施工图预算表,,,,,,,,,,,,,,
工程编号,,,,,,,,,,,,,,
工程名称:炼铁、炼钢、10m2竖炉、轧钢除尘管道加检测孔平台及梯子,,,,,图号,,,预算编号,,,,,,
序,工程项目名称,单位,数量,定额编号,单价,其中,,,,总价,其中,,,
号,,,,,,人工费,材料费,机械费,人工日,,人工费,材料费,机械费,人工日
一、,炼钢厂除尘管道加检测孔及平台,,,,,,,,,,,,,
1,平台(1)(2)及支架制作,t,0.643,3-8-36,3953.81,315.79,3036.43,,,2542,203.05,1952.42449,,
,扣除主材费,t,0.643,3-8-36,-2605,,,,,-1675,,,,
2,平台(1)(2)及支架安装,t,0.643,3-6-25,618.86,167.18,70,,,398,107.50,45.01,,
,安装加度超30m人工增加费,人工,107.50,,0.3,,,,,32,,,,
3,平台踏步梯制作,t,0.068,3-8-43,4145.4,495.98,2970.46,,,282,33.73,201.99128,,
,扣除主材费,t,0.068,3-8-43,-2591,,,,,-176,,,,
4,平台踏步梯安装,t,0.068,3-6-29,670.96,176.47,71.44,,,46,12.00,4.85792,,
,安装加度超30m人工增加费,人工,12.00,,0.3,,,,,4,,,,
5,平台及踏步梯栏杆制作,t,0.33,3-8-44,3758.25,334.37,2929.96,,,1240,110.34,966.8868,,
,扣除主材费,t,0.33,3-8-44,-2552,,,,,-842,,,,
6,平台及踏步梯栏杆安装,t,0.33,3-6-33,818.35,213.62,81.74,,,270,70.49,26.9742,,
,安装加度超30m人工增加费,人工,70.49,,0.3,,,,,21,,,,
7,金属构件除锈,t,1.041,3-9-1,124.75,94.74,30.01,,,130,98.62,31.24041,,
8,金属构件刷防锈漆第一遍,t,1.041,3-9-15,195.93,64.09,131.84,,,204,66.72,137.24544,,
9,金属构件刷防锈漆第二遍,t,1.041,3-9-16,173.52,61.3,112.22,,,181,63.81,116.82102,,
10,平台制作从大库领料用拖拉机台班,个,1,实际,160,60,,,,160,60.00,,,
11,构件安装高处作业用25t吊车进出厂一次,次,1,实际,800,60,,,,800,60.00,,,
12,进出风检测孔DN80管道短节安装,10个,0.2,5-3-123,232.99,87.08,,108.5,,47,17.42,,21.7,
,安装高度超过12m人工机械增加费,人+机,39.12,定额说明,0.1,,,,,4,,,,
13,进出风检测孔DN80法兰安装,副,2,5-3-264,21.74,9.75,,8.06,,43,19.50,,16.12,
,安装高度超过12m人工机械增加费,人+机,35.62,定额说明,0.1,,,,,4,,,,
,直接工程费(A)合计:,,,,,,,,,3714,923,3483.45156,,
,安装脚手架搭拆费,人+材,4407,,10.00%,,,,,440.66,,,,
,临时设施费,A,3714,,0.50%,,,,,18.57,,,,
施工图预算表,,,,,,,,,,,,,,
工程编号,,,,,,,,,,,,,,
工程名称:炼铁、炼钢、10m2竖炉、轧钢除尘管道加检测孔平台及梯子,,,,,图号,,,预算编号,,,,,,
序,工程项目名称,单位,数量,定额编号,单价,其中,,,,总价,其中,,,
号,,,,,,人工费,材料费,机械费,人工日,,人工费,材料费,机械费,人工日
,其它措施费,A,3714,,0.47%,,,,,17.45,,,,
,企业管理费,A,3714,,2.96%,,,,,109.9,,,,
,计:,,,,,,,,,4300.3,,,,
,工程定额测定费,,4300.3,,0.5‰,,,,,2.15,,,,
,利润,A,3714,,1.50%,,,,,55.7,,,,
,小计:,,,,,,,,,4358,,,,
,人工费调价,,数量,定额价,市场价格,价差,,,,,,,,
,调价,,39.76,23.22,60,36.78,,,,1462,,,,
,小计:,,,,,,,,,5820,,,,
,税金:,,,,17.00%,,,,,989,,,,
,工程合计:,,,,,,,,,6810,元,,,
二、,轧钢除尘管道加检测孔及平台,,,,,,,,,,,,,
1,进出风平台(1)(2)及支架制作,t,0.944,3-8-36,3953.81,315.79,3036.43,,,3732,298.11,2866.38992,,
,扣除主材费,t,0.944,3-8-36,-2605,,,,,-2459,,,,
2,进出风平台(1)(2)及支架安装,t,0.944,3-6-25,618.86,167.18,70,,,584,157.82,66.08,,
3,出风口平台爬梯制作,t,0.11,3-8-43,4145.4,495.98,2970.46,,,456,54.56,326.7506,,
,扣除主材费,t,0.11,3-8-43,-2591,,,,,-285,,,,
4,出风口平台爬梯安装,t,0.11,3-6-29,670.96,176.47,71.44,,,74,19.41,7.8584,,
