目录
1总贝!I.............................................................................................1
1.1目的及适用范围1
1.2编制依据XXXXXXXA;N,K>Z...................................................................1
1.3章节划分1
2施工准备.............................................2
2.1驻地建设2
2.2现场布置2
2.3拌和站4
2.4施工供风、供水、供电.................................................................4
2.5弃渣场、自办料场、危险品库...........................................................6
2.5.1弃渣场...........................................................................6
2.5.2自办料场.........................................................................6
2.5.3危险品库.........................................................................7
2.6技术准备7
2.6.1施工前的调查和设计文件核对.......................................................7
2.6.2物资准备.........................................................................7
2.6.3施工测量.........................................................................7
2.6.4施工方案.........................................................................7
2.6.5第三方监测.......................................................................8
2.7作业条件准备8
2.7.1材料的采备.......................................................................8
2.7.2组织机械设备进场.................................................................8
2.7.3组织人员进场.....................................................................9
2.5.4材料样品及有关技术条件资料应列入建设档案备杳。..................................9
3洞口与明洞工程.......................................10
3.1施工准备10
3.2一般要求10
3.3施工程序12
3.4施工要点12
3.4.1洞口土石方开挖..................................................................12
3.4.2排水工程........................................................................13
3.4.3坡面临时防护....................................................................13
3.4.4进洞辅助措施....................................................................13
3.4.5明洞与洞门施工..................................................................14
4洞身开挖.............................................17
4.1一般要求17
4.2分离式隧道18
4.2.1施工程序........................................................................18
4.2.2开挖方法的选定..................................................................18
4.2.3浅埋段施工......................................................................19
4.3连拱隧道19
4.3.1一般要求........................................................................19
4.3.2施工程序........................................................................20
4.3.3施工要点........................................................................20
4.4小净距隧道21
4.4.1施工方案........................................................................2I
4.4.2开挖方法的选定..................................................................2I
4.4.3施工要点........................................................................22
4.4.4监控量测........................................................................23
4.5开挖方法23
4.5.1中隔壁法(CD法)...............................................................23
4.5.2交叉中隔壁法(CRD法)...........................................................24
4.5.3双侧壁导坑法....................................................................25
4.5.4环形开挖留核心土法..............................................................26
4.5.5台阶法施工......................................................................27
4.5.6全断面开挖法....................................................................27
4.6钻爆设计27
4.7钻爆作业29
4.7.1机械设备选型配套................................................................29
4.7.2施工工序........................................................................29
4.7.3施工要点........................................................................30
5初期支护与辅助工程措施...............................32
5.1一般要求32
5.2喷射混凝土32
5.2.1一般要求........................................................................32
5.2.2施工工艺........................................................................34
5.2.3施工要点........................................................................34
5.3锚杆36
