




版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、建筑工程常用英词词汇analysers 分析仪表anti-vortey 防过流钢板 backfill 回填土cat ladder 爬梯 chequer plate 检查盖板 concrete plinth 混凝土支架 drain valve 放空阀 electromagnetic flowmeters 电磁流量计EXGL =existing ground level 原地面标高 expansion joint 伸缩缝FGL = finished ground level 设计地面标高flowmeter chamber 流量计井grid installation access 安装栅格的入口 i
2、nlet penstock 进水闸门inlet stoplog 进水叠梁闸 manhole access to overflow collecting pit 去溢流收集井的人孔manhole access with ladder guide and safety removal grid 带爬梯和可 移盖板的人孔overflow channel 溢流渠 partial plan view 局部平面图pumps and blower room 反洗泵和鼓风机房rapid sand filters building 快速砂滤池 sections and details 剖面图和详图 slope
3、斜坡steel pipe exterior bituminous coating 钢管外包沥青steel pipe internal epoxy coated 钢管内喷环氧树脂steel pipe to be installed before closing the room 在封墙前安装钢管sump 集水坑treated water reservoir 清水池 treated water 清水ultrasonic flowmeters 超声波流量计used washwater outlet channel 反洗废水出水渠used washwater tank 反洗废水池 viking JOH
4、NSON seal or similar 伸缩接头wastewater network 废水管网water table level 地下水位 raw water 生水 chlorination contact time baffle 增加氯气接触时间折板valve 阀prefabrication 预制lavatory 厕所sewerage 下水道septic tank 化粪池sanitation 卫生设备cure 硬化;ventilation 通风; 通风设备refrigerator 冷藏室costings 概算 cost keeping 成本核算fireproof 防火处理warehouse
5、 仓库compressor 空压机, 衰减器distribution chamber 分配井 service 检修; 供给; 用户管illumination 照明; 照明设备grub 场地清理datum 基准面( 线, 点); 资料level 标高; 水准仪; 水平测量utility 公共设施bench mark 基准点fool proof 安全装置entry 入口purchase order 进货单bury 埋深periodic 高碘的plant 施工设备; 工厂formwork 模板 工程 stripping 拆模plywood 胶合板in situ concrete 现浇hardened
6、 concrete 硬化混凝土mould oil 脱模油aggregate 骨料retarding liquid/admixture 缓凝外加剂setting 初凝water- soluble 水溶的adhesive 粘合剂tubular steel scaffolding 钢管脚手架finish 装修(面, 材料)grout 灰浆; 灌浆; 灌缝材料formwork striking time 拆模时间additive 外加剂tropical curing 高温养护extraction fan 抽气风扇extraction jack 拔桩机line of symmetry 对称线compac
7、ted fill 夯实填土; 压实填土blinding concrete粗制混凝土mass concrete 大体积混凝土match line 段面线twincell culvert 双管涵mortar screed 砂浆外表面rabbet 槽口compacted backfill 夯实的回填土standing ladder 便梯sheet zinc 薄锌板sealing coat 隔离层; 密封层sealing joint 止水缝insulation 隔热(声, 振) ;保温层; 绝缘材料; 绝热材料catwalk 轻便梯; 施工步道; 工作平台masonry 砌体; 砌体工程 footin
8、g 基础; 垫层; 大放脚 site exploration 场地勘探drilling prospection method 钻探法Luoyang spoon 洛阳铲sounding method 触探法static sounding 静力触探dynamic sounding 动力触探 standard penetration test 标准贯入试验excavation prospecting method掘探法test pit 探坑perched water, subsoil water上层滞水phreatic water, subsoil water潜水confined water层间水c
9、ollapsible loess, slumping loess湿陷性黄土expansive soil, swelling soil膨胀土active earth pressure主动土压力passive earth pressure被动土压力earth pressure at rest静止土压力Coulombs earth pressure theory库伦土压力理论Rankines earth pressure theory朗肯土压力理论check and acceptance of foundation trenches验槽spread foundation扩展(扩大)基础rigid f
10、oundation刚性基础isolated footing, pad foundation独立基础combined footing联合基础strip foundation条形基础slab foundation板式基础socket foundation杯形基础raft foundation, mat foundation片筏基础flexible foundation 柔形基础shell foundation 壳体基础box foundation箱型基础compensated foundation补偿性基础pile foundation桩基础open caisson foundation沉井基础c
