版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、Thank you for your using air source water heater series products. Please read in struct ion book before use and keep it for future referenee. Please record the machine model and serial nu mber on the warra nty card.Adaptive Model Number: JN-100L、150L、200L、300L.Catalog1.Cautions2.Performa neeandFeatu
2、res3.Performa neeParameter4.Operati onInstructions5. ProductStructure6. OutdoorCircuitDiagram7. CareandMaintenance8. SimpleTroubleSelf-examination9. Warra ntycard1. CautionsWiring Rule;disc onnectionThanks for your purchas ing our products, please note the followi ng poi nts:a. Read this in structio
3、 n book carefully before in stallati on!b. It shall be in stalled follow the rule of Natio nalc. Power socket shall be triplex receptacle with safe gro und wireand match with the mach ine plug. The content shall no less tha n 2times of machine rated current.The socket shall be near the machineand in
4、 the place of plug reached.d. It shall use special branch circuit that 2 times more than maximumrated current.The wire shall match to the maximumvalue of customer use. The circuit shall hold suitable all-pole protector (1.5-2 times more tha n rated curre nt.e. The display board shall be in stalled i
5、n the shade dry place.f. Keep the water tank full before the power socket is conn ected at the first time. Please do not close the water valve at the time of normal use or it will not make the water outlet.g. Do not set over heated water as you would like to. As the watertemperature reach to the 55&
6、#176;C . You should mix the cool water withhot water for being scalded (especially old man and childre n);h. Do not in stall and move the mach ine by yourself. All works shallbe done by professi onal in stall workers.i. As the trouble made by customers, the company will not be resp on sible for it.2
7、. Performa nee and FeaturesAir source water heater is usually used in the places of family house, bath ing spot and hotel. The main adva ntages as follows:En ergy Con servati onCompare with gen eral water heater, it holdslowest operation costs. It is lower than electrical solar water heater in the w
8、hole year.Environment Protect ionFree from con tam in ati on .It use newtype refrigera nt that zero emissi on onto ozono sphere. Besides that, it does not make any excreta.All-weather Does not be in flue need by bad weather such asovercast and rainy and snow. It could normalbe used among-10 C 43 C .
9、 It works effectively in dry and wet places withIn tellige nt defrost system.Reliable QualityUse well known best quality specialcompressor, food grade sta ini ess steel tan k. It could be used for more tha n 15 years un der no rmal use.Safety Real completely separated water from electricity;Convenie
10、nt Easy installationand smaller floor space. Itcould be in stalledin a suitable places and content therequireme nt of customers.floor temperature or higher tha n ceili ng temperature and make the water temperaturebetween“ floor temperature ” and “ ceiling3. Performa nee ParameterNote: Heat water eom
11、pe nsati on speed is tested in the con diti onof 20 °C Wet-bulb temperature, 20°C inlet water temperature, 55°Cleavi ng water temperature. This list parameter is for refere neeonly. Detail parameter is subject to the machine brand.4. Operati on In structi onsa. Temperature Display:the
12、 con troller shows the watertemperature in the tank. Press"” , it will show the outsidetemperature.b. ON/OFF: Press"O' to ON/OFF mach ine. As in the con diti onsof ON, it shows"heat ” ,"heat insulation” ,"defrosting ” .It shows"OFF'while the machi ne is power of
13、f. When ever thecon diti onis.italways shows the presenttime and presenttemperature.c. Temperature Setting: Press“ S' and get into the temperaturesetting condition. As it shows the “ ceiling temperature ” , press"” or "” to change the value(press "” to raise 1C,press "” to fa
14、ll down1C; holda ” or "” for more than0.5 second, it will raise and falldown quickly).Press “ S' againand the floor temperature settingmethod follows ceiling temperature.As setting finished,press "” once again to go back from setting con diti on. It will begi n to work as the temperatu
15、re lower tha n theModel No.JN-100L-30WJN-150L-30WJN-200L-40WJN-300L-40WTa nk Volume(L)100150200300HeatSpeed(L/h)75759595MaxLeav ingWater Temp( C)60 CPower220V/50HZRatedIn putPower (W)940128012802000Tank Beari ng Pressure0.6MpaTemp Range( C )-10 C 43 CTankWeight(kg)26364665Tank Out SizeC480X 1074C 48
16、0X 1514C570X1300C570X1835Machi ne Weight(kg)27363645Machi neOutSize790*255*540790*255*540790*255*540790*255*540Suited People132424Above 4temperatured. Time setting: press “” , the hour part will be shining,press “ ” or "” to adjust the hour part; press “” againtemperature accord ing to the pre-
