版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
,,,,,,,,,,,,,,,,,,,,,,,
道路高程测量成果记录表,,,,,,,,,,,,,,,,,,,,,,
工程名称,,信利项目相关道路工程设计、施工总承包,,,,,测量部位,,,工业大道K0+040~K0+160段路基分层回填第1层,,,,,后视读数(m),,0.475,,,,,
施工单位,,贵州建工集团有限公司,,,,,水准点编号及高程(m),,,GYDD-01411.632,,仪器高(m),,412.107,测量日期,,2018.5.25,,,桩号,设计路床顶,第1层高程
项目,,,测量及计算数据,,,,,,,,,,,,,,,,,K0+040,413.36,411.62
,,,桩号,左37.5m,左22.5m,左11m,中桩,右11m,右22.5m,右37.5m,桩号,左37.5m,左22.5m,左11m,中桩,右11m,右22.5m,右37.5m,,K0+060,413.09,411.35
前视读数(m),,,K0+040,1.059,0.819,0.652,0.483,0.637,0.817,1.060,K0+060,1.310,1.093,0.916,0.738,0.927,1.100,1.319,,K0+080,412.82,411.08
实测高程(m),,,,411.049,411.289,411.442,411.624,411.470,411.290,411.048,,410.798,411.015,411.191,411.369,411.180,411.008,410.789,,K0+100,412.55,410.81
设计高程(m),,,,411.058,411.283,411.455,411.620,411.455,411.283,411.058,,410.788,411.013,411.185,411.350,411.185,411.013,410.788,,K0+120,412.28,410.54
高程偏差值(mm),,,,-9,6,-13,4,15,7,-10,,10,2,6,19,-5,-5,1,,K0+140,412.01,410.27
设计横坡(%),,,,1.50,1.50,1.50,\,1.50,1.50,1.50,,1.50,1.50,1.50,\,1.50,1.50,1.50,,K0+160,411.74,410
实测横坡(%),,,,1.60,1.33,1.65,\,1.40,1.57,1.61,,1.45,1.53,1.62,\,1.72,1.50,1.46,,K0+180,411.47,409.73
横坡偏差值(%),,,,0.10,-0.17,0.15,\,-0.10,0.07,0.11,,-0.05,0.03,0.12,\,0.22,-0.00,-0.04,,,,
前视读数(m),,,K0+080,1.576,1.366,1.211,1.011,1.197,1.382,1.599,K0+100,1.845,1.646,1.476,1.304,1.445,1.647,1.879,,,,
实测高程(m),,,,410.532,410.742,410.896,411.096,410.910,410.725,410.509,,410.263,410.462,410.631,410.803,410.662,410.461,410.229,,,,
设计高程(m),,,,410.518,410.743,410.915,411.080,410.915,410.743,410.518,,410.248,410.473,410.645,410.810,410.645,410.473,410.248,,,,
高程偏差值(mm),,,,14,-1,-19,16,-5,-18,-9,,15,-11,-14,-7,17,-12,-19,,,,
设计横坡(%),,,,1.50,1.50,1.50,\,1.50,1.50,1.50,,1.50,1.50,1.50,\,1.50,1.50,1.50,,,,
实测横坡(%),,,,1.40,1.34,1.82,\,1.69,1.61,1.44,,1.33,1.47,1.56,\,1.28,1.75,1.55,,,,
横坡偏差值(%),,,,-0.10,-0.16,0.32,\,0.19,0.11,-0.06,,-0.17,-0.03,0.06,\,-0.22,0.25,0.05,,,,
横断面测点示意图,,,,,,,,,,,,,,,,,,,,,,
,,,,,,,,,,,,,,,,,,,,,,,
注:高程数据为现场实测,横坡及偏差等以现场数据为依据采用电脑进行计算并整理。,,,,,,,,,,,,,,,,,,,,,,
测量:,,,,复核:,,,计算:,,,,技术负责人:,,,,监理单位:,,,,,,,
,,,,,,,,,,,,,,,,,,,,,,,
道路高程测量成果记录表,,,,,,,,,,,,,,,,,,,,,,
工程名称,,信利项目相关道路工程设计、施工总承包,,,,,测量部位,,,工业大道K0+040~K0+160段路基分层回填第1层,,,,,后视读数(m),,0.475,,,,,
施工单位,,贵州建工集团有限公司,,,,,水准点编号及高程(m),,,GYDD-01411.632,,仪器高(m),,412.107,测量日期,,2018.5.25,,,,,
项目,,,测量及计算数据,,,,,,,,,,,,,,,,,,,
,,,桩号,左37.5m,左22.5m,左11m,中桩,右11m,右22.5m,右37.5m,桩号,左37.5m,左22.5m,左11m,中桩,右11m,右22.5m,右37.5m,,,,
