1、陕西省商州区高级中学建设项目高 压 线 围 护施工方案编制人: 审核人: 批准人: 编制单位: 编制时间: 目 录1、 编制说明·······································
2、183;················································22、 编制依据
3、··················································
4、··················································
5、···23、 工程概况及现场概况·············································
6、;········································24、 防护方法········
7、83;·················································
8、83;············································25、 施工技术要求····
9、;··················································
10、;··········································36、 搭设方法······
11、83;·················································
12、83;··············································37、 施工安全措施··
13、;··················································
14、;············································48、 安全技术措施····&
15、#183;·················································&
16、#183;·········································59、 防护架体检查······
17、83;·················································
18、83;······································510、 防护架拆除··········
19、;··················································
20、;·······································611、 安全、文明施工·········
21、;··················································
22、;·····························7十二、劳动力安排···················
23、183;·················································
24、183;··························7高压电线围护专项施工方案1、 编制说明本工程为陕西省商州区高级中学建设项目,4#图书馆南侧现正使用学校围墙边,有高压电线一路在塔吊回转半径范围之内。根据施工现场临时用电安全技术规范JGJ46-2005要求,防止塔吊钢丝绳碰撞高压电线,因此需要高压电线进行防护。2、 编制依据1、
25、 施工现场实地勘察。2、 施工现场临时用电安全技术规范(JCJ46-2005)3、 建筑施工高处作业安全技术规范(JGJ80-91)4、 建筑施工扣件式钢管脚手架安全技术规程(JGJ130-2011)5、 国家相关规范规定。3、 工程概况及现场概况1、 工程概况工程名称:陕西省商州区高级中学建设项目工程地址:陕西省商州区大赵峪办事处东龙山业主单位:陕西省商州区高级中学项目建设管理处建设单位:商洛明城基础设施开发有限公司勘察设计单位:商洛市建筑勘察设计院监理单位:陕西远大工程项目管理有限公司2、 现场概况 在本建设项目4#图书馆南侧,现正使用学校围墙边,有架空高压电线一路在塔吊回转半径范围之内。
26、根据施工现场临时用电安全技术规范JGJ46-2005要求,为防止塔吊钢丝绳碰撞高压电线,必须采取安全防护措施。4、 防护方法 因施工所用的塔吊需要360°回转,所以现场南侧搭设防护架体。架体采用两种材料搭设,6m以下采用扣件式钢管脚手架,6m及其以上采用竹木搭设,高度超出高压线2米,水平距离离高压线1.5米,顶层铺设毛竹片做保护。详见附图。 底部采用扣件式钢管脚手架搭设,上部采用绝缘材料毛竹搭设防护栏杆,搭设参数为:步高1.8米,搭设高度为超过高压线2米。同时在高压线保护栏上设警示牌,警示牌上书写:“高压危险”。或者每隔6米,在立杆上固定一面红旗,以示警戒。5、 施工技术要求1、 搭
27、设材料1.1钢管采用48×3.5mm的钢管,有严重锈蚀、弯曲、压扁、损伤和裂纹的均不得使用。扣件应有合格证明,要光洁灵活,发现有脆裂、变形、清丝等现象禁止使用。1.2根据现场实际情况,用钢管搭设架体底下6m,6m以上的架体采用毛竹搭设,毛竹有效部分小头直径不得小于75mm。1.3绑扎铁丝用12#脚手架专用铁丝,镀锌铁丝使用时不允许用火烧,次品和锈蚀严重的镀锌铁丝严禁使用。1.4围护材料采用:高压线下2米往上靠工地一侧处采用毛竹片,其他部分采用密目安全网。1.5厚木垫板,木板厚度不得小于50宽度不得小于300,木板不得腐蚀,变形、破裂等质量缺陷。2、 搭设尺寸及要求2.1防护架总长度按
