九龙国际建材城C、D区工程基坑支护及降排水施工方案编制人:审核人:审批人:编制单位:贵州建威建设集团有限公司年月日目录一、编制根据···············································4二、工程概况···············································5三、工程环境条件············································5四、水文及地质状况···········································54.1水文状况················································54.2地质条件················································64.3场地水对施工的影响·····································7五、基坑降排水施工·······································75.1基坑降排水组织管理····································75.2基坑明排水施工··········································75.3环保方法·············································85.4临边防护·············································9六、基坑监测·············································96.1监测点的位置及数量···································96.2监测与测试的控制指标·································96.3监测规定·············································10七、施工注意事项及规定····································10抽水监测与管理········································11九、安全文明施工方法·····································119.1安全施工方法·······································119.2文明施工方法·········································12十、安全生产方法········································13一、编制根据1、根据《建筑桩基技术规范》(JGJ94-);《建筑基坑支护技术规程》(JGJ120-);《建设工程项目管理规范》GB/T50326-《建筑施工组织设计规范》GB/T50502-《锚杆喷射混凝土支护技术规范》GB50086-《施工现场临时用电安全技术规范》JGJ46-2、原则(1)严格执行国家、贵州省、遵义市对工程建设的各项方针、政策、规定和规定,突出重点、突破难点、科学管理、内容全方面、思路清晰,以确保施工安全为前提,可操作性强。(2)坚持质量第一、安全第一的思想,做好保护环境、主动防疫、文明施工、消防、保卫、健康等工作,做到确保体系完整,保障方法有力。施工全过程对环境破坏最小、占用场地最少,严格控制地表沉降对周边建筑物的影响。保护地下水资源,并有周密的环保方法。(3)全方面理解掌握施工图纸、工程地质资料、监测报告、检测报告等内容,结合现场实际状况,应用技术手段,确保各项施工方案科学合理,减少工程成本。(4)充足研究掌握施工现场施工环境妥善解决施工组织和周边接口问题,使施工对周边的影响最小化。二、工程概况本次实施项目位于遵义医学院新蒲校区内,场地交通方便、地形平坦,无建筑物障碍。