前视读数(m),,,K0+120,2.145,1.908,1.732,1.578,1.737,1.892,2.133,K0+140,2.408,2.158,1.984,1.821,1.990,2.180,2.413,,,,
实测高程(m),,,,409.963,410.200,410.379,410.529,410.370,410.216,409.975,,409.700,409.950,410.123,410.286,410.117,409.928,409.695,,,,
设计高程(m),,,,409.978,410.203,410.375,410.540,410.375,410.203,409.978,,409.708,409.933,410.105,410.270,410.105,409.933,409.708,,,,
高程偏差值(mm),,,,-15,-3,4,-11,-5,13,-3,,-8,17,18,16,12,-5,-13,,,,
设计横坡(%),,,,1.50,1.50,1.50,\,1.50,1.50,1.50,,1.50,1.50,1.50,\,1.50,1.50,1.50,,,,
实测横坡(%),,,,1.58,1.56,1.36,\,1.45,1.34,1.61,,1.67,1.51,1.48,\,1.54,1.65,1.55,,,,
横坡偏差值(%),,,,0.08,0.06,-0.14,\,-0.05,-0.16,0.11,,0.17,0.01,-0.02,\,0.04,0.15,0.05,,,,
前视读数(m),,,K0+160,2.683,2.442,2.275,2.119,2.275,2.435,2.661,K0+180,2.932,2.703,2.544,2.370,2.559,2.700,2.955,,,,
实测高程(m),,,,409.425,409.666,409.832,409.988,409.832,409.672,409.447,,409.176,409.404,409.563,409.737,409.548,409.407,409.153,,,,
设计高程(m),,,,409.438,409.663,409.835,410.000,409.835,409.663,409.438,,409.168,409.393,409.565,409.730,409.565,409.393,409.168,,,,
高程偏差值(mm),,,,-13,3,-3,-12,-3,9,9,,8,11,-2,7,-17,14,-15,,,,
设计横坡(%),,,,1.50,1.50,1.50,\,1.50,1.50,1.50,,1.50,1.50,1.50,\,1.50,1.50,1.50,,,,
实测横坡(%),,,,1.61,1.45,1.42,\,1.42,1.40,1.50,,1.52,1.39,1.58,\,1.72,1.23,1.69,,,,
横坡偏差值(%),,,,0.11,-0.05,-0.08,\,-0.08,-0.10,0.00,,0.02,-0.11,0.08,\,0.22,-0.27,0.19,,,,
横断面测点示意图,,,,,,,,,,,,,,,,,,,,,,
,,,,,,,,,,,,,,,,,,,,,,,
注:高程数据为现场实测,横坡及偏差等以现场数据为依据采用电脑进行计算并整理。,,,,,,,,,,,,,,,,,,,,,,
测量:,,,,复核:,,,计算:,,,,技术负责人:,,,,监理单位:,,,,,,,
,,,,,,,,,,,,,,,,,,,,,,,
道路高程测量成果记录表,,,,,,,,,,,,,,,,,,,,,,
工程名称,,信利项目相关道路工程设计、施工总承包,,,,,测量部位,,,工业大道K0+040~K0+160段路基分层回填第2层,,,,,后视读数(m),,1.094,,,,,
施工单位,,贵州建工集团有限公司,,,,,水准点编号及高程(m),,,GYDD-01411.632,,仪器高(m),,412.726,测量日期,,2018.5.25,,,,,
项目,,,测量及计算数据,,,,,,,,,,,,,,,,,,,
,,,桩号,左37.5m,左22.5m,左11m,中桩,右11m,右22.5m,右37.5m,桩号,左37.5m,左22.5m,左11m,中桩,右11m,右22.5m,右37.5m,,,,
前视读数(m),,,K0+040,1.363,1.134,0.971,0.789,0.976,1.145,1.351,K0+060,1.656,1.416,1.247,1.094,1.234,1.402,1.647,,,,
实测高程(m),,,,411.364,411.592,411.768,411.937,411.750,411.581,411.376,,411.070,411.310,411.479,411.632,411.492,411.325,411.080,,,,
设计高程(m),,,,411.358,411.583,411.755,411.920,411.755,411.583,411.358,,411.088,411.313,411.485,411.650,411.485,411.313,411.088,,,,
高程偏差值(mm),,,,6,9,13,17,-5,-2,18,,-18,-3,-6,-18,7,12,-8,,,,
设计横坡(%),,,,1.50,1.50,1.50,\,1.50,1.50,1.50,,1.50,1.50,1.50,\,1.50,1.50,1.50,,,,
