铁路上跨桥-桥梁结构计算书_第1页
铁路上跨桥-桥梁结构计算书_第2页
铁路上跨桥-桥梁结构计算书_第3页
铁路上跨桥-桥梁结构计算书_第4页
铁路上跨桥-桥梁结构计算书_第5页
已阅读5页,还剩43页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

铁路上跨桥

桥梁结构计算书

第一册共一册

目录

1设计概况..............................................................................3

2设计规范...............................................................................3

3采用的计算方法和计算软件..............................................................3

4设计荷载...............................................................................3

5主要材料指标..........................................................................4

6上部结构...............................................................................4

6.135M小箱梁横向分布系数计算..........................................................4

6.235M小箱梁边梁计算..................................................................7

6.2.1模型建立及分析................................................................7

6.2.2持久状况承载能力极限状态.....................................................11

6.2.3持久状况正常使用极限状态.....................................................13

6.2.4持久状况应力验算.............................................................18

6.2.5短暂状况应力验算.............................................................20

6.335M小箱梁中梁计算.................................................................21

6.3.1模型建立及分析...............................................................21

6.3.2持久状况承载能力极限状态.....................................................25

6.3.3持久状况正常使用极限状态.....................................................26

6.3.4持久状况应力验算.............................................................31

6.3.5短暂状况应力验算.............................................................33

6.4右边梁悬臂板计算.............................................................34

6.4.1模型建立与分析...............................................................34

6.4.2计算结果......................................................................36

6.5左边梁悬臂板计算.............................................................37

6.5.1模型建立与分析...............................................................38

6.5.2计算结果......................................................................40

7下部结构.............................................................................41

1

7.1桥台计算.......................................................................41

7.1.1模型建立与分析...............................................................41

7.1.2盖梁计算结果.................................................................43

7.1.3桩基计算结果.................................................................44

7.2单桩承载力验算.................................................................46

8计算结论.............................................................................47

2

1设计概况

拟建渝贵铁路上跨桥按桥梁中心线计全长36.6m,按道路设计线计全长36.893m,起点班号

K0+464.159,终点桩号K0+501.052,正交布置,标准宽度37m。.本桥平面位于R=250的圆曲线上,纵

断面位于3.0%下坡和竖曲线段内,梁体纵坡3.46缸上部结构采用1x35m简支小箱梁,预制吊装施工;

下部结构采用轻型桥台、桩基础,桩基采用旋挖施工,干法成孔。

2设计规范

(1)《城市桥梁设计规范》(CJJ11-2011)(2019版))

(2)《城市桥梁抗震设计规范》(CJJ166-2011)

(3)《城市桥梁工程施工与质量验收规范》(CJJ2—2008)

(4)《公路桥涵设计通用规范》(JTGD60-2015)

(5)《公路钢筋混凝土及预应力混凝土桥涵设计规范》(JTG3362-2018)

(6)《公路垢工桥涵设计规范》(JTGD61-2005)

(7)《公路桥涵地基与基础设计规范》(JTG3363-2019)

(8)《公路桥涵施工技术规范》(JTG/T3650-2020)

(9)《公路交通安全设施设计规范》(JTGD81-2017)

3采用的计算方法和计算软件

(1)使用程序:MIDAS/Civil2020、桥梁博士4.0。

(2)截面设计内力:3维。

(3)构件类型::预应力建小箱梁梁为部分预应力A类构件,盖梁为钢筋混凝土构件。

(4)设计安全等级:一级。

(5)构件制作方法:小箱梁梁预制吊装。

4设计荷载

(1)一期恒载

混凝土容重26KN/m3»

