编制/r/n:/r/n审核/r/n:/r/n审批/r/n:/r/n目录/r/n/r/n/r/n/r/n/r/n/r/n/r/n一、工程概况/r/n /r/n/r/n-4-/r/n/r/n/r/n/r/n1/r/n、工程概况:/r/n /r/n/r/n-4-/r/n/r/n/r/n/r/n2/r/n、基坑支护设计情况/r/n:/r/n /r/n/r/n1/r/n/r/n/r/n/r/n3/r/n、工程地质条件/r/n /r/n/r/n5/r/n/r/n/r/n/r/n4/r/n、施工平面布置/r/n /r/n/r/n7/r/n/r/n/r/n/r/n二、编制说明和依据/r/n /r/n/r/n13/r/n/r/n/r/n/r/n1/r/n、编制说明:/r/n /r/n/r/n13/r/n/r/n/r/n/r/n2/r/n、编制依据/r/n:/r/n /r/n/r/n13/r/n/r/n/r/n/r/n3/r/n、编制原则:/r/n /r/n/r/n14/r/n/r/n/r/n/r/n三、施工计划/r/n /r/n/r/n15/r/n/r/n/r/n/r/n1/r/n、施工进度计划/r/n /r/n/r/n15/r/n/r/n/r/n/r/n2/r/n、材料供应计划/r/n /r/n/r/n15/r/n/r/n/r/n/r/n3/r/n、施工设备计划/r/n /r/n/r/n16/r/n/r/n/r/n/r/n4/r/n、劳动力计划/r/n /r/n/r/n17/r/n/r/n/r/n/r/n5/r/n、施工用水计划/r/n /r/n/r/n17/r/n/r/n/r/n/r/n6/r/n、施工用电计划/r/n /r/n/r/n17/r/n/r/n/r/n/r/n7/r/n、项目部组织结构/r/n /r/n/r/n18/r/n/r/n/r/n/r/n四、施工总规划/r/n /r/n/r/n22/r/n/r/n/r/n/r/n1/r/n、施工整体安排/r/n /r/n/r/n22/r/n/r/n/r/n/r/n2/r/n、施工工艺流程/r/n /r/n/r/n22/r/n/r/n/r/n/r/n3/r/n、工期安排/r/n /r/n/r/n25/r/n/r/n/r/n/r/n4/r/n、施工重难点分析/r/n /r/n/r/n27/r/n/r/n/r/n/r/n5/r/n、常见质量通病及预防措施/r/n /r/n/r/n29/r/n/r/n/r/n/r/n五、施工分项概述/r/n /r/n/r/n31/r/n/r/n/r/n/r/n一)、测量放线/r/n /r/n/r/n31/r/n/r/n/r/n/r/n二)、土方开挖/r/n /r/n/r/n31/r/n/r/n/r/n/r/n三)、止水桩施工/r/n /r/n/r/n42/r/n/r/n/r/n/r/n四)、支护桩\立柱桩施工/r/n /r/n/r/n42/r/n/r/n/r/n/r/n五)、喷锚施工/r/n /r/n/r/n46/r/n/r/n/r/n/r/n六)、锚索施工/r/n /r/n/r/n48/r/n/r/n/r/n/r/n七)、冠梁、内支撑施工/r/n /r/n/r/n53/r/n/r/n/r/n/r/n八/r/n)/r/n、内支撑拆除/r/n /r/n/r/n54/r/n/r/n/r/n/r/n九)、疏干井施工/r/n /r/n/r/n54/r/n/r/n/r/n/r/n十)、检查验收/r/n /r/n/r/n54/r/n/r/n/r/n/r/n六、施工质量保证措施/r/n /r/n/r/n56/r/n/r/n/r/n/r/n1/r/n、质量目标:/r/n /r/n/r/n56/r/n/r/n/r/n/r/n2/r/n、组织保障/r/n /r/n/r/n56/r/n/r/n/r/n/r/n3/r/n技术措施/r/n /r/n/r/n58/r/n/r/n/r/n/r/n七、文明施工及环境保护/r/n /r/n/r/n60/r/n/r/n/r/n/r/n1/r/n、环境保护目标/r/n /r/n/r/n60/r/n/r/n/r/n/r/n2/r/n、文明施工及环境保护保证体系/r/n /r/n/r/n60/r/n/r/n/r/n/r/n3/r/n、文明施工保证措施/r/n /r/n/r/n61/r/n/r/n/r/n/r/n4/r/n、环境保护措施/r/n /r/n/r/n62/r/n/r/n/r/n/r/n八、安全生产/r/n /r/n/r/n63/r/n/r/n/r/n/r/n1/r/n、安全生产目标/r/n /r/n/r/n63/r/n/r/n/r/n/r/n2/r/n、安全保证机构与安全保证体系图/r/n /r/n/r/n63/r/n/r/n/r/n/r/n3/r/n、生产安全措施/r/n /r/n/r/n65/r/n/r/n/r/n/r/n4/r/n、人身安全保证措施/r/n /r/n/r/n65/r/n/r/n/r/n/r/n5/r/n、防火措施/r/n /r/n/r/n65/r/n/r/n/r/n/r/n九、施工应急预案/r/n /r/n/r/n67/r/n/r/n/r/n/r/n1/r/n、应急预案的方针与原则/r/n /r/n/r/n67/r/n/r/n/r/n/r/n2/r/n、项目部应急指挥及救援组织机构/r/n /r/n/r/n67/r/n/r/n/r/n/r/n3/r/n、/r/n/r/n项目部安全小组机构组成/r/n /r/n/r/n67/r/n/r/n/r/n/r/n4/r/n、项目部应急指挥及救援组织职责/r/n /r/n/r/n68/r/n/r/n/r/n/r/n5/r/n、项目部安全资料与设施/r/n /r/n/r/n68/r/n/r/n/r/n/r/n6/r/n、上级安全生产管理机构、应急服务机构的联系方式/r/n /r/n/r/n69/r/n/r/n/r/n/r/n7/r/n、应急响应方案/r/n /r/n/r/n69/r/n/r/n/r/n/r/n8/r/n、应急准备/r/n /r/n/r/n74/r/n/r/n/r/n/r/n9/r/n、应急响应/r/n /r/n/r/n75/r/n/r/n/r/n/r/n10/r/n、突发事件应急预案/r/n /r/n/r/n77/r/n/r/n/r/n/r/n十、监测监控措施/r/n /r/n/r/n79/r/n/r/n/r/n/r/n1/r/n、监测的目的/r/n /r/n/r/n79/r/n/r/n/r/n/r/n2/r/n、监测项目/r/n /r/n/r/n79/r/n/r/n/r/n/r/n3/r/n、其它/r/n /r/n/r/n79/r/n/r/n/r/n/r/n十一、附件/r/n /r/n/r/n79/r/n/r/n/r/n/r/n1/r/n、《广西九洲国际基坑支护预埋孔及爆破拆除设计与施工方案》(广西桂大爆破工程有限公司)/r/n /r/n/r/n79/r/n/r/n/r/n/r/n2/r/n、《广西九洲国际基坑监测方案》(/r/n广西华都建筑科技有限公司/r/n)/r/n /r/n/r/n79/r/n一、工程概况/r/n1/r/n、工程概况:/r/n本工程为/r/n广西九洲天龙房地产开发有限公司兴建项目,主要功能为商业、酒店、办公,其中:/r/n5A/r/n级写字楼/r/n86713平方米/r/n;商场/r/n27751平方米/r/n;五星级酒店物业/r/n44595平方米/r/n;地下车库、人防、设备、避难及技术层共/r/n53058平方米/r/n。