1、设备验收流程及设备检验规格书以下为设备验收流程 , 仅供参考 :1.0 Machine qualification activities description设备验收执行过程描述Afterreceivingmachines, itwillspend 1week to verifymachine functionand reliability before send it to user. Below describes in details how to verify machine step by step until machine delivery to site according
2、to the flowchart.收到设备后,需要1 周时间验证设备的功能和可靠性。以下定义设备检验步骤。Qualification Flowchart检查验收流程图 :1.1 Verification Preparation检验准备It is required to prepare the following items before starting verifying machine: 检验前需准备以下事项1) Machine 设备2) Machine drawings 设备图纸3)Machine verification specification & checklist设备检
3、查规格和清单4)Machine labeling and machine control number设备标识及客户资产编号5) DUT样品6)Test Station if required测试站7)Measurement if required检查工具或设备1.2General Information Completed设备信息的填写Atthis beginning, Pls. fillin thegeneral information of machine, suchas machine number, description, revision, control number, ser
4、ialnumber, equipment ID number, verified by, verify date and so on. Below is for referenced: 开始请填写设备信息如编号 , 描述 , 版本等等 , 以下可供参考1.2Documents Verifying文件检查This sectionis to check ifthe machine willbe verifiedby using correctrelative documents, software, test station, DUT etc; So it need tocomplete the
5、following items, see below for reference:这里主要检查和确认是否用最新且正确的图纸 , 规格 , 软件 , 测试位 , 样品等来检验设备 , 请参考如下 :1.2Mechanical/Pneumatic Verifying机械和气动部分的检查This section is mainly to verify mechanical and/or pneumatic portion ofmachines. If result for each itemis accepted, concession or rejected, Pls. complete the
6、comment/resultcolumn with “OK”,“UAI” or“NG” and signed the name in checked bycolumn.If it is UAI or NG, it is better to add some comments on thecolumn and also annotate the comment on machine labeling for tracking.If itisgood, just complete with“OK” and no need to annotate on machinelabeling. Below
7、items are step by step:这里主要是机械和气动部分的检查 . 对每个检查项 , 结果主要有三种 : 接受 , 让步接受 , 拒绝 . 如果是让步接受或拒绝 , 请在结果栏里填上“ UAI”或“ NG”,也可加些备注,同时必须备注在设备标识上以便跟进 . 如果是接受 , 请在结果栏里填上“ OK”即可 . 下面是检查的具体项目:1) Verify raw materials for manufacturing parts are correct at documented type, Common &ESD Material检查机械加工件的原材料是否正确 ( 非 ES
8、D材料 ) 检查要求防静电的零件材料是否正确 (ESD 材料 )2) Verify surface treatment for manufacturing part is correct atdocumented type and no any scratch/damage/broken on surface and no any sharp edge or burrs.检查机械加工件表面 ( 颜色 , 处理工艺是否正确 ,外观有否擦伤痕迹 / 锐边 / 尖角等 )3) Verify all parts are manufactured according to correct drawing
9、,especially critical dimension must be verified in spec and enclosed when delivery.确保机械零件按图加工,要求提供符合要求的关键尺寸表4) Verify manufacturing parts are assembled in proper fashion and no missing检查机械加工部件的装配是否正确及完整 , 有没有装反 , 装错或遗漏5) Verifyallfasteningparts(screw,washer, nut,bolt,spacer,are assembled correctly a
10、nd no missing and securely at documentedtorque检查紧固件 ( 螺丝螺母卡簧等 ) 是否安装正确 , 完整及可靠circlip)6) Verifycriticalcomponents(cylinder,bearings,linear,etc)isassembledcorrectly & cant be alternative unless specified.检查关键标准件 ( 气缸 ,轴承轴套 , 导轨等 ) 是否安装正确 ,不可替代除非特别指示7) Verify all pneumatic parts are no pressure le
11、ak, adjusted in correct position, proper function and at documented pressure value, speed, and travel smoothly without sticking or binding检查气动元件在指定气压下是否漏气 , 安装正确 , 工作正常 , 动作顺畅 , 速度异常等现象 , 并备注实际气压值 .8) Use DUT to verify all guide parts are fit for alignment用样品检查定位件的对位是否准确9) Verify all rubber parts ha
12、rdness, colour and check if it fittings/align with DUT and mark hardness value.检查硅胶件的硬度 , 颜色及与样品的配合是否过紧过松或偏位 . 并备注硬度值10) All moving parts are verified unobstructed throughout their entirecourse of travel检查所有移动零部件是否移动顺畅11) Verify fittingly/smoothly operation of loading and unloading of DUT检查设备放置样品及取出
13、样品是否顺畅 , 便利 , 无干涉无阻碍等12) Verify machine will be secure and safety during operating检查设备在使用过程中是否可靠 , 安全 , 不可有夹伤或损伤操作人员的危险和隐患1.2Electrical Verifying电子部分的检查This section is mainly to verify electrical portion of machines. Theguideline is the same as above. Below items are step by step:这里主要是电子部分的检查 .要求同上