5,平台栏杆制作,t,0.223,3-8-44,3758.25,334.37,2929.96,,,838,74.56,653.38108,,
,扣除主材费,t,0.223,3-8-44,-2552,,,,,-569,,,,
6,平台栏杆安装,t,0.223,3-6-33,818.35,213.62,81.74,,,182,47.64,18.22802,,
7,金属构件除锈,t,1.277,3-9-1,124.75,94.74,30.01,,,159,120.98,38.32277,,
8,金属构件刷防锈漆第一遍,t,1.277,3-9-15,195.93,64.09,131.84,,,250,81.84,168.35968,,
9,金属构件刷防锈漆第二遍,t,1.277,3-9-16,173.52,61.3,112.22,,,222,78.28,143.30494,,
施工图预算表,,,,,,,,,,,,,,
工程编号,,,,,,,,,,,,,,
工程名称:炼铁、炼钢、10m2竖炉、轧钢除尘管道加检测孔平台及梯子,,,,,图号,,,预算编号,,,,,,
序,工程项目名称,单位,数量,定额编号,单价,其中,,,,总价,其中,,,
号,,,,,,人工费,材料费,机械费,人工日,,人工费,材料费,机械费,人工日
10,平台制作从大库领料用拖拉机台班,个,1,实际,160,60,,,,160,60.00,,,
11,构件安装用8t吊车进出厂一次,次,1,实际,800,60,,,,800,60.00,,,
12,进出风检测孔DN80管道短节安装,10个,0.4,5-3-123,232.99,87.08,,108.5,,93,34.83,,43.4,
13,进出风检测孔DN80法兰安装,副,4,5-3-264,21.74,9.75,,8.06,,87,39.00,,32.24,
,直接工程费(A)合计:,,,,,,,,,4325,1127,4288.67541,,
,安装脚手架搭拆费,人+材,5416,,10.00%,,,,,541.57,,,,
,临时设施费,A,4325,,0.50%,,,,,21.63,,,,
,其它措施费,A,4325,,0.47%,,,,,20.33,,,,
,企业管理费,A,4325,,2.96%,,,,,128.0,,,,
,计:,,,,,,,,,5036.5,,,,
,工程定额测定费,,5036.5,,0.5‰,,,,,2.52,,,,
,利润,A,4325,,1.50%,,,,,64.9,,,,
,小计:,,,,,,,,,5104,,,,
,人工费调价,,数量,定额价,市场价格,价差,,,,,,,,
,调价,,48.54,23.22,60,36.78,,,,1785,,,,
,小计:,,,,,,,,,6889,,,,
,税金:,,,,17.00%,,,,,1171,,,,
,工程合计:,,,,,,,,,8060,元,,,
三、,炼铁厂1#炉槽下除尘加检测孔及平台,,,,,,,,,,,,,
1,进出风平台(1)(2)及支架制作,t,0.968,3-8-36,3953.81,315.79,3036.43,,,3827,305.68,2939.26424,,
,扣除主材费,t,0.968,3-8-36,-2605,,,,,-2522,,,,
2,进出风平台(1)(2)及支架安装,t,0.968,3-6-25,618.86,167.18,70,,,599,161.83,67.76,,
3,进风口平台踏步梯制作,t,0.158,3-8-43,4145.4,495.98,2970.46,,,655,78.36,469.33268,,
施工图预算表,,,,,,,,,,,,,,
工程编号,,,,,,,,,,,,,,
工程名称:炼铁、炼钢、10m2竖炉、轧钢除尘管道加检测孔平台及梯子,,,,,图号,,,预算编号,,,,,,
序,工程项目名称,单位,数量,定额编号,单价,其中,,,,总价,其中,,,
号,,,,,,人工费,材料费,机械费,人工日,,人工费,材料费,机械费,人工日
,扣除主材费,t,0.158,3-8-43,-2591,,,,,-409,,,,
4,进风口平台踏步梯安装,t,0.158,3-6-29,670.96,176.47,71.44,,,106,27.88,11.28752,,
5,平台及踏步梯栏杆制作,t,0.225,3-8-44,3758.25,334.37,2929.96,,,846,75.23,659.241,,
,扣除主材费,t,0.225,3-8-44,-2552,,,,,-574,,,,
6,平台及踏步梯栏杆安装,t,0.225,3-6-33,818.35,213.62,81.74,,,184,48.06,18.3915,,
7,金属构件除锈,t,1.351,3-9-1,124.75,94.74,30.01,,,169,127.99,40.54351,,
8,金属构件刷防锈漆第一遍,t,1.351,3-9-15,195.93,64.09,131.84,,,265,86.59,178.11584,,
9,金属构件刷防锈漆第二遍,t,1.351,3-9-16,173.52,61.3,112.22,,,234,82.82,151.60922,,
10,平台制作从大库领料用拖拉机台班,个,1,实际,160,60,,,,160,60.00,,,
11,构件安装用8t吊车进出厂一次,次,1,实际,800,60,,,,800,60.00,,,
12,进出风检测孔DN80管道短节安装,10个,0.2,5-3-123,232.99,87.08,,108.5,,47,17.42,,21.7,
13,进出风检测孔DN80法兰安装,副,2,5-3-264,21.74,9.75,,8.06,,43,19.50,,16.12,
