1、Project Management - 4Defining the ProjectContent & objectivesTo recognize the importance of a complete scope statement for the projectTo layout guidelines for creating a WBS for a projectTo demonstrate the importance of WBS to the management of projects and how it serves as a database for planning
2、and controlTo demonstrate how the OBS establishes accountability to organizational unitsTo apply a WBS to a case or suggested project Defining the ProjectStep 1:Defining the Project ScopeStep 2:Establishing Project PrioritiesStep 3:Creating the Work Breakdown StructureStep 4:Integrating the WBS with
3、 the OrganizationStep 5:Coding the WBS for the Information System Step 1: Defining the Project ScopeProject ScopeA definition of the end result or mission of the projecta product or service for the client/customerin specific, tangible, and measurable terms.Purpose of the Scope Statement To clearly d
4、efine the deliverable(s) for the end user.To focus the project on successful completion of its goals.To be used by the project owner and participants as a planning tool and for measuring project success. WORK DEFINITIONonce objectives set, TRANSLATE INTO WORK ELEMENTSwhat needs to be doneeasy to ove
5、rlook some, or duplicateWORK BREAKDOWN STRUCTUREdivide project into major work categoriessubdivide Determine RequirementsSpecify work activitiesSTATEMENT OF WORK:product descriptionsconstraintsschedule requirementsbudget limitsroles & responsibilities Project Scope ChecklistProject objectiveDelivera
6、blesMilestonesTechnical requirementsLimits and exclusionsReviews with customer Project Scope: Terms and DefinitionsScope StatementsAlso called statements of work (SOW)Project CharterCan contain an expanded version of scope statementA document authorizing the project manager to initiate and lead the
7、project.Project CreepThe tendency for the project scope to expand over time due to changing requirements, specifications, and priorities. Step 2: Establishing Project PrioritiesCauses of Project Trade-offsShifts in the relative importance of criterions related to cost, time, and performance paramete
8、rsBudgetCostScheduleTimePerformanceScopeManaging the Priorities of Project Trade-offsConstrain: a parameter is a fixed requirement.Enhance: optimizing a parameter over others.Accept: reducing (or not meeting) a parameter requirement. Project Management Trade-offs Project Priority Matrix Step 3: Crea
9、ting the Work Breakdown StructureWork Breakdown Structure (WBS)An hierarchical outline (map) that identifies the products and work elements involved in a project.Defines the relationship of the final deliverable (the project) to its subdeliverables, and in turn, their relationships to work packages.
10、Best suited for design and build projects that have tangible outcomes rather than process-oriented projects. Work Breakdown Structure Work Breakdown Structurelevel 1 - overall projectlevel 2 - categorymajor project subelementlevel 3 - tasksubelement of categorylevel x - subtasklevel bottom - WORK PA
11、CKAGEspecific activity Develop a WBS for a project in which you are going to build a bicycle. Try to identify all of the major components and provide three levels of detail. Hierarchical Breakdown of the WBS How WBS Helps the Project ManagerWBSFacilitates evaluation of cost, time, and technical perf
12、ormance of the organization on a project.Provides management with information appropriate to each organizational level.Helps in the development of the organization breakdown structure (OBS). which assigns project responsibilities to organizational units and individualsHelps manage plan, schedule, an
13、d budget.Defines communication channels and assists in coordinating the various project elements. Work Breakdown Structureneeds to be checked, approvedprovidesgood definition of workhow long it will takeresources requiredestimated costsplanning & controlassignments, budget, basis for control Work Pa
14、ckagesA work package is the lowest level of the WBS.It is output-oriented in that it:Defines work (what).Identifies time to complete a work package (how long)Identifies a time-phased budget to complete a work package (cost)Identifies resources needed to complete a work package (how much)Identifies a