17、sett ing. Un der theEcono micmodel, only make the water hot in the pre set time.f. Work Period under Economic Model Setting: hold the“”rforEconomic” . Under the “Automatic ” model, it will control the waterto adjust the minutes part, press “ ” once again to finish.e. Operating Mode Setting: Press“ M
18、' and shift “Automatic ” to2 seconds and set three heat period as screen shows.( is used for switch the project,“ ” or "” is used forvalue change). If you do not need so many setting period, you could make the start time and fin ish time on “ 00:00 ” .If the start time is later than finish
19、time, it will consider that the finished time is on the n ext day. For example: if you set the one of the period on “22:00 ” to"03:30 ” , the machine will consider the periodisstart from 22:00 and finish in 3:30 next day.5. Product Structure> JOci8(Fig 1)6. Outdoor Circuit DiagramDisplay SeT
20、eesiMachine TestTank Test LineBlueBlueF war- lay ValveBroTn® 1BlueiFm»fHflVDh兴 Note: Non-professionalsare not allowed to change!7. Care and MaintenanceFault DisplayFault CauseShow “OPEOpen circuit on water tank test li ne or outside mach ine test li neShow “ SHR”Short circuit on water tank
21、 test line or outside mach ine test li neShow “Drop”Communi cati on failures betwee n display panel and outside con trol boardShowa leakage ”Mach ine electric leakageAlarm on failures defrosti ngDuring the settled time, machine temperature could not reach to the settled defrosting temperature.Alarm
22、on high temperatureThe temperature is 10°C higher than ceiling.For long time work, there is some dust on heat i ntercha ngerregularly.As the machi ne has some in formal no ise, you should power off itand con tact the professi on als.Healthy SymptomThe symptom as follows does not mean someth ing
23、 had happe ned to themach ine:a. For the compressor ' s defective function, the machine does not start for 3 min utes.b. There is some condensed water discharged from the outdoor mach ine.c. Some no ise in the mach ine. As the mach ine worked, there is some bicker or sizzle no ise. It is a no rm
24、al no ise from refrigera nt.d. For safety valves ' pressure relieve function,the valve willdischarge some water to relieve as the water tank get overpressure.alu minum foil. It shall be brushed with water regularly or itwould have effect on heat absorption. As there are great amount of dust, ple
25、ase let professi on als clea n.Check the connect end is leak or not regularly. Please con tactthe professi on als to repair it if it is leak.Check the wire is plug, socket and wire is well connected or not8. Simple Trouble Self-exam in ati onSymptomFault CauseSoluti onCompressor does not workMain po
26、wer does not be conn ectedCheck up on both incoming line and air switchThe control panel does not ope nPress the"Ob” keyFault code on drive-by-wire con trollerCheck follows the code tableCan not reach to the sett ing temperature for long time heati ng.Dust on heatin tercha nger, the ambie nt te
27、mperature is too cold, refrigera nt is dischargedClea n the heatin tercha nger; improve the environment; check on leakage point, suppleme nt some refrigera ntNo words on the display panelMain power does not be conn ectedCheck on incoming line and air switchPoor con tact on sig nal wireCheck on signa
28、l wire and fitti ngsCan not make hotFour-way valve orReplace four-way valvewater and the mai n machi ne blows hot windfour-way valve loop is broke nor four-way valve loopWiring harn ess is looseKeep the line be conn ectedFan can not workEither fan or capacitanee is brokenReplace fan or capacita neeW
29、iring harn ess is looseKeep the line be conn ectedBig no ise as the mach ine workFrame screw loosescrew dow n screwSome copper pipes touched each other in the mach ineCheck on the copper pipesNote: 1. The test or disc onnect failure will be solved as both testand com muni cati on are recovered.2. Th
30、e high temperature alarm will be discharged as the watertemperature drop to the no rmal.3. There are some ways to solve the problem of defrost ingfailure as followeda) The outdoor mach ine temperature is higher tha n defrosti ngstart temperature.b) Press"O” key to close the mach ine.Factory Num
31、berPurchase priceb. Customer InfoNameJobZip CodePhone NumberAddress9. Warra nty cardWarra nty card (Please send affiliated card to us and reserve the originalcard)In order to keep our service promise and release customers from worries, we will establish customer info file in our company computer sys
32、tem.Please complete the warra nty card and send our the affiliatedcard in one monthIf the orig inal card or purchas ing proof is miss ing, you could look up your customer info file and get some related service. a. Products InfoPurchase datePurchase PlaceModel. No.Note: please tear out this part and
33、send it to us as follow requirement (copyhere of is invalid)Please fill this warranty card and send us the affiliated card as soon aspossible.Please fill this warranty card and send us the affiliated card as soon as possible.Zip Code:AddressAfter service DepartmentProductsNameFactoryNumberNOType No.
