1、生命赐给我们,我们必须奉献生命,才能获得生命。工序procedure基础安装foundation本体就位properposition其他others主变压器本体安装main transformer proper installation表号 table number:检验结果 inspection检验项目inspection items质量标准 quality standardresults按设计规定对照设计图纸检预埋件 embedded parts查 meet the designs基础水平误差foundation level 5mmerror轨道间距误差space error 5mmbet
2、ween tracks标准规定值standardized油绝缘性能oil insulationreading套管与封闭母线中心线thecenterline of bushing and一致 identicalsealed busbar支墩与变压器及预埋件连接connection of rest pier to the牢固 firmtransformer and embedded parts本体接地 proper grounding牢固,导通良好firm,conductivity冲击值和次数 impact value and按制造厂规定值 according tofrequencythe man
3、ufacturer s data油箱顶部定位装置orientation无变形,无开裂nodevice on the topof theoil tankdeformation, no crack验收结论:质检机构验收意见 Comments签名 SignatureQuality inspection organizationNEPC 施工班组符合 complyConstruction teamSigned confirmationNEPC 工地技术员符合 complySite Technician Signed confirmationNEPC( 专业工程师 )符合 complyProfessio
4、nal engineer Signed confirmationCNEEC( 专业工程师 )符合 complyProfessional engineer Signed confirmation希望是本无所谓有,无所谓无的。这正如地上的路;其实地上本没有路,走的人多了,也便成了路。生命赐给我们,我们必须奉献生命,才能获得生命。HPC/OE( 专业工程师 )符合complyProfessional engineer Signed confirmation变压器检查inspection of the transformer表号 form number:DL/T5161.3-主变压器检查inspect
5、ion of the transformer检查状态inspection工序procedure器身外观Appearance铁芯transformer core绕检验项目 inspection items质量标准quality standard检验结果result器身各部位 each location无移动 no movement各部件外观 appearance of each无烧伤、损坏及变形 no burnedpartor damaged deformation各部件绑扎措施each part binding齐全、紧固 complete and firm绝缘螺栓及垫块insulation b
6、olt and齐全,无损坏,且防松措施可靠 complete, no damage, notsizing blockloose绕组及引出线绝缘层 insulation完整、包缠牢固紧密 complete,layer of widing and leads iwrapped tightly铁芯接地 the core grounding1 点,连接可靠 one point,connection steady用 2500V 兆欧表测试, 不小于铁芯绝缘 the core insulation200 兆欧。 By 2500Vmegaohm meter not less than200megaohm外观
7、无毛刺、尖角、断股、断片、拧弯 no burr, no sharp horn,appearano break wire, no break裸导体 exposedconductorncepiece, not bent焊接满焊 ,无脱焊 fully welded, noweldingloose weld高压应力锥 high voltage stress完好 functioncone油路(有围屏者除外) oilline, ( the无异物 , 畅通 smooth组one with screen not included)winding均压屏蔽罩( 500kV 高压侧)average完好 ,无损伤 c
8、omplete, novoltage shield(500kV side)damage线圈固定检查 winding fix inspection固定牢固 firm绕组绝缘 winding insulation不低于出厂值的 70% notlower than 70% of希望是本无所谓有,无所谓无的。这正如地上的路;其实地上本没有路,走的人多了,也便成了路。生命赐给我们,我们必须奉献生命,才能获得生命。manufacturer s requirement连接 connection可靠 steady清洁度、弹力无锈蚀、油污、且弹性良好 nocleanness,rust, no grease, b
9、ounced wellbounce开关可靠,塞尺塞不进 steady, by接触 touchfeeler触头 switch head对应位置电压切换装置voltageswitch其他othersrelative正确、一致 correct, identicalpositions部件装配 parts equipped齐全、正确 complete, correct操作杆长度三相一致 identical threehandlephase无励磁分接开关lengthnon-excitation tap转动器动作灵活,密封良好rotatorresponsive, sealed well开关动作顺正确,切换时