实测横坡(%),,,,1.52,1.53,1.54,\,1.70,1.47,1.37,,1.60,1.47,1.39,\,1.27,1.46,1.63,,,,
横坡偏差值(%),,,,0.02,0.03,0.04,\,0.20,-0.03,-0.13,,0.10,-0.03,-0.11,\,-0.23,-0.04,0.13,,,,
前视读数(m),,,K0+080,1.909,1.685,1.510,1.339,1.515,1.685,1.909,K0+100,2.159,1.958,1.769,1.617,1.779,1.951,2.174,,,,
实测高程(m),,,,410.818,411.041,411.216,411.387,411.211,411.041,410.817,,410.567,410.768,410.957,411.109,410.947,410.775,410.552,,,,
设计高程(m),,,,410.818,411.043,411.215,411.380,411.215,411.043,410.818,,410.548,410.773,410.945,411.110,410.945,410.773,410.548,,,,
高程偏差值(mm),,,,0,-2,1,7,-4,-2,-1,,19,-5,12,-1,2,2,4,,,,
设计横坡(%),,,,1.50,1.50,1.50,\,1.50,1.50,1.50,,1.50,1.50,1.50,\,1.50,1.50,1.50,,,,
实测横坡(%),,,,1.49,1.53,1.55,\,1.60,1.48,1.49,,1.34,1.65,1.38,\,1.47,1.50,1.49,,,,
横坡偏差值(%),,,,-0.01,0.03,0.05,\,0.10,-0.02,-0.01,,-0.16,0.15,-0.12,\,-0.03,-0.00,-0.01,,,,
横断面测点示意图,,,,,,,,,,,,,,,,,,,,,,
,,,,,,,,,,,,,,,,,,,,,,,
注:高程数据为现场实测,横坡及偏差等以现场数据为依据采用电脑进行计算并整理。,,,,,,,,,,,,,,,,,,,,,,
测量:,,,,复核:,,,计算:,,,,技术负责人:,,,,监理单位:,,,,,,,
,,,,,,,,,,,,,,,,,,,,,,,
道路高程测量成果记录表,,,,,,,,,,,,,,,,,,,,,,
工程名称,,信利项目相关道路工程设计、施工总承包,,,,,测量部位,,,工业大道K0+040~K0+160段路基分层回填第2层,,,,,后视读数(m),,0.475,,,,,
施工单位,,贵州建工集团有限公司,,,,,水准点编号及高程(m),,,GYDD-01411.632,,仪器高(m),,412.107,测量日期,,2018.5.25,,,,,
项目,,,测量及计算数据,,,,,,,,,,,,,,,,,,,
,,,桩号,左37.5m,左22.5m,左11m,中桩,右11m,右22.5m,右37.5m,桩号,左37.5m,左22.5m,左11m,中桩,右11m,右22.5m,右37.5m,,,,
前视读数(m),,,K0+120,1.836,1.615,1.432,1.248,1.420,1.613,1.819,K0+140,2.099,1.870,1.697,1.523,1.709,1.887,2.089,,,,
实测高程(m),,,,410.272,410.493,410.678,410.859,410.687,410.495,410.289,,410.009,410.237,410.410,410.584,410.398,410.220,410.019,,,,
设计高程(m),,,,410.278,410.503,410.675,410.840,410.675,410.503,410.278,,410.008,410.233,410.405,410.570,410.405,410.233,410.008,,,,
高程偏差值(mm),,,,-6,-10,3,19,12,-8,11,,1,4,5,14,-7,-13,11,,,,
设计横坡(%),,,,1.50,1.50,1.50,\,1.50,1.50,1.50,,1.50,1.50,1.50,\,1.50,1.50,1.50,,,,
实测横坡(%),,,,1.47,1.61,1.65,\,1.56,1.67,1.37,,1.52,1.51,1.58,\,1.69,1.55,1.34,,,,
横坡偏差值(%),,,,-0.03,0.11,0.15,\,0.06,0.17,-0.13,,0.02,0.01,0.08,\,0.19,0.05,-0.16,,,,
前视读数(m),,,K0+160,2.352,2.140,1.979,1.802,1.978,2.144,2.375,K0+180,2.623,2.411,2.252,2.095,2.234,2.399,2.623,,,,
实测高程(m),,,,409.756,409.967,410.128,410.305,410.129,409.963,409.732,,409.484,409.696,409.855,410.012,409.873,409.708,409.484,,,,
设计高程(m),,,,409.738,409.963,410.135,410.300,410.135,409.963,409.738,,409.468,409.693,409.865,410.030,409.865,409.693,409.468,,,,