34、Guara ntee timeFromMonthYear in oneyear is validPurchas in g dateDateMon thYearStoren ameTelAddressZip.CustomerNameTelAddressZip.Guara nteeCardProblem & DateRepair feesPart you excha nged:Charg ingMethodfree/not freeRepair Method:RepairPeopleWarranty card (Reserve the original card)To shops: thi
35、s warranty card is a clear proof for customers. The sales should write dow n the warra nty card for customers and give it to customers.To customers: free repair duri ng warra nty period. Customers should keep the card. Please note that maybe there are some con diti ons about excha nge parts or goods
36、.ProductsNameFactoryNumberNOType No.Guara ntee timeFromMon thyear is validYear in onePurchas in g dateDateMon thYearStoren ameTelAddressZip.CustomerNameTelAddressZip.Guara nteeCardProblem & DateRepair feesPart you excha nged:Charg ingMethodfree/not freeRepair Method:RepairPeopleIn structi ons a.
37、 Main Machine Installation Siteb. Main Machine Installation Stepsc. Temperature Hold Box Sited. Temperature Hold Box In stallati on Stepse. Heat Conn ect ing Hose In stallatio nf. Leakage Check ing on Conn ect ing Hostg. Conn ecti ons of Circuitsh. Test Runningg. Remove air source1.the place or othe
38、r 300kg/m2.Thank you for your using air source water heater series products. Please read in struct ion book before use and keep it for future refere nee.Adaptive Model Number: JN-100L、150L、200L、300L.CatalogIn stallati on1. In stallatio n In structi onsa. Main Machine Installation Site(1) As the main
39、 mach ine was in stalled on the wall or roof, they in stalled shall be made of solid brick,con cretestre ngth place. The main in stall place shall load more tha n200L、300L.In stallati onKeep it upright and level.(2) The in stall face shall made of wood or metal that has eno ughfirm.(3) The space bet
40、ween main machine and obstacles shall not smaller than the space showed in (Figure 1)(4) lf you in stall the can opy, please note that it shall not blockheat absorpti on and dissipatio n of the main mach ine(5) The space betwee n main mach ine and water tank will not Ion gerthan 2.5m (there are some
41、 length limitation on main connection host).b. Main Machine Installation Steps(1) Direct installation(With customer permission,ensure that thereis no leak in expa nded hole)(a) Mapp ing the space betwee n the outside in stallati on holes. Markthe pre-i nstalled place.(b) Dig 4 M12.5 holes by impact
42、drivers(c) Fix the outside machine by M8 steel setscrew.Thank you for your using air source water heater seriesproducts. Please read in struct ion book before use and keep it for future refere nee.Adaptive Model Number: JN-100L、150L、Catalog1.In structi ons a. Main Machine Installation Siteb. Main Ma
43、chine Installation Stepsc. Temperature Hold Box Sited. Temperature Hold Box In stallati on Stepse. Heat Conn ect ing Hose In stallatio nf. Leakage Check ing on Conn ect ing Hostg. Conn ecti ons of Circuitsh. Test Runningg. Remove air source1. In stallati on In structi onsa. Main Machine Installation
44、 Site(1) As the mai n mach ine was in stalled on the wall or roof, the placethey in stalled shall be made of solid brick,con crete or otherstre ngth place. The main in stall place shall load more tha n 300kg/m2. Keep it upright and level.(2) The in stallface shall made of wood or metal that has eno
45、ugh firm.(3) The space betwee n main mach ine and obstacles shall not smallerthan the space showed in (Figure 1)(4) lf you in stall the can opy, please note that it shall not blockheat absorpti onand dissipatio n of the main mach ine(5) The space betwee n main mach ine and water tank will not Ion ge
46、rthan 2.5m (there are some length limitation on main connection host).b. Main Machine Installation Steps(1) Direct installation(With customer permission,ensure that thereis no leak in expa nded hole)(a) Mapp ing the space betwee n the outside in stallati on holes. Mark the pre-i nstalled place.(b) D