/r/n本项目占地17.28亩,规划建筑面积/r/n212117平方米/r/n,框架-核心筒结构,建筑高度/r/n3/r/n16.8/r/n米/r/n,地上71层、地下6层、裙楼6层。工程/r/n±/r/n0.000绝对高程/r/n102.600米/r/n,基底标高/r/n基坑支护方案采用桩锚加大/r/n直径/r/n环撑支护形式,基坑开挖深度/r/n18.4/r/n~/r/n26.20m/r/n,基坑工程安全等级一级。/r/n项目东、南面为中新路/r/n,场地地势/r/n南高北低,西高东低。/r/n西、北面为华润开发项目,/r/n该项目目前正在建设中,目前已完成二层地下室的修建,地下室距基坑开挖边线/r/n5.0m/r/n,距基坑开挖边线/r/n16.80m/r/n为在建45层高层住宅楼,预计2012年6月封顶。本/r/n地块与华润地块关系紧密,互为整体。/r/n中新路人行道下埋有市政管线、电缆等,管线与项目关系如下:/r/n雨水管:管径/r/n600mm/r/n,埋深/r/n2.5m/r/n,最近处距基坑开挖线/r/n3.2m/r/n,距支护桩/r/n2.2m/r/n;/r/n污水管:管径/r/n400mm/r/n,埋深/r/n3.0m/r/n,最近处与该段支护桩重叠;/r/n电缆:埋深/r/n0.8m/r/n,最近处距基坑开挖线/r/n2.5m/r/n,距支护桩/r/n1.5m/r/n。/r/n本工程参建单位:/r/n监督单位:/r/n南宁市建委/r/n建设单位:广西九洲天龙房地产开发有限公司/r/n主体/r/n设计单位:华南理工建筑设计院/r/n勘察单位:建材桂林地质工程勘察院/r/n监理单位:南宁市建昶建设工程监理咨询有限责任公司/r/n基坑支护设计单位:湖北中南勘察基础工程有限公司/r/n施工单位:中铁建设集团有限公司南宁分公司/r/n基坑施工专业分包单位:湖北中南勘察基础工程有限公司/r/n基坑支护总平面布置图:/r/n2/r/n、基坑支护设计情况:/r/n基坑支护设计采用桩锚/r/n加内支撑/r/n支护/r/n形式/r/n,/r/n按周边荷载与地层情况,共分为/r/n七/r/n个剖面,各剖面设计参数见下表:/r/n剖面/r/n支护/r/n高度/r/n支护形式/r/n说明/r/n止水桩/r/n支护桩参数/r/n内支撑参数/r/n锚索参数/r/nAB/r/n18/r/n排桩+/r/n止水桩+/r/n内支撑/r/n[两桩咬合/r/n30cm/r/n]@2000/r/nφ/r/n1000@2000/r/n双层内支撑/r/nBC/r/n24/r/n排桩+内支撑/r/nφ/r/n1000@1500/r/n三层内支撑/r/nCD/r/n24/r/n桩锚+内支撑/r/nφ/r/n1000@1500/r/n双层内支撑/r/n三排锚索,2/r/n3/r/n~/r/n2/r/nDE/r/n26/r/n桩锚+内支撑/r/nφ/r/n1000@1500/r/n双层内支撑/r/n三排锚索,2/r/n3/r/n~/r/n2/r/nEF/r/n26/r/n桩锚+/r/n止水桩+/r/n内支撑/r/nφ/r/n8/r/n00@1500/r/nφ/r/n1000@1500/r/n三层内支撑/r/n一/r/n排锚索,/r/n26/r/nFG/r/n18/r/n排桩+/r/n止水桩+/r/n内支撑/r/nφ/r/n8/r/n00@1500/r/nφ/r/n1000@1500/r/n三层内支撑/r/nGA/r/n18/r/n排桩+/r/n止水桩+/r/n内支撑/r/n[两桩咬合/r/n30cm/r/n]@2000/r/nφ/r/n1000@2000/r/n双层内支撑/r/n本工程基坑开挖深度大,最深处达/r/n26.20m/r/n,为目前南宁市最深基坑,地下室与用地红线距离近,周边环境复杂。/r/n项目支护形式采用大直径环撑,充份利用项目的空间特征,方便土方开挖与主体核心筒施工。/r/n施工难度在于施工顺序的调配,如何利用场地内有限的空间进行各种临时设施的搭设、各工序的衔接,为此我方根据各施工阶段分别安排场地总体布置,对各工序施工进行优化,以安全、按期完成本工程。/r/n基坑支护主要工作量见下表:/r/n序号/r/n项目/r/n工作量/r/n单位/r/n备注/r/n1/r/n支护桩/r/n5200/r/nm3/r/n2/r/n立柱桩/r/n32/r/n根/r/n3/r/n止水桩/r/n1445/r/nm3/r/n4/r/n减压井/r/n3/r/n口/r/n5/r/n锚索/r/n3176/r/nm/r/n6/r/n喷射砼/r/n3870/r/nm2/r/n7/r/n支撑梁/r/n3414/r/nm3/r/n8/r/n锚索腰梁/r/n97/r/nm3/r/n9/r/n排水沟/r/n400/r/nm/r/n基坑支护整体剖面图及分段剖面图见后页。/r/n
/r/n
/r/n3/r/n、工程地质条件/r/n拟建场地位于南宁市/r/n琅/r/n东开发区、中国/r/n—/r/n东盟国际商务区,民族大道、青秀路及中新路之间华润万象城的东南侧,局部为邻近场地开挖的弃土堆填,总体南高北低,勘探期间测得各钻孔的孔口标高在/r/n98.86/r/nm/r/n~/r/n107.83/r/nm/r/n之间,最大高差/r/n8.97/r/nm/r/n。场地地貌上属于构造剥蚀丘陵地貌。/r/n根据钻探结果及区域地质资料,场地岩土层在钻探深度范围内,上覆第四系人工堆积层(Q/r/n4/r/nml/r/n)素填土/r/n①/r/n层,下伏第三系邕宁群上组(EY/r/n2/r/n)湖相沉积层泥岩/r/n②/r/n层、泥质粉砂岩/r/n③/r/n层、砂岩/r/n④/r/n层。依据其工程地质特征,自上而下描述如下:/r/n1、素填土/r/n①/r/n层(Q/r/n4/r/nml/r/n)/r/n杂色,松散,稍湿,主要由粘性土构成,含少量圆砾、块石及植物根茎,均匀性差,硬质物含量5~10%,为新近堆积,属高压缩性土。该层分布于场地的大部分钻孔,分布厚度不均,层厚为0.50/r/n~/r/n4/r/n.80/r/nm/r/n2、泥岩/r/n②/r/n层(EY/r/n2/r/n)/r/n本层属第三系邕宁群上组湖相沉积层,半成岩状态,属极软岩。灰~青灰色,泥状结构,层状构造,切面光滑。以粘土质泥岩为主,局部为粉砂质泥岩或泥质粉砂岩,岩体较完整,岩石质量等级为/r/nⅤ/r/n级,为软化岩石。该层根据风化程度不同分为三个亚层:/r/na、全风化泥岩/r/n②/r/n-1层/r/n灰白~灰色,稍湿,硬塑状态,全风化。