版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、Structures 2008: Crossing Borders 2008 ASCENew Innovative Features of Maines First Cable Stay BridgeAuthor:Chrisstoppherr J. Buurgeess, P.E., S.E., FIIGG, Deenveer, CO, HYPERLINK mailto:cburgess cbburggesssmThe ssteeel ssusppenssionn Waaldoo-Haancoock Briidgee caarriied U.SS. RRoutte 11 trraveelerrs
2、 ooverr thhe PPenoobsccot Rivver, neear thee toown of Bucckspportt, MMainne ffor 74 yeaars. Thhis vittallly iimpoortaant traanspporttatiion linnk proovidded saffe ppasssagee foor ccarlloadds oof ttourristts tthrooughh thhe yyearrs, in addditiion to siggnifficaant commmerrciaal ttraffficc reelatted t
3、o reggionnal papper-makkingg, ggrannitee-quuarrryinng, boaat bbuilldinng,mmanuufaccturred houusinng pprodducttionn annd aa hoost of freeighht iitemms, succh aas ddeliiverry oof hhomee heeatiing oill. IIn 220022, aa scchedduleed rrenoovattionn beegann annd iin tthe summmerr off 20003, thhe mmainn suu
4、speensiion cabbless weere unwwrapppedd too prrepaare forr a vissuall innspeectiion of thee inndivviduual wirres in thee 377 caablees in eacch mmainn caablee. DDeteerioorattionn off thhe mmainn caablee onn thhe ssoutth ssidee off thhe bbriddge wass muuch morre aadvaanceed tthann exxpecctedd, lleaddin
5、gg thhe bbriddge ownner, Maainee Deeparrtmeent of Traanspporttatiion, too simmulttaneeoussly undderttakee a strrenggtheeninng pprojjectt onn thhe WWalddo-HHanccockk Briidgee annd tthe dessignn off thhe PPenoobsccot Narrrowws BBriddge & OObseervaatorry oon aa paaralllell allignnmennt to thee exxistti
6、ngg brridgge.FIGURE 1FIGURE 1THE WALDO-HANCOCK BRIDGE AND NEW PENOBSCOT NARROWS BRIDGE & OBSERVATORY SIDE-BY-SIDE OVER THE PENOBSCOT RIVER, LINKING WALDO AND HANCOCK COUNTIES IN MAINE. THE NEW BRIDGE OPENED TO TRAFFIC ON DECEMBER 30, 2006, JUST 42 MONTHS AFTER THE EMERGENCY REPLACMENT NEED WAS IDENT
7、IFIED.In orrderr too sppeedd thhe pproccesss, MMainne uundeertoook thee reeplaacemmentt inn ann innnovvatiive ownner-facciliitatted dessignn buuildd prroceess andd grrounnd wwas brookenn inn Deecemmberr off 20003 forr thhe nnew cabble-staayedd briidgee, aa fiirstt foor MMainne. A kkey eleemennt iin
8、tthe dessignn off thhe nnew casst-iin-pplacce cconccrette seggmenntall brridgge iis tthe connsidderaablee atttenntioon aand efffortt innvesstedd too prroviide a dduraablee annd eeasyy too maainttainn sttruccturre wwithh a plaanneed sservvicee liife excceeddingg 1000 yyearrs. Thee brridgge iis tthe f
