the sling, chain, or cable before lifting a load. 5 OVERHEAD AND GANTRY CRANE OPERATION Use the following practices to avoid swinging loads: Locate the hoist directly above the lifting point of the load before lifting. Lower loads directly below the hoist. Keep hoisting ropes vertica
5、l. Do not pull or push the load. Maintain two full wraps of cable on the hoisting drum. 6 OVERHEAD AND GANTRY CRANE OPERATION When lifting loads at or near capacity, test the hoist brakes by returning the master switch or push button to the “OFF” position after raising the load a few inches off the
6、floor. If the brakes do not hold, lower the load to the floor slowly and do not operate the crane. Report the situation immediately and DO NOT USE until repaired. 7 OVERHEAD AND GANTRY CRANE OPERATION Ensure that all loads are lifted high enough to clear obstructions before moving the bridge or trol
7、ley. Whenever possible, maintain a minimum clearance of one foot above loads and to the sides. Raise the load only to the height necessary to clear lower objects. Never pull a hoist by the pendant cable. 8 OVERHEAD AND GANTRY CRANE OPERATION Never leave the controls unattended while a load is suspen
8、ded. If it becomes necessary to leave the controls, lower the load to the floor. Familiarize yourself with the location of the disconnect switch. If loss of electrical power occurs, place controls in the “OFF” position to prevent unexpected startup upon restoration of power. 9 OVERHEAD AND GANTRY CR
9、ANE OPERATION Disconnect power to a hoist that is unsafe or in need of repair. Arrange to have the disconnect switch locked and the control panel tagged with and “Out of Order” or “Do Not Operate” tag. Never operate a hoist that has been tagged with an “Out of Order” or “Do Not Operate” tag, or is y
10、our opinion, UNSAFE TO OPERATE 10 HOISTS / CRANES Daily Inspection Checklist Check for any loose or missing parts. Check end stops. End stops prevent the trolley from running off the beam. Know the location of disconnect switch that will cut the power off only to the hoist or crane. Be sure it is re
11、adily accessible and not blocked. 11 HOISTS / CRANES Daily Inspection Checklist Make sure all control buttons are labeled to indicate their function. Operate each button to make sure it functions properly, releases immediately, and does not stick. Check upper hoist limit switch by slowly raising the
12、 block to trip the switch. Lower the hoist block to activate the lower limit switch if the hoist is so equipped, leaving at least one turn of rope on the take-up drum. 12 HOISTS / CRANES Daily Inspection Checklist Make sure wire rope is properly seated in its drum and sheave grooves without any slac
13、k or overlapping. Operate the crane or hoist several feet in each direction that it travels. Listen for any unusual noises. Look for any jerky movements. When moving an A frame hoist, take care to ensure that the wheels on each side stay on the track. 13 HOISTS / CRANES Daily Inspection Checklist Ch
14、eck all hooks. Hooks should not be cracked, stretched, bent, or twisted. Each hook must have a safety latch that automatically closes the throat of the hook. If the latch is bent, spring is broken, or is otherwise damaged the latch must be repaired before use. Hooks should rotate freely in block ass
15、embly without any “grinding” felt or heard. 14 HOISTS / CRANES Daily Inspection Checklist Check the block assembly for structural damage or cracks in any components. Sheaves should rotate freely without any grinding felt or heard coming from the bearings. The sheave guard must be unbroken and intact
16、. No part of the sheave guard should be in contact with the wire rope or sheave. 15 HOISTS / CRANES Daily Inspection Checklist Check the wire rope by lowering the block to the lowest level and looking for the following conditions. If any of these conditions are observed, they should be reported imme
17、diately. Reduced diameter of the rope. This may indicate the rope has been stretched, has lost its inner core support, or has worn outside wires. Any number of broken strands of wires. Kinked, crushed, cut, or “bird caged” wiring, or wiring with heat damage. 16 HOISTS / CRANES Daily Inspection Check
18、list Check load chain for damage, wear at contact points, cracks, or distorted (bent, twisted, or stretched) links. Inspect all mechanical coupling links to insure linking pins are secure and in good condition. Report unsafe conditions immediately. 17 HOISTS / CRANES Daily Inspection Checklist Check
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
评论
0/150
提交评论