1、 出处:安瑞克混凝土桥梁结构形式j建筑实录(美),2010,33(36):3436the structure of concrete bridgepre-stressed concrete has proved to be technically advantageous, economically competitive, and esthetically superior bridges, from very short span structures using standard components to cable-stayed girders and continuous box
2、girders with clear spans of nearly 100aft .nearly all concrete bridges, even those of relatively short span, are now pre-stressed. pre-casting, cast-in-place construction, or a combination of the two methods may be used .both pre-tensioning and post tensioning are employed, often on the same project
3、.in the united states, highway bridges generally must-meet loading ,design ,and construction requirements of the aashto specification .design requirements for pedestrian crossings and bridges serving other purposes may be established by local or regional codes and specifications .aci code provisions
4、 are often incorporated by reference .bridges spans to about 100ft often consist of pre-cast integral-deck units ,which offer low initial cost ,minimum ,maintenance ,and fast easy construction ,with minimum traffic interruption .such girders are generally pre-tensioned .the units are placed side by
5、side ,and are often post-tensioned laterally at intermediate diaphragm locations ,after which shear keys between adjacent units are filled with non-shrinking mortar .for highway spans ,an asphalt wearing surface may be applied directly to the top of the pre-cast concrete .in some cases ,a cast-in-pl
6、ace slab is placed to provide composite action .the voided slabs are commonly available in depths from 15 to 21 in .and widths of 3 to 4 ft .for a standard highway hs20 loading, they are suitable for spans to about 50 ft, standard channel sections are available in depths from 21 to 35 in a variety o
7、f widths, and are used for spans between about 20 and 60 ft .the hollow box beams-and single-tee girders are intended for longer spans up to about 100 ft.for medium-span highway bridges ,to about 120 ft ,aashto standard i beams are generally used .they are intended for use with a composite cast-in-p
8、lace roadway slab .such girders often combine pre-tensioning of the pre-cast member with post-tensioning of the composite beam after the deck is placed .in an effort to obtain improved economy ,some states have adopted more refined designs ,such as the state of washington standard girders.the specia
9、lly designed pre-cast girders may be used to carry a monorail transit system .the finished guide way of walt disney world monorail features a series of segments, each consisting of six simply supported pre-tensioned beams ,together to from a continuous structure .typical spans are 100 to 110 ft . ap
10、proximately half of the 337 beams used have some combination of vertical and horizontal curvatures and variable super elevation .all beams are hollow, a feature achieved by inserting a styro-foam void in the curved beams and by a moving mandrel in straight beam production.pre-cast girders may not be
11、 used for spans much in excess of 120 ft because of the problems of transporting and erecting large, heavy units.on the other hand ,there is a clear trend toward the use of longer spans for bridges .for elevated urban expressways ,long spans facilitate access and minimize obstruction to activities b
12、elow .concern for environmental damage has led to the choice of long spans for continuous viaducts . for river crossings, intermediate piers may be impossible because of requirements of navigational clearance. in typical construction of this type, piers are cast-in-place, often using the slip-formin
13、g technique .a “hammerhead” section of box girder is often cast at the top of the pier, and construction proceeds in each direction by the balanced cantilever method. finally, after the closing cast-in-place joint is made at mid-span, the structure is further post-tensioned for full continuity .shea