现场做标准贯入试验23次,实测平均锤击数24.2击。本层取岩样1组,压缩系数平均值/r/na/r/n1-2/r/n=/r/n0./r/n07/r/nM/r/nP/r/na/r/n-1/r/n。该亚层分布于场地的大部分钻孔,分布厚度不均,层厚为1.00/r/n~/r/n13/r/n.60/r/nm/r/nb、强风化泥岩/r/n②/r/n-2层/r/n深灰~青灰色,干,坚硬状态,强风化。现场做标准贯入试验34次,实测平均锤击数39.6击。本层取岩样5组,压缩系数平均值/r/na/r/n1-2/r/n=/r/n0./r/n14/r/nM/r/nP/r/na/r/n-1/r/n,岩石单轴饱和抗压强度标准值/r/nƒ/r/nrk/r/n=1.485MPa。该亚层分布于场地的大部分钻孔,分布厚度不均,层厚为1.50/r/n~/r/n14/r/n.50/r/nm/r/nc、中风化泥岩/r/n②/r/n-3层/r/n青灰色,干,坚硬状态,中风化。现场做标准贯入试验22次,实测平均锤击数61.2击。本层取岩样7组,压缩系数平均值/r/na/r/n1-2/r/n=/r/n0./r/n08/r/nM/r/nP/r/na/r/n-1/r/n,岩石单轴饱和抗压强度标准值/r/nƒ/r/nrk/r/n=2.786MPa。该亚层分布于场地的大部分钻孔,分布厚度不均,层厚为1.20/r/n~/r/n16/r/n.00/r/nm/r/n3、泥质粉砂岩/r/n③/r/n层(EY/r/n2/r/n)/r/n本层属第三系邕宁群上组湖相沉积层,紫红色、紫灰色夹灰黑和灰褐等色,中风化,粉砂砂泥状结构,薄~中厚层状构造,泥质胶结。以泥质粉砂岩为主,局部地段夹含泥质较多的粉砂质泥岩或为泥岩薄层。岩芯较完整,呈短柱、长柱状,采取率50~70%。现场做标准贯入试验19次,实测平均锤击数75.2击。本层取岩样19组,压缩系数平均值/r/na/r/n1-2/r/n=/r/n0./r/n09/r/nM/r/nP/r/na/r/n-1/r/n,岩石单轴饱和抗压强度标准值/r/nƒ/r/nrk/r/n=3.647MPa。岩石坚硬程度为极软岩,岩体完整程度较完整,岩体基本质量等级为/r/nⅤ/r/n级,为软化岩石。该亚层分布于场地的大部分钻孔,分布厚度不均,揭露层厚为0.20/r/n~/r/n27/r/n.40/r/nm/r/n4、砂岩/r/n④/r/n层(EY/r/n2/r/n)/r/n本层属第三系邕宁群上组湖相沉积层,半成岩状态。紫红灰~灰白色,粒晶结构,中厚~厚层状构造。主要成分为石英,断面粗糙。该层根据风化程度不同分为两个亚层:/r/na、强风化砂岩/r/n④/r/n-1层/r/n紫红色~灰白色,强风化,现场做标准贯入试验2次,实测平均锤击数40.0击。岩石坚硬程度为极软岩,岩体完整程度为极破碎,岩体基本质量等级为/r/nⅤ/r/n级,为软化岩石。该亚层分布于场地的大部分钻孔,分布厚度不均,层厚为0.50/r/n~/r/n17/r/n.20/r/nm/r/nb、中风化砂岩/r/n④/r/n-2层/r/n棕红色~灰白色,中风化。质地较硬,现场做标准贯入试验钻具跳动,不能贯入。本层取岩样10组,岩石单轴饱和抗压强度标准值/r/nƒ/r/nrk/r/n=10.179MPa。岩石坚硬程度为软岩,岩体完整程度为较完整,岩体基本质量等级为/r/nⅣ/r/n级,为软化岩石。该亚层分布于场地的大部分钻孔,分布厚度不均,揭露层厚为0.3/r/n0~/r/n30/r/n.60/r/nm/r/n4、/r/n施工平面布置/r/n本工程主要工作量集中在三个阶段:1)基坑四周/r/n支护/r/n桩施工;2)/r/n-/r/n16.3/r/nm/r/n第一排内支撑施工;3)/r/n根据这三个阶段,分别规划不同的临时设施与临时场地布置。/r/n1)/r/n支护桩施工阶段/r/n本阶段为材料大用量阶段,支护桩钢筋笼加工、堆放均需要大量场地,需要为支护施工用旋挖钻机、灌注用混凝土运输车、泵车、渣土运输车预留施工道与停放场地,所以将临时设施及场地均放置在场地中间,将场地中部平整后进行临设搭建。/r/n支护桩阶段/r/n临时设施/r/n\/r/n临时场地表/r/n
/r/n编号/r/n名/r/n/r/n称/r/n面积(平方米)/r/n数量/r/n1/r/n钢筋堆放场地/r/n150/r/n2/r/n2/r/n钢筋笼制作场地/r/n75/r/n2/r/n3/r/n钢筋笼堆放场地/r/n600/r/n2/r/n钢筋笼加工场地位于基坑开挖线内,待支护桩完成后拆除,加工地面做/r/nC20/r/n混凝土面层,厚/r/n5cm/r/n,比场地高/r/n10cm/r/n,钢筋加工场地采用钢管搭设,不做密封,顶棚采用铁皮瓦/r/n。/r/n2)/r/n-/r/n16.3/r/n本阶段现场需要堆放大量钢筋、模板、钢管等材料,/r/n为减少搬运,将材料运中基坑中部堆放、加工。/r/n第二阶段/r/n临时设施/r/n\/r/n临时场地表/r/n
/r/n编号/r/n名/r/n/r/n称/r/n面积(平方米)/r/n数量/r/n1/r/n钢筋堆放场地/r/n150/r/n1/r/n2/r/n钢筋/r/n加工/r/n场地/r/n150/r/n1/r/n3/r/n钢管/模板堆放场地/r/n15/r/n0/r/n1/r/n4/r/n半成品堆放场地/r/n100/r/n1/r/n3)/r/n-2/r/n1.3/r/n本阶段场地布置与/r/n-1/r/n6.3/r/n第三阶段临时设施/r/n\/r/n临时场地表/r/n
/r/n编号/r/n名/r/n/r/n称/r/n面积(平方米)/r/n数量/r/n1/r/n钢筋堆放场地/r/n150/r/n1/r/n2/r/n钢筋加工场地/r/n150/r/n1/r/n3/r/n钢管/模板堆放场地/r/n15/r/n0/r/n1/r/n4/r/n半成品堆放场地/r/n100/r/n1/r/n4)坡顶材料堆放及相应荷载要求/r/n根据设计文件/r/n《基坑设计总说明(二)》十三条第二节要求:/r/n“/r/n基坑四周堆载应距坡顶/r/n5m/r/n,堆载荷载不得超过设计荷载/r/n”/r/n,看剖面设计荷载如下表:/r/n