高程偏差值(mm),,,,18,4,-7,5,-6,0,-6,,16,3,-10,-18,8,15,16,,,,
设计横坡(%),,,,1.50,1.50,1.50,\,1.50,1.50,1.50,,1.50,1.50,1.50,\,1.50,1.50,1.50,,,,
实测横坡(%),,,,1.41,1.40,1.61,\,1.60,1.45,1.54,,1.41,1.39,1.43,\,1.26,1.44,1.49,,,,
横坡偏差值(%),,,,-0.09,-0.10,0.11,\,0.10,-0.05,0.04,,-0.09,-0.11,-0.07,\,-0.24,-0.06,-0.01,,,,
横断面测点示意图,,,,,,,,,,,,,,,,,,,,,,
,,,,,,,,,,,,,,,,,,,,,,,
注:高程数据为现场实测,横坡及偏差等以现场数据为依据采用电脑进行计算并整理。,,,,,,,,,,,,,,,,,,,,,,
测量:,,,,复核:,,,计算:,,,,技术负责人:,,,,监理单位:,,,,,,,
,,,,,,,,,,,,,,,,,,,,,,,
道路高程测量成果记录表,,,,,,,,,,,,,,,,,,,,,,
工程名称,,信利项目相关道路工程设计、施工总承包,,,,,测量部位,,,工业大道K0+040~K0+160段路基分层回填第3层,,,,,后视读数(m),,1.227,,,,,
施工单位,,贵州建工集团有限公司,,,,,水准点编号及高程(m),,,GYDD-01411.632,,仪器高(m),,412.859,测量日期,,2018.5.25,,,,,
项目,,,测量及计算数据,,,,,,,,,,,,,,,,,,,
,,,桩号,左37.5m,左22.5m,左11m,中桩,右11m,右22.5m,右37.5m,桩号,左37.5m,左22.5m,左11m,中桩,右11m,右22.5m,右37.5m,,,,
前视读数(m),,,K0+040,1.203,0.990,0.804,0.627,0.806,0.993,1.204,K0+060,1.491,1.249,1.056,0.913,1.068,1.252,1.479,,,,
实测高程(m),,,,411.656,411.869,412.073,412.232,412.053,411.866,411.655,,411.369,411.610,411.803,411.946,411.791,411.607,411.381,,,,
设计高程(m),,,,411.658,411.883,412.055,412.220,412.055,411.883,411.658,,411.388,411.613,411.785,411.950,411.785,411.613,411.388,,,,
高程偏差值(mm),,,,-2,-14,18,12,-2,-17,-3,,-19,-3,18,-4,6,-6,-7,,,,
设计横坡(%),,,,1.50,1.50,1.50,\,1.50,1.50,1.50,,1.50,1.50,1.50,\,1.50,1.50,1.50,,,,
实测横坡(%),,,,1.42,1.78,1.45,\,1.63,1.63,1.41,,1.61,1.68,1.30,\,1.41,1.60,1.51,,,,
横坡偏差值(%),,,,-0.08,0.28,-0.05,\,0.13,0.13,-0.09,,0.11,0.18,-0.20,\,-0.09,0.10,0.01,,,,
前视读数(m),,,K0+080,1.746,1.525,1.344,1.195,1.346,1.518,1.760,K0+100,2.029,1.801,1.612,1.465,1.633,1.766,1.992,,,,
实测高程(m),,,,411.113,411.334,411.515,411.664,411.513,411.341,411.099,,410.830,411.058,411.247,411.394,411.226,411.093,410.867,,,,
设计高程(m),,,,411.118,411.343,411.515,411.680,411.515,411.343,411.118,,410.848,411.073,411.245,411.410,411.245,411.073,410.848,,,,
高程偏差值(mm),,,,-5,-9,0,-16,-2,-2,-19,,-18,-15,2,-16,-19,20,19,,,,
设计横坡(%),,,,1.50,1.50,1.50,\,1.50,1.50,1.50,,1.50,1.50,1.50,\,1.50,1.50,1.50,,,,
实测横坡(%),,,,1.47,1.58,1.35,\,1.37,1.50,1.61,,1.52,1.65,1.34,\,1.53,1.16,1.51,,,,
横坡偏差值(%),,,,-0.03,0.08,-0.15,\,-0.13,-0.00,0.11,,0.02,0.15,-0.16,\,0.03,-0.34,0.01,,,,
横断面测点示意图,,,,,,,,,,,,,,,,,,,,,,
,,,,,,,,,,,,,,,,,,,,,,,
注:高程数据为现场实测,横坡及偏差等以现场数据为依据采用电脑进行计算并整理。,,,,,,,,,,,,,,,,,,,,,,
测量:,,,,复核:,,,计算:,,,,技术负责人:,,,,监理单位:,,,,,,,
,,,,,,,,,,,,,,,,,,,,,,,
道路高程测量成果记录表,,,,,,,,,,,,,,,,,,,,,,