14、r keys may be used on the vertical faces between segments, and pre-cast are glued with epoxy resin.the imaginative engineering demonstrated by many special techniques has extended the range of concrete construction for bridges far beyond anything that could be conceived just a few years ago .in the
15、united states, twin curved cast-in place segmental box girders have recently been completed for of span of 310 ft over the eel river in northern california .preliminary design has been completed for twin continuous box girders consisting of central 550 ft spans flanked by 390 ft side spans.another f
16、orm of pre-stressed concrete bridge well suited to long spans is the cable-stayed box girder .a notable example is the chaco-corrientes bridge in argentina .the bridges main span of 804 ft is supported by two a-frame towers, with cable stays stretching from tower tops to points along the deck .the d
17、eck itself consists of two parallel box girders made of pre-cast sections erected using the cantilever method .the tensioned cables not only provide a vertical reaction component to support the deck ,but also introduce horizontal compression to the box girders ,adding to the post-tensioning force in
18、 those members .stress-ribbon bridge pioneered many years ago by the german engineer ulrich finsterwalder. the stress-ribbon bridge carries a pipeline and pedestrians over the rhine river with a span of 446 ft .the superstructure erection sequence was to (a) erect two pairs of cables, (b) place pre-
19、cast slabs forming a sidewalk deck and a u under each of the sets of cables, and (c) cast-in-place concrete within the two us. the pipeline is placed atop supports at railing height, off to one side, which greatly increases the wind speed of the structure.it is appropriate in discussing bridge forms
20、 to mention structural esthetics .the time is past when structures could be designed on the basis of minimum cost and technical advantages alone .bridge structures in particular are exposed for all to see .to produce a structure that is visually offensive ,as has occurred all too often in the past,
21、is an act professional irresponsibility .particularly for major spans ,but also for more ordinary structures ,architectural advice should be sought early in conceptual stage of the design process.混凝土梁桥的结构形式事实证明,预应力混凝土结构是在技术上先进、经济上有竞争力、符合审美学的一种先进技术。从使用标准组成的小跨径桥梁到吊梁和跨径将近100英尺的连续箱梁桥,几乎所有的混凝土桥梁,甚至于相对短时间
22、的桥梁都是预应力结构的。采用预制、现场浇筑或两种方法并用。在同一工程中经常同时使用先张法和后张法。在美国,公路桥一般情况下必须满足荷载、设计和aashto规定的建设的要求。对于服务于其它目的步行街和桥梁的设计要求由当地的或地方的代码建立。aci代码的备注也被纳入参考。伴随最小交通中断的大约100英尺的跨径的桥梁由提供低的初级预算,最小量维修和养护费用和快速的简易的预制板组成。这种梁一般是用先张法。预制板一块挨一块的放置并且在相邻的预制板间受剪的缝隙填满不收缩的灰泥之后,经常在中间横膈膜的位置后张拉。对于公路,用沥青铺设的表面可以直接用在预制混凝土的上面。在某些情况下,一块放置在正确位置的现浇板
23、提供复合作用。空心板一般用于深度15英尺到21英尺,宽度3英尺或4英尺。对于一个标准hs20的公路,空心板适合于大约50 英尺的跨径。标准渠化区段在多种宽度,深度从21英尺到35英尺时是有利的,可用于大约20英尺到60英尺的跨径。中空的箱形梁和t形梁用于大约100英尺的长跨径。对于中等跨径的大约120英尺的公路桥,一般使用aashto 标准梁。它们和一种复合现场预制行车道板一起使用。在板被安置之后,这样的梁经常在预浇梁的先张拉 与合成梁的后张拉后结合。试图获得改进经济,一些国家已经采用更精炼的设计,例如华盛顿州标准梁。 经过特别设计预制建筑梁可以用来携带一个单轨铁路系统。完成的沃尔特迪斯尼乐园单轨铁路的一系列的特征, 每个包括六个单独支持的预拉梁,一起形成连续结构。典型的跨距是100到110英尺。被使用的337根梁,大约一半有垂直与水平曲率和易变超级升高的一些结合。所有的梁是中空的,它的特征是通过在曲梁中插入泡沫和在直梁制作中移动形心轴获得。由于运输问题和构件垂直的大而重的问题,预制梁不能用于跨径超过120英尺的桥梁。另一方面,桥梁有一种向大跨径发展的明显趋势。对于提高的都市高速道路来说,大跨径促进通路而且将对下面的活动妨碍减到最少。对环境的损害问题的关心,导致连续高架桥大跨径的选择。对于跨河桥,因为
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2024年度城市智能安防系统建设合同2篇
- 2024年度百货商场品牌入驻租赁合同6篇
- 2024全新智能消防水池建设与维护承包协议3篇
- 2024人力资源校园招聘活动策划服务合同2篇
- 2024年度水泥运输信息管理系统开发与应用合同3篇
- 2024套房租赁合同范本-含租客紧急疏散预案3篇
- 2024年度四川省国际产能合作项目融资合同2篇
- 2024年度石子材料采购合同终止合同3篇
- 2024年智能办公楼门禁工程合同
- 2024年度建筑工程设计咨询费用合同6篇
- 学校工程验收报告单
- 线路工程灌注桩施工作业指导书施工方案
- 重力坝的分缝与止水
- 三重管高压旋喷桩施工工艺规程与施工方案
- 云南白药公司近三年财报分析
- 卫浴产品世界各国认证介绍
- 个体诊所药品清单
- 深度学习数学案例(课堂PPT)
- 中国地图含省份信息可编辑矢量图
- 卧式钻床液压系统设计课件
- 水库维修养护工程施工合同协议书范本
评论
0/150
提交评论