1、Rule of Thumb & Schindler Benchmark.基本原那么和迅达基准Introduction & Guidelines.相关介绍和指引Rule of Thumb.基本原那么A Methodic of best guess of the Elevator Configuration needed.对电梯配置进行有条理和最有效预估的要素Rule of Thumb. 基本原那么How to Design an Elevator for an Office Building?如何规划办公楼的电梯配置? Defined Building Population ? 确定大楼人数?
2、Defined HC5 Requirement ? 确定5分钟运载能力要求? Defined WT Requirement ? 确定候梯时间要求? Define Number of Elevators 确定电梯数量 Define Car Speed 确定电梯速度 Define Car Load 确定电梯载重Rule of Thumb. 基本原那么Estimate Numbers of Elevators needed. 估算电梯数量 250 persons per elevator 每台电梯服务250人 4 - 5 floors per elevator 每台电梯服务4-5个楼层 24 flo
3、ors per elevator group 每个梯组服务24个楼层Office Building. 办公楼Define the Car Speed. 确定电梯速度HQ = Travel height (65m example beside)HQ = 提升高度假设左侧例子的提升高度为65米T = Travel time from main floor to top floor without taking time losses into account caused by acceleration and decelerationT = 从基站直驶到最高层站的时间,不考虑加减速等 额外时间R
4、ecommended Values for Travel Time行程时间推荐值- 20 sec for top requirement (example beside) 顶级标准为20秒假设左侧例子如是- 25 sec for medium requirement 中档标准为25秒 - 32 sec basic requirement 普通标准为32秒VKN = HQ / T = 65m / 20s = 3.25 m/sRule of Thumb. 基本原那么Summary. 综述Rule of Thumb. 基本原那么Relation WT / INT. WT和INT的关系Interpre
5、tation of Interval Waiting Time说明:间隔时间候梯时间The relation of interval INT and average waiting time WT has been examined for a number of different elevator groups. It has found out that the ratio WT/INT depends very much on the elevator group and on the arrival rate (as percentage of the maximum handlin
6、g capacity).经过对比不同梯组的电梯间隔时间和平均候梯时间,我们发现:WT/INT系数很大程度上取决于梯组配置和到达率与5分钟运载能力最大值相等For assessing an elevator groups maximum performance, the usual relation of “WT = 60 % x INT is not realistic. Better use “WT = 80 % x INT or even “WT = INT.要对电梯梯组的最大性能进行评估,惯常用的“WT=60%xINT公式并不能反映真实情况,建议使用“WT=80%xINT或“WT=INT
7、。Rule of Thumb. 基本原那么How to Define the Car Load GQ? 确定电梯载重P = Ar x INTP = Passengers per car (car loaded with 80%)P = 每个轿厢的乘客数量轿厢满载率80%Ar = Arrival rate = arriving persons per secondAr = 到达率 = 每秒内到达的人数INT = Interval considering waiting time WT = 80% of INT = rough estimationINT = 间隔时间按WT=80%xINT考虑 =
8、 粗略估算Arrival Rate Ar (example): 到达率Ar举例说明:Population = 800, handling capacity = 14 %, arriving persons = 112 persons / 5 min人数=800,运载能力=14%,到达人数112人/5分钟Ar= 0.3733 persons / sec. Ar人/秒Interval INT (example): 间隔时间INT举例说明:Required waiting time WT = 24 sec 候梯时间要求WT=24秒Interval = (WT/80)x100 = 30 sec间隔时间
9、 = (WT/80)x100 = 30秒Car Load 电梯载重P = Ar x INT = 0.3733 persons/sec x 30 sec. P = Ar x INT人/秒 x 30秒= 11.2 persons considering 80% car load人,80%轿厢满载率= 14.0 persons considering 100% car load人,100%轿厢满载率GQ 100% = 14 persons x 75 kg / person = 1050 kg = choose 1250KgTraffic Vision 3.0Overview 概览Given Inpu
10、t 假设值:Building with a Population of 800 大楼总人数800人Amount of floors above main Floor = 16 基站以上楼层数=16Travel Height around 65 m 提升高度大约为65米Required HC 5 = 14% 要求HC5=14%Required average WT around 24 sec 要求平均候梯时间WT约为24秒1.Estimated Number of Elevators 估算电梯数量Number of Elevators = 4 (800People / 200People per