总建筑面积为77208.52㎡,其中占地面积:32134㎡。建筑层数为地上3层,地下2层,建筑总高度为21.1m。构造为框架构造。基础形式为桩基及独立基础。三、工程环境条件拟建“九龙国际建材城C、D区工程”位于遵义南部新区,拟建场地交通便利,场地地下无管线,工程环境相对较好。本工程有地下室,但地下室底板标高比±0.000标高低10.8米,边孔与边坡脚的近来距离为1m,且边坡高度均在10米左右,孔桩施工时会影响到边坡的稳定性。特编制本方案。四、水文及地质状况4.1水文状况地表水蚂蚁河自北向南从场地西侧约30m处流过,水量较小,勘察期间水位849.0m左右,拟建场地及周边无其它大的地表水体通过。地下水根据场地状况分析,拟建场区地下水由松散孔隙与基岩裂隙水共同组志,前者赋存于素填土层之中,含有水量不均匀,受季节性影响大的特点,该类型水无统一水位。后都赋二存于基岩层中,以岩溶洞为赋存,场地地下水重要为基岩层中的岩溶裂隙水,属潜水类型。钻探期间,经对全部钻孔进行的水位观察知,局部钻孔孔内垮塌严重,无法观察到水位,经观察知场地水位埋深在10.00m左右,根据前期勘察所做的抽水实验,抽水孔静止水位9.30m,孔口标高854.57m,静止水位标高845.27m,场区地下水重要由河水及大气降水补给。据区域水文地质资料,场区地下水由北东向南西迳流。4.2地质条件据地表调查及钻探揭发,拟建场区岩土构成由上至下由素填土、红粘土及基岩层构成,现分述以下:素填土灰褐色,稍湿,松散,以粘土为主,局部夹碎石,堆载时间短,为近期平场形成,回填不超出六个月,未完毕固结,分布于场地绝大部分区域,零星缺失,厚度0.0∽10.0m,均厚3.81m。红粘土(Qel+dl)土黄色,质纯、细腻,含铁锰氧化物,复浸水特性为Ⅱ类,钻探范畴内根据其含水比可分为可塑红粘土、软塑红粘土。软塑红粘土很湿,偶见裂隙,致密构造,场地内零星分布,仅在C-16、C-35、C-39、C-66、C-74、C-108号孔可见,厚0∽1.3m,平均厚度0.05m.可塑红粘土:湿,含较多裂隙,块状构造,场地内局部分布,最厚处为7.4m,见于C-92号孔,层面最低标高为844.03m,见于C-23,平均厚度1.54m。基岩层(T1m)炭岩,灰色,中厚层状,微晶构造,节理裂隙及溶蚀现象发育,局部见方解石脉、铁质浸染断面及溶蚀蜂窝状小孔,岩芯呈块状、短柱状,少量呈长柱状。钻深范畴内根据其风化程度,可分为强风化灰岩、中风化灰岩。强风化灰岩灰色,岩体破碎,岩芯碎块粉砂状,场地内局部分布,厚0∽13.2m,平均厚度2.27m,岩芯采用率30%左右,属极软岩,岩体基本质量等级Ⅴ类。中风化灰岩灰色,岩芯多呈短柱状、块状、少量长柱状,全场地分布,岩芯采用率70%左右,钻探范畴内揭发平均厚度为7.42m,经现场鉴定,岩体的完整程度分类为较破碎,属较硬岩,岩体基本质量等级分类为Ⅳ类。4.3场地水对施工的影响根据地勘报告显示,地下水对地下室及基础施工有一定的影响,重要影响来源于大气降水,在实际开挖过程中,地表水及临区道路埋设管道内大量积水流入基坑内,基坑内积水深达70cm,存在较大安全隐患,为了确保本工程施工安全及进度,应做好降水排水方法。五、基坑降排水施工及解决本工程地下室基坑开挖工作已基本完毕,因现在处在雨季时期,地下室基坑在开挖完毕后出现积水现象,造成我单位无法对孔桩进行施工,同时因综合楼处在回填区域,为了避免地表水流入基坑造成校区道路侧路基遭到雨水浸泡、沉降而受到损坏,故对地下室基坑底采用C15砼100mm厚进行封底,本工程采用集水明排的排水方法。5.1基坑降排水组织管理基坑排水工作是确保基坑顺利开挖的必要确保,降排水效果直接影响到土方开挖和外运的难度以及现场文明施工管理,因此从土方开挖开始即建立以项目经理为中心的排水管理组织,配备好排水施工人员,做好排水工作。土方开挖期间,施工用电从基坑边电箱接出,并后备75KW发电机一台,如遇电网停电,及时告知降水施工人员,启用备用电源,确保正常降排水,确保施工安全。