(2)二期恒载

第一联:桥面铺装25KN/m,单侧防撞栏杆IKN/m,单侧人行道栏杆0.6KN/m,单侧人行道下预留综

合管网&0KN/m。单片小箱梁具体恒载由荷载横向分布计算结果确定。

收缩徐变:收缩徐变时间取10年,即3650天。

3

(3)移动荷载

汽车荷载城市-A级,人群荷载3.5kN/m,

(4)汽车制动力

制动力采用165kN或者10%车道荷载,并取两者中的较大值,但不包括冲击力。

(5)温度荷载

混凝土结构整体温度变化按升温25℃,降温2(TC取值。梯度温度按《公路桥涵设计通用规范》(JTG

D60-2015)4.3.12条取值。

(6)荷载组合:MidasCivil程序根据规范《公路桥涵设计通用规范》(JTGD60-2015)4.1.5、

4.1.6条自动组合。

5主要材料指标

(1)混凝土

混凝土材料特性

强度弹性模量剪切模量强度标准值(MPa)强度设计值(MPa)泊松比

轴心抗压轴心抗拉轴心抗压轴心抗拉

等级Ec(MPa)Gc(MPa)Vc

C30300001200020.12.0113.81.390.2

C40325001300026.82.4018.41.650.2

C50345001380032.42.6522.41.830.2

热膨胀系数:a=0.000010/℃

(2)15.2低松弛钢绞线

直径d=15.2mm;弹性模量Ep=195000MPa;抗拉强度标准值:fpk=1860MPa;张拉控制应力:

0.75fpk=1395MPa;管道摩阻擦系数:1=0.2;管道偏差系数:k=0.0015;锚具变形:A1=6硒。

(3)普通钢筋

表5.1普通钢筋材料及材料性能表

弹性模量容重fskfsdf'sd

普通钢筋

(MPa)(KN/m3)(MPa)(MPa)(MPa)

HPB300210000.00076.980300.000250.000250.000

HRB400200000.00076.980400.000330.000330.000

6上部结构

6.135m小箱梁横向分布系数计算

4

上部结构采用1x35m后张法预应力混凝土小箱梁结构,结构体系为简支结构。小箱梁梁高1.8m。

中梁顶板宽2.4m,边梁顶板宽2.6m;顶、底板及翼缘厚0.2m,根部厚0.36m,腹板厚0.2m,湿接^宽

0.45m,顶板横坡1.5机桥梁横向设置13片小箱梁。

横向分布系数选取较不利0号台横断面计算。

支飕桐

(叫的

缈卜3574!

wi।~~1

计算方法:刚(较)接板梁法

【结构描述】

主梁跨径:32.920m

材料剪切模量/弯曲模量=0.4

梁号梁宽弯惯矩扭惯矩左板宽左惯矩右板宽右惯矩连接

12.83e+0005.21e-0016.22e-0011.40e+0002.58e-0021.43e+0002.58e-002无

22.85e+0005.37e-0016.48e-0011.436+0002.58e-0021.43e+0002.58e-002较接

32.85e+0005.37e-0016.48e-0011.43e+0002.58e-0021.43e+0002.58e-002较接

42.85e+0005.37e-0016.48e-0011.43e+0002.58。-0021.43e+0002.58e_002较接

52.85e+0005.37e-0016.48e-0011.43e+0002.58e-0021.43e+0002.58e-002较接

62.85e+0005.37e-0016.48e-0011.43e+0002.58e-0021.43e+0002.58e-002较接

72.85e+0005.37e-0016.48e-0011.43e+0002.58e-0021.43e+0002.58e-002较接

82.85e+0005.37e-0016.48e-0011.43e+0002.58e_0021.43e+0002.58e-002较接

92.85e+0005.37e-0016.48e-0011.43e+0002.58e-0021.43e+0002.58e-002较接

102.85e+0005.37e-0016.48e-0011.43e+0002.58e-0021.43e+0002.58e-002较接

112.85e+0005.37e-0016.48e-0011.43e+0002.58e-0021.43e+0002.58e-002较接

122.85e+0005.37e-0016.48e-0011.43e+0002.58e-0021.43e+0002.58e-002较接

132.83e+0005.21e-0016.22e-0011.43e+0002.58e-0021.40e+0002.58e-002较接

5

【荷载信息】

桥面布置:

桥面类型桥面宽度m车道数恒载kN/m2

车行道34.280510.000

人行道3.570012.990

其他:

计算规范:2019城市规范

桥面中线至首梁中心线距离:18.500

是否自动计入车道折减:是

影响线结果

2345678910111213

00.3160.2200.1490.1010.0690.0470.0320.0220.0150.0110.0080.0060.005

1.4000.2910.2280.1550.1050.0710.0480.0330.0230.0160.0110.0080.0060.005

2.8250.2640.2370.1610.1090.0740.0500.0340.0230.0160.0110.0080.0060.005

4.2500.2220.2250.1780.1210.0820.0560.0380.0260.0180.0130.0090.0070.006

5.6750.1790.2130.1960.1330.0900.0610.0420.0280.0200.0140.0100.0080.007

7.1000.1500.1780.1910.1550.1050.0710.0490.0330.0230.0160.0120.0090.008

8.5250.1220.1440.1850.1770.1200.0820.0560.0380.0260.0180.0130.0100.009

9.9500.1020.1210.1550.1750.1440.0980.0670.0460.0310.0220.0160.0130.011

11.3750.0820.0980.1250.1720.1690.1150.0780.0530.0370.0260.0190.0150.012

12.8000.0690.0820.1050.1440.1680.1400.0950.0650.0450.0310.0230.0180.015

14.2250.0560.0660.0850.1170.1660.1650.1120.0770.0530.0370.0270.0210.018

15.6500.0470.0560.0710.0980.1400.1650.1380.0940.0650.0460.0330.0260.022

17.0750.0380.0450.0580.0790.1130.1640.1640.1120.0770.0540.0390.0310.026

18.5000.0320.0380.0490.0670.0950.1380.1640.1380.0950.0670.0490.0380.032

19.9250.0260.0310.0390.0540.0770.1120.1640.1640.1130.0790.0580.0450.038

21.3500.0220.0260.0330.0460.0650.0940.1380.1650.1400.0980.0710.0560.047

22.7750.0180.0210.0270.0370.0530.0770.1120.1650.1660.1170.0850.0660.056

24.2000.0150.0180.0230.0310.0450.0650.0950.1400.1680.1440.1050.0820.069

25.6250.0120.0150.0190.0260.0370.0530.0780.1150.1690.1720.1250.0980.082

6

27.0500.0110.0130.0160.0220.0310.0460.0670.0980.1440.1750.1550.1210.102

28.4750.0090.0100.0130.0180.0260.0380.0560.0820.1200.1770.1850.1440.122

29.9000.0080.0090.0120.0160.0230.0330.0490.0710.1050.1550.1910.1780.150

31.3250.0070.0080.0100.0140.0200.0280.0420.0610.0900.1330.1960.2130.179

32.7500.0060.0070.0090.0130.0180.0260.0380.0560.0820.1210.1780.2250.222

34.1750.0050.0060.0080.0110.0160.0230.0340.0500.0740.1090.1610.2370.264

35.6000.0050.0060.0080.0110.0160.0230.0330.0480.0710.1050.1550.2280.291

37.0000.0050.0060.0080.0110.0150.0220.0320.0470.0690.1010.1490.2200.316

汽车荷载横向分布

横向分布系数结果

梁号汽车人群恒载特载

10.5260.01929.2550

20.4990.02229,6660

30.4590.02829.3480

40.4130.03929.160

50.3820.05529.0730

60.370.0829.0730

70.3660.11829.1610

80.370.17329.3490

90.3820.25529.6680

100.40.37530.1650

110.4030.55330.9170

120.3880.81432.0340

130.3521.03932.3060

6.235m小箱梁边梁计算

6.2.1模型建立及分析

7

6.2.1.1计算模型

图1模型视图

节点数量:23个;

单元数量:22个;

边界条件数量:2个;

施工阶段数量:5个,施工步骤如下:

施工阶段1:张拉;L0天;

施工阶段2:存梁30;30.0天;

施工阶段3;存梁60;30.0天;

施工阶段4:存梁90;30.0天;

施工阶段5:CS2;3650.0天;

6.2.1.2荷载工况及荷载组合

自重

自重系数:T.04

徐变收缩

收缩龄期:3.0天;

理论厚度自动计算:由程序自动计算各构件的理论厚度。公式为:

h=aXAc/u;

u=Lo+aXLi;

一周长u的计算公式中L。为外轮廓周长,L为内轮廓周长,a为要考虑轮廓周长的比例系数。

可变荷载

8

活载:汽车荷载,桥梁等级为公路I级;

对于汽车荷载纵向整体冲击系数口,按照《公路桥涵通用设计规范》第4.3.2条,冲击系数u可

按下式计算:

当fVL5Hz时,口=0.05;