11、 Elevator) and (Floor amount / 4floor serving per Elevator) = Higher value should be considered电梯数量=4800人/每台电梯服务200人,如同时使用另外一个公式楼层数/每台电梯服务4个楼层来计算电梯数量,应取两者的最大值。2.Estimated Speed 估算电梯速度Elevator Speed to reach top/medium level travel time between 20-25 secV = HQ/t=20sec = 65/20 = 3.25 m/s expected spee
12、d 3m/s如要满足顶级或中档要求,电梯的行程时间应在20-25秒之间V=HQ/t=20秒米/秒,预期电梯速度为3米/秒。3.Estimated Car load 估算电梯载重INT = (WT/80) x 100 = (24/80)x100 = 30 secAr = (Population/100)*HC5 / 300 = (800/100)*14/300 = 0.37333 Persons/secP = Ar * INT = 0.3733 * 30 = 11.2 Persons (80% car load) 100% carload would be around 14.0 Persons
13、) estimated car load (75 Kg/ person) = 1050 Kg would fit with a 1250 Kg Car Load DesignP=Ar人(轿厢满载率80%),如按100%轿厢满载率,人数约为14人,按75公斤/人,那么电梯载重=1050公斤,向上取整得电梯载重1250公斤。Schindler Traffic Standards.迅达交通流量标准Defined Traffic Situations 确定交通状况Schindler Traffic Standards. 迅达交通流量标准Traffic Situations (Criteria). 交通
14、状况标准Schindler Traffic Standards. 迅达交通流量标准Star Rating (Criteria). 星级评定标准Defined Criteria 确定标准Schindler Traffic Standards. 迅达交通流量标准Guidelines. 指引Important Note:重点提示:As a Schindler guideline always follow the following rules.迅达指引总是遵循以下原那么:Look at the lowest rating of all analyses of a project. Then:查看项
15、目里所有的分析数据,找出最低值,然后:3 stars or more are o.k. and recommended.如果达到三星级或以上,该电梯配置可行并可推荐。2 stars: Such projects must be examined carefully (including a second opinion e.g. of a superior) and are only accepted for good reasons. You should be aware that such a project is marginal . elevator performance, and
16、 we might face critical questions or problems related to high waiting times etc.二星级:这类项目必须仔细核实如获取上级意见,如无充分理由将不予采纳。应当谨记这样的电梯配置其效能是相当低的,日后我们很可能会由于候梯时间等问题受到客户的质询。1 star or less: Such projects must be rejected by Schindler. The elevator performance is poor, and such installations may cause severe proble
17、ms and damage Schindlers reputation.一星级或以下:迅达必须拒绝承接这类项目。由于电梯的效能极差,在投入使用后会问题不断,直接影响迅达的声誉。Overview Report (Example)报告概览例子 ,以下图这个例子,该分析取得的星级是corresponding to the following performance values:对应的性能数值为:HC5 = 10.4 %, WT = 43.1 s (Project is not recommended!)Defined Reporting Standards 确定报告标准Schindler Traf
18、fic Standards. 迅达交通流量标准Star Rating for Office Buildings. 办公楼的星级STAR CriteriaInterpretation:STAR WordingComment* or lessUnsatisfactorySuch projects must be rejected by Schindler.*MarginalBelow recommended performance level; such projects must be examined carefully (including a second opinion e.g. of
19、a superior) and are only accepted for good reasons.*SatisfactoryLevel for standard office buildings.*GoodLevel for mid-to-higher requirements.*Very goodLevel for high requirements (such as international head quarters, premium sites). Schindler Traffic Standards. 迅达交通流量标准Star Rating for Hotel Buildin
20、gs. 酒店的星级STAR CriteriaInterpretation:STAR WordingComment* or lessUnsatisfactorySuch projects must be rejected by Schindler.*MarginalBelow recommended performance level; such projects must be examined carefully (including a second opinion e.g. of a superior) and are only accepted for good reasons.*Sa
