




版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、1. Project Summary22. Plastic material information - 3 3. Analysis purpose & Process condition 44. Part information, Runner and cooling system design 685. Analysis result9276. Conclusion & suggestion 28Mold Flow Report1Mold Flow Reportcase1case2Mold NO:Prepared by: Bill.Bin Cavity number:1*2Analysis
2、 purpose : improve warpage。Analysis Project:Cool +Fill +Pack + WarpCase1 is the 3D design. Case2 is revise mold design and modified the process condition.2Material PropertyViscosity vs Shear rateP-V-TABS Polylac PA-737 Manufacturer : Chi Mei Corporation1. Melt Density : 0.96055g/cu.cm8. Melt Tempera
3、ture Maximum 240 deg.C2. Solid Density : 1.0494g/cu.cm9. Mold Temperature Minimum 40deg.C3. Ejection Temperature 90 deg.C10. Mold Temperature Maximum 80deg.C4. Recommended Mold 60 deg.C11. Maximum Shear Rate 50000 1/s5. Recommended Melt Temperature 220deg.C12. Maximum Shear Stress 0. 5 Mpa6. Filler
4、unfilled13. Thermal conductivity 0.19(k)w/m.c7. Melt Temperature Minimum 200deg.C14. Measured MFR 3 g/10min(5kg/200.C)3Process settingAnalysis purpose: improve warpageAnalysis Project:Cooling + flow + WarpageProcess settingcase1Mold Temperature:60/65Melt Temperature: 220 Fill Time: automaticCooling
5、time:60SV/P switch-over: 99% of filled volumepack80%V/P 10Scase280%X0.3+0X1.5+6X60%+12X100%S4Part infomatiomThickness distribution5Cooling system designAll case is base 2d mold design.6Runner system designCase1 is base 2d mold design ,12mm10mm8mm2.88mm102.8mmcase17Runner system designcase2Same case1
6、Same case1Same case1case2 is reviser runner system (move gate )Move gate8Fill TimeThe fill time result shows the position of the flow front at regular , as the cavity fills. Each color contour represent the parts of the mold Which were being filled at same time.The fill time is about 5.6 second in t
7、he model . No racetrack effect occur. Air trap appear on the last filled area. Do set enough vent over there.case2case19Fill TimeThe fill time result shows the position of the flow front at regular , as the cavity fills. Each color contour represent the parts of the mold Which were being filled at s
8、ame time.The fill time is about 5.6 second in the model . No racetrack effect occur. Air trap appear on the last filled area. Do set enough vent over there.case2case110Pressure at V/P switchoverThe result shows the pressure distribution through the flow path inside the mold at the Switchover point f
9、rom velocity to pressure control.case1case211Air TrapThe air traps are show in pink nodecase1case212Air TrapThe air traps are show in pink nodecase1case213Weld line Notice the positions of the weld lines, which may affect the qualing of the part appearance but which maybe affect the part structural
10、functions.case1case214 波前温度The melt temperature is 220, this themperature at flow front is allow. case1case215Pressure at injection location :XY PlotThe result shows the pressure and clamp force at various times during the filling and packing phases of the analysis.case1case216Clamp force: XY PlotTh
11、e result shows the pressure and clamp force at various times during the filling and packing phases of the analysis.case1case217circuit coolant temperatureThe cooling analysis screen output contains the change in coolant temperature from coolant-into coolant-out If the increase is unacceptable (great
12、er than 2-3 deg.c)case1case218Time to freezeThe result shows the thickness of the frozen. A higher value represents a thicker frozen layer, while low value means a thinner polymer melt (flow )layer Cooing channel need to near sprue , for reduce cycle time.case2case119Temperature mold The temperature
13、 mold result shows the average temperature of the plastic mold interface at the top side, of the mold element during the cycle time . The result displays in the mold surface has a small range.case2case120Volumetric Shrinkage at EjectionThe Volumetric shrinkage at ejection result can be used to detect sink marks on the model. Volumetric shrinkage should be uniform across the whole part to reduce warpage.High shrin
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- Unit 3 Wrapping Up the Topic-Project 教学设计 2024-2025学年仁爱科普版英语七年级上册
- 2糖到哪里去了(教学设计)-2023-2024学年一年级下册科学冀人版
- 南方科技大学《环境资源法》2023-2024学年第二学期期末试卷
- 《7 校园绿化设计》(教学设计)-2023-2024学年六年级下册综合实践活动粤教版
- 冀中职业学院《书法艺术与欣赏》2023-2024学年第二学期期末试卷
- 苏州经贸职业技术学院《安装工程计量与计价》2023-2024学年第二学期期末试卷
- 教科版高中信息技术必修教学设计-5.1 音频信息的采集与加工
- 四川化工职业技术学院《信号分析与处理C》2023-2024学年第二学期期末试卷
- 濮阳医学高等专科学校《微波技术基础》2023-2024学年第二学期期末试卷
- 四川外国语大学成都学院《儿科护理学(实验)》2023-2024学年第二学期期末试卷
- 转运铁水包安全风险告知卡
- 31863:2015企业履约能力达标全套管理制度
- 苏教版数学二年级下册《认识时分》教案(无锡公开课)
- 打造金融级智能中台的数据底座
- 工程合同管理教材(共202页).ppt
- ANKYLOS机械并发症处理方法
- 道路桥梁实习日记12篇
- 第十章运动代偿
- 氩弧焊机保养记录表
- 明星97iii程序说明书
- 《企业经营统计学》课程教学大纲
评论
0/150
提交评论