/r/n编号/r/n剖面/r/n坡顶允许荷载值/r/n说明/r/n1/r/nAB剖/r/n30KPa/r/n坡顶行车要求/r/n2/r/nBCCD\DE\EF剖/r/n20KPa/r/n3/r/nFG剖/r/n0KPa/r/n坡顶有重要建筑,不允许堆载/r/n4/r/nGA剖/r/n20KPa/r/n二、编制说明和依据/r/n1/r/n、编制说明:/r/n基坑支护施工分项较多,必须对各个工序进行严格的控制,并且做好各个工序的间的衔接,才能安全顺利的完成支护工作。/r/n根据基坑支护设计图结合我公司多年来的施工经验,为便于指导施工,达到安全、高效地完成本基坑施工任务,特作此施工方案。/r/n2/r/n、编制依据:/r/n分类/r/n序号/r/n名称/r/n有效/r/n文件/r/n1/r/n《广西九洲国际基坑支护设计》(湖北中南勘察基础工程有限公司);/r/n2/r/n《/r/n工程施工承包/r/n合同》;/r/n3/r/n《广西九洲国际大厦岩土工程详细勘察报告》(建材桂林地质工程勘察院);/r/n4/r/n《南宁/r/n•/r/n中国-东盟国际商务区3、5号道路工程3号路管线竣工图》(中国建筑第五工程局);/r/n5/r/n《关于广西九洲天龙项目基坑支护对我项目安全影响的紧急函》([2011]华南第[073]号);《关于广西九洲国际大厦基坑支护方案相关意见的函》([2011]华南工备字第[178]号)(华润置地);/r/n规范/r/n6/r/n《建筑基坑支护技术规程》(JGJ120-99);/r/n7/r/n《建筑桩基技术规范》(JGJ94-2008)/r/n8/r/n《锚杆喷射混凝土支护技术规范》(GB50086/r/n—/r/n2001);/r/n9/r/n《建筑基坑工程监测技术规范》(GB50497-2009);/r/n10/r/n《岩土锚杆(索)技术规程》(CECS22:2005);/r/n11/r/n《土层锚杆设计与施工规范》(CECS22:90);/r/n12/r/n《施工现场临时用电安全技术规范》JGJ46-2005;/r/n13/r/n《建筑施工安全检查标准》JGJ59-99;/r/n14/r/n《建筑变形测量规程》(JGJ/T8-2007);/r/n15/r/n《建筑机械使用安全技术规程》(JGJ33-2001)/r/n16/r/n《建筑施工土石方工程安全技术规范》(JGJ/T180-2009)/r/n17/r/n《预应力筋用锚具、夹具和连接器》GB/T14370/r/n法律法规、地方文件/r/n18/r/n中华人民共和国国务院第393号令《建设工程安全生产管理条例》;/r/n19/r/n国家、广西及南宁市颁布的现行有关规范、质量评定标准、安全法规、文明施工条例;/r/n3/r/n、编制原则:/r/n1/r/n、精心组织、精心施工,确保按合同要求保质保量完成施工任务;/r/n2/r/n、根据施工现场环境条件及设计要求,确定合适的施工方法,合理调配机械设备及人力、物力资源;/r/n3/r/n、合理安排施工顺序,作好工序衔接,减少因工序衔接不良而产生的时间间歇与窝工。/r/n三、施工计划/r/n1/r/n、施工进度计划/r/n本工程工作量大,施工分项多,/r/n关/r/n键节点多/r/n,/r/n必须对施工进行详细安排/r/n,本基坑支护工程计划工期/r/n150/r/n日期天,按/r/n以/r/n下顺序施工。/r/n施工整体顺序图/r/n详见施工进度横道图。/r/n2/r/n、材料供应计划/r/n各类建筑材料包括钢筋、/r/n混凝土、/r/n水泥、砾石、砂等可就近购进/r/n,/r/n计划材料用量见下表/r/n:/r/n材料品种/r/n规格/r/n计划用量/r/n备注/r/n圆盘/r/nA/r/n10/r/n187.6/r/nt/r/n螺纹钢/r/nB/r/n18/r/n21./r/n5/r/nt/r/n螺纹钢/r/nB/r/n22/r/n22.6/r/nt/r/n螺纹钢/r/nB/r/n25/r/n135.9/r/nt/r/n螺纹钢/r/nB/r/n28/r/n56.5/r/nt/r/n螺纹钢/r/nC/r/n25/r/n110/r/nt/r/n螺纹钢/r/nC/r/n32/r/n790/r/nt/r/nL200角钢/r/nL200/r/n122/r/nt/r/n钢板/r/n59/r/nt/r/n商品混凝土/r/nC/r/n30/r/n10340/r/nm/r/n3/r/n商品混凝土/r/nC15/r/n1660/r/nm/r/n3/r/n钢绞线/r/nA/r/nS15.24/r/n10.8/r/nt/r/n铁丝网/r/n16/r/n#/r/n3850/r/nm/r/n2/r/n水泥/r/nP.O42.5/r/n9/r/n0/r/nt/r/n河砂/r/n中砂/r/n25/r/n0/r/nm/r/n3/r/n砾石/r/n0.5~/r/n2cm/r/n40/r/n0/r/nm/r/n3/r/n红砖/r/n标准砖/r/n3000/r/n块/r/n3/r/n、施工设备计划/r/n主要计划施工设备一览表/r/n序号/r/n设备名称/r/n型号规格/r/n数量/r/n产地/r/n出厂日期/r/n额定功率/r/n(kw)/r/n用于施工部位/r/n1/r/n旋挖钻机/r/nSR280R/r/n3/r/n长沙/r/n2009/r/n支护桩/r/n2/r/n锚杆钻机/r/nMDL-120D1/r/n1/r/n无锡/r/n/r/n2011/r/n55Kw/r/n锚索/r/n3/r/n吊车/r/n2/r/n徐州/r/n2007/r/n支护桩/r/n4/r/n反铲挖掘机/r/nPC-120/r/n2/r/n厦门/r/n2008/r/n支护桩/r/n5/r/n电焊机/r/n12/r/n15Kw/r/n6/r/n注浆泵/r/nBW-150/r/n1/r/n衡阳/r/n2009/r/n7.5Kw/r/n锚索/r/n7/r/n空压机/r/n12m/r/n3/r/n1/r/n长沙/r/n2009/r/n75Kw/r/n喷射砼/r/n8/r/n混凝土喷射机/r/nGP/r/n-5A/r/n1/r/n洛阳/r/n2010/r/n7.5Kw/r/n喷射砼/r/n9/r/n切割机/r/n1/r/n4Kw/r/n10/r/n钢筋剪断机/r/n2/r/n7.5Kw/r/n内支撑/r/n11/r/n钢筋弯曲机/r/n2/r/n11Kw/r/n内支撑/r/n12/r/n震动泵/r/n3/r/n1.5Kw/r/n内支撑/r/n13/r/n全站仪/r/nNTS-302B/r/n1/r/n工程测量/r/n14/r/n氧焊/r/n一套/r/n4/r/n、劳动力计划/r/n人员安排计划表/r/n序号/r/n项目/r/n计划人数/r/n累计/r/n备注/r/n1/r/n支护桩/r/n/止水桩/r/n18/r/n18/r/n2/r/n钢筋笼/r/n25/r/n43/r/n3/r/n锚索/r/n9/r/n52/r/n4/r/n喷射砼/r/n7/r/n59/r/n5/r/n冠梁、内支撑/r/n40/r/n99/r/n6/r/n项目管理人员/r/n12/r/n111/r/n5、施工用水计划/r/n本工程采用旋挖钻机干成孔,/r/n支护桩施工阶段不需/r/n用水,用水主要在锚杆施工阶段成孔用水和支撑梁施工洒水养护。