1、Process flow and raw materials of aluminum andaluminum alloy anodic oxidation tintingProcedure specification on aluminum and aluminum alloy anodic oxidation tinting1. Procedure specification(line drawing)Substrate Mounted hanging Degreasing Alkaline etching Neutralization Anodic oxidation Electrolyt

2、ic coloring Sealing Electrophoretic coating CuringUnloading packaging Warehousing2. Mounted hanging:2.1 preparations before mounted hanging.2.1.1 Check the conductive parts like conductive beams and bars. They should be regularly polished, cleaned or repaired.2.1.2 Get ready conductivity of aluminum

3、 and aluminum wire.2.1.3 Check the pneumatic tools and related equipment.2.1.4 Check whether or not requirements like length, count, color, thickness on the flow paper or production task list are consistent with the order drawing and actual materials.2.1.5 Depending on the specifications (size of ci

4、rcumscribed circle, external surface area, etc.) to determine the count and space. To control the pigment spacing about 1.2 times than the horizontal width of the material shaped, and the white material spacing about 1 time than the width.2.1.6 Choose the appropriate rack, and ensure that hook numbe

5、r of negative and positive hangers is the same with the count of materials shaped.2.2 Mounted hanging:2.2.1 When hanging, fix the topside one first, and then the bottom one, and then arrange the remaining sections in the middle, and tighten the screws.2.2.2 Before hanging, placing one aluminum sheet

6、 between the material and aluminum screw p so that it can prevent poor conductivity impacting oxidation, coloring and electrophoresis.2.2.3 When hanging, it is not allowed to hang all the materials in the lower or upper rack.2.2.4 The hanged materials should recline more than 14 degrees in order to

7、facilitate air exhausting in electrophoresis or coloring, and reduce the air bubbles.2.2.5 When hanging, considering the facing of the decorative surface and groove to prevent the color shading, bubbles, pitting appearing in the decorative surface.2.2.6 Like some flexible and easily deformed materia

8、ls, put one more rack or aluminum wire in the middle to prevent friction between the materials or touching tank plate, and that may abrade or burn the surface.2.2.7 When selecting vice-bar rack, the plug rod is preferred. When using aluminum banding, they must be evenly spaced, and the outcrops shou

9、ld be less than 25mm.2.2.8 Materials with great disparity of cross-section size and shape are prohibited to hang in the same row.2.2.9 When hanging and handling equipment, you must wear clean gloves, gently and well protecting the surface.2.2.10 When hanging or handling equipment, workers should str

10、engthen self-examination and cross-examination, the failure materials are non-mounted, and take appropriate measures to deal with the surface stained with oil or aluminum burrs2.2.11 After eliminating unqualified ones, you must make them up in time by order.2.2.12 In hanging area, materials should n

11、ot be stored for too long time, to prevent corrosion of the surface.2.2.13 Filling the hanging record and oxidation process card. Accurately calculating and fill in oxidation of each linked area, checking models, count and color by orders at any time.2.2.14 Do a good job in shift procedures and keep

12、 the work area clean.3. Preparation before oxidized production units:3.1 Checking the level of the liquid in the process tank. According to test report card, to adjust the concentration of the bath solution and ensure that bath solution is always in line with technical requirements. Workers should f

13、requently sweep the dirt from the bath solution.3.2 Checking the vehicle, freezer, rectifiers, circulating acid pump, water pump, transfer cars, furnace and other equipment, any exception should be immediately solved.3.3 Check PH (or conductivity) and cleanliness in the pure water washing tank and r

14、unning water washing tank. If it does not meet the technical requirements, workers should change it and hydrating overflow.3.4 Open the alkaline etching, hot pure water tank, sealing the steam or cooling water tank; open the oxidation tank, coloring tank and cooling system of electrophoresis tank to

15、 ensure the uniformity of bath solution and temperature complying with requirements.3.5 Check the Roots blowers, exhaust blowers and exhaust fans. Before the production, they should be opened.3.6 Carefully check the oxidation process card, specifically confirm the production requirements, and prepar

16、e the color palette.4. General requirements for oxidation sets operation:4.1 It is not allowed to hang t more than two hangings every time. And keeping a certain distance between the two hangings to prevent collision between the materials.4.2 When materials hung into and hung out of the bath solutio

17、n, they must be inclined to 30.4.3 Materials falling into the tank must be removed promptly and hung up in rafts, the damage ones must be promptly notified to group-to-order equipment to make them up.4.4 In addition to alkaline etching and coloring, the sections should be hung out after the bath sol

18、ution drained away to reduce the flow of waste and pollution.4.5 When the hanging materials must cross other sections, the transferring ones must maintain the level of the degree to reduce the flow of liquid and pollute materials and conductive beam.4.6 Each process should be promptly fill in the ox