5.3.1一微要求........................................................................36
5.3.2施工工艺........................................................................36
5.3.3施工要点........................................................................37
5.4钢筋网38
5.5钢架39
5.5.1钢架力口工要点....................................................................39
5.5.2钢架安装施工工艺...............................................................4I
5.5.3钢架安装施工要点...............................................................4I
5.6初期支护质量要求43
5.7超前锚杆支护45
5.7.1施工工艺........................................................................45
5.7.2施工要点........................................................................45
5.8超前小导管预注浆支护................................................................45
5.8.1施工工艺........................................................................46
5.8.2施工要点........................................................................46
5.9超前管棚支护47
5.9.1施工工艺........................................................................47
5.9.2施工要点........................................................................48
5.10超前预注浆48
5.10.1施工工艺.......................................................................48
5.10.2注浆材料.......................................................................48
5.10.3施工要点.......................................................................48
5.II地表砂浆锚杆50
5.12地表注浆50
5.13处理涌水措施51
5.13.1处理涌水的原则.................................................................51
5.13.2超前钻孔排水...................................................................51
5.13.3井点降水.......................................................................52
6仰拱与铺底...........................................53
6.1一般要求53
6.2施工工序53
6.3施工要点54
6.3.1开挖............................................................................54
6.3.2初期支护........................................................................54
6.3.3二衬钢筋........................................................................54
6.3.4混凝土施工......................................................................55
7防水与排水...........................................56
7.1一般要求56
7.2施工工序56
7.3施工防、排水56
7.3.1地表防、排水....................................................................56
7.3.2洞内顺坡排水....................................................................57
7.3.3洞内反坡排水....................................................................58
7.3.4洞内水量较大时的处理措施........................................................59
7.3.5其他情况下的施工防排水措施......................................................59
7.3.6防涌(突)水(泥)安全措施......................................................60
7.4结构防、排水60
7.4.1防、排水结构原材料..............................................................60
7.4.2衬砌背后防.、排水设施施工要点....................................................61
7.4.3防水板铺设施工要点..............................................................62
7.4.4施工缝的处置....................................................................66
7.4.5变形缝的处置....................................................................66
7.4.6止水带施工......................................................................67
8二次衬砌.............................................68
8.1一般要求68
8.2施工工序68
8.3施工要点68
8.3.1衬砌模板台车....................................................................68
8.3.2二衬混凝土的性能要求及配合比设计要点............................................72
8.3.3矮边墙施工......................................................................72
8.3.4二次衬砌钢筋....................................................................73
8.3.5预留洞室和预埋件................................................................75
8.3.6台车就位........................................................................75
8.3.7安装挡头模板、止水带等..........................................................76
8.3.8混凝土施工......................................................................76
8.3.9拆模............................................................................77
8.3.10养生...........................................................................78