工程名称,,信利项目相关道路工程设计、施工总承包,,,,,测量部位,,,工业大道K0+040~K0+160段路基分层回填第3层,,,,,后视读数(m),,1.227,,,,,
施工单位,,贵州建工集团有限公司,,,,,水准点编号及高程(m),,,GYDD-01411.632,,仪器高(m),,412.859,测量日期,,2018.5.25,,,,,
项目,,,测量及计算数据,,,,,,,,,,,,,,,,,,,
,,,桩号,左37.5m,左22.5m,左11m,中桩,右11m,右22.5m,右37.5m,桩号,左37.5m,左22.5m,左11m,中桩,右11m,右22.5m,右37.5m,,,,
前视读数(m),,,K0+120,2.272,2.045,1.884,1.706,1.868,2.053,2.284,K0+140,2.547,2.345,2.162,1.988,2.149,2.314,2.556,,,,
实测高程(m),,,,410.588,410.814,410.990,411.153,410.991,410.806,410.575,,410.312,410.514,410.697,410.871,410.710,410.545,410.304,,,,
设计高程(m),,,,410.578,410.803,410.975,411.140,410.975,410.803,410.578,,410.308,410.533,410.705,410.870,410.705,410.533,410.308,,,,
高程偏差值(mm),,,,10,11,15,13,16,3,-3,,4,-19,-8,1,5,12,-4,,,,
设计横坡(%),,,,1.50,1.50,1.50,\,1.50,1.50,1.50,,1.50,1.50,1.50,\,1.50,1.50,1.50,,,,
实测横坡(%),,,,1.51,1.53,1.48,\,1.47,1.61,1.54,,1.35,1.60,1.58,\,1.46,1.44,1.61,,,,
横坡偏差值(%),,,,0.01,0.03,-0.02,\,-0.03,0.11,0.04,,-0.15,0.10,0.08,\,-0.04,-0.06,0.11,,,,
前视读数(m),,,K0+160,2.818,2.614,2.432,2.249,2.427,2.609,2.824,K0+180,3.092,2.850,2.697,2.528,2.710,2.861,3.093,,,,
实测高程(m),,,,410.041,410.245,410.427,410.610,410.432,410.250,410.035,,409.767,410.009,410.162,410.331,410.149,409.998,409.766,,,,
设计高程(m),,,,410.038,410.263,410.435,410.600,410.435,410.263,410.038,,409.768,409.993,410.165,410.330,410.165,409.993,409.768,,,,
高程偏差值(mm),,,,3,-18,-8,10,-3,-13,-3,,-1,16,-3,1,-16,5,-2,,,,
设计横坡(%),,,,1.50,1.50,1.50,\,1.50,1.50,1.50,,1.50,1.50,1.50,\,1.50,1.50,1.50,,,,
实测横坡(%),,,,1.36,1.59,1.66,\,1.62,1.59,1.43,,1.61,1.33,1.54,\,1.65,1.32,1.55,,,,
横坡偏差值(%),,,,-0.14,0.09,0.16,\,0.12,0.09,-0.07,,0.11,-0.17,0.04,\,0.15,-0.18,0.05,,,,
横断面测点示意图,,,,,,,,,,,,,,,,,,,,,,
,,,,,,,,,,,,,,,,,,,,,,,
注:高程数据为现场实测,横坡及偏差等以现场数据为依据采用电脑进行计算并整理。,,,,,,,,,,,,,,,,,,,,,,
测量:,,,,复核:,,,计算:,,,,技术负责人:,,,,监理单位:,,,,,,,
,,,,,,,,,,,,,,,,,,,,,,,
道路高程测量成果记录表,,,,,,,,,,,,,,,,,,,,,,
工程名称,,信利项目相关道路工程设计、施工总承包,,,,,测量部位,,,工业大道K0+040~K0+160段路基分层回填第4层,,,,,后视读数(m),,1.44,,,,,
施工单位,,贵州建工集团有限公司,,,,,水准点编号及高程(m),,,GYDD-01411.632,,仪器高(m),,413.072,测量日期,,2018.5.25,,,,,
项目,,,测量及计算数据,,,,,,,,,,,,,,,,,,,
,,,桩号,左37.5m,左22.5m,左11m,中桩,右11m,右22.5m,右37.5m,桩号,左37.5m,左22.5m,左11m,中桩,右11m,右22.5m,右37.5m,,,,
前视读数(m),,,K0+040,1.117,0.872,0.717,0.556,0.731,0.885,1.127,K0+060,1.404,1.152,0.980,0.820,0.987,1.167,1.402,,,,
实测高程(m),,,,411.956,412.201,412.374,412.516,412.341,412.188,411.946,,411.669,411.921,412.092,412.252,412.085,411.906,411.671,,,,
