1、Final CASE STUDY for Master ofSE, Fall, 2010-2011College of Software Technology. Zh可inng UniversityThe GPS Auto-navigationSystem Verification ProjectXXxxxxxxx2010-XX-XXREQUIREMENT la.(a) develop an initial project charterProject Number:20101119Project Name: The GPS Auto-navigation System Verificatio

2、n ProjectProject Purpose: need to test 5 systems under operational conditions to support claims of reliability to convince the customer that the product design performance was stable and reliable. Also,planning, conducting, and evaluating the engineering implications of the reliability test as well

3、as tlie “tear down inspect ionProject Manager: Zhou Jie, Reliability Engineering ManagerProject Member:Gail YU, Manager of Quality EngineeringTom HUANG, Manager of Design and Product Engineeri ngJesse LIU, senior engineer from Product Manufacturing Pete DONG, senior engineer from Administration resp

4、 on sible for comp orient purchasi ng and incoming testing of materialsScope: 1. Design test plan and time arrangement2. Guidance system reliability testing3. Module decomposition audit and result of audit4. Analysis test and result of audit5. Submit a project summary reportREQUIREMENT lb.(b) develo

5、p a complete Linear Responsibility Chart, a - Responsibility b - Supervisionc Must be con suitedd - May be con suited e - Must be notified f - Approval authorityActivityDesign test planGuidance system reliability testingModule decomposition auditAnalysis test and result of auditSubmit a project summ

6、ary reportXXa,b,fa,b,ea,b,ea,bfa,b,fGail YUc,fa,b,fa,b,fa,c,ec,eTom HUANGcfa,c,ea,c,ca,c,ec,eJesse LIUdc,ec,ec,edPete DONGdc,ec,ec,edREQUIREMENT lc.(c) complete a stakeholder analysis.stakeholder analysisNameOrganizationRoleProfitImpactGeorge WUSenior ManagerProject ManagerPretty HighPrettyHighPeter

7、 WANGSeniorManagerSenior Vice-president,Director of Product ManufacturingHighHighThomas GUSenior ManagerDirector of Marketing and SalesHighMediumJames TANSenior ManagerDirector of EngineeringPrettyHighPrettyHighJane YANGSenior ManagerDirector of Inspection & TestPrettyHighHighRobert HOUCustomer repr

8、esentativeInteral CustomerRespresentativeHighMediumXXProject TeamReliability Engineering ManagerPrettyHighPrettyHighGail YUProject TeamManager of Quality EngineeringPrettyHighHighTom HUANGProject TeamManager of Design andProduct EngineeringPrettyHighHighJesse LIUProject Teamsenior engineer from Prod

9、uct ManufacturingPrettyHighHighPete EXDNGProject Teamsenior engineer from Administration responsible for component purchasing and incoming testing of materialsPrettyHighHighREQUIREMENT 2a.(a) Develop a CPM Activity on Node diagram for the projectREQUIREMENT 2b.(h) Determine the critical path and the

10、 duration of the critical pathfar the projectAccording to the CPM Activity on Node diagram above:We could caculate the critical path isSo, the total day would be cost is5+2+11+3=21 (days)REQUIREMENT 2c.(c) What conclusions can you draw from the CPM diagram?We can conclude that the main workload and

11、cost concentrate on the reliability testing. Only to ensure the testing completed on time , the whole project can not be postponed and the projects processing can be balanced by tracing the critical path.REQUIREMENT 2d.(d) Discuss the assumptions, limitations, mid implications for using the CPM as a

12、n approachfor scheduling this project?Critical path method is paramount when attempting to manage the progress of a project. If a portion of the project needs to be shortened, also known as fast tracking, the project manager can order more of the activities to take place at the same time. Using the

13、critical path method, a manager can also increase the productivity of an individual activity by crashing the critical path. This means that additional resources are added to shorten the duration of the activity. Overall, the best advantage of the critical path method is the ability to speed up or sl

14、ow down the processes of a project.REQUIREMENT 3a.(a) Develop a PERT Activity on Node diagram for the project (This diagram must specify the critical path and duration ofthe CPBy means of analizing PERT Chart we can caculate the total day needed is 24.REQUIREMENT 3b.(b) Construct a table which ident

15、ifies: Activity, duration, Early Start, Early Finish, Late Start, Late Finish, and Slack (Float), and Activity Standard Deviation (round to 1 decimal place)ActivityABCDEFGDuration52.812.841.74Early Start15512.915.819.81Early finish57.9615.819.821.54Late Start0511.912.915.819.84Late Finish57.912.915.

16、819.821.57.9Slack006.90003.9StanderdDeviation0.31.201.210.703ActivityHIJKLMNDuration51.75.81.81.2113Early Start7.921.5555718Early finish12.923.211771821Late Start7.921.517.27.27.29.220.2Late Finish12.923.223.29.29.220.223.2Slack00122.22.22.22.2Standerd Deviation1.30.70.50.20.2030.3REQUIREMENT 3c.(c)

17、 What can you conclude about the project duration from analysis of the PERT network diagram?According to analysis the PERT Charts critical path, we know tliat Module decomposition audit and result of audit is the key point of the project. So, if we can control the time spend on Module decomposition

18、audit, it can be narrow the whole projects time.REQUIREMENT 3d.(d) What are the primary concenis that a PM must consider in using PERT for project scheduling?The indetermination that makes use of PERT to carry on an item management to adjust main considerated time, particularly lie in to time of con

19、trol. if already known the optimistic time, pessimism time and the most possible time, it can be using the formula below to caculate the expect time:a: + 4c; + b:耳=6*REQUIREMENT 4a.(a) discuss the statement made by James TANJames Tans argument is incomplete.The main purpose of risk management, proje

20、ct management process is to identify risk and control risk. Through the transfer of risk to prevent, avoid, reduce and use of five strategies for effective risk management. In any project there is a risk, risk is a kind of uncertainty, the risk may lead to project failure, effective risk management

21、can reduce this possibility. However, the risk of project feilure are not necessarily factors. So risk management can not completely eliminate the possibility of project failure. But can effectively reduce this possibility.REQUIREMENT 4b.(b) identify prima/y sources cf risk inherent in this projectT

22、he risk of the project can be broadly defined as the source of the following:1. Technical risk, lack of training, methods, tools and technical understanding is not enough, not enough experience in the field of application of new technologies and development methods, the method does not work correctl

23、y2. Cost risk, though company officials promised regardless of cost, but did not explicitly limit the specific costs3. Human resource risk, project organization and division of responsibilities is not scientific, the absence of other staff4. Communication-related risks, including with customers, executives and team members a common problem among5. Time or resources available on the date of the estimation error; on the distribution of the floating lag time or poor managementREQUIREMEN

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论