9、irrst to utiilizze aa unniquue ccombbinaatioon oof ffeatturees ddesiigneed sspeccifiicallly to prootecct tthe briidgee annd oonlyy thhe seccondd too beeneffit froom aa piioneeeriing craadlee syysteem, devveloopedd annd ppateenteed bby tthe briidgees dessignner.FIGURE 2FIGURE 2ADJACENT CRADLES POSITI
10、ONED IN THE UPPER PYLON ALONG WITH FORMWORK, AS THE JUMP FORMS ARE BEING PREPARED TO MOVE UP AND CAST THE NEXT SECTION. THE CRADLES ARE FABRICATED, DELIVERED TO THE SITE, POSITIONED AND SURVEYED IN POSITION IN THE FRAMEWORK, THEN LIFTED INTO PLACE AND THE ENTIRE ASSEMBLY SURVEYED FOR CORRECT POSITIO
11、NING PRIOR TO CASTING.An innnovvatiive nittroggen gass prroteectiion andd moonittoriing sysstemm prroviidess ann enncloosedd envviroonmentt off prresssuriizedd innertt gaas aarouund eacch ccablle sstayy. TThe maiin ccompponeentss off thhe sysstemm arre tthe gass, HHDPEE shheatthinng, resservvoirr ta
12、ankss, aanchhoraage-seaalinng ccapss annd mmoniitorringg harrdwaare. Niitroogenn gaas wwas sellectted duee too itts nnon-corrrossivee prropeertiies andd eaase of avaailaabillityy.Ann ennvirronmmentt off prresssuriizedd puure nittroggen esssenttiallly eliiminnatees ooxyggen, chhlorridees aand moiistu
13、ure, alll ppoteentiiallly ccorrrosiive eleemennts.A priimarry ggoall waas tto ccostt-efffecctivvelyy crreatte aa gaas-ttighht ssealled sysstemm thhat commpleetelly encclosses thee sttayss. AAfteer iinsttalllatiion of thee sttayss, ttheyy weere purrgedd off mooistturee annd nnitrrogeen ggas injjectte
14、d to purrge thee exxisttingg aiir ffromm thhe cclossed envviroonmeent. Thhe nnitrrogeen wwas theen preessuurizzed to twoo pooundds pper squuaree innch.A seaalinng ccap covverss thhe sstraand taiils at eacch aanchhoraage andd fuullyy enncappsullatees aall ancchorragee harrdwaare. A cleear endd pllate
15、e alllowws ddireect vissuall innspeectiion of thee annchoor aareaa. EEachh sttay is proovidded witth aa 3000 ccubiic ffoott niitroogenn gaas rreseervooir to reccharrge thee gaas iin tthe eveent of a ddropp inn preessuure. Gaaugees rrecoord alll fllucttuattionns iin ppresssurre aand serrve as a ttool
16、l foor tthe Depparttmennt tto eassilyy moonittor thee sttatuus oof tthe sysstemm annd ttakee coorreectiive acttionn, iif nneceessaary. Thhe aannuularr spaace bettweeen tthe cabble staay sstraand andd thhe ccraddle sleeevees aalloows gass too fllow freeelyy thhrouugh thee staay ssysttem in an isoolat
17、ted envviroonmeent.To thhe bbestt off ouur kknowwleddge, thhe sstayy caablee gaas pprottecttionn syysteem uutillizeed iin tthe neww Pennobsscott Naarroows Briidgee iss a worrld firrst. Thhis uniiquee syysteem pprovvidees ttwo addditiionaal llayeers of prootecctioon bby ccompplettelyy suurroounddingg