14、.下面是检查的具体项目:1) VerifyWIREis properlysecured,layoutis reasonable,strainrelievedwith correct length and measure connection by manual elect measuring检查连线的长度 ,是否在设备使用中有干涉,布线是否合理 ,人工检测连线正确性2)Verify PCBA is populated correctly and check I/O value manually according to schematic/diagram检查电路板是否按图和 BOM加工 , 电
15、子零件是否贴装正确 , 人工检测输入输出电压电流是否正常2) Verify NEEDLE and PCB beds against drawing and connection well in specified compression of needles检查探针连线是否按图正确连接,和 PCB的针位是否通电4)Verify CABLES are function by manual electrical measuring and/or when connected with testing equipment, and also verify length of cable, verif
16、y value & soldering of resistors, capacitors, diodes when they are solderwith shrink tubes and with connectors.人工检查或连接到设备上以确认电缆的连接是否连通 , 电缆的长度是否正确 , 电缆和零件焊接时是否有短接虚焊 , 是否有热塑管保护5) Verify that ALL CONNECTIONis proper contacted per schematic or wiring diagram before power on最终通电前,检查所有连接是否按电路图正确连接6)
17、Verify Critical Component cant be alternated unless specify关键电子件不可替代除非特别指示7) Verify function of LED通电检查 LED指示灯的功能是否正常8) Verify function of SENSORS and if assembled correct检查感应器功能及安装位置是否正确9) Verify BATTERY CONNECTOR/CONTACT is assembled correctly and measure electrical battery pin by manual electrica
18、l measure检查电源连接器 / 连接件是否安装正确 , 人工检查是否通电10) Verify SYSTEM CONNECTOR is assembled correctly and function when connected with station检查系统连接器是否安装正确 , 是否与测试位连接正常11) Verify ANTENNA is assembled correctly and function检查天线是否安装正确 ,功能是否正常12) Verify MICROPHONE is assembled correctly & function检查麦克风是否安装正确 ,
19、 功能正常13) Verify SPEAKERis assembled correctly and its function by using signal generator equipment检查扬声器是否安装正确,用信号发生器检查其功能是否正常14) Verify RF CONNECTOR is assembled correctly and its function when engage and compression检查高频连接器是否安装正确,在接合及压缩时其功能是否正常15) Verify RF INTERFACE BOXES shielding function检查屏蔽箱的功能
20、16) Verify EARCOUPLERis assembled correctly and in correct position atdocumented specified检查耳机藕合器是否安装准确,位置是否正确 ,功能是否正常7.2Function and GR&R Verifying设备功能和可靠性检查This section is mainly to verify function and GR&R of machines. The guideline is the same as above. Below items are step by step:这里主要是
21、设备功能和可靠性的检查.要求同上 .下面是检查的具体项目:1) Verify base machine function with test software用测试程序检查通用设备部分是否功能正常2) Verify application machine function with DUT& test software用样品和程序检查应用设备的功能3) Verify final machine (including base machine, application machine, DUT, Test software) have been functionally tested a
22、nd pass tests用样品和程序检查整个设备的功能是否通过测试4) Run GR&R test and verify all results are passed (Dev<=0.2,3DUT, 3Operators, 10times/DUT, Total 90times)检查设备的重复性和可靠性 (3 个操作员分别用 3 个样品进行测试 , 每样测 10 次 , 共 90 次, 偏离不可大于 0.2)7.3Buy Off and Signature设备最终验收和签名This step describesbuying offand sign of machine ifiti
23、s verified.qualification result should be: Pass, UAI, Rejected and Scrapped. Theresult will be identified on machine labeling for each machine. When amachines is verifiedpass, itis requiredto sign a <<machine verificationThespecification &checklist>> finally and documented and delivery with machines. Below is reference:这里规定如何最终验收设备, 每个设备检查的结果由设备检查规格书来判定。 每个设备附带一份该设备检查规格书并备案。 送交设备时,一份最终签署的设备检查规格书和设备一同送出。1.8 Delivery to Site设备验收后交送Once machines are buy-off and documented
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2024年度产品代理销售合同(含产品名称、销售区域等)3篇
- 2024年度二手房买卖及房屋过户手续代办定金合同协议书2篇
- 2024年槽罐车天然气运输合同
- 2024安装工劳务合同范文:绿色环保设备安装服务2篇
- 2024版农业生态补偿合同:补偿范围与补偿标准2篇
- 2024版化工原料采购供应商风险评估与管理合同3篇
- 2024年度建筑工程担保合同范本与执行标准3篇
- 2024年度钢构施工安全监管及验收合同3篇
- 2024版个人房屋抵押贷款合同担保人责任条款3篇
- 2024年度风险投资公司反担保合作协议3篇
- 分布式光伏电站项目施工方案
- 2024届广东省广州市华南师范大附属中学数学七年级第一学期期末综合测试试题含解析
- 器械相关感染的预防与控制
- PPP模式项目的风险管理分析
- 硫酸安全技术说明书-MSDS
- GB/T 17421.2-2023机床检验通则第2部分:数控轴线的定位精度和重复定位精度的确定
- 第五次全国经济普查综合试点业务培训班课件 从业人员及工资总额
- 劳动能力鉴定复查申请书
- 菏泽学院中外教育史期末考试复习题
- 合肥供电公司城市新建住宅小区电力建设技术标准
- 小学三年级上册美术教案(全册)
评论
0/150
提交评论