/r/n计划进场一台锚杆钻机,根据我方施工经验,供水量/r/n0.1m/r/n3/r/n/min即可满足要求,/r/n6、施工用电计划/r/n根据施工设备计划,现场使用主要用电设备功率与说明如下:/r/n序号/r/n设备名称/r/n额定功率/r/n(kw)/r/n数量/r/n功率合计/r/n(kw)/r/n1/r/n锚杆钻机/r/n55/r/n1/r/n台/r/n55/r/n2/r/n电焊机/r/n15/r/n12/r/n台/r/n180/r/n3/r/n注浆泵/r/n7.5/r/n1/r/n台/r/n7.5/r/n4/r/n空压机/r/n75/r/n1/r/n台/r/n75/r/n5/r/n混凝土喷射机/r/n7.5/r/n1/r/n台/r/n7.5/r/n6/r/n切割机/r/n4/r/n1/r/n台/r/n4/r/n7/r/n钢筋剪断机/r/n7.5/r/n2/r/n台/r/n15/r/n8/r/n钢筋弯曲机/r/n11/r/n3/r/n台/r/n33/r/n9/r/n震动泵/r/n1.5/r/n3/r/n台/r/n4.5/r/n根据施工总体计划,所有用电设备不会同时工作,根据最不利组合,考虑/r/nEF/r/n、/r/nDE/r/n剖支护桩施工完成后,土方开挖,第一排锚索开始施工,假定此时/r/nAB/r/n剖与/r/nGA/r/n剖支护桩尚未完工,/r/n按同时工作一台锚杆钻机、6台电焊机、1/r/n台注浆泵/r/n计算,最大用大量为/r/n190/r/nKw,以此作为本工程供电需求/r/n,按1.2倍用电储备/r/n,请建设单位按/r/n230/r/nKw/r/n用电量报批。/r/n施工用电采用TN-S架空三相/r/n五/r/n线制,并执行三级配电二级保护,和/r/n“/r/n一机、一闸、一漏、一箱/r/n”/r/n强制性临时供电措施。/r/n考虑到本工程的特殊性和便于文明施工组织,周边架空临时线路/r/n采用VLV22-120型聚氯乙稀绝缘聚氯乙稀护套多芯/r/n五/r/n线电力电缆,现场一级配电总开关设置在现有临时配电房内,二级防水钢质配电箱/r/n根据施工图布置/r/n,然后从二级配电箱用电缆接至三级移动配电开关箱后,再向作业面各用电设备供电。/r/n7/r/n、项目部组织结构/r/n1/r/n)组织机构与项目管理/r/n按照/r/n“/r/n项目法/r/n”/r/n要求施工,由组织过大量同类工程的/r/n喻勇/r/n同志来担任本工程项目经理,/r/n刘洋/r/n同志任项目总工共同组建一个强有力的项目经理部来负责本工程的具体施工管理。详见项目组织机构图。/r/n各施工管理职能部门在项目经理部的指导下做到有计划地组织施工,确保本工程质量、工期、安全等方面达到目标要求。/r/n职务/r/n主要职责/r/n项目经理/r/n(/r/n喻勇/r/n)/r/n项目经理是公司法人在项目上的授权代理,负责项目全面工作,在项目施工全过程对业主负责/r/n。/r/n组建项目经理部组织机构,确定各部门岗位设置人员构成,并确定岗位职责。/r/n领导建立适应项目管理需要的各种规章制度。/r/n贯彻公司质量安全与环保方针、制定项目质量安全与环保目标。/r/n负责全面履行业主合同。/r/n负责与业主、监理、政府相关部门及其它外围关系的总体协调与沟通。/r/n项目副经理/r/n(/r/n严建波/r/n)/r/n负责领导项目工程管理部及安全总监的工作,组织项目实施过程中生产要素的协调/r/n。/r/n做好生产要素的综合平衡工作。/r/n执行施工组织设计、施工技术方案、技术措施的贯彻实施、监督与检查。/r/n对各分项、分部的施工质量负直接领导责任。/r/n编制项目施工总进度计划,并认真贯彻执行项目的各类生产计划、施工方案,负责落实项质量计划和质量目标的执行。/r/n做好现场降水、支护、土方挖运机械设备的管理工作。/r/n项目总工/r/n(/r/n刘洋/r/n)/r/n主管项目工程技术部、物资部工作。/r/n保持与业主、设计院之间的密切联络与设计协调工作,并取得对方的认可,确保设计工作和能够满足项目连续生产的需要。/r/n对工程质量负有第一技术责任。贯彻执行质量方针、项目质量计划,负责审核项目物资计划及工程物资需要计划。/r/n负责组织相关人员编制施工组织设计、施工技术文件、专项施工方案等。/r/n负责领导图纸会审及技术交底,领导与组织项目各项认证体系的运行,对工程施工资料的完整性负主要责任。/r/n质检员/r/n(/r/n陈杰/r/n)/r/n负责对材料的进货过程及最终质量的检验/r/n。/r/n复核轴线、桩位和标高。/r/n制定和落实预防措施,并对不合格品进行处理。/r/n4/r/n、及时收集和整理资料。/r/n施工员/r/n(/r/n邓森/r/n)/r/n及时、准确地测轴线、标高、桩位。/r/n对作业人员进行技术交底。/r/n对各工序跟踪检查,形成各种产品质量记录。/r/n负责日常施工中的技术问题的处理。/r/n安全员/r/n(/r/n王自党/r/n)/r/n认真贯彻执行《建筑法》和有关的建筑工程安全生产法令、法规,坚持/r/n“/r/n安全第一。预防为主/r/n”/r/n的方针,具体落实上级公司的各项安全生产规章制度。/r/n监督、检查操作人员的遵章守纪。制止违章作业,严格安全纪律,当安全与生产发生冲突时,有权制止冒险作业。/r/n检查劳动保护用品的质量,反馈使用信息,对进入现场使用的各种安全用品及机械设备,配合材料部门进行验收检查工作。/r/n贯彻安全保证体系中的各项安全技术措施,组织参与安全设施、施工用电、施工机械的验收。/r/n协助上级部门的安全检查,如实汇报工程项目或生产中的安全状况/r/n。/r/n材料员/r/n(吕卫东)/r/n了解掌握施工过程和形象进度,掌握所需要的主要材料的品名、规格、数量、质量。配合施工部门编制好施工材料计划,确保施工现场的材料供应。/r/n配合现场施工员负责材料到场的计量收方工作。/r/n/r/n负责各种材料原始凭证、计量凭证、核算凭证质量证明书等资料收集,按程度准确及时地传递和反馈,并装订成册,专项保管。/r/n4/r/n、忠于职守,实事求是,全面、准确、及时地收方、结算、报统计资料,为改善管理,提高经济效益提供依据。/r/n预算员/r/n(陈晶)/r/n参与各类合同的洽谈,掌握资料/r/n做出/r/n单价分析,供项目经理参考。/r/n及时掌握有关的经济政策、法规的变化,如人工费、材料费等费用的调整,及时分析提供调整后的数据。/r/n正确及时编制好施工图(施工)预算,正确计算工程量及套用定额,做好工料分析,并及时做好预算主要实物量对比工作。/r/n施工过程中要及时收集技术变更和签证单,并依次进行登记编号,及时做好增减帐,作为工程决算的依据。/r/n协助项目经理做好各类经济预测工作,提供有关测算资料。/r/n正确及时编制竣工决算,随时掌握预算成本、实际成本,做到心中有数。/r/n资料员/r/n(陈娟)/r/n收集整理齐全工程前期的各种资料。/r/n做好本工程的工程资料并与工程进度同步。/r/n工程资料应认真填写,字绩工整,装订整齐。/r/n收集保存好公司及相关部门的会议文件。/r/n及时做好资料的审查备案工作。/r/n施工组织机构的启动与高效运作/r/n根据本工程的情况及特点,有针对性地组建项目班子,并且人选一旦经过甲、乙双方确认,未经甲方同意中途不得变换人选。