18、 thhe sstayys wwithh ann innertt gaas, andd thhrouugh auttomaaticc anndcoontiinuaal mmoniitorringg off thhe ggas preessuure levvel. Moonittoriing alllowss thhe MMainne DDepaartmmentt off Traanspporttatiion reaal-ttimee knnowlledgge oof aany pottenttiall coomprromiise in thee syysteem. Theere aree a
19、tottal of fouur nnestted levvelss off prroteectiion, prroviidinng rreduundaancyy: Epooxy coaatinng oon tthe staay sstraandss Outter layyer of HDPPE ssheaathiing arooundd thhe sstayys Sysstemm fiilleed wwithh niitroogenn gaas tto ppurgge ppoteentiial corrrossivees Seaaledd syysteem wwithh moonittorii
20、ng equuipmmenttThis prooacttivee appprooachh alllowws mmainntennancce ccrewws tto iidenntiffy aand adddresss ppoteentiial proobleems at an earrly staage, wiith minnimaal mmoniitorringg effforrt.An adddittionnal monnitoorinng ttooll foor tthe Pennobsscott Naarroows Briidgee iss a serriess off foorcee
21、 monnitoorinng ssysttemss onn eaach staay. Dywwidaag SSysttemss Innterrnattionnal proovidded thee foorcee moonittoriing sysstemms, whiich cann acccurrateely dettermminee thhe fforcce wwithhin 1% usiing a pporttablle ffielld llapttop uniit.TThe sysstemm iss veery rugggedd, rrequuirees nno mmainntenna
22、ncce, hass noo moovinng ppartts aand willl pprovvidee monnitoorinng tthrooughhoutt thhe pprojjectted serrvicce llifee off thhe bbriddge, alllowwingg Deeparrtmeent empployyeess easse iin rreguularrly monnitoorinng tthe forrcess inn thhe ccablle aas ppartt off thheirr innspeectiion prooceddurees, witt
23、houut thee neeed forr liift-offf eqquippmennt oor tthe utiilizzatiion of speeciaal eexpeensiive tecchniiquees ssuchh ass viibraatioon meaasurremeentss. WWithh thhis monnitoorinng ssysttem, thhe fforcce iin tthe cabble is obttainned in minnutees wwithhoutt anyy innterrferrencce wwithh thhe ttraffficc
24、 onn thhe bbriddge. Thhe lleadds ffromm thhe ssenssorss arre iin aa gaas ttighht boxx loccateed iinsiide thee boox ggirdder jusst uundeer tthe cabble ancchorragee, mmainntaiininng tthe inttegrrityy off thhe seaaledd syysteem oof tthe gass moonittoriing sysstemm.FIGURE 3FIGURE 3CONSTRUCTION TOOK PLAC
25、E IN THREE DIRECTIONS ON BOTH PYLONS TWO CANTILEVERS EXTENDING FROM THE PYLON AS THE PYLONS WERE CAST TO THEIR FULL HEIGHT OF 420. THE TOP OF THE WESTERN PYLON HOUSES A THREE STORY GLASS PUBLIC OBSERVATORY WHICH IS ACCESSED BY AN ELEVATOR THAT RUNS UP THROUGH THE CORE OF THE PYLON.As prreviioussly m
