文档简介
1、Software Project TrackingA CMM Level 2Key Process AreaSoft Tech Development Inc.天马行空官方博客:http:/tmxk_docin ;QQ:1318241189;QQ群:1755696321Soft Tech PurposeThe purpose of Software Project Tracking and Oversight is to provide adequate visibility into actual progress so that management can take effective
2、actions when the projects performance deviates significantly from the plans.Software Project Tracking and Oversight involves tracking and reviewing the accomplishments and results against documented estimates, commitments, and plans, and adjusting these plans based on the actual accomplishments and
3、results.天马行空官方博客:http:/tmxk_docin ;QQ:1318241189;QQ群:1755696322Soft Tech GoalsGoal 1 Actual results and performances are tracked against the software plans.Goal 2Corrective actions are taken and managed to closure when actual results and performance deviate significantly from the software plans.Goal
4、 3Changes to software commitments are agreed to by the affected groups and individuals.3Soft Tech CommitmentA project software manager is designated to be responsible for the projects software activities and results.The project follows a written organizational policy for managing the software projec
5、t.4Soft Tech AbilityA software development plan for the software project is documented and approved.The project manager explicitly assigns responsibility for work products and activities.Adequate resources and funding are provided for tracking the software project.The managers are trained in managin
6、g the technical and personnel aspects of the project.First-line managers receive orientation in the technical aspects of the project.5Soft Tech ActivitiesA documented software development plan is used for tracking the software activities and communicating status.The projects software development pla
7、n is revised according to a documented procedure.Software project commitments and changes to commitments made to individuals and groups external to the organization are reviewed with senior management according to a documented procedure.6Soft Tech ActivitiesApproved changes to commitments that affec
8、t the software project are communicated to the members of the software engineering group and other software-related groups.The size of the software work products (or size of the changes to the software work products) are tracked, and corrective actions are taken as necessary. The projects software e
9、ffort and costs are tracked, and corrective actions are taken as necessary.7Soft Tech ActivitiesThe projects critical computer resources are tracked, and corrective actions are taken as necessary.The projects software schedule is tracked, and corrective actions are taken as necessary.Software engine
10、ering technical activities are tracked, and corrective actions are taken as necessary.The software risks associated with cost, resource, schedule, and technical aspects of the project are tracked.8Soft Tech ActivitiesActual measurement data and replanning data for the software project are recorded.T
11、he software engineering group conducts periodic internal reviews to track technical progress, plans, performance, and issues against the software development plan.Formal reviews to address the accomplishments and results of the software project are conducted at selected project milestones according
12、to a documented procedure.9Soft Tech MeasuresMeasurements are made and used to determine the status of the software tracking and oversight activities.Examples of measurements include:effort and other resources expended in performing the tracking and oversight activities; andchange activity for the s
13、oftware development plan, which includes changes to size estimates of the software work products, software cost estimates, critical computer resource estimates, and schedule.10Soft Tech VerificationThe activities for project tracking and oversight are reviewed with senior management on a periodic ba
14、sis.The activities for project tracking and oversight are reviewed with the project manager on both a periodic and event-driven basis.The software quality assurance group reviews and/or audits the activities and work products for project tracking and oversight and reports the results.11Soft Tech Cov
15、erage Goal 1Actual results and performance are tracked against the plansThe software group uses the project plan AC 1 and conducts periodic internal reviews AC12 to track: product size AC 5 effort and cost AC 6 critical computer resources AC 7 project schedule AC 8 technical activities AC 9 project
16、risks AC 10Measurement and re-planning data are recorded AC 11Formal reviews are help at key milestones AC 1312Soft Tech Coverage Goal 2Corrective actions are taken and managed to closureThe following are tracked and corrective actions taken: product size AC 5 effort and cost AC 6 critical computer
17、resources AC 7 project schedule AC 8 technical activities AC 9Measurement and re-planning data are recorded AC 11The project plan is revised using a documented procedure AC 213Soft Tech Coverage Goal 3Changes to commitments are agreedCommitments and changes to commitments with external groups are reviewed with
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025【合同范本】简易租房合同协议书
- 2025房地产代理销售合同范本
- 合伙人退出合作协议书
- 停车场绿化工程合同标准文本
- 二零二五股票与股权分配协议
- 2025年粮食、棉花、化肥等农产品仓储服务项目合作计划书
- 办理协议离婚经过的程序
- 业务员协议书
- 聘用主播的合同范例
- 房地产销售代理合同样本
- 【工程项目施工阶段造价的控制与管理8100字(论文)】
- XX学校推广应用“国家中小学智慧教育平台”工作实施方案
- 非遗文化创意产品设计 课件全套 第1-5章 概述- 非遗文创产品设计案例解析
- 法律尽职调查所需资料清单
- 幼儿园中班安全教育活动《紧急电话的用途》
- 118种元素原子结构示意图
- 英语四线三格Word版
- 幼儿园行政工作制度
- 广州新华学院
- 部编版七年级下册道法期中试卷1
- 知识图谱-课件
评论
0/150
提交评论