19、idation process cards, and sign them.5. Degreasing:5.1 Process ParametersComposition of bath solution: acidic degreasing agent 2 to 3%Temperature: room temperatureDegreasing time: 1 3min5.2 Operating requirements:5.2.1 Check process card, make production requirements clear. Materials with the same c

20、olor, same model and same order or similar specification should be suspended into the degreasing tank simultaneously or preferentially, so that it can facilitate the operation the post-procedure.5.2.2 When the degreasing is finished, the materials should be hung out of the tank, preventing the sand

21、from the surface.5.2.3 After degreasing, the surface should be well-distributed and wet, and the materials should be washed by Level 2 water then turned into the alkaline etching process.6. Alkaline etching:6.1 Process parameters:Composition of bath solution: plain-surface alkaline etching, sand-sur

22、face alkaline etchingNaOH: 40 50g / l 45 60g / lAdditives (NaOH): 1 / 12 1 / 15 1 / 6 1 / 8Temperature: 40 45 45 55 Alkaline etching time: 1 3min 10 30min6.2 Operating requirements:6.2.1 When alkaline etching, the forced draught blowers and exhaust fans should be opened.6.2.2 When alkaline etching i

23、s finished, materials should be hung out as soon as possible, finishing shedding immediately and transferring to the tank washing, so that it can prevent straying marking from the surface.6.2.3 Strictly control alkaline etching process parameters, to ensure uniform quality of the surface after alkal

24、ine etching.6.2.4 Post-alkaline-etching materials must be washed by Level 2 overflow. The remaining alkaline liquid should be fully cleared away, so that the raffinate can t pollute other tanks.7. Neutralization:7.1 Process parameters:Composition of bath solution: HNO3: 120 150g / lTank temperature:

25、 room temperatureNeutralizing time: 2 5min7.2 Operating requirements:7.2.1 . When neutralizing, the materials should be moved up and down and anti-tilt, fully neutralizing exhaust liquor in the hole and remove appearing dust.7.2.2 Post- neutralizing materials must be washed by Level 2 overflow, and

26、turn to the anodizing tank.7.2.3 The surface quality inspection should be strengthened to check the surface of the sand surface conditions, mottling, burrs, welding lines and other surface defects, for timely processing, reworking.7.2.4 Regularly check screws are loose or not, to ensure good electri

27、cal conductivity.8. Anodic oxidation:8.1 process parameters:Tank composition: H2SO4:150 180 g/l AL ion: 5 to 15 g/lTank temperature: 20 ± 1 o COxidation voltage: 14 and 18 VCurrent density: 130 150 A / m2The oxidized time: according to requirements film thickness calculation.8.2 Operating requi

28、rements:8.2.1 Anodic oxidation must be open before:(a) Rectifier cooling water.(b) Bath circulation cooling system (cooling unit).(c) Send the exhaust fan.8.2.2 Anodic oxidation must be checked in advance: conductive copper conducting copper aluminum piece, hanging fixture and conductive beam in con

29、tact, and the situation of the conductive, should be often burnished.8.2.3 Anodic oxidation must be opened before a conductive copper cooling water, check and conductive beam bending, whether the conductive bending beam must be replaced, in case of burn out the conductive and impacts anodic oxidatio

30、n.8.2.4 Before electricity oxidation, profile must be placed in middle of oxidation tank, ensure that with both side distances are the same.8.2.5 Before electricity oxidation link up, driving hook must be taken off conductive beam hook, when the power and oxidation end, driving hook can hang conduct

31、ive beam hook, in order to avoid short circuit, damage the equipment.8.2.6 Anodic oxidation set the current density, oxidation method should accord to the oxidation area of profiles multiplied with the current density. Shading materials for the current density of oxidation must be controlled in 130

32、A / m2.8.2.7 When Anodic oxidation, should often visited the voltage, current, temperature, etc. Various kinds of instrument, any abnormal should be promptly eliminated.8.2.8 After Oxidation of profiles, should detect the film thickness, and make records, if film thickness can not reach the requirem

33、ents, must be to prolong the oxidized time to film thickness to meet requirements.9. Electrolytic coloring:9.1 process parameters:Bronze is golden brown departmentBath composition: SnSO4: seven to 10 g/l GD: 35 to 45 g/lNiSO4 ? 6 H2O: 20 30 g/l SeO2:8 10 g/lAdditives: Same amount with SnSO4 CuSO4:2

34、3.5 g/lH2SO4:15 20 g/l 12 to 17 g/lPH: 0.6 1.0 PH: 0.7 1.025 temperature: 15 20 25 Voltage: 14 to 18 V 14 to 16 VShading time: 20 S 15 min 2 6 min9.2 Operating requirements:9.2.1 Maintain bigger slope when putting anodic oxidated profiles into color cell, and placed at the middle of poles, ensure eq