11、ylinder pile foundation, cylinder caisson foundation 管柱基础caisson foundation沉箱基础bed, bedding基床friction pile, buoyant pile 摩擦桩end-bearing and friction pile端承摩擦桩end-bearing pile, column pile, point bearing pile端承桩friction and end-bearing pile 摩擦端承桩cast-in-place pile, cast-in-site pile灌注桩excavating pile
12、钻孔灌注桩pile with man-excavated shaft 人工挖孔灌注桩cast-in-site pile with sunk casing沉管灌注桩Benoto method贝诺托法blown tip pile爆扩灌注桩root pile树根桩reticulated root pile 网状树根桩(pile) casing护筒hole trimming 清孔necking缩颈suspended leg pile吊脚桩steel tube pile钢管桩under-reamed bored pile of large diameter大直径扩底灌注墩driving hammer,
13、pile hammer 桩锤 drop hammer 落锤diesel pile hammer 柴油桩锤vibratory pile hammer 振动桩锤pneumatic pile hammer 气动桩锤hydraulic pile hammer液压桩锤ram 锤体pile driver 桩架static pile loading 静力压桩anchored and jack pile 锚杆式静压桩non-supporting and jack pile 自承式静压桩pile jacker 静力压桩机boring machine, drilling machine 钻孔机vibrosinki
14、ng 振动沉桩hydrauger pile, wash bored pile 水冲沉桩driven bored pile 钻孔锤击沉桩driven pile 锤击沉桩minimum penetration 最小贯入度stress due to hammer driving 锤击应力hydrostatic excess pressure 超静水压力aseismic trench 防震沟technology for sinking pile with bores in the upper shallow strata 浅层钻孔沉桩pneumatic caissons 气压箱heavy tampin
15、g method, dynamic consolidation (compaction) method 强夯法hammer, ram, pounder 夯锤maximum dry unit weight 最大干重度ramming energy 夯击能compaction pile method 挤密桩法sand and stone compaction pile method 砂石桩法 replacement method 换填法preloading method 预压法ballast preloading method 加载预压法atmospheric pressure method, va
16、cuum method 真空预压法sand wick, pack drain 袋装砂井plastic drainage plate 塑料排水带vibro flotation 振冲法vibro-replacement 振冲置换法vibro-densification 振冲压实法vibroflot 振冲器deep mixture 深层搅拌法high pressure jet grouting 高压喷射注浆法underpinning 托换法piling underpinning 桩式托换法pit and jack pile underpinning 坑式静压桩托换anchored and jack
17、pile underpinning锚杆静压托换cast-in-place pile underpinning 灌注桩托换root pile underpinning 树根桩托换pit underpinning 坑式托换grouting underpinning 灌浆托换cement grouting 水泥灌浆法silicification 硅化加固法aqueous alkali stabilization 碱液加固法enlarge foundation underpinning加大基础托换underpinning by thermal stabilization 热加固托换remedial u
18、nderpinning 补救性托换precautionary underpinning 预防性托换第二部分PART 施工招标文件Bidding Documents For The Construction目录Contents第一章Section 1 投标邀请书 Invitation For Bids第二章 Section 2 投标须知 Instructions To Bidders 前附表 Cover Sheet 总则 Generals 1 工程说明 Description of Works 2 资金来源 Source of Funds 3 合格条件与资格要求 Eligibility and
19、Qualification Requirements 4 招标时间表 Bidding Time Schedule 5 投标费用 Cost of Bidding 6 现场考察 Site Visit 招标文件 Bidding Documents 7 招标文件的内容 Content of Bidding Documents 8 招标文件的澄清 Clarification of Bidding Documents 9 招标文件的修改 Amendment of Bidding Documents 投标准备 Preparation of Bids 10 投标书的语言 Language of Bid 11