10、无开路 correct,序 sequencecircuit closed when switched有载调压分接开关of switchesload tap changing切 z 换开关密封 seal of良好 functionswitch强油循环管与下轭绝缘接口密封insulation interface seal between良好 functiionforced circulation tube and loweryoke无杂物、 污迹、屑末 no dirt, no各部位清理clearing of each partgrease, no scraps阀门动作vavle response验
11、收结论:质检机构验收意见Comments签名 SignatureQuality inspection organizationNEPC施工班组符合complyConstruction teamSigned confirmation希望是本无所谓有,无所谓无的。这正如地上的路;其实地上本没有路,走的人多了,也便成了路。生命赐给我们,我们必须奉献生命,才能获得生命。NEPC工地技术员符合 complySite Technician Signed confirmationNEPC(专业工程师 )符合 complyProfessional engineer Signed confirmationCNE
12、EC(专业工程师 )符合 complyProfessional engineer Signed confirmationHPC/OE(专业工程师 )符合 complyProfessional engineer Signed confirmation主变压器附件安装the main transformer accessories installed表号 form number :主变压器附件安装the main transformer accessories检查状态inspectioninstalled质量标准检验结果工序 procedure检验项目 inspection itemquality
13、inspectionstandardresult套管及电流互感器试验 bushing and合格current mutual inductance testacceptable接线端子牢固,无渗漏油wiringfirm, no外观leakage ofoilterminal检查升高座最高处放气塞 airappearanceat the top ofreleaseplughoist seat高升高座安安装位置 installation正确 correct压装 hoistposition套seat正确,不影响套管installed管穿人安绝缘筒装配 insulationcorrect, not装ca
14、nister equippeddisturb tothehigh voltage bushinginsertion ofinstalledbushing法兰连接 flange紧密 sealedconnection清洁,无损伤,油位正常套管检查 bushingclean, noinspectiondamage,regular oillevel希望是本无所谓有,无所谓无的。这正如地上的路;其实地上本没有路,走的人多了,也便成了路。生命赐给我们,我们必须奉献生命,才能获得生命。齐全,紧固法兰连接螺栓flangecomplete,connection boltfirm穿线 wire顺直、不扭曲stra
15、ight andinsertionnot twisted在均压罩内, 深应力锥度合适 inside220kVstressthe equalizer引conecover, fairdepth出在均压屏蔽罩线内间距 15mm左安均压球右 15mm space装500kVequalizerinside thewireballequalizerleadscover连接螺栓紧固,引线与套管连接密封良好connectionconnectionbetween leads andboltbushingfastened,sealed清洁,无损伤低压套管检查 bushing inspectionclean, an
16、d nodamage套管连接螺栓紧固low voltage bushing法兰连接 flange connectionconnectionbolt fastened无励磁分传动连杆 driven回装正确, 转动无卡阻 smooth接开关rodrotatationnon-excitation tap密封良好switch指示器 indicator电压sealed well切换分接头位置与指对应,且联锁、装置限位正确 ,示器指示 tapvoltage switch有载调压matched,position and开关 loadinterlocked,indicatortap-changinglimit
17、ed油室密封 oil良好 functionchamber sealed储内部检查 inside inspection清洁、无杂物油clean, no dirt柜胶囊或隔膜 bag or separation film无变形、损伤,希望是本无所谓有,无所谓无的。这正如地上的路;其实地上本没有路,走的人多了,也便成了路。生命赐给我们,我们必须奉献生命,才能获得生命。安且清洁 no装deform, nooil tank installeddamage, andclean胶囊或隔膜气密性bag or separation无泄漏 nofilm air-tightleakage无泄漏,呼吸通胶囊口密封 b
18、ag sealed畅 no leakage,wind smoothly反映真实油位油位计检查 oil level inspectionactualresponse ofoil level无堵塞、清洁连通管 connection tubesmooth and吸湿器安装clean在油面线处 atmoisture-absorber油封油位 oil level of oil sealoil surfaceinstalledline吸湿剂 moisture-absorbent颜色正常regular color无杂物、污迹内部检查 inside inspectionno dirt, nosmear隔膜 s