8.3.11缺陷处理.......................................................................78
8.3.12紧急停车带、车行横洞及人行横洞二次衬砌施工.....................................78
8.4质量要求79
8.4.1外观质量........................................................................79
8.4.2二衬质量检测....................................................................79
8.4.3预留洞室........................................................................80
8.4.4拱顶预留接线盒..................................................................80
9路面及附属工程.......................................81
9.1路面81
9.1.1一般要求........................................................................81
9.1.2施工工艺........................................................................8I
9.1.3施工要点........................................................................81
9.2设备洞、横通道及预留洞室............................................................86
9.3水沟、电缆沟87
9.4蓄水池87
9.5预埋件87
10超前地质预报与监控量测..............................89
10.1实行“第三方监测”制度..............................................................89
10.2超前地质预报89
10.2.1一般要求.......................................................................89
10.2.2超前地质预报的分级.............................................................90
10.2.3超前地质预报的内容.............................................................9I
10.2.4超前地质预报分类..............................................................92
10.3监控量测92
10.3.1一般要求.......................................................................92
10.3.2工作程序.......................................................................93
10.3.3量测项目.......................................................................93
10.3.4量测操作要点...................................................................96
10.3.5量测数据处理与应月.............................................................98
10.3.6竣工后量测....................................................................100
11安全管理与文明施工.....................................................................101
11.1安全风险评估与管理.................................................................101
11.2安全管理101
11.3文明施工103
1总则
1.1目的及适用范围
1.1.1目的
为总结我省高速公路隧道建设多年来的实践经验,进一步规范隧道施工的各项工序
操作,提高施工管理水平,实现全省隧道施工标准化,克服质量通病,促进高速公路隧
道施工质量再上一个新台阶,编写本指南。
1.1.2适用范围
本指南适用于我省所有新建、在建、扩建或改建高速公路工程项目(含连接线)的
山岭隧道工程建设。
1.2编制依据
1.2.1交通部公路隧道设计、施工规范及细则、质量蛤收标准。
1.2.2省高指提出的“一流的材料,一流的设备,一流的工艺,一流的管理”的要求及
其有关施工管理、技术文件。
1.2.3本行业通行的和先进的工艺和管理方法。
1.3章节划分
本指南共十一章,分为总则、施工准备、洞口与明洞工程、洞身开挖、初期支护与
辅助工程措施、仰拱与铺底、防水与排水、二次衬砌、路面及附属工程、监控量测与超
前地质预报以及安全管理与文明施工。其中部分章节按分离式隧道、连拱隧道和小净距
隧道等分节分段落叙述。
2施工准备
2.1驻地建设
2.1.1承包人在隧道施工点搭建的临时生活、办公用房应符合《福建省高速公路工地建
设标准化指南》第2.1条的相关规定,生产用房、生活及办公用房应分开建设。见图2.1.1
所示。
图2.1.1生活及办公房屋现场照片
2.1.2生产场、房可采用竹棚、彩钢板棚及砖砌房屋,必须搭设稳固,室内外地面采用
5cm厚的Cl5砂进行硬化。
2.1.3承包人应做好场、房内的安全用电和防火工作,必须按有关规定配备消防器材,
台风季节应做好防台风各项准备工作。
2.1.4承包人应搞好工地生活区环境卫生工作,对生活垃圾和污水进行合理处理,保证
周围环境整洁卫生。
2.2现场布置
2.2.1承包人应合理规划施工场地布置,在施工过程中应保证施工场地规范、整洁,应
在显著位置悬挂安全文明生产、质量管理、廉政建设等标牌标语。如图2.2.1T所示。
图2.2.17隧道施工场地规划及标牌标语布置
(1)工程简介牌:本工程的主要构造,地质情况、施工方案、分阶段的工期计划
等作一简要介绍,如图2.2.1-2所示。
图2.2.1-2工程简介牌示意
(2)安全质量保证牌:明确对该项工程的安全质量保证措施,如图2.2.1-3所示。
隧道质量管理制度隧道安全生产管理制度
一.建立・金质・保UE体•・««#«««««,一、黄1■执行”安全第一,雷用为主-的方计.■:tt・全资金变产8"体系・产
二.■卖餐■,任・•■化4Hl■■人员.■作人H的安全■城”,任。“统处・4安全
二.需支安全生产鱼口・,atr•誉生产•・管安全"
三.H逋开工务・校术人员必现时施工・厥造行审ML辨网■■作■人
三、跳行安全发术文扈■度.・修工序开工・・应■工安全I•作震*/・则.鼻
员斑行■工工芝、・・、安全、豚1111术招■交底.
向■工人员交底C
■■方可总行一工.
n.B.定・用■工人员送行安全宣符假口.不♦■・"工安全重识.
五.材H.MA.&♦、方力必AIM足做!>微冷的开工福合・米.看.5H落实事事■道■工安全校本用■.
六.牝■不合格的原材MifiUh1.,内・3,所有人员・超安全量・200f第c
七.■工中尸格宾行内9•三・・・:9:工■■•・affiXAtt*由爆“亭我震定工尸・打残♦”
且夏“分”以上.经安全员楼童伏安全
员怆■,・后曲雪取用依员矗行0・.然后向*11慑怆。2.15M•
后.才充■工忤立人团培人工作・c
八.■■■/*•大0•内・•筋•水・•♦工H0位4MlitH■■工0
5MBarmtraxsr.单内■宏亶立・险晨■开•、・
。0・、整・・・富翁•后方・遗匕下一・工♦•工・力不舍“依・.
■出设3■时,esa«»xAAttasuft.待篦事处■道■加苜必
不予tt愉.。育・履U«aW*9BTMH.
九、・遵泰线■科、超前儡轩、屈一小IMT建•、・、检及财水一・4.维工余及珥■遇内ELI:斑长、■工人员心・立叩座怠■地Iftifia・暴鼻电
••川■等关・工序、・位必・实行更鳍“身・人•守atm情・人员・鼻怠・堆盘、的施工■,人生速・伤n*妥取处理博”,
十、・日安履・、分・SL■人员龙・或不定所。・道・工队的现通5.风水■与・力H分1|也干・疑■■(’电力!!*・3•■力.■停上中
■工检术、工E■■雄行liflL并做的■■记4U下・0・灯光充足♦不存・■.尸■•电工人同包!!取按电fit
6.。本上“*.工具不—tut.M^wwx*eew>
十一.,叫l■•flrG<M1■■・承含“且精依的枝术人员例任.
