1、厕浴间聚氨酯涂膜防水层( Polyurethane coating waterproof layerfor toilet and bath room )Polyurethane coating waterproof layer for toilet and bath roomThe technical disclosure is applicable to the construction of waterproof and cold work with polyurethane coating on toilets, toilets and other floors.material req

2、uirementspolyurethane coating waterproof material (double component). The factory certificate should be issued.The component A is madeof polyurethane and diisocyanate as raw materials, through polymerization and the reaction products containing isocyanate terminated polyurethaneEster prepolymer, the

3、 appearance of light yellow thick, barreled 20kg per barrel.The second component is made of accelerator, curing agent, toughening agent, anti mildew agent, bulking agent and diluent mixing process; the appearance of red, black and white,Yellow and coffee paste, bottled, 40kg per barrel.The component

4、 A is stored in a room ventilated dry place, storage period not exceeding 6 months.The B component is stored in the chamber and the storage period is not more than 12 months. Twosets of materials should be kept separately, no mixing in one room; remaining after useMaterials should be tightly sealed

5、to prevent material failure.Main technical performance:Solid content: 93%The tensile strength is not less than 0.7MpaElongation at break ranged from 300% to 400%Heat resistance of 80 degrees, not flowingLow temperature flexibility: 20 degrees around the 20mmdiameter round bar, no crackWater impermea

6、ble: 0.3Nmm2.No. 325 ordinary portland cement is used to prepare cement mortar protective layer.Medium sand: mud content is not greater than 3%.phosphoric acid or benzene sulfonyl chloride: used as retarder.Two lauric acid two butyl tin: used as a coagulant.Ethyl acetate: Rinse gel on handXylene: us

7、e dilution and cleaning toolsPolyester nonwoven fabric or glass cloth: Specifications for 60gmain machines and toolsShould be equipped with an electric mixer (power 0.3 0.5KW, 200500 to min), mixing barrel (volume 10L), paint bucket (3L), plasticMaterial or rubber scraper, rolling brush, paint brush

8、, spring scale, dry powder fire extinguisher, etc.operating conditionsthe basic surface coating waterproof layer, dust and other debris must be cleaned, the surface residual mortar lumps and protrusions should shovelFlat, clean, light pressure, yin and Yang Kok should put into arc or obtuse angle.th

9、e surface coating of the waterproof layer should be kept dry, and to smooth, firm, no hollowing, cracks and other defects from the sand.the floor drain at the leveling layer, the Guan Gen, the outlet and the root (edge) of the sanitary ware should be rounded. The slope meets the design requirements.

10、 Thecomponents must be firmly installed and tightly sealed.to highlight the ground pipe root, floor drain, drainage, yin and Yangcorner, etc., should first do additional layer wall repair treatment, brush polyurethane bottom adhesiveAfter inspection and completion of the hidden works acceptance.all

11、kinds of materials used for waterproof layer, the base treatment agent, xylene and other flammable substances, storage and storage should be far away from the source, construction exercisesFireworks should be strictly prohibited during the process. (6) the construction of waterproof layer shall not

12、be carried out on rainy days or windy days, and the environmental temperature during winter construction shall be no less than 5 degrees centigrade.operation processTechnological process :Clean the surface of the base layer, detail treatment, preparation of base rubber, brushing the bottom rubber, b

13、rushing the bottom glue (equivalent to cold base oil), adding the additional layer of detailThe first coating second times coating third times coating waterproof layer construction waterproof layer test water protection layer finishing layer construction waterproof layerTwo water test to waterproof

14、layer acceptancebefore the construction of waterproof layer, the dust, debris and so on on the base surface should be removed and cleaned with a clean damp cloth.the basic surface coating waterproof layer, no uneven, loose sand, hollowing, cracking and other defects. Water content is generally not g

15、reater than 9%,The surface of the base uniform white, no watermark.brushing the base rubber is equivalent to cold base oil:prepare the base rubber. First, add a polyurethane and B material to toluene, the ratio is 1:1.5:2 (weight ratio), and stir evenly. The amount of preparation should be specificC

16、ircumstances should not be too much.brushing the base adhesive,Will be prepared by the top of the rubber mixture, with a long roll brush evenly coated at the base surface, brushing amount of 0.15:0.2kgm,Painted after the normal temperature season 4h, whenthe handle is not sticky, you can do the next

17、 process.coating waterproof layer construction:material preparation:Polyurethane waterproof material is polyurethane nail material, polyurethane, ethyl material and xylene, the ratio is 1:1.5:3 (weight ratio); in the construction, coating waterproof materialThe mixture ratio should be measured accur