47、ig 4 M12.5 holes by impact drivers(c) Fix the outside mach ine by M8 steel setscrew.Note During Direct installation:It shall be permitted by customersIt will not be leak from the expa nded holeNote the discharge of condense water Use A-frame to fixa) Make sure the frame position according to the out
48、side machine base holeb) Dig 40 14.5 holes by impact driversc) fix the frame with 4 M10X150 setscrew. Semmetry installationofframed) Fix the outside mach ine with 4 M8 hexago n n ipples.(3) Dig 0 70 host hole between water storage tank and outside machinegroup. Outside hole shall be slopes dow nward
49、 a little (as Figure 2shows) and wear it coat on the wall hole.(Fig 2 )c. Temperature Hold Box Site :1) The tank shall be in stalled 2.5mfar from main mach in e. It couldbe in stalledon outdoor balc ony, roof and also be in stalledin door.(Fig 3 )2) The water storage tank shall be in stalledwith the
50、 method of floor2sta nd. In stall place shall be firm and could load 500kg/m. If thefloor is not flat eno ugh, it shall be in stalled with hang wall.3) The storage shall be pre-addressed tap-water pipe and hot waterpipe in terface, and set a valve on water ini et.d. Temperature Hold Box Installation
51、 Steps1) Please in stall the safety relief valve in the place of water inlet outside connecting steel wire.+ (Note: point to the water tank), the other end of safety relief valve is connect with water tap pipe, make storage tank connect with hot water pipe. Do follow with (Fig3)2) Open water tap inl
52、et valve. Open any hot water tap in hot water pipe. Fill it till the water overflowed. Close the hot water tap and test it to en sure it is not leak.Note: keep it full of water. Keep the water in let ope n.e. Heat Conn ect ing Hose In stallatio n1) Keep all connecting hose, con trol wire, twin core
53、test wire andrelief valve plastic belted by plastickeep warm belt and keep themgo through C 70 tube hole.(Fig 4 )2) Screw off the end socket nut of tank conn ect ing hose.3) Get out the end socket plug screw, make the connect in terface screw to the tank taps (firstly keep the copper hose aim to in
54、terface andthen lock the screw.)Do as Fig 4 shows.4) Put plastic hose over pressure relief ope ning of safety reliefvalve. Connect the con trol wire with display pan el. Dig two related deep holes and fix the display panel with setscrew5) Un screw ing the end socket nut of disc onnecting valve and t
55、riple valve. Screw the conn ect ing hose to disc onnecting valve and triple valve. Tight them. Fig 5f. Leakage Check ing on Conn ect ing Host:1) En sure the pipe is corrected conn ected.2) Un screw the cooper cap of twodisc onn ect ingvalve and threedisconnectingvalve. Get off pour opening cap from
56、three waydisc onnecting valve.3) Turn 1/2 round of two way valve with coun ter-clockwise by inner hexag on spa nner.4) Coat the conn ect ing host in terface and water tank in terface and check both of them are bladdery or not. If there are, tight5) Make inner hexagon spanner thrust against pour opening' sORNL(讯)< Lcore. After 10 seconds“sizzle ” , stop thrust for one minutes. Doit again for three time till the air become cool.6) Turn and ope n t
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 九年级语文下册 第三单元 12《江城子 密州出猎》教学设计 新人教版
- 箱梁预制施工安全管理方案
- 湖北省武汉为明学校高中语文 第六单元 11 牲畜林教学设计 新人教版《外国小说欣赏》
- 七年级英语下册 Unit 5 Our school life Topic 1 I usually come to school by subway Section C教案 (新版)仁爱版
- 2016年贵州省铜仁市中考真题语文试题(解析版)
- 机房强电布置课程设计
- 机床维修与操作课程设计
- 机密机械设计课程设计
- 机场行李分拣系统plc课程设计
- 陕西省蓝田县高中地理 第二章 自然环境中的物质运动和能量交换 2.2 地球表面形态教案2 湘教版必修1
- 制浆车间操作规程(山东海韵公司)
- 格宾石笼施工技术交底
- 美丽乡村监理实施细则
- 小学汉语拼音声韵母表镂空版.doc
- 哮病(热哮证)中医临床路径临床疗效总结分析报告
- 高等学校学生食堂伙食结构及成本核算指导意见
- 二年级数学德育渗透教学计划
- 《逃离》爱丽丝·门罗
- 口腔诊所规章制度-口腔诊所18项规章制度
- 俄语建筑幕墙词汇
- 露天采石场开采方案
评论
0/150
提交评论