20、组成投标书的文件 Documents Comprising the Bid 12 投标价格 Bid Prices 13 投标货币与支付货币 Currencies of Bid and Payment 14 投标的有效期 Bid Validity 15 投标保证金 Bid Security 16 投标条件的变动 Variations in Bidding Conditions 17 标前会议Pre-Bid Meeting 18 投标书的形式和签署 Format and Signing of Bids 投标书的提交 Submission of Bids 19 投标书的密封与标志 Sealing a
21、nd Marking of Bids 20 投标截止日期 Deadline for Submission of Bids 21 迟到的投标书 Late Bids 22 投标书的修改与撤回 Modification and Withdrawal of Bids 开标与评标 Bid Opening and Evaluation 23 开标 Bid Opening 24 过程保密 Process to Be Confidential 25 投标书的澄清 Clarification of Bids 26 投标书合格性的确定 Determination of Responsiveness 27 错误的修
22、正 Correction of Errors 28 换算为单一的货币 Conversion to Single Currency 29 投标书的评价与比较 Evaluation and Comparison of Bids 合同授予 Award of Contract 30 合同授予标准 Award Criteria 31 业主接受任何投标和拒绝任何投标或所有投标的权力 Employers Right to Accept Any Bid and to Reject Any or All Bids 32 授标通知 Notification of Award 33 合同协议书的签署 Signing
23、 of Agreement 34 履约保证金 Performance Security第三章 合同条件 Conditions of Contract 定义及解释 Definitions and Interpretation 1.1 定义 Definitions 1.2 标题和旁注 Headings and Marginal Notes 1.3 注释 Interpretation 1.4 单数和复数 Singular and Plural 1.5 通知、同意、批准、证明和决定 Notices, Consents, Approvals, Certificates and Determination
24、s 1.6 给业主和监理工程师通知的地址 Address of Notice to Employer and Engineer 监理工程师和监理工程师代表 Engineer and Engineers Representative 2.1 监理工程师的职责和权力 Engineers Duties and Authority 2.2 监理工程师代表 Engineers Representative 2.3 监理工程师授权的权力 Engineers Authority to Delegate 2.4 助理的任命 Appointment of Assistants 2.5 书面指令 Instruct
25、ion in Writing 2.6 监理工程师行为公正 Engineer to Act Impartially 转让和分包 Assignment and Subcontracting 3.1 合同的转让 Assignment of Contract 4.1 分包 Subcontracting 4.2 分包人义务的转让 Assignment of Subcontractors Obligations 合同文件 Contract Documents 5.1 语言和法律 Language and Law 5.2 合同文件的优先顺序 Priority of Contract Documents 6.
26、1 图纸、文件的保管和提供 Custody and Supply of Drawings and Documents 6.2 一套图纸应保存在工地One Copy of Drawings to be Kept on Site 6.3 施工进度的打乱 Disruption of Progress 6.4 图纸延期和图纸延期所产生的费用 Delays and Cost of Delay of Drawings 6.5 承包人未提交图纸 Failure by Contractor to Submit Drawings 7.1 补充图纸和指令 Supplementary Drawings and In
27、structions 7.2 由承包人设计的永久性工程 Permanent Works Designed by Contractor批准不影响责任 Responsibility Unaffected by Approval 一般义务 General Obligations 8.1 承包人的一般责任 Contractors General Responsibilities 8.2 现场操作和施工方法Site Operations and Methods of Construction 8.3 错误的通知Notification of Errors 9.1 合同协议书 Contract Agree
28、ment 10.1 履约担保 Performance Security 10.2 履约担保的有效期 Period of Validity of Performance Security 10.3 根据履约担保的的索赔Claims under Performance Security 11.1 现场考察 Inspection of Site 11.2 数据资料的获取 Access to Data 12.1 投标书的完备性 Sufficiency of Bid 12.2 不利的外界障碍和条件 Adverse Physical Obstructions or Conditions 13.1 工程应符
29、合合同规定 Work to be in Accordance with Contract 14.1 应提交的施工计划 Program to be Submitted 14.2 施工计划的修订 Revising the Program of Works 14.3 须提交的现金流动估算表 Cash Flow Estimate to be Submitted 14.4 承包人不能免除的职责 Contractor not Relieved of Duties or Responsibilities 15.1 承包人的监督 Contractors Superintendence 15.2 承包人代表的语