18、ately, and the electric mixer must be used for stirring.make additional layers in detail:Prominent floor drain, Guan Gen, water outlet, sanitary ware and so on root (edge), yin and yang angle and so on weak parts, should do before large-area besmear brushsA cloth, two oil waterproof additional layer

19、, after the drying of the rubber table, the fabric will be cut into the same size as the floor drain, pipe root and the same shape, and will be widened around 20cm cloth coverIn the pipe, root and other details, and besmear coating waterproof material, after the normal temperature 4Htable dry, and t

20、hen brush second coating waterproof material, 24h work, you can carry on the big surfaceConstruction of laminated coating waterproof layer.coating waterproof layer:The first coating waterproof layer: the already good polyurethane coating waterproof material, with plastic or rubber scraper evenly coa

21、ted on the base has been coated with glueLayer surface, dosage of 1.5kgm2, thickness of 1.3 1.5mm, no leakage, brush and bubble and other defects, 24h curing, second coatings can be carried out;Second coating: on the cured coating, use the direction perpendicular to the first coating and evenly brus

22、h on the surface of coating, the coating amount is slightly less than that of the coatingFirst, the dosage is 1kgm2, thickness of 0.7 1mm, no leakage, brush and bubble and other defects, 24h curing, the first test water, in case of seepageShould be carried out to repair, leakage, leakage does not oc

23、cur so far;In addition to the above brushing method, you can use a long roll brush layered, vertical direction of each other four times brushing, each coating amount of 0.6kgm2; such as barParts may also be sprayed, but the thickness and evenness must be well controlled. Details are not easy to spra

24、y parts, should be done after the dry brush;in the construction of waterproof coating layer, should be in accordance with the standard procedure, organize relevantpersonnel carry out technology and materials used in construction, complete the construction of waterproof layer, after the water test ab

25、ove 24h, found no water seepage Water Leakage for qualified, then inspection and acceptance of concealed work, pay under construction.the problems encountered in the construction process should be dealt with as follows:when it is found that the coating viscosity is too large to be brushed easily, a

26、small amount of xylene can be added to dilute it, and the amount added shall be no more than 10% of the total amount of the material.when it is found that the coating is cured too fast, it may add a small amount of phosphoric acid or benzene sulfonyl chloride and other retarders to the construction,

27、 and the amount of addition should be no more than that of a nail0.5%.when the coating is found to be too slow to cure, a small amount of two lauric acid and two butyl tin can be added as the setting accelerator, and the amount of addition shall be no more than that of a nail0.3%.coating waterproof

28、layer besmear 24h not cured, still have sticky phenomenon, besmear besmear second paint have difficulty, can first besmear a layer of talcum powder, and thenfuckWhen the utility model is used, the feet can not be adhered, and the quality of the coating can not be affected.If it is found that the pre

29、cipitation of the material, it should be stirred evenly and then with the preparation of a material, otherwise it will affect the quality of coating.quality standardguarantee project:coating waterproof material and non-woven fabric technical performance must comply with the design requirements and t

30、he relevant standards, the product should be accompanied by factory certificationWater quality certification, on-site sampling test, unauthorized or re tested unqualified waterproof material shall not be usedpolyurethane coating waterproof layer and its details and other practices must comply with t

31、he design requirements and construction specifications, and shall not have leakage phenomenon.basic items:waterproof polyurethane coating base should be firm, clean, smooth surface, yin and yang angle is in a circular arc shapeor obtuse, polyurethane adhesive coating should haveUniform, no leakage c

32、oating.polyurethane base rubber and polyurethane coating additional layer, its brushing method, lap, and head should comply with the provisions, and should be bonded firmly, tight, joint sealingStrict, no damage, bulging.polyurethane coating waterproof layer should be painted evenly, the protection

33、layer and waterproof layer bonding firm, no damage, uneven thickness and other defects.allowable deviation items:The lap width of polyurethane coating waterproof layer is 10cm, and the upper and lower two layers shall be staggered with each other, 30cm.finished product protectionwaterproof polyureth

34、ane coating has good coating, protective measures should be taken promptly, before doing a protective layer, not wear spikes in and outIn order to avoid damage to waterproof layer.highlight the ground pipe, root, floor drain, drain, sanitary ware and so on, the surrounding waterproof layer shallnot be damaged, and parts shall not be changed.the floor drain, drain and so on should be kept unblocked. During construction, debris should be prevented from falling and the water should be caref

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论