当1.5HzWfW14Hz时,P=0.17671n(f)-0.0157;

当f>14Hz时,U=0.45;

根据规范,计算的结构基频f=2.99Hz,冲击系数U=0.178。

荷载组合

表2荷载工况

序号工况名称描述

1钢束一次TP

2钢束二次TS

3恒荷载DL

4温度梯度降TPG1

5温度梯度升TPG

6收缩二次SS

7徐变二次CS

8人群荷载0.019MCRL

9汽车荷载0.537M

荷载组合列表:

基本1:基本;1.200(DL)+1.200(TS)+1.000(CS)+1.000(SS);

基本2:基本;1.200(DL)+1.200(TS)+1.000(CS)+1.000(SS)+1.400(M);

基本3:基本;1.200(DL)+l.200(TS)+1.000(CS)+1.000(SS)+l.400(MCRL);

基本4:基本;1.200(DL)+1.200(TS)+1.000(CS)+1.000(SS)+l.400(TPG);

基本5:基本;1.200(DL)+l.200(TS)+1.000(CS)+1.000(SS)+l.400(TPG1);

基本6:基本;1.200(DL)+1.200(TS)+1.000(CS)+1.000(SS)+1.400(M)+1.050(MCRL);

基本7:基本;1.200(DL)+1.200(TS)+1.000(CS)+1.000(SS)+1.400(M)+1.050(TPG);

基本8:基本;1.200(DL)+1.200(TS)+1.000(CS)+1.000(SS)+l.400(M)+1.050(TPG1);

9

基本9:基本;1.200(DL)+1.200(TS)+1.000(CS)+1.000(SS)+l.400(M)+l.050(MCRL)+1.050(TPG);

基本10:基本;

1.200(DL)+1.200(TS)+1.000(CS)+1.000(SS)+1.400(.M)+l.050(MCRL)+1.050(TPG1);

基本11:基本;1.000(DL)+1.000(TS)+1.000(CS)+1.000(SS);

基本12:基本;1.000(DL)+l.000(TS)+l.000(CS)+l.000(SS)+l.400(M);

基本13:基本;1.000(DL)+l.000(TS)+l.000(CS)+l.000(SS)+l.400(MCRL);

基本14:基本;1.000(DL)+1.000(TS)+1.000(CS)+1.000(SS)+1.400(TPG);

基本15:基本;1.000(DL)+1.000(TS)+l.000(CS)+l.000(SS)+l.400(TPG1);

基本16:基本;1.000(DL)+l.000(TS)+l.000(CS)+l.000(SS)+l.400(M)+l.050(MCRL);

基本17:基本;1.000(DL)+l.000(TS)+l.000(CS)+l.000(SS)+l.400(M)+l.050(TPG);

基本18:基本;1.000(DL)+1.000(TS)+1.000(CS)+1.000(SS)+1.400(M)+l.050(TPG1);

基本19:基本;

1.000(DL)+1.000(TS)+1.000(CS)+1.000(SS)+1.400(M)+l.050(MCRL)+1.050(TPG);

基本20:基本;

1.000(DL)+1.000(TS)+1.000(CS)+1.000(SS)+1.400(M)+l.050(MCRL)+1.050(TPG1);

频遇1:频遇;1.000(DL)+l.000(TP)+1.000(TS)+1.000(CS)+l.000(SS)+1.000(MCRL);

频遇2:频遇;1.000(DL)+l.000(TP)+1.000(TS)+1.000(CS)+l.000(SS)+0.800(TPG);

频遇3:频遇;1.000(DL)+l.000(TP)+1.000(TS)+1.000(CS)+l.000(SS)+0.800(TPGl);

频遇4:频遇;1.000(DL)+1.000(TP)+1.000(TS)+1.000(CS)+l.000(SS)+0.594(M);

频遇5:频遇;1.000(DL)+l.000(TP)+1.000(TS)+1.000(CS)+l.000(SS)+0.594(M)+0.400(MCRL);

频遇6:频遇;1.000(DL)+1.000(TP)+1.000(TS)+1.000(CS)+l.000(SS)+0.594(M)+0.800(TPG);

频遇7:频遇;1.000(DL)+l.000(TP)+1.000(TS)+1.000(CS)+l.000(SS)+0.594(M)+0.800(TPG1);