28、照塔吊辐射范围确定(约110米),立杆间距为1.5米,水平杆步距为1.8米,第一步扫地杆距地0.15米。防护距离离围墙0.5米。2.2防护栏杆每隔5米设抛撑一根,抛撑必须与地面牢固连接。同时防护栏与外架进行连接,以保证防护架体的稳定。2.3所有立杆和抛撑基础必须回填夯实密实,确保基底平整、坚实、不下沉。2.4防护架应牢固稳定具有抗风能力,围护竹片绑扎牢固保证不掉落。2.5利用学校围墙,采用9.3钢丝绳与围墙拉结,拉结部位同时用毛竹与围墙斜撑防止反向倾覆。3、 参照标准:施工现场临时用电安全技术规范(JGJ46-2005)第4.1.4条、4.1.6条。6、 搭设方法1、 准备工作1.1清除施工现
29、场的障碍物。1.2夯实搭设防护栏杆范围内的基土,并排好立杆位置,用厚木板垫与立杆之下,木板必须垫实、垫平。1.3根据毛竹粗细、材质、外形等进行合理挑选分类,决定其用途及使用的部位。2、 施工工艺流程及要求场地平整夯实确定立杆位置铺垫垫板竖立杆绑扫地杆绑大横杆固定杆件与防护架体的连接竹笆的铺挂警示标志安装红旗的绑扎。2.1场地平整:因本架体属于防护架且架体较高,能拉结的地方很少,只能靠架体本身相互拉结,形成整体而稳定。因此对架体地基密实度和平整度要求极高,必须按照施工规范要求施工。2.2垫板:垫板铺设必须平整,板底必须与基土接触实在,不得有空虚出现。2.3扫地杆:防护栏杆高度较高,在立杆底部加扫
30、地杆绑扎牢固。2.4竖立杆:先竖两端头立杆,再竖中间立杆。立杆竖好后,应纵成行横成方,杆身垂直。立杆弯曲时,其弯曲面应顺纵向方向,既不能朝高压线面也不能背高压线面,以保证大横杆能与立杆接触良好。2.5绑大横杆:防护栏两端大横杆的大头应朝外。绑扎第一步架的大横杆时,应检查立杆是否埋正、埋牢。同一步架的大横杆大头朝向应一致,上下相邻两步架的大横杆大头朝向应相反,以增强防护架的稳定。2.6绑扎水平和竖向防护毛竹片,应与防护架立杆、横杆绑扎牢固,绑扎间距不得大于500mm,每张毛竹片应有支撑点,防止坠落。2.7安装警示标志,在围护竹笆外安装警示标志,所有警示标志必须安装牢固。每34根立杆上绑扎一面红旗
31、也起警示作用。3、 搭设标准3.1钢管架部分必须严格按照建筑式钢管脚手架安全技术规程要求施工。3.2毛竹架部分必须满足下列要求:立杆:立杆应大头朝下,上下垂直,立杆杆身垂直偏差不得超过架高的1/1000,且不得大于100mm。不得向外偏斜。最后一根立杆应大头朝上,为使立杆顶端齐平,可将高出的立杆向下错动。立杆必须按规定进行接长,相邻立杆的接头至少错开一步架,接头的搭接长度不得小于1.5米。为使接长后的立杆位于同一平面内,上下立杆的接头应沿纵向错开。横杆:大横按绑在立杆内侧,沿纵向平放。大横杆必须按规定进行接长,接头应置于立杆处,大头伸出立杆200300mm,并使小头压在大头上,搭接长度不小于1
32、.5米。接头位置,上下相邻大横杆的接头应错开一个立杆。七、施工安全措施 1、搭设和拆除防护架必须由符合“特种作业人员安全技术考核规定”的架子工进行,操作人员必须持证上岗,且不得穿高跟鞋操作,有不适应高空作业的人员不得上岗(如恐高症等)。操作时必须佩戴安全帽、安全带、穿防滑鞋。2、 操作人员进入施工现场必须遵守安全生产六大纪律,必须带好安全帽及安全带,并扣好安全扣。3、 大雾、大雨、大雪和六级以上的大风天气,不得进行防护架上的高处作业,雨雪天后作业必须采取安全防滑措施。4、 初始搭设时应有临时支撑,防止初立的立杆倾倒伤人。5、 在搭至近高压线时,须特别注意每次传递竹杆不得与高压线相碰,操作人员必
33、须相互提醒,相互关心。6、 在搭设时,必须由专业的安全员全程巡视监控作业人员操作的各个环节的安全动态情况,发现有不符合安全规范的地方,尤其是在距高压线很近时必须全程监控。7、 在作业前,安全员应向班组操作人员作详细的交底并严格按照方案搭设技术要求进行。8、 作业人员在搭设过程中注意架体高升时防止杆件坠落伤人。9、 搭设前应设置警戒线,并指派专人看护,防止人员进入警戒区。八、安全技术措施1、对各作业班组进行安全用电教育,特别电工、塔吊驾驶员除必要的安全交底、教育外;针对场内的高压线、变压器的使用安全,要求每日交接班检查,任何人未经许可不得进入。2、项目部把高压线立为重大危险源,针对重大危险源制定专职安全员每日巡检,项目部周检制度。3、防护架搭设前必须根据规范规定和施工方案,制定防护架的安全技术措施。4、为防止塔吊钢丝绳碰撞高压线,对塔吊离最近一根高压线5米处设立限位装置,现场设监管人员一名,严禁塔吊转入高压线和校园内侧。5、塔吊设专职指挥
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 关于责任心的课件
- 2024年考研英语(一)真题及答案
- 高新技术企业税收减免政策
- 《平安守护星》课件
- 业务提成奖励协议书样本
- 酒店用品采购员招聘合同
- 城市通信施工合同样本
- 授权投标协议书
- 油气管道消防改造施工合同
- 游艇俱乐部会员配奶服务流程
- 占用人行道开挖施工方案
- 食品召回记录表
- 农村小学基于国家中小学智慧教育平台下的双师课堂研究
- 国开高级财务会计1-9综合练习试题及答案
- 人教版八年级上册 Unit 8 教学课件
- 天津大学《计算机辅助设计与制造》期末考试备战题库全集
- 《小英雄雨来》整本书阅读课件
- 职业技能大赛决赛选手报名表
- 安全用电用火用气主题班会教学课件
- PQR-按ASME要求填写的焊接工艺评定报告
- 汽轮机主汽门活动试验