人也只与防么借一彩1»足•关分原e
十二.而关■■位.・■工”人员・e■Q修上■・井尸•«?・住般网■工。
大、量为"■1”第U上■■亶・电工、电0工、越■工、■于工、务・工、M
十二.・•■住■人员«n«AMeMww^B(万碑上一•
十出"・事”及»・管.不七、发生史金口裁公修及畲.不。・・“内人■震定设行址d.
三中铁十七局集团有限公司生
•・,■永宁高速公・A8合网以『日收理・巾IJ
质量方针安全生产理念
以人为本,诚信守约,顾客满意,以人为本、Hi防为主、综合治理.
优质高效,追求卓越・安全生产方针
遵章守法,提高职工的安全素质,
质量目标
改善职工的工作条件,给社会创造更多
以“一流的材料、一流的设备、一流的工艺、一的安宁、便利。
潦的管理”四个一流为准贵,创国内一流水平.安全生产管理目标
1、工哥质・目检率达到100%,,实现壬体工程不
贯彻“安全第一、颈防为主”的方针,安全、
缺陷;
离效、优质地建成本工程,为沿线经济建设服务•
2、单位工程一次峨收合格率达到100%:完工后达到预定安全生产目标,
3、燃路工后沉降、差异沉降及结构变形有效控制】1.职工饬亡率控制在0,重伤率控制在0・
4、杜绝工程质■!»患及重大质■事故:2、其它事故,万元以上的直接经济损失控制在
年产值的0.04猿以下•
5、工程确保优良,争创精品・
3、消灭安全事故苗头,实现项目全过程安全生
产无事故目标•
,中铁十七局集团有限公司生||
■永宁♦■公路八8合同股事日^■部巾
图2.2.1-3安全质量保证牌示意
(3)施工场地布置牌:采用电脑绘制,对施工现场的布置采用图示方式表达,注
明位置、面积、功能.
(4)创优规划标识牌:主要明确该工程的创优目标及创优措施。
(5)安全生产操作规程牌;主要明确施工各工序的安全生产操作规程。
(6)廉政监督牌:主要明确施工廉政制度、廉政领导小组、廉政监督小组和廉政
监督电话等。
(7)工程质量责任人标识牌:明确建设单位、设计单位、监理单位、承包人的负
责人及承包人的项目总工、质检工程师、单位工程负责人、质检员,现场监理人、监理
员。
(8)施工进度牌:主要反映隧道掘进、初支、铺底、二衬施工进度。
(9)进洞人员动态揭示牌:要求作业人员人手一张卡片,进洞放牌,出洞翻牌。
如图2.2.1-4示意。
图2.2.1-4进洞人员动态揭示牌示意
2.2.2现场机械设备布置有序,必要时应悬挂安全操作规程。
2.2.3隧道施工现场应按照《福建省高速公路工地建设标准化指南》第4.1条的要求设
置各种标志标牌,并应按其要求制作及安装。
2.2.4进隧道口处应设置值班室,并设专人值班负责,严格执行人员进洞登记制度;长
大隧道应配置电子安全监控系统;应在洞口醒目位置设置禁止、指令标志。
2.3拌和站
2.3.1按照《关于规范高速公路拌和站、预制场、钢筋加工场建设的通知》闽高路工[2009]
172号文件“三个集中”的要求,隧道施工用混凝土应由拌和站集中供应。
2.3.2隧道初期支护喷射混凝土可由拌和站集中供应,也可在隧道洞口建设专门用于喷
射混凝土施工的小型拌和站,但须采用具有两仓自动计量的搅拌设备,其建设应符合《福
建省高速公路工地建设标准化指南》第3.1条的要求。
2.4施工供风、供水、供电
2.4.1施工供风
(1)压风站应在洞口旁边选址修建,并宜靠近变电站,应有防水、降温、保温和
防雷击设施。
(2)压风站供风能力须满足隧道正常施工需要,供风管路布置应尽量避免压力损