5.2基坑明排水施工本基坑影响土方开挖地下水重要为浅部粘性土层的孔隙潜水,基坑涌水量不大,但在基坑开挖过程中普通需要采用排水沟、集水井明排水方法辅助控制地下水。明排水施工要点以下:(1)坡顶设立泛水坡:宽度1米,坡度3~5°,以避免地表水流向基坑。(2)基坑开挖见底后,应在基底做出排水沟及集水井;排水沟、集水井应设立在基础轮廓线与围护桩内边线之间,并沿着护坡布置。(3)排水沟边沿层离开坡脚不不大于0.3米,深0.3米、宽0.3米,向集水井坡降3‰,沟内碎石回填或沟壁采用砖墙护壁。(4)集水井布置在基坑重要边角,较长的中间地段按照30~50米设一种,平面尺寸*mm、深1000mm,四周用24砖墙护壁,井底铺设20-30cm碎石和卵石,以防泥砂堵塞水泵。(5)排水沟进入集水井部位应设滤网。排水沟与集水井保持一定高差,集水井底比排水沟应低0.5~1.0米,排水沟底比挖土面应低0.3~0.5米。(6)土方开挖期间,随着基坑的开挖,排水沟、集水井分级设立与下落;临时排水沟和集水井能够不采用护壁方法,但必须有组织排水。(7)基坑排水时,不得出现回流或倒灌现象,若水量较大则规定一井一泵5.3环保方法(1)含泥砂的污水,应在污水出口处设立沉淀池或用泥浆车及时运出场外。池内泥砂应及时清理,并做妥善解决,严禁随处排放。(2)施工期间应加强环境噪声的控制,特别是夜间降水施工。(3)泥浆车携带物应及时进行清洗,洗车污水应经沉淀后排出。5.4临边防护基坑四周必须设立牢固的防护栏杆,至基低设立临时通道,夜间基坑周边有充足的照明设施。栏杆的固定办法可用钢管打入地面50~70CM,杆间基坑边的距离不应不大于150CM。栏杆高度1.2M,并刷红白相间警示色。基坑开挖完毕之后,搭设专用的施工人员上下基坑和材料及料具运输通道,通道两边设立护身栏杆和挡脚板。六、基坑监测本基坑监测项目涉及支护构造的水平位移、周边建筑物及地下管线的变形、地下水位、土体分层位移等。6.1监测点的位置及数量(1)在基坑顶部各转角处应设立沉降、倾斜及水平位移观察点;(2)护坡的应力及应变观察点应设立在受力较大位置,数量及位置宜结合现场条件拟定。(3)地下水位的观察宜在基坑四周设四个观察井。(4)基坑底部回弹及隆起观察视现场状况拟定。6.2监测与测试的控制指标(1)周边建筑物及管线水平位移总量不不不大于30mm;(2)地下水位应低于设计指标。6.3监测规定(1)在围护构造施工前精确测定初始值。(2)施工中应加强对测试点及测试设备的保护,避免损坏;(3)应采用有效方法确保测试基准点的可靠性及测试设备的完好,以确保测试数据的精确性。(4)应及时向设计人员提供监测数据及最后测试评价成果,方便进行分析及采用对应的防备方法。监测周期从基坑土方开挖至基坑回填土。在围护施工时,正常状况下,临近监测对象每2天观察1次,当天变化量或累计变化量超警戒值时,监测频率适宜加密,每天观察1次。特殊状况如监测数据有异常或突变,变化速率偏大等,适宜加密监测频率,直至跟踪监测。在地下构造施工阶段,各监测项目观察频率为2~3次/周。七、施工注意事项及规定7.1做好基坑内的排水工作,雨季施工必须准备足够的抽排水设备。7.2支护板桩施工应采用有效方法控制好桩位、垂直度及确保咬口及转角处的闭合。7.3钢筋焊接,必须是持有特种作业上岗证的人员操作,确保安全与质量。7.4土方开挖期间,应采用有效的管理手段及可靠的确保方法避免挖土机械碰撞支护构造,基坑四周严禁堆土或堆载,地面施工荷载不超出15Kpa。7.5加强基坑监测,监测数据应及时告知有关人员。八、抽水监测与管理(1)降排水之前观察一次自然水位,在抽水开始的5~l0天内,规定每早晚各观察一次水位、流量;后来改为每天观察一次,并作好统计。进入雨季或出现新的补给源时,应增加观察次数。(2)对观察统计应及时整顿,绘制Q~t(抽水量与时间)与S~t(水位下降值与时间)关系曲线图,分析水位下降的趋势与流量变化,预测水位下降达成设计规定的时间;根据实际抽水状况,研究降水设计的可靠程度或提出调节方法:查明抽水过程中的不正常状况及其产生的因素,及时组织排除。