1、.State of IllinoisCAPITAL DEVELOPMENT BOARDA/E - PEARCHITECT/ENGINEERPERFORMANCE EVALUATIONCDB Project #:Firm Evaluated:Project:Firm ID # Prime ConsultantLocation:Address:Prepared by:Title:Contract #Affiliation: Contractor User PMTotal Contract Amt:Evaluation: Design-50% Design-100%Date Evaluation C

2、ompleted: Interim Construction/Close-outPART I - PERFORMANCEPHASEEVALUATION CRITERIAEVALUATION SCORING:“To what level.”Rate the firm with scores 5 through 1. 5 = Excellent; 4 = Good; 3 = Satisfactory; 2 = Less than Satisfactory; 1 = Unacceptable. N/A = Not Applicable. Comments are required if any sc

3、ore is less than 3.:Design1.did the contract documents meet the specific requirements of the project scope?2.did the contract documents comply with applicable design requirements in the PSA and DCM?3.did the A/E maintain the design schedule in the Professional Services Agreement, Appendix A?4.was th

4、e completeness of the design document, including estimates, at each review submittal?5.was the A/E prepared at meetings?6.was the accuracy of the A/Es entire project estimate compared to the total of the apparent low bids?7.were the contract documents significantly changed by addenda?8.did the A/E p

5、rovide accurate and timely design meeting minutes?9.did the A/E produce a set of bid documents coordinating all design disciplines?Construction10.were the contractors pay requests accurately reviewed for completeness and processed in a timely manner?11.did the A/E provide accurate and timely constru

6、ction meeting minutes?12.did the A/E provide competent site observation including timely and accurate observation reports?13.were shop drawings, RFIs and RFP/COs responded to, researched, evaluated and promptly processed?14.was the degree of errors and omissions as they relate to CDB limits?15.did t

7、he A/E respond to issues in a timely manner?16.did the A/E follow proper procedures during the contractors final close-out?17.were the A/Es close-out documents submitted in an accurate and timely manner?Design/Construction18.did the A/E utilize the personnel and consultants as submitted on their 255

8、 form?19.did the A/E coordinate cooperate and communicate with CDB, the User and the contractors?PART II PROCESSING (CDB USE ONLY)CDB PROJECT MANAGERDATE:REVIEWED/REGIONAL MANAGERDATE:DISTRIBUTION BY:DATE:DISTRIBUTION:A/E A/E Responsibility File December 2005Each A/E firm performing services for CDB

9、 shall be subject to periodic and final performance evaluations. All evaluations shall be submitted on the current CDBs A/E Performance Evaluation Form. Interim evaluations may be initiated at any time. A/E Performance Evaluations are a key component in determining an A/Es Responsibility Rating.Part

10、 I will be used to indicate the firms overall performance progress to date.Part II is for CDBs use only. Copies of all evaluations will be forwarded to the A/E firm by CDB.The A/E firm may respond to any evaluation by corresponding directly to the CDB. Responses will be reviewed and permanently retained with the corresponding evaluation. E-MAIL THIS FORM:This form may be submitted to CDB electronically. Attach a completed form to an e-mail addressed to the CD

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论