设计高程(m),,,,411.958,412.183,412.355,412.520,412.355,412.183,411.958,,411.688,411.913,412.085,412.250,412.085,411.913,411.688,,,,
高程偏差值(mm),,,,-2,18,19,-4,-14,5,-12,,-19,8,7,2,0,-7,-17,,,,
设计横坡(%),,,,1.50,1.50,1.50,\,1.50,1.50,1.50,,1.50,1.50,1.50,\,1.50,1.50,1.50,,,,
实测横坡(%),,,,1.63,1.51,1.29,\,1.59,1.33,1.61,,1.68,1.49,1.45,\,1.52,1.56,1.57,,,,
横坡偏差值(%),,,,0.13,0.01,-0.21,\,0.09,-0.17,0.11,,0.18,-0.01,-0.05,\,0.02,0.06,0.07,,,,
前视读数(m),,,K0+080,1.651,1.439,1.255,1.109,1.241,1.410,1.643,K0+100,1.929,1.697,1.527,1.351,1.517,1.687,1.932,,,,
实测高程(m),,,,411.422,411.634,411.817,411.963,411.831,411.663,411.430,,411.144,411.376,411.545,411.721,411.555,411.386,411.141,,,,
设计高程(m),,,,411.418,411.643,411.815,411.980,411.815,411.643,411.418,,411.148,411.373,411.545,411.710,411.545,411.373,411.148,,,,
高程偏差值(mm),,,,4,-9,2,-17,16,20,12,,-4,3,0,11,10,13,-7,,,,
设计横坡(%),,,,1.50,1.50,1.50,\,1.50,1.50,1.50,,1.50,1.50,1.50,\,1.50,1.50,1.50,,,,
实测横坡(%),,,,1.41,1.60,1.33,\,1.20,1.47,1.55,,1.55,1.47,1.60,\,1.51,1.47,1.63,,,,
横坡偏差值(%),,,,-0.09,0.10,-0.17,\,-0.30,-0.03,0.05,,0.05,-0.03,0.10,\,0.01,-0.03,0.13,,,,
横断面测点示意图,,,,,,,,,,,,,,,,,,,,,,
,,,,,,,,,,,,,,,,,,,,,,,
注:高程数据为现场实测,横坡及偏差等以现场数据为依据采用电脑进行计算并整理。,,,,,,,,,,,,,,,,,,,,,,
测量:,,,,复核:,,,计算:,,,,技术负责人:,,,,监理单位:,,,,,,,
,,,,,,,,,,,,,,,,,,,,,,,
道路高程测量成果记录表,,,,,,,,,,,,,,,,,,,,,,
工程名称,,信利项目相关道路工程设计、施工总承包,,,,,测量部位,,,工业大道K0+040~K0+160段路基分层回填第4层,,,,,后视读数(m),,1.44,,,,,
施工单位,,贵州建工集团有限公司,,,,,水准点编号及高程(m),,,GYDD-01411.632,,仪器高(m),,413.072,测量日期,,2018.5.25,,,,,
项目,,,测量及计算数据,,,,,,,,,,,,,,,,,,,
,,,桩号,左37.5m,左22.5m,左11m,中桩,右11m,右22.5m,右37.5m,桩号,左37.5m,左22.5m,左11m,中桩,右11m,右22.5m,右37.5m,,,,
前视读数(m),,,K0+120,2.191,1.962,1.797,1.630,1.803,1.985,2.177,K0+140,2.451,2.242,2.078,1.891,2.073,2.244,2.458,,,,
实测高程(m),,,,410.882,411.111,411.258,411.442,411.269,411.088,410.896,,410.622,410.831,410.994,411.181,410.999,410.829,410.615,,,,
设计高程(m),,,,410.878,411.103,411.275,411.440,411.275,411.103,410.878,,410.608,410.833,411.005,411.170,411.005,410.833,410.608,,,,
高程偏差值(mm),,,,4,8,-17,2,-6,-15,18,,14,-2,-11,11,-6,-4,7,,,,
设计横坡(%),,,,1.50,1.50,1.50,\,1.50,1.50,1.50,,1.50,1.50,1.50,\,1.50,1.50,1.50,,,,
实测横坡(%),,,,1.53,1.28,1.67,\,1.57,1.58,1.28,,1.39,1.42,1.70,\,1.65,1.48,1.43,,,,
横坡偏差值(%),,,,0.03,-0.22,0.17,\,0.07,0.08,-0.22,,-0.11,-0.08,0.20,\,0.15,-0.02,-0.07,,,,
前视读数(m),,,K0+160,2.728,2.492,2.325,2.163,2.333,2.527,2.716,K0+180,3.015,2.762,2.592,2.423,2.619,2.760,3.022,,,,