(3)对抽水设备应建立定时检修保养制度,保持设备的正常运行。降水期间不得停泵。(4)抽出的水排至都市雨污水系统,不应产生回渗。遇有大雨或暴雨,应及时排除地面和基坑积水,以减少下渗,确保降水。九、安全文明施工方法9.1安全确保方法9.1.1工作人员,必须严格执行有关规范、操作规程和本施工组织设计。9.1.2施工人员必须戴安全帽上岗,爬高必须系安全带。9.1.3受建设方、监理公司及治安部门对现场质、治安、环卫等工作的管理和监督。9.1.4场供电线路的设计、安装要合理、牢固,移动性用电设备必须用电缆供电并安装漏电保护装置,主电线路必须由专职工员负责,任何人员不得随意推、拉闸刀。9.1.5照明电灯必须用低压供电,严禁使用220V交流电手灯。9.16坑上口按安全规定搭设基坑围栏。9.2文明施工方法工地重要入口要设立大门,门旁必须设立明显的标牌,标出工程名称、施工单位和工程负责人姓名。建立文明施工责任制,划分区域,明确管理负责人,实施挂牌制,做到现场清洁整洁。施工现场场地平整,道路坚实畅通。施工现场临时水点应由专人管理,不得有常流水常明灯。施工现场的临时设施,涉及生产、办公、民用用房、仓库、料场,临时上下水管道及照明动力线路,要严格遵照有关规定及施工设计拟定的施工平面图布置,搭设整洁。操作地点和周边必须清洁整洁,做到活完脚下清。泥浆在运输过程中,不洒、不漏,丢洒在路上的泥浆及时清理。施工现场不准乱堆垃圾及余物,应在适宜地点设立监时堆放点,并定时清运或外运渣上、垃圾及流体物品,并要采用遮盖防漏方法。在钢筋制作场地、钻孔施工场地等处设立通告板,注明重要施工数据,方便于监督和检查。施工现场设立宣传标语和黑板报,并适时更换内容,做到鼓舞土气,表彰先进鞭策后进。进入施工现场的人员必须配戴胸卡和安全帽,严格穿插鞋、凉鞋、高根鞋及带钉后根鞋,严禁酒后进入施工现场。现场使用的钻机、钢筋加工机等应按平面图位置摆放,恪守机械安全技术规程,经常保持机身周边环境的清洁,机械的标记、编号明显,安全装置可靠。清洁机械排出的污水要有排放方法,不得随处流淌。全部机械必须根据的性能,分期分阶段定时检修、保养,并统计备案。建立健全机械设备定机、定人、定岗位责任的三定制度,操作证制度,交接班制度和奖罚制度。十、安全生产方法(1)、现场要设健全的安全领导小组,全体人员应认真执行各工种的安全操作规程及有关规定。开工前要做好各级安全交底工作。根据本工程施工机械多,配合工作多,土质条件差以及运土路线复杂等特点,规定定时开展安全活动。(2)、施工机械进入现场合通过的道路应事先勘查,做好必要的加宽、加固工作。(3)、做好应急解决,提前准备好编织袋、草袋、木桩等物,加强基坑监测,在基坑开挖期间,设专人检查基坑,发现问题及时报有关施工负责人,
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 酒店制服购销合约
- 广华客运站招标要求及流程详解
- 招标文件制作招标
- 网络服务合同协议范本
- 中小企业借款合同英文
- 物流展览服务协议
- 美甲店承包协议
- 员工职责书保证样本
- 企业劳务分包合同的完善
- 投资合同律师代理
- 2024北京海淀初一(上)期末语文试卷及答案
- CMQOE质量组织卓越认证经理历年考试真题试题库(中文版)
- 九年级安全班会课件
- 《预防性侵安全教育》主题班会教案
- 学前儿童卫生与保健-期末大作业:案例分析-国开-参考资料
- 2023-2024学年河北省廊坊十八中八年级(上)期末数学试卷
- GB/T 44500-2024新能源汽车运行安全性能检验规程
- 劳动教育智慧树知到期末考试答案章节答案2024年上海杉达学院
- (正式版)SHT 3046-2024 石油化工立式圆筒形钢制焊接储罐设计规范
- 生涯职业发展展示
- 新人教版五年级小学数学全册奥数(含答案)
评论
0/150
提交评论