15、 single person responsible for units of work (who)Identifies monitoring points (milestones) for measuring success. Work Packageschunk of required workrelatively small cost and short durationincludessummary of workinputs required (predecessors)manager responsibleproduct specificationsresources requir
16、ed (including budget, dates)deliverables Work Packagesneed to identify start and finish events for each work packagerelated tasks without definable end results (overhead & management; inspection; maintenance) should be included as task-oriented work packages for COST purposes list of work packages(a
17、ctivities)system designactivity predecessor time A2 identify reqd infoA110 daysA31 basic software A23 daysA32 data access reqdA21 dayA33 vendor softwareA21 day Work Breakdown StructureDevelop a WBS matrix for a local banquet. Step 4: Integrating the WBS with the OrganizationOrganizational Breakdown
18、Structure (OBS)Depicts how the firm is organized to discharge its work responsibility for a project.Provides a framework to summarize organization work unit performance.Identifies organization units responsible for work packages.Ties the organizational units to cost control accounts. Work Breakdown
19、Structure Direct Labor Budget Sorted By WBS Step 5: Coding the WBS for the Information SystemWBS Coding SystemDefines:Levels and elements of the WBSOrganization elementsWork packagesBudget and cost informationAllows reports to be consolidated at any level in the organization structure WBS Coding Det
20、ailed Task ListWBS can be focused onPRODUCTFUNCTIONetc.when work packages identified,estimate requirements by resourceWHAT IS NEEDEDWHENWHAT MUST PRECEDE Work Package Estimates Project Roll-upCost AccountThe intersection of the WBS and the OBS that is a budgetary control point for work packages.Used
21、 to provide a roll-up (summation) of costs incurred over time by a work package across organization units and levels, and by deliverables. Direct Labor Budget Rollup (000) Process Breakdown StructureProcess-Oriented ProjectsAre driven by performance requirements in which the final outcome is the pro
22、duct of a series of steps of phases in which one phase affects the next phase.Process Breakdown Structure (PBS)Defines deliverables as outputs required to move to the next phase .Checklists for managing PBS:Deliverables needed to exit one phase and begin the next.Quality checkpoints for complete and
23、 accurate deliverables.Sign-offs by responsible stakeholders to monitor progress. PBS for Software Project Development Project Organizationidentify resources required by work packageRESPONSIBILITY MATRIXwhich functions do what work packagescost account structurestart & finish datebudgetresponsibilit
24、ies You are the father or mother of a family of four (kids ages 13 and 15) planning a weekend camping trip. Develop a responsibility matrix for the work that needs to be done prior to starting your trip. TaskDateFatherMotherSonDaughterResearch sitesRSSDecide on siteSRSSReserve siteRShopping listSRSS
25、Purchase suppliesRSPack camping equipmentSRPack fishing gearSRFill car with gasRGet cashR Responsibility MatricesResponsibility Matrix (RM)Also called a linear responsibility chart.Summarizes the tasks to be accomplished and who is responsible for what on the project.Lists project activities and participants.Clarifies critical interfaces between units and individua
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 管道施工安装合同范本
- 出国劳动合同范本
- 辽宁省铁岭市铁岭县2025届九年级上学期12月期末考试数学试卷
- 2025年终总结汇报模板8
- 2025景观照明工程施工合同书
- 2025年合作经营合同模板示例
- 2025建筑吊车租赁合同模板
- 2025成都市房屋租赁合同样本
- 高一语文新学案:第二单元《短歌行》
- 2025房屋租赁合同范本授权标准版
- 数学-江西省部分高中2025届高三下学期3月联合检测(一模)试题和解析
- 运动营养学(第三版)全套课件第1-10章
- 广东省实验中学广州市天河区附属实验学校2021-2022学年八年级下学期期中物理试题(含答案)
- 2025年吉林司法警官职业学院单招职业技能测试题库审定版
- 2025-2031年中国工业自动化设备行业发展前景预测及投资方向研究报告
- 农村小学实施铸牢中华民族共同体意识教育实践探索
- 2025年国防安全知识竞赛题库及答案(共60题)
- 《营养不良与肥胖》课件
- 《事故汽车常用零部件修复与更换判别规范》
- 第六单元《组合图形的面积》(教学设计)-人教版五年级数学上册
- 地理-北京市朝阳区2024-2025学年高三第一学期期末质量检测考试试题和答案
评论
0/150
提交评论