实测高程(m),,,,410.345,410.581,410.747,410.909,410.739,410.546,410.357,,410.058,410.310,410.480,410.649,410.453,410.312,410.050,,,,
设计高程(m),,,,410.338,410.563,410.735,410.900,410.735,410.563,410.338,,410.068,410.293,410.465,410.630,410.465,410.293,410.068,,,,
高程偏差值(mm),,,,7,18,12,9,4,-17,19,,-10,17,15,19,-12,19,-18,,,,
设计横坡(%),,,,1.50,1.50,1.50,\,1.50,1.50,1.50,,1.50,1.50,1.50,\,1.50,1.50,1.50,,,,
实测横坡(%),,,,1.57,1.45,1.47,\,1.55,1.68,1.26,,1.68,1.48,1.54,\,1.78,1.23,1.75,,,,
横坡偏差值(%),,,,0.07,-0.05,-0.03,\,0.05,0.18,-0.24,,0.18,-0.02,0.04,\,0.28,-0.27,0.25,,,,
横断面测点示意图,,,,,,,,,,,,,,,,,,,,,,
,,,,,,,,,,,,,,,,,,,,,,,
注:高程数据为现场实测,横坡及偏差等以现场数据为依据采用电脑进行计算并整理。,,,,,,,,,,,,,,,,,,,,,,
测量:,,,,复核:,,,计算:,,,,技术负责人:,,,,监理单位:,,,,,,,
,,,,,,,,,,,,,,,,,,,,,,,
道路高程测量成果记录表,,,,,,,,,,,,,,,,,,,,,,
工程名称,,信利项目相关道路工程设计、施工总承包,,,,,测量部位,,,工业大道K0+040~K0+160段路基分层回填第5层,,,,,后视读数(m),,2.051,,,,,
施工单位,,贵州建工集团有限公司,,,,,水准点编号及高程(m),,,GYDD-01411.632,,仪器高(m),,413.683,测量日期,,2018.5.25,,,,,
项目,,,测量及计算数据,,,,,,,,,,,,,,,,,,,
,,,桩号,左37.5m,左22.5m,左11m,中桩,右11m,右22.5m,右37.5m,桩号,左37.5m,左22.5m,左11m,中桩,右11m,右22.5m,右37.5m,,,,
前视读数(m),,,K0+040,1.425,1.206,1.028,0.866,1.021,1.190,1.411,K0+060,1.688,1.463,1.312,1.127,1.296,1.459,1.692,,,,
实测高程(m),,,,412.259,412.477,412.643,412.817,412.662,412.493,412.273,,411.996,412.221,412.371,412.556,412.387,412.225,411.992,,,,
设计高程(m),,,,412.258,412.483,412.655,412.820,412.655,412.483,412.258,,411.988,412.213,412.385,412.550,412.385,412.213,411.988,,,,
高程偏差值(mm),,,,1,-6,-12,-3,7,10,15,,8,8,-14,6,2,12,4,,,,
设计横坡(%),,,,1.50,1.50,1.50,\,1.50,1.50,1.50,,1.50,1.50,1.50,\,1.50,1.50,1.50,,,,
实测横坡(%),,,,1.45,1.45,1.58,\,1.41,1.47,1.47,,1.50,1.31,1.68,\,1.54,1.41,1.55,,,,
横坡偏差值(%),,,,-0.05,-0.05,0.08,\,-0.09,-0.03,-0.03,,0.00,-0.19,0.18,\,0.04,-0.09,0.05,,,,
前视读数(m),,,K0+080,1.977,1.721,1.577,1.392,1.554,1.758,1.979,K0+100,2.233,2.006,1.847,1.678,1.826,1.991,2.241,,,,
实测高程(m),,,,411.707,411.962,412.106,412.291,412.129,411.925,411.705,,411.451,411.677,411.836,412.005,411.857,411.692,411.443,,,,
设计高程(m),,,,411.718,411.943,412.115,412.280,412.115,411.943,411.718,,411.448,411.673,411.845,412.010,411.845,411.673,411.448,,,,
高程偏差值(mm),,,,-11,19,-9,11,14,-18,-13,,3,4,-9,-5,12,19,-5,,,,
设计横坡(%),,,,1.50,1.50,1.50,\,1.50,1.50,1.50,,1.50,1.50,1.50,\,1.50,1.50,1.50,,,,
实测横坡(%),,,,1.70,1.26,1.68,\,1.47,1.78,1.47,,1.51,1.39,1.54,\,1.35,1.44,1.66,,,,
横坡偏差值(%),,,,0.20,-0.24,0.18,\,-0.03,0.28,-0.03,,0.01,-0.11,0.04,\,-0.15,-0.06,0.16,,,,