/r/n根据项目经理部的工作实际,具体明确每个项目管理人员的责、权、利,使全体管理人员有条不紊、忙而有序地开展工作,从而较大幅度地提高项目经理部的工作效率,有效促进整体管理实力的强化,使项目经理部管理体系有更多的精力和时间来分析运筹各种复杂的管理局面,做到项目整体下活一盘棋,充分发挥每个棋子的作用,并且决策有的放矢,成竹在胸,不打无把握之仗。/r/n以已制定的各项管理制度来指导、督促、规范每个管理人员的工作以提高工作质量、效率。强化制度管理,保证项目管理有章可循、执法必严、违章必纠、赏罚分明。/r/n一切以用户为中心,将项目职业道德作为专项考核制度,并在项目管理中大力提倡和推广。/r/n四、施工/r/n总规划/r/n1/r/n、/r/n施工整体安排/r/n本工程施工时间长,为了在最短的时间内能安全快捷、顺利地完成本基坑支护桩工程。必须按以下总体安排做好如下几项工作:/r/n落实项目施工组织机构,健全各项规章制度,保证项目机构能够高效运转。/r/n择优确定一个技术先进、安全可靠、施工速度快的最佳设计施工方案,事前有周密计划,计划执行过程中定期进行检查落实,严格控制关键工序的工期。/r/n本工程难点在于工序间的调协衔接,支护桩、锚索施工相互影响,必须做好各工序的协调工作。/r/n加强对开挖基坑的变形监控,实行信息化施工。/r/n2、/r/n施工工艺流程/r/n本工程平面分段,交叉流水的作业程序进行施工,其总体施工程序如下图:/r/n3/r/n、工期安排/r/n本工程工作量大,工序较多,施工中需要考虑因素较多。劳动力、设备、气候、材料供应、各工序施工衔接等都可以影响工程进度,如何合理安排生产施工顺序、进度、机械、材料计划及劳动力等至关重要。为此我方配备了最现代化的施工设备和最先进的施工工艺,以确保工程的顺利完工。/r/n按上图施工工序流程,经我方测算,总施工工期/r/n约/r/n为/r/n150/r/n天,详见施工进度横道图。/r/n4、施工重难点分析/r/n本工程施工工序简单,均为比较成熟工艺,施工重点、难点在于施工质量控制、施工工序配合,具体为:/r/n支护桩施工阶段,控制桩施工顺序,/r/n不仅/r/n需要/r/n支护桩与/r/n止水桩跳打/r/n,还不能与下放钢筋笼、灌浆相互影响,这要求现场施工员严格执行已定的桩施工计划,/r/n加强钻机人员的管理/r/n。/r/n进出土道路与/r/nAB/r/n剖接头缓坡结构,必须优先施工,并事先计算每桩桩桩顶标高,/r/n灌注时技术人员即时测量浆面,即不要超灌浪费混凝土,也不能留下空洞后期补浆影响支护桩整体强度。/r/n立柱桩垂直度控制是本工程一大难点,立柱桩结构上部为角钢焊制,下部为钢筋/r/n笼,为减少孔口操作时间,钢立柱与钢筋笼在地面上焊接在一起,/r/n设计要求钢立柱与钢筋笼中心偏差不大于/r/n20mm/r/n,钢立柱垂直度偏差不大于1/300,我们决定从三方面解决此问题:/r/n选调有经验的焊工进行立柱角钢焊制,控制焊接顺序,减少焊制阶段立柱变/r/n形/r/n。/r/n钢筋笼与立柱焊接时使用对中支架,确保钢立柱与钢筋笼中心偏差/r/n。/r/n因本工程选用旋挖钻机成孔,钻孔垂直度较高,但在立桩桩施工前,仍需要/r/n对钻机垂直度进行校对,施工中轻挖慢进,以保证桩垂直度偏差小于1/200/r/n。/r/n钢立柱部分焊接对中支架,并且钢筋笼不下放到底,/r/n以悬挂方式保证立柱垂/r/n直,对中支架见下示意图/r/n。/r/n内支撑梁的水平控制也是本工程很重要的内容,/r/n土方开挖至每层梁底标高后,我/r/n方将水准点引至基坑内保护,在各梁部分埋设标高点,控制混凝土垫层厚度,要求支撑梁底标高差不大于/r/n10mm/r/n。/r/n本工程工期长,从基坑开始施工至地下室回填约需要1年,要求在基坑及主体施/r/n工阶段,需要基坑监测持续进行,监测结果及时反馈给我方,我方对结果进行分析,如达到监测报警值,立即通知设计人员,针对变形情况采用相应处理措施。/r/n5、常见质量通病及预防措施/r/n1)/r/n锚杆倾角小,锚固力差/r/n(/r/n1/r/n)/r/n原因分析/r/n锚杆的承载力与土体的极限摩阻力有关,一般情况下,上层土质较下层土质差,在同样/r/n锚固长度情况下,倾角小时锚固体深入较好土体长度少/r/n。/r/n(2)/r/n预防措施/r/na/r/n、/r/n正式施工锚杆前必须作锚杆基本试验,得出倾角、锚团长度关系,提供设计研究决/r/n定。/r/nb、/r/n倾角必须适宜,按规范规定:倾角为15/r/n°/r/n~25/r/n°/r/n,不大于45/r/n°/r/n,/r/n选择合适角度及合适极限承载力是必要的。/r/n2)/r/n锚/r/n具/r/n夹片滑脱,失去锚固作用/r/n(1)/r/n原因分析/r/n锚具、夹片硬度不足,不符合规范规定/r/n;/r/n当锚杆受力时,夹片对钢绞线因硬度不足而滑脱,预应力锚固后经不起受力而滑脱。/r/n/r/n(2/r/n)/r/n预防/r/n措施/r/na、/r/n夹片应采用表面渗碳工艺,提高硬度,使硬度HRC=50/r/n°/r/n~55/r/n°/r/n。/r/nb、/r/n施工完后应重新检查锚头有无松动、脱落,必要时重新将锚头张拉一下。/r/nc、/r/n工厂交付锚具、夹片时应作详细检查验收/r/n。/r/n3)支护桩钢筋笼难以下放或出现上浮/r/n(1)原因分析/r/n钢筋笼被卡住或混凝土灌注时被托出孔口。/r/n预防措施/r/n成孔时要保持孔壁面平整。/r/n严格控制钢筋笼的外形尺寸。/r/n钢筋笼起吊时采用两点起吊法,以免钢筋笼变形。/r/n在导管架上设计锚固点固定钢筋笼,加快浇灌速度,控制导管最大埋深不要超过/r/n6m/r/n,避免钢筋笼上浮。/r/n4)内/r/n撑未及时支撑造成地面裂缝/r/n(1)/r/n原因分析/r/n:/r/n为了挖土方便,未及时跟上支撑,改变了围护结构的受力情况。/r/n(2)/r/n防治措施/r/n:/r/n基坑工程必须按照施工方案规定施工,即如何分层挖土,/r/n及/r/n时加撑,千万不能马虎,必须按方案施工。/r/n5)/r/n钢筋混凝土支撑立/r/n柱/r/n下沉,支护结构破坏/r/n(1)/r/n原因分析/r/na、/r/n设计时未考虑软土地区支撑立柱下沉如此之多,导致梁开裂。/r/nb、/r/n支撑在温度变化后会产生应力变化,节点变化也会产生次应力,支撑立柱下沉,其轴力会大大增加。/r/n(2)/r/n防治措施/r/na、/r/n将立柱支撑在较好的地层上,并提高沉降安全系数。/r/nb、/r/n钢筋混凝土支撑设计时要考虑温度、节点变位等次应力。/r/nc、天热时对支撑系统浇水降温。/r/n6)/r/n拆除支撑时,邻近建筑物开裂/r/n(1)/r/n原因分析/r/n:为加快施工进度提前/r/n拆除混凝土支撑,导致土/r/n体/r/n位移/r/n、/r/n地基下沉,建筑物开裂。/r/n(2)/r/n防治措施/r/n:/r/n拆除钢筋混凝土支撑时,/r/n严格按照设计要求,先换撑后拆撑/r/n。