19、eparation film完好 function严密,不与大气隔膜与法兰连接connection between相通 sealed,separation film and flangenot connected安全气道安装及压力释to atmosphere放阀安装 safety air动作准确, 绝缘duct installed and隔膜位置触点 separation film location良好pressure releaseheadresponsive,valve installedinsulated位置 location正确 correct阀盖及弹簧 valve无变动 no释放器压
20、力cover and springchangereleaser动作准确, 绝缘pressure电触点检查良好inspection of powerresponsive,headand insulated气体继电器安装校验 calibration合格 acceptable希望是本无所谓有,无所谓无的。这正如地上的路;其实地上本没有路,走的人多了,也便成了路。生命赐给我们,我们必须奉献生命,才能获得生命。gas relay installed继电器安装 relay位置正确, 无渗漏 location,noinstalledleakage连通管升高坡度 the up便于气体排向气体继电器gasgra
21、dient of connectiondischarged to the gas relaytube温度计校验 themometer制造厂已校验 manufacturercalibrationcalibration插座内介质及密封与箱内油一致,密封良好identical to the oil inside温度计安装socket medium and sealsthe oil tank, sealed wellthermometer installed测温包毛细导管无压偏、死弯,弯曲半径大于capillary of50mm not flattened, no deadtemperatureleg
22、, elbow radius greatertanmeasurement50mm外观检查 appearance无变形、法兰端面平整nodeform, flat ends of flange密封性试验 seal test按制造厂规定 followmanufacturer s procedure支座及拉杆调整法兰面平行、 密封垫居中不偏心adjustment of holder受压 parallel flange ends,and rodseal pad centering冷潜油泵 submerged oil结合面严密 joint surfacepumpsealed却流速、差压继电器器flow v
23、elocity and relay按制造厂规定 follow安with difference ofmanufacturer s procedure装voltagecooler installed牢固,叶片无变形 firm, blade风扇 fannot deformed阀门动作 valve操作灵活,开闭位置正确responsive, open and close atresponsecorrect positions外接管路 outlet内壁清洁,流向标志正确 cleaninner wall and flowdirectionpipeline,label内部检查 inside清洁,无杂物、污迹
24、clean, noinspectiondirt, no smear冷却器安装 cooler滤网检查 filter完好 functioninstalledinspection吸湿剂 absorbent白色不透明 white and nottransparent其他 others耐油绝缘导线 oil-proof排列整齐,保护措施齐全insulation wirearranged in order, protected希望是本无所谓有,无所谓无的。这正如地上的路;其实地上本没有路,走的人多了,也便成了路。生命赐给我们,我们必须奉献生命,才能获得生命。牢固,密封良好firm, sealed接线箱盒ju
25、nction boxwell控制箱安装 control box牢固 firminstalled验收结论:质检机构签名Quality inspection organization验收意见 CommentsSignatureNEPC 施工班组符合 complyConstruction teamSigned confirmationNEPC 工地技术员符合 complySite Technician Signed confirmationNEPC( 专业工程师 )符合 complyProfessional engineer Signed confirmationCNEEC( 专业工程师 )符合 c
26、omplyProfessional engineer Signed confirmationHPC/OE( 专业工程师 )符合 complyProfessional engineer Signed confirmation主变压器注油及密封试验the transformer oiling and seal test表号 form number :DL/T5161.3- 1.0.3-4主变压器注油及密封试验the transformer oiling and检查状态 inspectionseal test工序检验项目 inspection items质量标准 qualityprocedurest
27、andard检验结果 result绝缘油试验 insulation oil test检查试验报告合格 acceptabletest report油温( 220kV 及以上变压器) oil高于器身温度 higher变temperature(for 220kV abovethan proper用温度计检查transformer)temperaturethemometer压checked器身温度 proper temperature20OC器注按制造厂规定 follow油真空度 vacuum extentmanufacturerstransformerdataoiling注油前真空保持时间 vacu