,直接工程费(A)合计:,,,,,,,,,4430,1151,4535.54551,,
,安装脚手架搭拆费,人+材,5687,,10.00%,,,,,568.69,,,,
,临时设施费,A,4430,,0.50%,,,,,22.15,,,,
,其它措施费,A,4430,,0.47%,,,,,20.82,,,,
,企业管理费,A,4430,,2.96%,,,,,131.1,,,,
,计:,,,,,,,,,5172.4,,,,
,工程定额测定费,,5172.4,,0.5‰,,,,,2.59,,,,
,利润,A,4430,,1.50%,,,,,66.4,,,,
,小计:,,,,,,,,,5241,,,,
,人工费调价,,数量,定额价,市场价格,价差,,,,,,,,
,调价,,49.59,23.22,60,36.78,,,,1824,,,,
,小计:,,,,,,,,,7065,,,,
施工图预算表,,,,,,,,,,,,,,
工程编号,,,,,,,,,,,,,,
工程名称:炼铁、炼钢、10m2竖炉、轧钢除尘管道加检测孔平台及梯子,,,,,图号,,,预算编号,,,,,,
序,工程项目名称,单位,数量,定额编号,单价,其中,,,,总价,其中,,,
号,,,,,,人工费,材料费,机械费,人工日,,人工费,材料费,机械费,人工日
,税金:,,,,17.00%,,,,,1201,,,,
,工程合计:,,,,,,,,,8266,元,,,
四、,"炼铁厂K4,K5皮带机头除尘加检测孔及平台",,,,,,,,,,,,,
1,进出风平台(1)(2)及支架(脚板)制作,t,0.97,3-8-36,3953.81,315.79,3036.43,,,3835,306.32,2945.3371,,
,扣除主材费,t,0.97,3-8-36,-2605,,,,,-2527,,,,
2,进出风平台(1)(2)及支架(脚板)安装,t,0.97,3-6-25,618.86,167.18,70,,,600,162.16,67.9,,
3,进出风平台踏步梯及脚板制作(2个),t,0.533,3-8-43,4145.4,495.98,2970.46,,,2209,264.36,1583.25518,,
,扣除主材费,t,0.533,3-8-43,-2591,,,,,-1381,,,,
4,进出风平台踏步梯及脚板安装(2个),t,0.533,3-6-29,670.96,176.47,71.44,,,358,94.06,38.07752,,
5,进出风平台支架及踏步梯脚板胀栓打眼,个,24,实际,10,,,,,240,,,,
,胀栓乙方自购主材费,个,24,实际,2.3,,,,,55,,,,
6,进出风平台及踏步梯栏杆制作,t,0.184,3-8-44,3758.25,334.37,2929.96,,,692,61.52,539.11264,,
,扣除主材费,t,0.184,3-8-44,-2552,,,,,-470,,,,
7,进出风平台及踏步梯栏杆安装,t,0.184,3-6-33,818.35,213.62,81.74,,,151,39.31,15.04016,,
8,金属构件除锈,t,1.687,3-9-1,124.75,94.74,30.01,,,210,159.83,50.62687,,
9,金属构件刷防锈漆第一遍,t,1.687,3-9-15,195.93,64.09,131.84,,,331,108.12,222.41408,,
10,金属构件刷防锈漆第二遍,t,1.687,3-9-16,173.52,61.3,112.22,,,293,103.41,189.31514,,
11,平台制作从大库领料用拖拉机台班,个,1,实际,160,60,,,,160,60.00,,,
12,构件安装用8t吊车进出厂一次,次,1,实际,800,60,,,,800,60.00,,,
13,进出风检测孔DN80管道短节安装,10个,0.2,5-3-123,232.99,87.08,,108.5,,47,17.42,,21.7,
14,进出风检测孔DN80法兰安装,副,2,5-3-264,21.74,9.75,,8.06,,43,19.50,,16.12,
,直接工程费(A)合计:,,,,,,,,,5646,1456,5651.07869,,
,安装脚手架搭拆费,人+材,7107,,10.00%,,,,,710.71,,,,
,临时设施费,A,5646,,0.50%,,,,,28.23,,,,
施工图预算表,,,,,,,,,,,,,,
工程编号,,,,,,,,,,,,,,
工程名称:炼铁、炼钢、10m2竖炉、轧钢除尘管道加检测孔平台及梯子,,,,,图号,,,预算编号,,,,,,
序,工程项目名称,单位,数量,定额编号,单价,其中,,,,总价,其中,,,
号,,,,,,人工费,材料费,机械费,人工日,,人工费,材料费,机械费,人工日
,其它措施费,A,5646,,0.47%,,,,,26.54,,,,
,企业管理费,A,5646,,2.96%,,,,,167.1,,,,
,计:,,,,,,,,,6578.9,,,,
,工程定额测定费,,6578.9,,0.5‰,,,,,3.29,,,,
,利润,A,5646,,1.50%,,,,,84.7,,,,
,小计:,,,,,,,,,6667,,,,
,人工费调价,,数量,定额价,市场价格,价差,,,,,,,,
,调价,,62.70,23.22,60,36.78,,,,2306,,,,
,小计:,,,,,,,,,8973,,,,
,税金:,,,,17.00%,,,,,1525,,,,
,工程合计:,,,,,,,,,10499,元,,,
五、,"炼铁厂K4,K5皮带机尾除尘加检测孔及平台",,,,,,,,,,,,,