26、enntioonedd, tthe Pennobsscott Naarroows Briidgee allso inccluddes thee usse oof aa caablee-sttay craadlee syysteem (U.SS. PPateent No. 6,8800,1993) dessignned by FIGGG, thee ennginneerr off reecorrd ffor thee proojecct; it is thee seeconnd ssuchh innstaallaatioon. Thee crradlle ssysttem alllowss fo
27、or tthe usee off coontiinuoous strrandds ffromm brridgge ddeckk too brridgge ddeckk, ccarrryinng eeachh sttay thrrouggh aa sttainnlesss ssteeel ssleeeve in thee craadlee asssemmblyy. TThe inddiviiduaal ssleeevess inncreeasee duurabbiliity by eliiminnatiing thee pootenntiaal ffor strrandd-too-sttrann
28、d cconttactt. TThe craadlee syysteem alsso eelimminaatess annchooragges in thee pyylonn, rreduucess tennsille fforcces in thee pyylonn annd aalloows forr moore strreammlinned pyllon dimmenssionns. Anyy giivenn sttrannd mayy bee reemovved, innspeecteed aand repplacced witth aa neew sstraand at sellec
29、tted inttervvalss too veeriffy tthe conndittionn off thhe sstayys, witthouut ccompprommisiing thee brridgges iinteegriity. Siix mmontths aftter thee opeeninng oof tthe neww brridgge tto ttraffficc onn Deecemmberr 300, 220066, ssix reffereencee sttrannds werre rremoovedd andd reeplaacedd wiith carrbo
30、nn fiiberr sttrannds. Thhis is thee fiirstt suuch insstalllattionn inn thhe UU.S. Monnitoorinng of thee sttrannds, booth steeel andd caarboon ffibeer pprovvidees ffeeddbacck oon tthe usee off thhis innnovaativvemaaterriall annd wwilll heelp furrtheer iincrreasse dduraabillityy ass fuuturre bbriddges
31、s wiill be dessignned utiilizzingg thhis tecchnoologgy.FIGURE 4FIGURE 4A LARGE PLAZA GREETS VISITORS TO THE WORLDS TALLEST PUBLIC BRIDGE OBSERVATORY ENTRANCE, ALONG THE BANKS OF THE PENOBSCOT RIVER. THE ENTRANCE IS FRAMED IN GRANITE, IN CONCERT WITH THE BRIDGE AESTHETIC THEME OF GRANITE. DETAILS REF
32、LECT ON THE ADJACENT HISTORIC FORT KNOX. AN ELEVATOR TAKES VISITORS TO THE OBSERVATORY AT THE TOP OF THE PYLON.The pproaactiive andd piioneeeriing appproaachees eencoouraagedd byy thhe MMainne DDepaartmmentt off Traanspporttatiion havve aadvaanceed sstanndarrds forr fuuturre ccablle-sstayyed briidge
33、e deesiggns. Thheree wiill be oppporttuniitiees tto aanallyzee annd eevalluatte tthe monnitoorinng rrecoordss frrom thee sttay sysstemm, wwhicch wwilll ressultt inn coontiinueed aadvaanceemennts in unddersstanndinng ccablle-sstayy brridgge pperfformmancce aand enhhancced lonng ttermm duurabbiliity.
34、Thhe PPenoobsccot Narrrowws BBriddge & OObseervaatorry iis pprovvidiing saffe ppasssagee forr trraveelerrs ooverr thhe PPenoobsccot Rivver, whhilee neearlly 775,0000 vissitoors in thee fiirstt seeasoon hhavee traavelled to thee woorldds ttalllestt puubliic bbriddge obsservvatoory (4220 abbovee thhe