21、tisfactoryLevel for up to approx. 3-star hotels.*GoodLevel for up to approx. 4-star hotels.*Very goodLevel for up to approx. 5-star hotels. Schindler Traffic Standards. 迅达交通流量标准Star Rating for Residential Buildings. 住宅楼的星级STAR CriteriaInterpretation:STAR WordingComment* or lessUnsatisfactorySuch pro
22、jects must be rejected by Schindler.*MarginalBelow recommended performance level; such projects must be examined carefully (including a second opinion e.g. of a superior) and are only accepted for good reasons.*SatisfactoryLevel for low-price segment.*GoodLevel for mid-price segment.*Very goodLevel
23、for high-price segment. Star Rating. 星级评定Explanation. 说明Schindler Star Rating DefinitionStar Rating Auto Setting. 自动选取星级Explanation on Office Building Up-peak.针对办公楼上行高峰模式的说明WTsecHC5%5202510153035401213141516113*4*5*3*4*5*4.75*4.75*Auto evaluation Points where the System finds the optimum of rating,
24、means where WT and HC5 have the same Star rating in our example 4.75*系统自动选取星级点,在该点WT和HC5的星级值是一样的,如本例子为4.75*PerformanceCurve SimulationIf we would choose manually the Values the system takes the lower one from HC5 or WT in our example on 13% HC5 it would be 3.5*如果我们要进行手动调整,系统会选取HC5或WT对应星级较小的数值,例如本例子H
25、C5为13%时对应的星级是3.5*3.5*Relation to CIBSE Guide D与CIBSE Guide D的关系CIBSE Guide D RecommendationsCIBSE Guide D的推荐值Recommendations for office buildings (single and multiple tenancy, standard and prestige), hotels, residential buildings, hospitals, schools.各类推荐值包括办公楼单租户和多租户,普通及高档,酒店,住宅,医院,学校。Recommendation
26、s expressed by arrival rate and interval.到达率和间隔时间的推荐值。Note: Traffic situations are not clearly stated.备注:对于交通状况并没有清晰的规定Details for office, hotels, residential: See next pages.对于办公楼,酒店,住宅的详细介绍:请参阅下页。CIBSE Guide DOverview 概述CIBSE Guide D Recommendations (from Table 3.1)Assumed Traffic Situation: Up-Pe
27、akOffice Buildings 办公楼Comparison 对比 Office Building HC5INT“WT=0.8xINT or =INT” Single tenant (standard)1215 %2530 s2030 sSingle tenant (prestige)1317 %2025 s1625 sMulti-tenant (standard)1114 %2530 s2030 sMulti-tenant (prestige)1215 %2025 s1625 s Schindler RatingTraffic Situation: Up-PeakOffice Building HC5 WTAny tenancy (* = satisfactory)1214 % 2030 sAny tenancy (* = good)1416 % 1520 s Notes:备注:Schindler recommendations are close to CIBSE Gui
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2024年小学教学档案管理制度
- 2024跨国医疗设备采购合同
- 2024铁路劳务分包合同模板
- 2024年长途汽车运输合同:长途汽车客运合同:边境旅游线路定制运输服务3篇
- 2024版技术服务长期合作协议3篇
- 2024渣土运输服务合同协议书
- 历史对比视角
- 2024钢筋买卖合同范例:简约风格
- 动物营养与饲料加工知到智慧树章节测试课后答案2024年秋黑龙江农业工程职业学院(松北校区)
- 2024版国内货物运输承运人责任保险合同
- 淮北市和淮南市2025届高三第一次质量检测(一模)地理试卷(含答案)
- 二年级语文教学反思
- 安徽省淮北市部分学校2024-2025学年七年级上学期1月期末历史试卷
- 化学-安徽省淮北市和淮南市2025届高三第一质量检测(淮北淮南一模)试题和答案
- 2025内蒙古电力(集团)限责任公司供电单位边远地区岗位招聘713高频重点提升(共500题)附带答案详解
- 2020-2021学年【江西省抚州市】八年级(上)期末生物试卷
- 2025年山西文旅集团招聘笔试参考题库含答案解析
- 2023学年杭州市十四中高二数学(上)期末考试卷附答案解析
- GB/T 8607-2024专用小麦粉
- 新增值税法学习课件
- 如何反馈与指导-培训课件
评论
0/150
提交评论