1,进出风平台(1)(2)及支架(脚板)制作,t,0.762,3-8-36,3953.81,315.79,3036.43,,,3013,240.63,2313.75966,,
,扣除主材费,t,0.762,3-8-36,-2605,,,,,-1985,,,,
2,进出风平台(1)(2)及支架(脚板)安装,t,0.762,3-6-25,618.86,167.18,70,,,472,127.39,53.34,,
3,进出风平台踏步梯及脚板制作(2个),t,0.368,3-8-43,4145.4,495.98,2970.46,,,1526,182.52,1093.12928,,
,扣除主材费,t,0.368,3-8-43,-2591,,,,,-953,,,,
4,进出风平台踏步梯及脚板安装(2个),t,0.368,3-6-29,670.96,176.47,71.44,,,247,64.94,26.28992,,
5,进出风平台支架及踏步梯脚板胀栓打眼,个,24,实际,10,,,,,240,,,,
,胀栓乙方自购主材费,个,24,实际,2.3,,,,,55,,,,
6,进出风平台及踏步梯栏杆制作,t,0.15,3-8-44,3758.25,334.37,2929.96,,,564,50.16,439.494,,
,扣除主材费,t,0.15,3-8-44,-2552,,,,,-383,,,,
7,进出风平台及踏步梯栏杆安装,t,0.15,3-6-33,818.35,213.62,81.74,,,123,32.04,12.261,,
8,金属构件除锈,t,1.28,3-9-1,124.75,94.74,30.01,,,160,121.27,38.4128,,
施工图预算表,,,,,,,,,,,,,,
工程编号,,,,,,,,,,,,,,
工程名称:炼铁、炼钢、10m2竖炉、轧钢除尘管道加检测孔平台及梯子,,,,,图号,,,预算编号,,,,,,
序,工程项目名称,单位,数量,定额编号,单价,其中,,,,总价,其中,,,
号,,,,,,人工费,材料费,机械费,人工日,,人工费,材料费,机械费,人工日
9,金属构件刷防锈漆第一遍,t,1.28,3-9-15,195.93,64.09,131.84,,,251,82.04,168.7552,,
10,金属构件刷防锈漆第二遍,t,1.28,3-9-16,173.52,61.3,112.22,,,222,78.46,143.6416,,
11,平台制作从大库领料用拖拉机台班,个,1,实际,160,60,,,,160,60.00,,,
12,构件安装用8t吊车进出厂一次,次,1,实际,800,60,,,,800,60.00,,,
13,进出风检测孔DN80管道短节安装,10个,0.2,5-3-123,232.99,87.08,,108.5,,47,17.42,,21.7,
14,进出风检测孔DN80法兰安装,副,2,5-3-264,21.74,9.75,,8.06,,43,19.50,,16.12,
,直接工程费(A)合计:,,,,,,,,,4600,1136,4289.08346,,
,安装脚手架搭拆费,人+材,5425,,10.00%,,,,,542.54,,,,
,临时设施费,A,4600,,0.50%,,,,,23.00,,,,
,其它措施费,A,4600,,0.47%,,,,,21.62,,,,
,企业管理费,A,4600,,2.96%,,,,,136.2,,,,
,计:,,,,,,,,,5323.2,,,,
,工程定额测定费,,5323.2,,0.5‰,,,,,2.66,,,,
,利润,A,4600,,1.50%,,,,,69.0,,,,
,小计:,,,,,,,,,5395,,,,
,人工费调价,,数量,定额价,市场价格,价差,,,,,,,,
,调价,,48.94,23.22,60,36.78,,,,1800,,,,
,小计:,,,,,,,,,7195,,,,
,税金:,,,,17.00%,,,,,1223,,,,
,工程合计:,,,,,,,,,8418,元,,,
六、,炼铁厂2#炉槽下除尘加检测孔及平台,,,,,,,,,,,,,
1,出风口平台(1)(2)及支架(脚板)制作,t,0.804,3-8-36,3953.81,315.79,3036.43,,,3179,253.90,2441.28972,,
,扣除主材费,t,0.804,3-8-36,-2605,,,,,-2094,,,,
施工图预算表,,,,,,,,,,,,,,
工程编号,,,,,,,,,,,,,,
工程名称:炼铁、炼钢、10m2竖炉、轧钢除尘管道加检测孔平台及梯子,,,,,图号,,,预算编号,,,,,,
序,工程项目名称,单位,数量,定额编号,单价,其中,,,,总价,其中,,,
号,,,,,,人工费,材料费,机械费,人工日,,人工费,材料费,机械费,人工日
2,出风口平台(1)(2)及支架(脚板)安装,t,0.804,3-6-25,618.86,167.18,70,,,498,134.41,56.28,,
3,出风口平台踏步梯及脚板制作(2个),t,0.358,3-8-43,4145.4,495.98,2970.46,,,1484,177.56,1063.42468,,
,扣除主材费,t,0.358,3-8-43,-2591,,,,,-928,,,,
4,出风口平台踏步梯及脚板安装(2个),t,0.358,3-6-29,670.96,176.47,71.44,,,240,63.18,25.57552,,
5,出风口平台支架及踏步梯脚板胀栓打眼,个,12,实际,10,,,,,120,,,,
,胀栓乙方自购主材费,个,12,实际,2.3,,,,,28,,,,