失,保证工作面使用风压不小于0.5MPa。
(3)供风管道前端至开挖面距离不应大于20m。
2.4.2施工供水
(1)承包人在实施和维修本工程期间,应确保施工和生活用水设施的提供、安装
和保养满足施工及生活需要,并保证施工用水要求和按国家规定的生活饮用水标准持续
不断地供水。
(2)寻找水源,按施工需要的供水压力(水压不小于0.3MPa)合理选址修建高位
水池,安装上、下水管路。
(3)对于修建高位水池困难的隧道,宜采用变频高压供水装置满足施工需要。
(4)管道前端至开挖面一般不超过20m。
2.4.3施工临时供电
隧道施工临时供电的施工组织设计、建设及维护除应符合《福建省高速公路工地建
设标准化指南》第3.1.13条的要求外,还应符合以下要求。
(1)对于短隧道应采用高压至洞口,再低压进洞;长隧道及特长隧道应考虑高、
中压进洞,以满足施需要。
(2)隧道施工供电应采用400/230V三相五线供电系统;动力设备应采用三相380V;
照明电压一般作业地段不宜大于36V,成洞段和不作业地段可采用220V,瓦斯地段不得
超过110V,手提作业灯为12〜24V;选用的导线截面应使低压线路末端要点电JE降不应
大于10%;36V及24V线不得大于5版高压分线部位应设明显危险警告标志;所有配电
箱和开关应全部进行责任人和用途标识。
(3)洞外变电站应设置防雷击和防风装置,且宜设在靠近负荷集中地点和设在电
源来线一侧;当变电站电源线需跨越施工地区时,其最低点距人行道和运输线路的最小
高度应满足:电压35KV时7.5m,电压6〜10KV时6.5m,电压400V时6m;变压器容量
应按电气设备总用量确定,当单台电动设备容量超过变压器容量1/3时,宜适当增加启
动附加容量。
洞内变电站应设置在干燥的紧急停车带或不使用的横通道内,变压器与周围及上下
洞壁的最小距离,不得小于300mm,同时应按规定设置灯光、轮廓标等安全防护设施;
洞内高压变电站之间的距离宜为1000m,由变电站分别向相反两方向供电,每一方供电
距离宜采用500m;洞内高压变电站应采用井下高压配电装置或相同电压等级的油开关
柜,不应使用跌落式熔断器,应有防尘措施。
(4)成洞地段固定的电线路,应采用绝缘良好的胶皮线架设;施工地段的临时电
线路应采用橡套电缆;瓦斯地段的输电线必须使用密封电缆,不得使用皮线;涌水隧道
的电动排水设备应采用双回路输电,并有可靠的切换装置;动力干线上每一分支线,必
须装设开关及保险装置;严禁在动力线路上加挂照明设施。
(5)照明和动力线路安装在同一侧时,必须分层架设。电线悬挂高度应满足:110V
以下电线离地面距离不应小于2m,400V时应大于2.5m,6〜10kV时不应小于3.5m。供
电线路架设一般要求高压在上、低压在下,干线在上、支线在下,动力线在上、照明线
在下。见图2.4.3。
图2.4.3洞内照明线路及应急灯布置
2.4.4施工期间“三管两线”应架设、安装顺直、整齐,应按图2.4.4所示布置。
2.5弃渣场、自办料场、危险品
库
2.5.1弃渣场
(1)隧道弃渣必须运至确定的
弃渣场弃置,不得随意乱弃。
(2)隧道施工前应详细调查,
和业主及当地政府配合,选择出渣运
输方便、距离短的场所作为弃渣场,
场地容量应可容纳隧道弃渣量。
图2.4.4三管两线布置示意图
(3)弃渣场选址应不得占用其
他工程场地和影响附近各种设施的安全;不得影响附近的农田水利设施,不占或少占农