28、um time按制造厂规定 followmanufacturersbefore oilingdata注油(循环)速度 L/min oiling按制造厂规定 follow希望是本无所谓有,无所谓无的。这正如地上的路;其实地上本没有路,走的人多了,也便成了路。生命赐给我们,我们必须奉献生命,才能获得生命。(circulation) velocity L/minmanufacturer sdata注油过程检查( 220kV 及以上变压器)按制造厂规定 followoiling inspection (for 220kV andmanufacturer s220kV above transformer
29、)data注油后真空保持时间 vacuum timeafter按制造厂规定 followmanufacturer soilingdata油标指示 oil正确 correctindication油位检查 oil油标指示与油枕油面高level度 oil surface level按制造厂规定 followof oil indication andmanufacturer s dataoil conservator变压器注油净油设备出口油oil按制造厂规定 followtransformerpurifying equipmentmanufacturer s dataoilingoutlet oilO
30、C油箱内温按制造厂规定 follow500kV 变热油temperature insidemanufacturer s data循环器 500kVoil tankOChot oil循环时间按制造厂规定 followcirculatorcirculation timemanufacturer s datah热油循环后油质试验oil quality after hot合格 acceptableoil circulation试验压力 pressure testMPa按制造厂规定 followmanufacturer s data整体密封试验按制造厂规定 followoverall seal试验时间t
31、est timehmanufacturer s datatest所有焊缝及结合面密封seal on all无渗漏 no leakagewelding joints and joint surface希望是本无所谓有,无所谓无的。这正如地上的路;其实地上本没有路,走的人多了,也便成了路。生命赐给我们,我们必须奉献生命,才能获得生命。验收结论:质检机构验收意见Comments签名 SignatureQuality inspection organizationNEPC 施工班组符合complyConstruction teamSigned confirmationNEPC 工地技术员符合compl
32、ySite Technician Signed confirmationNEPC( 专业工程师 )符合complyProfessional engineer Signed confirmationCNEEC( 专业工程师 )符合complyProfessional engineer Signed confirmationHPC/OE( 专业工程师 )符合complyProfessional engineer Signed confirmation主变压器整体检查the transformer overall inspection表号 form number :DL/T5161.3- 1.0.3
33、-5主变压器整体检查the transformer overall检查状态 inspectioninspection工序 procedure检验项目 inspection item质量标准 quality检验结果 resultstandard变铭牌及接线图标志 nameplate齐全,清晰 complete,压and wiring tagsclear器所有附件安装 all accessories正确,牢固 correct and整installedfirm体油系统阀门 oil system valve打开,且指示正确 opened,检and correct indication查变压器外观 a
34、ppearance of the清洁,顶盖无遗留物 cleantheand no residual on thetransformertransformertop cover希望是本无所谓有,无所谓无的。这正如地上的路;其实地上本没有路,走的人多了,也便成了路。生命赐给我们,我们必须奉献生命,才能获得生命。overall符合支行要求位置指示正分接开关位置及指示 tap switch确 meet the requirementinspectionposition indicationfor position indication油位 oil level正常 regular测温装置 temperature指标正确 correctmea
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 支票作为借款抵押物的合同3篇
- 房屋买卖合同范本版3篇
- 方式购物合同格式3篇
- 改扩建工程施工合同的培训资料3篇
- 招标方案范本3篇
- 安全骑行承诺电动车安全责任3篇
- 文化创意产业基地合作协议3篇
- 新版无担保借款合同模板3篇
- 景观设计测量员劳动合同
- 港口工程委托施工合同
- 登高作业错题解析
- 昌乐二中271高效课堂培训与评价ppt课件
- 《国际经济法》案例思考题
- 省部联合减盐防控高血压项目培训教材
- 【作文素材】他被故宫开除,却成为“京城第一玩家”!——王世襄剖析
- 开发商退房通知书
- 模特的基础训练
- 药品招商流程
- 混凝土配合比检测报告
- 100道递等式计算(能巧算得要巧算)
- 【2019年整理】园林景观设计费取费标准
评论
0/150
提交评论