6,出风口平台及踏步梯栏杆制作,t,0.15,3-8-44,3758.25,334.37,2929.96,,,564,50.16,439.494,,
,扣除主材费,t,0.15,3-8-44,-2552,,,,,-383,,,,
7,出风口平台及踏步梯栏杆安装,t,0.15,3-6-33,818.35,213.62,81.74,,,123,32.04,12.261,,
8,进风口平台(3)(4)及支架(脚板)制作,t,1.274,3-8-36,3953.81,315.79,3036.43,,,5037,402.32,3868.41182,,
,扣除主材费,t,1.274,3-8-36,-2605,,,,,-3319,,,,
9,进风口平台(3)(4)及支架(脚板)安装,t,1.274,3-6-25,618.86,167.18,70,,,788,212.99,89.18,,
10,进风口平台踏步梯及脚板制作(2个),t,0.575,3-8-43,4145.4,495.98,2970.46,,,2384,285.19,1708.0145,,
,扣除主材费,t,0.575,3-8-43,-2591,,,,,-1490,,,,
11,进风口平台踏步梯及脚板安装(2个),t,0.575,3-6-29,670.96,176.47,71.44,,,386,101.47,41.078,,
12,进风口平台支架及踏步梯脚板胀栓打眼,个,16,实际,10,,,,,160,,,,
,胀栓乙方自购主材费,个,16,实际,2.3,,,,,37,,,,
13,进风口平台及踏步梯栏杆制作,t,0.163,3-8-44,3758.25,334.37,2929.96,,,613,54.50,477.58348,,
,扣除主材费,t,0.163,3-8-44,-2552,,,,,-416,,,,
14,进风口平台及踏步梯栏杆安装,t,0.163,3-6-33,818.35,213.62,81.74,,,133,34.82,13.32362,,
8,金属构件除锈,t,3.324,3-9-1,124.75,94.74,30.01,,,415,314.92,99.75324,,
9,金属构件刷防锈漆第一遍,t,3.324,3-9-15,195.93,64.09,131.84,,,651,213.04,438.23616,,
10,金属构件刷防锈漆第二遍,t,3.324,3-9-16,173.52,61.3,112.22,,,577,203.76,373.01928,,
11,平台制作从大库领料用拖拉机台班,个,2,实际,160,60,,,,320,120.00,,,
12,构件安装用8t吊车进出厂一次,次,2,实际,800,60,,,,1600,120.00,,,
施工图预算表,,,,,,,,,,,,,,
工程编号,,,,,,,,,,,,,,
工程名称:炼铁、炼钢、10m2竖炉、轧钢除尘管道加检测孔平台及梯子,,,,,图号,,,预算编号,,,,,,
序,工程项目名称,单位,数量,定额编号,单价,其中,,,,总价,其中,,,
号,,,,,,人工费,材料费,机械费,人工日,,人工费,材料费,机械费,人工日
13,进出风检测孔DN80管道短节安装,10个,0.2,5-3-123,232.99,87.08,,108.5,,47,17.42,,21.7,
14,进出风检测孔DN80法兰安装,副,2,5-3-264,21.74,9.75,,8.06,,43,19.50,,16.12,
,直接工程费(A)合计:,,,,,,,,,10796,2811,11146.92502,,
,安装脚手架搭拆费,人+材,13958,,10.00%,,,,,1395.81,,,,
,临时设施费,A,10796,,0.50%,,,,,53.98,,,,
,其它措施费,A,10796,,0.47%,,,,,50.74,,,,
,企业管理费,A,10796,,2.96%,,,,,319.6,,,,
,计:,,,,,,,,,12616.1,,,,
,工程定额测定费,,12616.1,,0.5‰,,,,,6.31,,,,
,利润,A,10796,,1.50%,,,,,161.9,,,,
,小计:,,,,,,,,,12784,,,,
,人工费调价,,数量,定额价,市场价格,价差,,,,,,,,
,调价,,121.07,23.22,60,36.78,,,,4453,,,,
,小计:,,,,,,,,,17237,,,,
,税金:,,,,17.00%,,,,,2930,,,,
,工程合计:,,,,,,,,,20167,元,,,
七、,炼铁炉前除尘加检测孔及平台,,,,,,,,,,,,,
1,进出风平台(1)(2)及支架制作,t,0.787,3-8-36,3953.81,315.79,3036.43,,,3112,248.53,2389.67041,,
,扣除主材费,t,0.787,3-8-36,-2605,,,,,-2050,,,,
2,进出风平台(1)(2)及支架安装,t,0.787,3-6-25,618.86,167.18,70,,,487,131.57,55.09,,
6,进出风平台栏杆制作,t,0.151,3-8-44,3758.25,334.37,2929.96,,,567,50.49,442.42396,,
,扣除主材费,t,0.151,3-8-44,-2552,,,,,-385,,,,
7,进出风栏杆安装,t,0.151,3-6-33,818.35,213.62,81.74,,,124,32.26,12.34274,,
施工图预算表,,,,,,,,,,,,,,
工程编号,,,,,,,,,,,,,,
工程名称:炼铁、炼钢、10m2竖炉、轧钢除尘管道加检测孔平台及梯子,,,,,图号,,,预算编号,,,,,,
序,工程项目名称,单位,数量,定额编号,单价,其中,,,,总价,其中,,,