30、言能力 Language Ability of Contractors Representative 16.1 承包人的雇员 Contractors Employees 16.2 当地的雇员 Local Employment 16.3 监理工程师有权反对和要求解雇 Engineer at Liberty to Object 17.1 放样 Setting-out 18.1 钻孔和探坑 Boreholes and Exploratory Excavation 19.1 安全、保卫和环境保护 Safety, Security and Protection of the Environment 19
31、.2 业主的责任 Employers Responsibility 20.1 工程的照管 Care of Works 20.2 弥补损失或损坏的责任 Responsibility to Rectify Loss or Damage 20.3 因业主风险导致损失或损害 Loss or Damage Due to Employers Risks 20.4 业主的风险 Employers Risks 21.1 工程及承包人设备的保险 Insurance of Works and Contractors Equipment 21.2 保险范围 Scope of Cover 21.3 对不能收回的金额的
32、责任 Responsibility for Amounts not Recovered 21.4 除外责任 Exclusions 22.1 对人身和财产的损害赔偿 Damage to Persons and Property 22.2 例外情况 Exceptions 22.3 业主的保障 Indemnity by Employer 23.1 第三方保险(包括业主财产) Third Party Insurance (including Employers Property) 23.2 最低保险金额Minimum Amount of Insurance 23.3 交叉责任 Cross Liabil
33、ities 24.1 工人的事故及伤残 Accident or Injury to Workmen 24.2 工人事故的保险 Insurance Against Accident to Workmen 25.1 保险证明及条款 Evidence and Terms of Insurance 25.2 保险的完备性 Adequacy of Insurance对承包人未保险的补救办法 Remedy on Contractors Failure to Insure 25.4 遵守保险单的条件 Compliance with Policy Conditions 26.1 遵守法律、规章 Complia
34、nce with Statutes, Regulations 27.1 化石处理 Fossils 28.1 专利权 Patent Rights 28.2 矿区使用费 Royalties对交通和毗邻财产的干扰 Interference with Traffic and Adjoining Properties 30.1 避免对道路的损坏 Avoidance of Damage to Roads承包人设备或临时工程的运输 Transport of Contractors Equipment or Temporary Works 30.3 材料或工程设备的运输 Transport of Materi
35、als or Plant 水运 Waterborne Traffic工程施工交通 Construction Traffic当地运输服务 Local Transportation Services为其他承包人提供机会 Opportunities for Other Contractors为其他承包人提供方便 Facilities for Other Contractors承包人保持现场整洁 Contractor to Keep Site Clear竣工时的现场清理Clearance of Site on Completion 劳务 Labor职员与劳务的雇用 Engagement of Staf
36、f and Labor承包商的外籍劳务及职员 Contractors Expatriate Labor and Staff当地劳务的获得 Obtaining Local Labor当地劳务的工资 Wages for Local Labor工地规则 Site Regulations防止不法行为 Prevention of Unlawful Conduct供水 Supply of Water酒精饮料或毒品 Alcoholic Liquor or Drugs武器弹药 Arms and Ammunition劳力及承包人设备的报表 Returns of Labor and Contractors Equ
37、ipment安全员 Safety Officer健康和安全及其记录 Health and Safety and its Records事故报告 Reporting of Accidents 材料、工程设备及工艺 Materials, Plant and Workmanship材料、工程设备和工艺的质量 Quality of Materials, Plant and Workmanship样品费用 Cost of Samples检验费用 Cost of Tests未规定检验的费用 Costs of Tests not Provided for监理工程师决定中未规定的检验 Engineers Determination where
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 国家电网电工基础知识试题及答案
- 2024年调酒师个人发展规划试题及答案
- 搬家劳务普通合同范本
- 供柴油油合同范本
- 湖南省邵阳市武冈市2024届高三上学期期中考试 英语答案
- 湖北文理学院理工学院《汽车运用工程I》2023-2024学年第二学期期末试卷
- 天津财经大学珠江学院《园林建筑设计(2)》2023-2024学年第二学期期末试卷
- 山东省临沂市兰山区2025届高三5月联合调研化学试题试卷含解析
- 云南省昭通市第一中学2025届高三(下)月考语文试题含解析
- DB15T 3948.1-2025药用植物工厂化育苗技术规程 第1部分:窄叶蓝盆花
- 高血压健康教育知识讲座课件
- 肾内科血透室品管圈
- 小学劳动教育一年级下册第二单元第3课《削果皮》课件
- 担任学生干部证明
- 学校消防宣传周活动方案食品安全宣传周方案
- 妇产科医生个人职业发展路径计划
- 装修工程合同范本(中英文版)
- 成人住院患者静脉血栓栓塞症预防护理
- 导游知识与技能训练智慧树知到期末考试答案章节答案2024年丽江文化旅游学院
- 无小孩无共同财产离婚协议书
- 企业多元化与包容性政策
评论
0/150
提交评论