35、rriveer) to enjjoy vieews of coaastaal MMainne ffromm thhe ttop of thee weesteern pyllon.ReferrenccesThe AAuthhor of thiis ppapeer, Chrristtophher J. Burrgesss, P.EE., S.EE., siggnedd annd ssealled thee deesiggn pplanns forr thhe bbriddge andd reeloccateed tto tthe sitte ffor twoo yeearss duurinng c
36、consstruuctiion of thee brridgge.结构20008:穿穿越边缘缘 20008美国国土木工工程师协协会缅因州第一一座斜拉拉桥的新新创新作者:Chhrisstoppherr J. Buurgeess, P.E., S.E., FIIGG, Deenveer, CO缅因州的沃沃尔多汉汉考克刚刚桁架桥桥是美国国的1号号旅客干干线,它它位于诺诺斯科特特河附近近的巴克克斯波特特,已近近有744年的历历史了。这这非常重重要的交交通枢纽纽,这些些年来通通过该道道路提供供的车辆辆安全通通道的货货物,除除了巨大大的商业业联系与与区域造造纸,花花岗岩采采石,造造船,制制造工业业和民用用
37、住房还还有货主主运送的的物品,如如,家庭庭取暖用用油。220022年,由由于桥的的南侧主主缆恶化化,比预预期的更更快些,一一个翻修修计划开开始并于于20003年开开始,计计划准备备在每一一个主索索分成337个小小的钢索索。为了加快这这一进程程,利用用缅因州州运输部部拥有较较早的桥桥梁,以以现有的的桥梁同同时开展展对沃尔尔多汉考考克桥梁梁加固工工程和诺诺斯科特特纳罗斯斯桥的设设计,并并将其与与天文台台于平行行排列。缅缅因州决决定用一一个新的的具有创创新意识识的业主主对桥梁梁进行设设计和建建造,该该斜拉桥桥于20003年年12月月破土动动工。这这是缅因因州第一一座斜拉拉桥图片图片1沃尔多的,汉考克
38、大桥,新诺斯科特纳罗斯上空的诺斯科特河大桥及天文台台,两端连接这缅因州沃尔多和汉考克县。2006年12月30日新大桥建成通车,但仅仅42个月后就需要维修并更换新的零部件。其中的一个个现浇混混凝土桥桥梁,人人们给予予了相当当大的关关注,它它的投资资计划是是要提供供超过1100年年寿命的的服务。其其中易于于维护的的结构设设计工作作的关键键因素。这这座桥是是第一个个利用一一个专为为保护桥桥梁而做做的现浇浇梁,第第二个是是受益于于创新的的摇篮制制度,制制定桥梁梁设计专专利保护护功能的的独特组组合。图片2图片2吊篮与模板一起定位在上部吊架,图中为正在准备移动吊篮的下一节。吊篮是先制造在运送到工地,先定位
39、同时在架构的地方测量,然后再吊装到设计好的地方。其中一个创创新是氮氮气保护护和监测测系统提提供在每每个斜拉拉索加压压惰性气气体的密密封环境境。该系系统的主主要组成成部分是是气体,高高密度聚聚乙烯护护套,储储水箱,锚锚固密封封帽和监监测硬件件。氮气气被选为为保护气气体是由由于其非非腐蚀性性和易于于储存,纯纯氮气环环境的压压力基本本上消除除了氧,氯氯化物、水水分和所所有潜在在的腐蚀蚀因素。该系统的一一个主要要目标是是有效地地创建一一个不透透气的密密封系统统,完全全将索揽揽包围。安安装后,缆缆索将注注入清洁洁的水分分和氮气气用以清清除封闭闭的环境境中现有有的空气气,此时时的氮加加压至22磅每平平方英
40、寸寸。然后用一个个密封帽帽将各锚锚具的尾尾部、钢钢绞线锚锚固端和和所有硬硬件充分分封装。再再预留一一个明显显的端板板可以直直接目视视检查的的锚区。每每个端部部都提供供了一个个3000立方英英尺氮气气水库补补给施工工中的压压力下降降。仪表表会记录录施工中中的气体体的所有有波动压压力,并并作为该该部分的的数据,轻轻松监控控系统的的状态,并并采取纠纠正措施施。如有有必要,电电缆之间间的环形形空间和和吊篮空空间可以以让气体体流经在在隔离的的环境下下。据我们所知知,利用用在新诺诺斯科特特纳罗斯斯桥的斜斜拉索气气体保护护系统是是世界第第一。这这种独特特的系统统提供了了完全周周围的惰惰性气体体的环境境,并通通过气体体压力自自动监测测水平和和连续的的两个附附加保护护层。交交通监措措施使系系统中的的任何潜潜在的威威胁都可可以及时时通知给给缅因州州交通部部。该系系统有四四嵌套级级别的保保护,共共提供冗冗余的保保护措施施:有环氧树树脂涂层层的钢索索外层的聚聚乙烯护护套
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 教育机构校长劳动合同3篇
- 新版项目软件合同3篇
- 提前终止月嫂合同3篇
- 安装工程合同中的技术解析3篇
- 数码相机购买合同3篇
- 摩托车位转让合同模板3篇
- 教育培训机构店长劳动合同3篇
- 旅游产品销售员招聘合同3篇
- 新版银行抵押贷款合同3篇
- 新媒体合作协议书3篇
- 山东省临沂市2023-2024学年高二上学期期末考试政治试题 含答案
- 东北三省精准教学2024-2025学年高三上学期12月联考数学试卷
- 医院廉洁购销合同
- 2024年汽车修理工职业技能考试练习题(含答案)
- 乡村振兴课件模板
- 专题11 名著阅读之《童年》(考题猜想)(期中真题速递20题)(含答案解析)
- TSGD7002-2023-压力管道元件型式试验规则
- 尝试与猜测 (说课稿)-2024-2025学年五年级上册数学北师大版
- 素描试卷家长会
- 风电场项目关键质量点控制清单
- 系统运行维护方案
评论
0/150
提交评论