田;不得堵塞河道、河谷,防止抬高水位和恶化水流条件;不得挤压桥梁墩台及其他建
筑物。
(4)弃渣场应按设“要求进行防护,当设II要求不能满足实际需要或设II无具体
要求时应对弃渣场的防护进行设计并报监理人批复,以确保边坡的稳定,防止水土流失、
泥石流、滑坡等危害。
2.5.2自办料场
当隧道开挖弃渣强度等指标符合规范要求、可作为结构用材料时,现场应建碎石场
以充分利用隧道弃渣,加工碎石设备应采用带除尘装置的反击破碎石机并有配套的联合
重筛分设备。
每个隧道碎石场应专门配备锤式碎石机生产喷射混凝土碎石料(见图2.5.2所示)。
喷射破应采用4.75〜13.2mm规格的碎石。
日产量在lOOn?以上的碎石场宜配置自动或
半自动水冲洗设备,以提高碎石质量。
2.5.3危险品库
2.5.3.1火工品库房的建设及管理除应符合
《福建省高速公路工地建设标准化指南》有关规
定外,还应符合以下要求C
(1)双洞中隧道及长隧道、特长隧道应设
置专用火工品库房,其他短隧道可结合其他隧道
及路基、桥涵施工集中设置。
(2)应根据施工进度计划安排及月循环进
尺核定火工品库库容量。图2.5.2锤式破碎机
2.5.3.2其他危险品,如氧气、乙焕、油料及剧毒、放射性物品等应单独建库存贮,
库房建设及管理应符合《福建省高速公路工地建设标准化指南》第3.6.11条的规定。
2.6技术准备
2.6.1施工前的调查和设计文件核对
(1)隧道施工对地表和地下既有结构物的影响C
(2)施工场地布置与洞口相邻工程、弃渣利用、农田水利、征地等的关系。
(3)建筑物、道路工程、水利工程和电信、电力线路等设施的拆迁情况和数量。
(4)施工中和运营后对自然环境、生活环境的影响及需要采取的保护措施。
(5)承包人应全面熟悉设计文件,并做好图纸审核工作。
(6)在施工调查和设计文件核对完成后,应将结果及存在的问题,以书面形式呈
送
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025下半年广东省江门开平市事业单位招聘职员128人历年高频重点提升(共500题)附带答案详解
- 2025下半年四川省广元市事业单位考试招聘13人高频重点提升(共500题)附带答案详解
- 2025上海大学行政管理岗位及部分教育辅助岗位公开招聘19人高频重点提升(共500题)附带答案详解
- 2025上半年贵州遵义市事业单位招聘1985人历年高频重点提升(共500题)附带答案详解
- 2025上半年四川自贡贡井区事业单位聘用工作人员120人历年高频重点提升(共500题)附带答案详解
- 2025上半年四川泸州古蔺县事业单位招聘工作人员189人历年高频重点提升(共500题)附带答案详解
- 高科技企业总经理招聘合同样本
- 2024年大宗货物运输与智能仓储解决方案合同范本3篇
- 万能工团队招聘合同
- 羽毛球运动员晋升制度
- 装修材料合同范例
- 共用线路三方协议合同范例
- 战略规划的关键要点
- 个人自检自查报告范文
- 食品买卖合同范本
- 期末素养质量检测卷(试题)-2024-2025学年三年级上册数学人教版
- 质控竞聘课件
- 2024年房地产开发商与承建商之间的工程承包合同
- 2024-2025学年高二上学期期中家长会-家校同频共话成长 课件
- 语文-句子成分划分名师公开课获奖课件百校联赛一等奖课件
- 班组安全争先创优竞赛活动考核细则表
评论
0/150
提交评论