/r/n五、施工分项概述/r/n一)、测量放线/r/n由规划单位利用规划点测放并提交我单位测绘报告,我/r/n项目/r/n利用规划点引至场地周边,复测无误后,做好永久性标识。/r/n利用总平面布置图计算各坐标点,如各支护桩坐标、咬合止水桩/r/n桩位、基坑边线等,并报监理复核。/r/n利用全站仪测放各坐标点。/r/n整个测量放线过程均需复测、检查误差控制在允许范围,方可进入下道工序。控制点、高程点埋设牢固并加以保护,定期复测校验。/r/n控制点埋设要求:/r/n首先以控制桩为中心砌长宽均为/r/n0.5/r/n米/r/n、高/r/n0.3/r/n基准点埋设示意图/r/n二/r/n)、/r/n土方/r/n开挖/r/n本工程基坑开挖面积大,开挖面积约为/r/n10100/r/n平方米/r/n,总土方开挖量约/r/n200000m/r/n3/r/n。基坑开挖深度大,开挖深度/r/n最深处约/r/n开挖深度范围内主要由人工填土、/r/n④/r/n强风化泥岩、粉砂岩、/r/n⑤/r/n中风化砂岩组成,特别是强风化粉砂岩和中风化砂岩,十分坚硬,勾机开挖较困难。/r/n开挖土方时,要根据设计图纸要求,按坡比开挖。先用挖掘机分层分段开挖,然后修坡,修坡/r/n角度/r/n大小和坡面平整度应达到设计及规范要求。/r/n1、/r/n土方开挖原则/r/n按照分层、分区、分块、盆式开挖/r/n,本着先撑后挖、分层开挖、严禁超挖的原则/r/n,严禁相邻多区域大面积同时开挖。/r/n2/r/n、土方开挖要求:/r/n土方开挖前,进行现场勘察,摸清工程情况、地质、水文情况,以及地下埋设物、/r/n电缆线路、上下水管道、煤气管道、邻近建筑等情况,以便有针对性的采取安全措施。/r/n根据基坑支护设计,出土道路(AB、BC段)坡顶荷载30KPa,除AB\BC段外,其它区/r/n段/r/n严禁车辆直接停放和行走在基坑边坡上/r/n。/r/n挖掘机工作时严禁碰撞挤推工程桩;严禁撞击钩挂支护结构,特别是/r/n内支撑/r/n、/r/n立/r/n柱/r/n。/r/n弃土应及时运出,如需要临时堆土或留作回填土,堆土坡脚至坑边距离应按挖坑深/r/n度、边坡坡度和土的类别而定。/r/n及时采取排水措施,以免基坑被水浸泡,造成坑壁土质松软、土方下滑、坍塌造成/r/n人员伤亡/r/n。/r/n基坑开挖后,在坡角设计临时排水沟,沟宽/r/n0.8m/r/n,深/r/n0.8m/r/n,并在底洼处设置集水井与排水沟相连,用水泵抽排集水,因本工程土质较好,主要为强、中风化岩,临时排水沟和集水井可不做抹灰处理。/r/n土方开挖前现场安全领导小组,针对安全要采取预防措施,对作业人员进行技术和/r/n安全进行交底,使作业人员做到心中有数。按施工方案、安全操作规程严格操作。/r/n专职安全员要在现场进行安全检查,发现隐患及时纠正处理。/r/n严禁坡顶堆放超载,行走运土车辆,坑边堆放物质超载不大于设计值。/r/n测量做到随挖随测,测量现场值班,严禁出现超挖现象,基坑开挖的最后阶段,要/r/n加强对周边环境的监测工作,监测的结果要及时反馈给项目部,在现场要准备足够的抢险材料,如水泥、砂、石等,并要求现场值班人员加强对基坑支护结构的巡视,对于发现的任何险情,都要向项目部反应,项目部再根据发生的情况,采用适当措施。/r/n基坑开挖的同时,场地照明、积水排放及时跟进,安排专职水电管理/r/n1/r/n人,确保夜/r/n间施工照明及雨天积水抽排。/r/n3、/r/n土方开挖流程/r/n先进行GA、AB剖面的基坑土方开挖,因AB位于靠华润还未进行开挖的高地块,开挖/r/n前由业主与华润方面进行沟通,有部分需要占地作临时运输道路的做道路硬化处理,有需要放坡的,按1:1/r/n坡比作放坡处理/r/n。/r/n本阶段开挖厚度在7~10m,总方量约6万方,要分3层进行开挖,而正在施工的华润中心幸福里基坑基底标高为/r/n93m/r/n,考虑排水现况,建议先开挖到比幸福里基底高出30~50cm/r/n,暂时减少排水困难/r/n。/r/n本阶段计划投入大型挖掘机3台,容积/r/n20m3/r/n运土车辆25台,此层土质属泥岩/r/n②/r/n层(EY2)、中风化泥岩/r/n②/r/n-3层和泥质粉砂岩/r/n③/r/n层(EY2)居多,大型挖掘机可以顺利开挖,本项开挖计划用时11/r/n个施工天,工作面交给支护单位作支护施工/r/n。/r/n待BCDEF段支护排桩施工完毕,进行开挖靠中新路原预留宽/r/n25m/r/n作支护操作面的土/r/n方,因中新路市政管道、地下埋设物复杂,支护是关键,开挖时应密切观测支护桩及冠梁的偏移情况,在偏移大于设计值时,应立即停止往/r/n下一层开挖,必要时还要采取应急措施,比如堆沙包、回填土方的措施/r/n。/r/n本阶段开挖厚度在靠近/r/nBCDEF/r/n剖面的支护桩往基坑方向/r/n6m/r/n为4~/r/n5m/r/n,是预留给做锚索工作面的,其余土方可以在此工作面以外按1:1放坡挖至跟/r/nGAB/r/n剖面同等高度,总方量约3万方,计划投入大型挖掘机3台,容积/r/n20m3/r/n运土车辆25台,此层土质亦属泥岩/r/n②/r/n层(EY2)、中风化泥岩/r/n②/r/n-3层和泥质粉砂岩/r/n③/r/n层(EY2)居多,大型挖掘机可以顺利开挖,本项开挖计划用时8个施工天,开挖至第一道锚索工作面,交给支护作钻孔、拉锚和锁定施工;/r/n待第一道锚索完全锁定和喷锚完工后,大致按照/r/n上一步/r/n的施工形式,/r/n投入大型挖掘机/r/n2/r/n台,容积/r/n20m3/r/n运土车辆25台,开挖至第二道锚索所需工作面,此阶段开挖土质属泥岩/r/n②/r/n层(EY2)、中风化泥岩/r/n②/r/n-3层和泥质粉砂岩/r/n③/r/n层(EY2)居多,大型挖掘机可以顺利开挖,总方量约2万方,本项开挖计划用时7个施工天,完成后交给支护作钻孔、/r/n拉锚和锁定施工/r/n。/r/n在CDE剖面的第二道锚索和GAH剖面排桩的施工中,可以交叉进行/r/n92.6m/r/n往下到/r/n86.6m/r/n的大面积开挖,此层开挖一定要采/r/n取由基坑中部往外扩的方法进行整体大面积开挖,开挖时视土质情况,与业主/r/n、监理方的资深工程师商讨,考虑现场的实际情况,扩挖到靠边坡足够安全的距离时应按1:1.5放坡,待BCDEF剖面的第二道锚索和HAB剖面排桩达到设计要求后,再继续统一扩挖至排桩边,在整个基/r/n坑面清理到第一道内支撑梁所需的工作面时,再清运入坑运土道路土方。/r/n此层挖土深度为/r/n6m/r/n,总方量约5.5万方,应分2层进行开挖,整体深度已达到/r/n-1/r/n5/r/nm/r/n,抽排水工作要及时,由于泥质粉砂层含水量比较大,在每层开挖好后,我方现场施工人员要及时安排机械挖好排水沟和集水井,由支护单位进行抽水/r/n。/r/n此阶段开挖的土方层比较复杂,有较为坚硬的强风化砂岩层和较软粉砂层,投入大型挖掘机3台,容积/r/n20m3/r/n运土车辆25台,在遇到强风化砂岩层时,因普通挖掘机工作进度比较缓慢,需要单钩挖掘机配合的采取单钩配合,进行松土以加快进度。