号,,,,,,人工费,材料费,机械费,人工日,,人工费,材料费,机械费,人工日
8,金属构件除锈,t,0.938,3-9-1,124.75,94.74,30.01,,,117,88.87,28.14938,,
9,金属构件刷防锈漆第一遍,t,0.938,3-9-15,195.93,64.09,131.84,,,184,60.12,123.66592,,
10,金属构件刷防锈漆第二遍,t,0.938,3-9-16,173.52,61.3,112.22,,,163,57.50,105.26236,,
11,平台制作从大库领料用拖拉机台班,个,1,实际,160,60,,,,160,60.00,,,
12,构件安装用8t吊车进出厂一次,次,1,实际,800,60,,,,800,60.00,,,
13,进出风检测孔DN80管道短节安装,10个,0.2,5-3-123,232.99,87.08,,108.5,,47,17.42,,21.7,
14,进出风检测孔DN80法兰安装,副,2,5-3-264,21.74,9.75,,8.06,,43,19.50,,16.12,
,直接工程费(A)合计:,,,,,,,,,3368,826,3156.60477,,
,安装脚手架搭拆费,人+材,3983,,10.00%,,,,,398.28,,,,
,临时设施费,A,3368,,0.50%,,,,,16.84,,,,
,其它措施费,A,3368,,0.47%,,,,,15.83,,,,
,企业管理费,A,3368,,2.96%,,,,,99.7,,,,
,计:,,,,,,,,,3898.6,,,,
,工程定额测定费,,3898.6,,0.5‰,,,,,1.95,,,,
,利润,A,3368,,1.50%,,,,,50.5,,,,
,小计:,,,,,,,,,3951,,,,
,人工费调价,,数量,定额价,市场价格,价差,,,,,,,,
,调价,,35.58,23.22,60,36.78,,,,1309,,,,
,小计:,,,,,,,,,5260,,,,
,税金:,,,,17.00%,,,,,894,,,,
,工程合计:,,,,,,,,,6154,元,,,
八、,炼铁原料一号转运站除尘加检测孔及平台,,,,,,,,,,,,,
1,进出风平台(1)(2)及支架(脚板)制作,t,0.658,3-8-36,3953.81,315.79,3036.43,,,2602,207.79,1997.97094,,
施工图预算表,,,,,,,,,,,,,,
工程编号,,,,,,,,,,,,,,
工程名称:炼铁、炼钢、10m2竖炉、轧钢除尘管道加检测孔平台及梯子,,,,,图号,,,预算编号,,,,,,
序,工程项目名称,单位,数量,定额编号,单价,其中,,,,总价,其中,,,
号,,,,,,人工费,材料费,机械费,人工日,,人工费,材料费,机械费,人工日
,扣除主材费,t,0.658,3-8-36,-2605,,,,,-1714,,,,
2,进出风平台(1)(2)及支架(脚板)安装,t,0.658,3-6-25,618.86,167.18,70,,,407,110.00,46.06,,
3,进出风平台踏步梯制作(2个),t,0.296,3-8-43,4145.4,495.98,2970.46,,,1227,146.81,879.25616,,
,扣除主材费,t,0.296,3-8-43,-2591,,,,,-767,,,,
4,进出风平台踏步梯安装(2个),t,0.296,3-6-29,670.96,176.47,71.44,,,199,52.24,21.14624,,
5,进出风平台支架梯脚板胀栓打眼,个,16,实际,10,,,,,160,,,,
,胀栓乙方自购主材费,个,16,实际,2.3,,,,,37,,,,
6,进出风平台及踏步梯栏杆制作,t,0.142,3-8-44,3758.25,334.37,2929.96,,,534,47.48,416.05432,,
,扣除主材费,t,0.142,3-8-44,-2552,,,,,-362,,,,
7,进出风平台及踏步梯栏杆安装,t,0.142,3-6-33,818.35,213.62,81.74,,,116,30.33,11.60708,,
8,金属构件除锈,t,1.096,3-9-1,124.75,94.74,30.01,,,137,103.84,32.89096,,
9,金属构件刷防锈漆第一遍,t,1.096,3-9-15,195.93,64.09,131.84,,,215,70.24,144.49664,,
10,金属构件刷防锈漆第二遍,t,1.096,3-9-16,173.52,61.3,112.22,,,190,67.18,122.99312,,
11,平台制作从大库领料用拖拉机台班,个,1,实际,160,60,,,,160,60.00,,,
12,构件安装用8t吊车进出厂一次,次,1,实际,800,60,,,,800,60.00,,,
13,进出风检测孔DN80管道短节安装,10个,0.2,5-3-123,232.99,87.08,,108.5,,47,17.42,,21.7,
14,进出风检测孔DN80法兰安装,副,2,5-3-264,21.74,9.75,,8.06,,43,19.50,,16.12,
,直接工程费(A)合计:,,,,,,,,,4029,993,3672.47546,,
,安装脚手架搭拆费,人+材,4665,,10.00%,,,,,466.53,,,,
,临时设施费,A,4029,,0.50%,,,,,20.15,,,,
,其它措施费,A,4029,,0.47%,,,,,18.94,,,,
,企业管理费,A,4029,,2.96%,,,,,119.3,,,,