35、ual polar distances.9.2.2 When shading, driving hook must be taken off conductive beam hook, and rest for 0.5 1 minutes to color.9.2.3 Shading voltage for the same kinds of color must be equal.9.2.4 When bronze cell shading over, must be lifted immediately as soon as possible, flow bath, transfer to

36、 sink quickly, fully clean the acid water in the hole of profiles, use coloring board to compare, when color is too light, put it into coloring tank to electricity complementary color, when color is too deep, put it into coloring tank (no electricity) or acidic water behind of oxidation tank to fade

37、 (bronze series).9.2.5 Because golden not fade, and shading time should not be too long.9.2.6 The shaded profiles shall be washed adequately by level 2 water, then go on electrophoresis or hole sealing.10. Sealing:10.1 Process parameters:Bath composition: Ni ion: 0.8 1.2 g/l, F ion: 0.35 0.6 g/l, PH

38、: 5.6 6.5, pure dampening solution temperature: 20 30 Hole sealing time: oxidation film thickness (um) x 1.2 min around (subject to quality standards).10.2 Operating requirements:10.2.1 Profiles should be washed by pure water before sealing, in case the pollution of electrophoresis and sealing slots

39、.10.2.2 When profiles enter into sealing slots, should prevent hole sealing water from splashing into electrophoresis recycling tank.10.2.3 Hole sealed profile after must be dried after being washed.10.2.4 Sealed profile should be strictly prohibited to contact with oil, electrolyte and bare hands.1

40、0.2.5 After sealing, should sport check the hole sealing quality, timely adjust hole sealing time, ensure that hole sealing quality to achieve the requirements, and prevent the over-sealing powder.11. electrophoresis11.1 process parameters:Tank composition:Solids: 5 8%Solvent: 1 5%Conductivity: 550

41、900S/cmPH: 7.6 8.0Electrophoresis Voltage: 90 120VTemperature: 23 ± 3 Electrophoresis time: 1 2min11.2 operating requirements:11.2.1 Before electrophoresis, the ones must be gone through one pure water, two hot water, three cold water washing, fully washing the acidic water and dirt in the mate

42、rial surface, hole and film hole.11.2.2 Always check PH, conductivity and cleanliness in the three water, keeping PH> 5.5 in the water tank, the first pure water conductivity <120 科 S/cm, the second and the third water conductivity <60 S / cm, and oftenge the water.11.2.3 Temperature of hot

43、 pure water tank should be controlled between 60 80 .11.2.4 Articles in hot water tank's time between 3 5min, after the hot water wash, should be fully dried and fully wiped to get conductive beam rid of oil and acid-base water. Keep special attention on cleaning and cooling of thick-walled tubu

44、lar.11.2.5 Temperature of Cold pure water washing tank should be maintained below 30 . Articlesthat are washed in cold water should not be dried, preventing extra wave when electrophoresis.11.2.6 Maintain the largest tilt when profiles are in the electrophoresis tank to facilitate the exclusion of a

45、ir.11.2.7 After put into the electrophoresis tank, articles should be placed in the central electrode, and ensure equal distance on both sides of the plate, and stand for one minute before electrophoresis.11.2.8 When electrophoresis, circulating pump and electrophoresis recycling equipment must be t

46、urned on. The two pure water tanks should meet the following technical requirements: The first pure water, the second oneSolids: <1.0% <0.3%PH: 8.0 8.3 8.0 8.5Conductivity: <100 科 S/cm <50 科 S/cm11.2.9 Electrophoresis solution should open refined purification system at fixed period as fo

47、r the increase of PH and conductivity to ensure the electrophoresis bath meet process requirements.11.2.10 After electrophoresis, articles must be passed by two pure water.11.2.11 Post-electrophoresis articles should be placed in the pre-dried area.11.2.12 keep electrophoresis area clean, non-oil, n

48、o dust, no acid mist to pollute profiles and electrophoresis tank.12. Curing:12.1 process parameters:Curing temperature: 180 200 Curing time: 30 45min12.2 operating requirements:12.2.1 Before curing, check oven and curing temperature measurement system, and regularly clean the curing oven.12.2.2 Whe

49、n finished curing and cooled to room temperature, workers check the quality of the electrophoresis film.13. unloading, packaging13.1 Preparation for discharge13.1.1 Check the storage rack, transport trolley, film machine, packaging machine13.1.2 Check the model, length, count, color on the card are

50、consistent with the material object or not. Make packaging requirements clear; prepare protective film, tape, wrapping paper and other packaging materials.13.1.3 Test oxidation thickness, composite thickness, sealing quality, the film hardness, film adhesion, color, color variation, appearance quali

51、ty. All of them adhere to requirements, then they can be discharged, and fill oxidation product inspection records.13.2 unloading, packaging13.2.1 Water sealing material is not allowed to unload with water, electrophoresis materials must be cooled to room temperature before unloading.13.2.2 Profiles must be unloaded by teams, non-impacted, non-beat, and prohibited to be directly contacted with

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论