开挖完毕后机械平整场地,整个场地/r/n移交/r/n支护单位作立柱桩和第一道内支撑梁的施工/r/n。/r/n此项开挖工作视强风化砂岩层含量程度,初步计算约用时25个施工天以上/r/n。/r/n待第一道支撑梁施工完毕和达到一定的强度后,可以进入/r/n―/r/n1/r/n6/r/nm/r/n~/r/n―/r/n首先安排原来停放在基坑内的挖掘机从环形支撑内取质地比较好的土方,回填好出/r/n土坡道,道路填好后,开始装车外运,先开挖环形支撑以内土方,还是由中到外的方法清挖完毕此部分土方/r/n,待第一道支撑梁的强度达到设计要求,再同时往三个三角形部位扩挖。/r/n因垂直空间狭小和立柱桩的横向空间狭小,给此层土方的开挖增加了很大的难度,开挖时施工员和安全员必须时刻跟进,/r/n并随时进行技术交底,严禁挖掘机工作时碰撞挤推立柱桩、内支撑梁等。/r/n因垂直/r/n4.1m/r/n和横向6~10m的工作空间,大型挖掘机与汽车无法入内进行开挖和运土,按此空间只能采用60型号的小型挖掘机进行破碎和转运,如此方法进度将会十分缓慢。为了加快进度,建议采用三角形内整体往下超挖/r/n1.5m/r/n,或挑选个别立柱桩较为宽阔的地方超挖/r/n2m/r/n,作为临时施工通道,使中型挖掘机、破碎机和单钩可以工作,大大提高推进进度,开挖时应算好超挖的需回填土方,用最边角上的土方回填之前超挖部分,然后用挖掘机来回压实,以防支撑梁施工时下陷/r/n。/r/n在三个三角形撑土方全部清运完毕和平整后,要进行的是出土道路土方的搬迁或清运,现阶段基底为/r/n-2/r/n0/r/nm/r/n,基坑下坡道路垂直高差为/r/n8/r/nm/r/n,按1:4的坡度计算土方量约/r/n5000m3/r/n,此部分土方可以停靠在斜坡道路上装车外运的只有/r/n此阶段开挖深度为/r/n5m/r/n,总方量约4.7万方,的土层大部分为/r/n强风化砂岩层,常规挖掘机开挖十分困难,加/r/n因场地所限,/r/n在/r/n进行环形支撑以内的土方开挖和清运时/r/n:/r/n计划投入2台大型挖掘机和1台大型单钩挖掘机(松土用);在进行三角形支撑土方开挖时:计划投入中型挖掘机(斗容/r/n1m3/r/n)3台、中型破碎机3台或60型破碎机4~6台,运土车辆15~20台;因土质坚硬和工作空间关系,初步计算每天的出土量在/r/n3/r/n500m3/r/n左右/r/n在第二道支撑强度达到设计要求后,大致采取/r/n上一步/r/n的开挖方法,将基坑开挖至基/r/n底:/r/n-2/r/n7/r/n./r/n5/r/nm/r/n(预留/r/n30cm/r/n人工清土,以免机械抓松软土破坏承载力),此层开挖深度/r/n6.5m/r/n,总方量约为6.2万方;不过此阶段土质会比/r/n上一阶段/r/n的土质更为坚硬,大部分地方会遇到1~/r/n4m/r/n待基底需清运土方全部清运完毕后,所有不需要在基坑内施工的机械完全退出基坑,坑内只留一台大型挖掘机,然后开始由基底开始一步一步往上清运斜坡道路土方,此道路落差/r/n1/r/n4/r/n.5m/r/n,土方量约1~1.2万方之间,首先将运土车辆停在原斜坡道路上,采用常规钩机进行反向装车,装车时不要过满,因汽车在半坡起步时比较困难,等常规挖掘机够不到基底时,改用加长臂挖掘机继续进行反向装车,原来留在坑内的挖掘机预先松土和归堆协助装车;由于长臂挖掘机的抓土深度可达/r/n18m/r/n鉴于长臂挖掘机的装载量为400~/r/n5/r/n00m3/r/n本工程基坑深度大,无法按常规方法在坑内设置临时道路放坡至坑底,所以在基坑施/r/n工至/r/n-2/r/n0/r/nm/r/n后,使用小型挖机在坑内转土,运土车辆及长臂挖机停放在/r/n当长臂挖机及运土车辆无停放位置时,换用挖斗抓取坑内土方,土方全部施工完毕,将小挖用吊车吊出基坑。/r/n3/r/n、土方开挖流向图/r/n3/r/n.1、/r/n-8.6m/r/n以上土方开挖流向图(见下页附图)/r/n3/r/n.2、/r/n-20.6m/r/n以上土方开挖流向图(见下页附图)/r/n三)/r/n、/r/n止水桩施工/r/n/r/n本止水桩采用素混凝土桩,用于支护桩桩间止水。/r/n1、施工工艺流程/r/n/r/n桩位放线/r/n桩位放线/r/n钻机就位/r/n成孔/r/n并清孔/r/n报验/r/n下导管/r/n灌砼至标高/r/n2、技术要求/r/n混凝土坍落度/r/n18/r/n/r/n2/r/n2/r/n混凝土强度等级:/r/nC/r/n15/r/n。/r/n为确保工程质量,/r/n要求使用商品混凝土/r/n。/r/n桩的施工允许偏差按设计要求:/r/neq\o\ac(/r/n○/r/n,1)/r/n/r/n桩径允许偏差:/r/n+100/r/n,/r/n-40mm/r/n;/r/neq\o\ac(/r/n○/r/n,2)/r/n/r/n垂直度允许偏差:/r/n1/r/n/r/n;/r/neq\o\ac(/r/n○/r/n,3)/r/n/r/n桩位允许偏差:/r/n±/r/n50mm/r/n。/r/n(5)每根桩制作/r/n一组/r/n试块/r/n3、施工注意事项/r/n止水桩采用跳打法施工,相近的两根桩施工时间间隔在24h以上。/r/n四/r/n)/r/n、/r/n支护桩/r/n\立柱桩施工/r/n为加快施工进度,支护桩采用旋挖钻机施工,因土质较好,决定选用干法成孔方案,可降低对周边环境污染。/r/n施工工艺流程图/r/n施工技术要求/r/n混凝土坍落度/r/n18/r/n/r/n22cm/r/n。/r/n混凝土强度等级:/r/nC30/r/n。/r/n为确保工程质量,
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- DB37-T 4409-2021 自然资源空间数据整合技术规范
- 二零二五年度酒店厨房食品安全管理承包合同3篇
- 《加热和冷却》课件
- 二零二五版外卖配送员劳动权益保护及激励措施合同
- 《不同的连接策略》课件
- 《高层建筑》课件
- 公厕人员劳动合同范本
- 单位分房合同范本
- 个人担保贷款合同范本
- 单位工装采购合同范例
- 胸腔积液护理查房-范本模板
- 水土保持方案中沉沙池的布设技术
- 安全生产技术规范 第25部分:城镇天然气经营企业DB50-T 867.25-2021
- 现代企业管理 (全套完整课件)
- 走进本土项目化设计-读《PBL项目化学习设计》有感
- 《网店运营与管理》整本书电子教案全套教学教案
- 教师信息技术能力提升培训课件希沃的课件
- 高端公寓住宅项目营销策划方案(项目定位 发展建议)
- 执业兽医师聘用协议(合同)书
- 第1本书出体旅程journeys out of the body精教版2003版
- 2022年肝动脉化疗栓塞术(TACE)
评论
0/150
提交评论