横断面测点示意图,,,,,,,,,,,,,,,,,,,,,,
,,,,,,,,,,,,,,,,,,,,,,,
注:高程数据为现场实测,横坡及偏差等以现场数据为依据采用电脑进行计算并整理。,,,,,,,,,,,,,,,,,,,,,,
测量:,,,,复核:,,,计算:,,,,技术负责人:,,,,监理单位:,,,,,,,
,,,,,,,,,,,,,,,,,,,,,,,
道路高程测量成果记录表,,,,,,,,,,,,,,,,,,,,,,
工程名称,,信利项目相关道路工程设计、施工总承包,,,,,测量部位,,,工业大道K0+040~K0+160段路基分层回填第5层,,,,,后视读数(m),,2.051,,,,,
施工单位,,贵州建工集团有限公司,,,,,水准点编号及高程(m),,,GYDD-01411.632,,仪器高(m),,413.683,测量日期,,2018.5.25,,,,,
项目,,,测量及计算数据,,,,,,,,,,,,,,,,,,,
,,,桩号,左37.5m,左22.5m,左11m,中桩,右11m,右22.5m,右37.5m,桩号,左37.5m,左22.5m,左11m,中桩,右11m,右22.5m,右37.5m,,,,
前视读数(m),,,K0+120,2.489,2.272,2.108,1.926,2.107,2.281,2.494,K0+140,2.776,2.556,2.368,2.208,2.381,2.551,2.774,,,,
实测高程(m),,,,411.195,411.412,411.582,411.757,411.576,411.402,411.190,,410.908,411.127,411.315,411.475,411.302,411.132,410.910,,,,
设计高程(m),,,,411.178,411.403,411.575,411.740,411.575,411.403,411.178,,410.908,411.133,411.305,411.470,411.305,411.133,410.908,,,,
高程偏差值(mm),,,,17,9,7,17,1,-1,12,,0,-6,10,5,-3,-1,2,,,,
设计横坡(%),,,,1.50,1.50,1.50,\,1.50,1.50,1.50,,1.50,1.50,1.50,\,1.50,1.50,1.50,,,,
实测横坡(%),,,,1.45,1.48,1.59,\,1.65,1.52,1.41,,1.46,1.64,1.45,\,1.57,1.48,1.48,,,,
横坡偏差值(%),,,,-0.05,-0.02,0.09,\,0.15,0.02,-0.09,,-0.04,0.14,-0.05,\,0.07,-0.02,-0.02,,,,
前视读数(m),,,K0+160,3.028,2.837,2.664,2.463,2.661,2.813,3.034,K0+180,3.303,3.093,2.906,2.752,2.930,3.085,3.311,,,,
实测高程(m),,,,410.656,410.846,411.019,411.220,411.022,410.871,410.649,,410.381,410.590,410.777,410.931,410.753,410.598,410.372,,,,
设计高程(m),,,,410.638,410.863,411.035,411.200,411.035,410.863,410.638,,410.368,410.593,410.765,410.930,410.765,410.593,410.368,,,,
高程偏差值(mm),,,,18,-17,-16,20,-13,8,11,,13,-3,12,1,-12,5,4,,,,
设计横坡(%),,,,1.50,1.50,1.50,\,1.50,1.50,1.50,,1.50,1.50,1.50,\,1.50,1.50,1.50,,,,
实测横坡(%),,,,1.27,1.51,1.83,\,1.80,1.
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 二零二五年度文化产业园区财务担保合同文化创意产业与会计操作3篇
- 二零二五年度教育行业助学贷款合同合规性分析3篇
- 二零二五年度二手珠宝首饰买卖简单协议书范本20253篇
- 海南政法职业学院《程序设计语言(C语言)》2023-2024学年第一学期期末试卷
- 2025年度建筑施工合同具体条款和工程标的2篇
- 二零二五年度手机店竞业禁止合同:离职员工的行为限制3篇
- 二零二五年度建筑工程合同索赔证据收集与固定技巧论文参考2篇
- 2025年度消防设备安装与调试合同6篇
- 2025年度混凝土施工技术培训合同2篇
- 二零二五年度文化遗产保护工程招标与投标执行协议3篇
- 北京2025年首都医科大学附属北京友谊医院招聘140人历年参考题库(频考版)含答案解析
- 股权质押权借款合同模板
- 《工商管理专业毕业实习》课程教学大纲
- 2025年中国社区团购行业发展环境、运行态势及投资前景分析报告(智研咨询发布)
- 国开电大本科《西方经济学(本)》网上形考(作业一至六)试题及答案
- 提高有风险患者预防跌倒坠床护理措施落实率品管圈PDCA案例汇报
- 2024年行政执法人员执法资格知识考试题库(附含答案)
- 西那卡塞治疗甲旁亢
- 无人驾驶 物流行业市场调研分析报告
- 代理记账有限公司简介(5个范本)
- 快速了解陌生行业的方法论及示例PPT课件
评论
0/150
提交评论