,计:,,,,,,,,,4654.3,,,,
,工程定额测定费,,4654.3,,0.5‰,,,,,2.33,,,,
施工图预算表,,,,,,,,,,,,,,
工程编号,,,,,,,,,,,,,,
工程名称:炼铁、炼钢、10m2竖炉、轧钢除尘管道加检测孔平台及梯子,,,,,图号,,,预算编号,,,,,,
序,工程项目名称,单位,数量,定额编号,单价,其中,,,,总价,其中,,,
号,,,,,,人工费,材料费,机械费,人工日,,人工费,材料费,机械费,人工日
,利润,A,4029,,1.50%,,,,,60.4,,,,
,小计:,,,,,,,,,4717,,,,
,人工费调价,,数量,定额价,市场价格,价差,,,,,,,,
,调价,,42.76,23.22,60,36.78,,,,1573,,,,
,小计:,,,,,,,,,6290,,,,
,税金:,,,,17.00%,,,,,1069,,,,
,工程合计:,,,,,,,,,7359,元,,,
九、,烧结矿料仓除尘加检测孔及平台,,,,,,,,,,,,,
1,进出风平台(1)(2)及支架(脚板)制作,t,0.895,3-8-36,3953.81,315.79,3036.43,,,3539,282.63,2717.60485,,
,扣除主材费,t,0.895,3-8-36,-2605,,,,,-2331,,,,
2,进出风平台(1)(2)及支架(脚板)安装,t,0.895,3-6-25,618.86,167.18,70,,,554,149.63,62.65,,
3,进出风平台踏步梯制作(2个),t,0.43,3-8-43,4145.4,495.98,2970.46,,,1783,213.27,1277.2978,,
,扣除主材费,t,0.43,3-8-43,-2591,,,,,-1114,,,,
4,进出风平台踏步梯安装(2个),t,0.43,3-6-29,670.96,176.47,71.44,,,289,75.88,30.7192,,
5,进出风平台支架脚板胀栓打眼,个,16,实际,10,,,,,160,,,,
,胀栓乙方自购主材费,个,16,实际,2.3,,,,,37,,,,
6,进出风平台及踏步梯栏杆制作,t,0.19,3-8-44,3758.25,334.37,2929.96,,,714,63.53,556.6924,,
,扣除主材费,t,0.19,3-8-44,-2552,,,,,-485,,,,
7,进出风平台及踏步梯栏杆安装,t,0.19,3-6-33,818.35,213.62,81.74,,,155,40.59,15.5306,,
8,金属构件除锈,t,1.515,3-9-1,124.75,94.74,30.01,,,189,143.53,45.46515,,
9,金属构件刷防锈漆第一遍,t,1.515,3-9-15,195.93,64.09,131.84,,,297,97.10,199.7376,,
10,金属构件刷防锈漆第二遍,t,1.515,3-9-16,173.52,61.3,112.22,,,263,92.87,170.0133,,
11,平台制作从大库领料用拖拉机台班,个,1,实际,160,60,,,,160,60.00,,,
12,构件安装用8t吊车进出厂一次,次,1,实际,800,60,,,,800,60.00,,,
13,进出风检测孔DN80管道短节安装,10个,0.2,5-3-123,232.99,87.08,,108.5,,47,17.42,,21.7,
施工图预算表,,,,,,,,,,,,,,
工程编号,,,,,,,,,,,,,,
工程名称:炼铁、炼钢、10m2竖炉、轧钢除尘管道加检测孔平台及梯子,,,,,图号,,,预算编号,,,,,,
序,工程项目名称,单位,数量,定额编号,单价,其中,,,,总价,其中,,,
号,,,,,,人工费,材料费,机械费,人工日,,人工费,材料费,机械费,人工日
14,进出风检测孔DN80法兰安装,副,2,5-3-264,21.74,9.75,,8.06,,43,19.50,,16.12,
,直接工程费(A)合计:,,,,,,,,,5098,1316,5075.7109,,
,安装脚手架搭拆费,人+材,6392,,10.00%,,,,,639.17,,,,
,临时设施费,A,5098,,0.50%,,,,,25.49,,,,
,其它措施费,A,5098,,0.47%,,,,,23.96,,,,
,企业管理费,A,5098,,2.96%,,,,,150.9,,,,
,计:,,,,,,,,,5937.8,,,,
,工程定额测定费,,5937.8,,0.5‰,,,,,2.97,,,,
,利润,A,5098,,1.50%,,,,,76.5,,,,
,小计:,,,,,,,,,6017,,,,
,人工费调价,,数量,定额价,市场价格,价差,,,,,,,,
,调价,,56.67,23.22,60,36.78,,,,2084,,,,
,小计:,,,,,,,,,8102,,,,
,税金:,,,,17.00%,,,,,1377,,,,
,工程合计:,,,,,,,,,9479,元,,,
十、,10m2电除风加检测孔及平台,,,,,,,,,,,,,
1,进风口平台(1)(2)及支架(脚板)制作,t,1.08,3-8-36,3953.81,315.79,3036.43,,,4270,341.05,3279.3444,,
,扣除主材费,t,1.08,3-8-36,-2605,,,,,-2813,,,,
2,进风口平台(1)(2)及支架(脚板)安装,t,1.08,3-6-25,618.86,167.18,70,,,668,180.55,75.6,,
3,进风口平台踏步梯制作(1个),t,0.346,3-8-43,4145.4,495.98,2970.46,,,1434,171.61,1027.77916,,
,扣除主材费,t,0.346,3-8-43,-2591,,,,,-896,,,,
4,进风口平台踏步梯安装(1个),t,0.346,3-6-29,670.96,176.47,71.44,,,232,61.06,24.71824,,
5,进风口平台爬梯制作,t,0.025,3-8-43,4145.4,495.98,2970.46,,,104,12.40,74.2615,,
施工图预算表,,,,,,,,,,,,,,
工程编号,,,,,,,,,,,,,,
工程名称:炼铁、炼钢、10m2竖炉、轧钢除尘管道加检测孔平台及梯子,,,,,图号,,,预算编号,,,,,,
序,工程项目名称,单位,数量,定额编号,单价,其中,,,,总价,其中,,,
号,,,,,,人工费,材料费,机械费,人工日,,人工费,材料费,机械费,人工日
,扣除主材费,t,0.025,3-8-43,-2591,,,,,-65,,,,
6,进风口平台爬梯安装,t,0.025,3-6-29,670.96,176.47,71.44,,,17,4.41,1.786,,
7,进风口平台支架胀栓打眼,个,12,实际,10,,,,,120,,,,
,胀栓乙方自购主材费,个,12,实际,2.3,,,,,28,,,,
8,进风口平台及踏步梯栏杆制作,t,0.152,3-8-44,3758.25,334.37,2929.96,,,571,50.82,445.35392,,
,扣除主材费,t,0.152,3-8-44,-2552,,,,,-388,,,,
9,进风口平台及踏步梯栏杆安装,t,0.152,3-6-33,818.35,213.62,81.74,,,124,32.47,12.42448,,
10,出风口平台制作,t,0.19,3-8-36,3953.81,315.79,3036.43,,,751,60.00,576.9217,,
,扣除主材费,t,0.19,3-8-36,-2605,,,,,-495,,,,
11,出风口平台安装,t,0.19,3-6-25,618.86,167.18,70,,,118,31.76,13.3,,
12,出风口平台栏杆制作,t,0.045,3-8-44,3758.25,334.37,2929.96,,,169,15.05,131.8482,,
,扣除主材费,t,0.045,3-8-44,-2552,,,,,-115,,,,
13,出风口平台栏杆安装,t,0.045,3-6-33,818.35,213.62,81.74,,,37,9.61,3.6783,,
14,金属构件除锈,t,1.838,3-9-1,124.75,94.74,30.01,,,229,174.13,55.15838,,
15,金属构件刷防锈漆第一遍,t,1.838,3-9-15,195.93,64.09,131.84,,,360,117.80,242.32192,,
16,金属构件刷防锈漆第二遍,t,1.838,3-9-16,173.52,61.3,112.22,,,319,112.67,206.26036,,
17,平台制作从大库领料用拖拉机台班,个,1,实际,160,60,,,,160,60.00,,,
18,构件安装用25t吊车进出厂一次,次,1,实际,800,60,,,,800,60.00,,,
19,进出风检测孔DN80管道短节安装,10个,0.2,5-3-123,232.99,87.08,,108.5,,47,17.42,,21.7,
20,进出风检测孔DN80法兰安装,副,2,5-3-264,21.74,9.75,,8.06,,43,19.50,,16.12,
,直接工程费(A)合计:,,,,,,,,,5829,1532,6170.75656,,
,安装脚手架搭拆费,人+材,7703,,10.00%,,,,,770.31,,,,
,临时设施费,A,5829,,0.50%,,,,,29.15,,,,
,其它措施费,A,5829,,0.47%,,,,,27.40,,,,
施工图预算表,,,,,,,,,,,,,,
工程编号,,,,,,,,,,,,,,
工程名称:炼铁、炼钢、10m2竖炉、轧钢除尘管道加检测孔平台及梯子,,,,,图号,,,预算编号,,,,,,
序,工程项目名称,单位,数量,定额编号,单价,其中,,,,总价,其中,,,
号,,,,,,人工费,材料费,机械费,人工日,,人工费,材料费,机械费,人工日
,企业管理费,A
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2024年联通云赛道试题库及答案
- 2025年度共享出行个人司机雇佣管理协议4篇
- 委托居间合同范本模板
- 2025年度环保建筑材料ROHS检测与质量监控协议3篇
- 二零二五年度车辆租赁合同(含司机培训及考核)4篇
- 绿色照明引领未来学校教室健康照明战略
- 2025年度住宅小区地下车库车位产权转让及维修保养合同3篇
- 2025年度人工智能应用开发个人外包合同模板4篇
- 二零二五年度宠物送养与领养公益合作协议3篇
- 二零二五年度宠物领养中心项目合作协议3篇
- 整式的加减单元测试题6套
- 股权架构完整
- 山东省泰安市2022年初中学业水平考试生物试题
- 注塑部质量控制标准全套
- 人教A版高中数学选择性必修第一册第二章直线和圆的方程-经典例题及配套练习题含答案解析
- 毕业设计(论文)-液体药品灌装机的设计与制造
- 银行网点服务礼仪标准培训课件
- 二年级下册数学教案 -《数一数(二)》 北师大版
- 晶体三极管资料
- 银行内部举报管理规定
- 石群邱关源电路(第1至7单元)白底课件
评论
0/150
提交评论