频遇8:频遇;

1.000(DL)+1.000(TP)+1.000(TS)+1.000(CS)+1.000(SS)+0.594(M)+0.400(MCRL)+0.800(TPG);

频遇9:频遇;

1.000(DL)+l.000(TP)+1.000(TS)+l.000(CS)+l.000(SS)+0.594(M)+0.400(MCRL)+0.800(TPG1);

准永久1:准永久;1.000(DL)+1.000(TP)+1.000(TS)+1.000(CS)+l.000(SS)+0.400(MCRL);

准永久2:准永久;1.000(DL)+l.000(TP)+1.000(TS)+1.000(CS)+l.000(SS)+0.800(TPG);

准永久3:准永久;1.000(DL)+l.000(TP)+1.000(TS)+1.000(CS)+l.000(SS)+0.800(TPG1);

准永久4:准永久;1.000(DL)+l.000(TP)+1.000(TS)+1.000(CS)+l.000(SS)+0.340(M);

10

准永久5:准永久;

1.000(DL)+1.000(TP)+1.000(TS)+1.000(CS)+1.000(SS)+0.340(M)+0.400(MCRL);

准永久6:准永久;

1.000(DL)+1.000(TP)+1.000(TS)+1.000(CS)+1.000(SS)+0.340(M)+0.800(TPG);

准永久7:准永久;

1.000(DL)+1.000(TP)+1.000(TS)+1.000(CS)+1.000(SS)+0.340(M)+0.800(TPG1);

准永久8:准永久;

1.000(DL)+1.000(TP)+1.000(TS)+1.000(CS)+1.000(SS)+0.340(M)+0.400(MCRL)+0.800(TPG);

准永久9:准永久;

1.000(DL)+l.000(TP)+1.000(TS)+l.000(CS)+l.000(SS)+0.340(M)+0.400(MCRL)+0.800(TPG1);

挠度1:挠度;1.000(DL)+0.594(M)+1.000(MCRL);

挠度2:挠度;0.594(M)+1.000(MCRL);

挠度3:挠度;1.000(DL)+0.297(M)+0.500(MCRL);

应力1:标准;1.000(DL)+1.000(TP)+1.000(TS)+1.000(CS)+1.000(SS)+1.000(MCRL);

应力2:标准;1.000(DL)+l.000(TP)+1.000(TS)+1.000(CS)+l.000(SS)+1.000(TPG);

应力3:标准;1.000(DL)+l.000(TP)+1.000(TS)+1.000(CS)+l.000(SS)+1.000(TPG1);

应力4:标准;1.000(DL)+1.000(TP)+1.000(TS)+1.000(CS)+l.000(SS)+0.849(M):

应力5:标准;1.000(DL)+1.000(TP)+1.000(TS)+1.000(CS)+l.000(SS)+0.849(M)+1.000(MCRL);

应力6:标准;1.000(DL)+1.000(TP)+1.000(TS)+1.000(CS)+l.000(SS)+0.849(M)+l.OOO(TPG);

应力7:标准;1.000(DL)+1.000(TP)+1.000(TS)+1.000(CS)+1.000(SS)+0.849(M)+1.000(TPG1);

应力8:标准;

1.000(DL)+1.000(TP)+1.000(TS)+1.000(CS)+1.000(SS)+0.849(M)+1.000(MCRL)+1.000(TPG);

应力9:标准;

1.000(DL)+1.000(TP)+1.000(TS)+1.000(CS)+1.000(SS)+0.849(M)+1.000(MCRL)+1.000(TPG1);

6.2.2持久状况承载能力极限状态

6.2.2.1正截面抗弯验算

11

距构件犯起始点距离m)

E

Z

-rMu(Mac)Mn(包XMax)-、rMu(Min)Mn(包XMin)

图表1持久状况正截面抗弯验算包络图

结论:

按照《桥规》第5.1.2-1条Y°SWR验算,结构的重要性系数*作用效应的组合设计最大值W构件

承载力设计值,满足规范要求;

6.2.2.2斜截面抗剪验算

Z

K

-rVd(Max)—Vn(Max)-*rVd(Min)—Vn(Min)

图表2持久状况斜截面抗剪验算包络图

结论:

按照《桥规》第5.1.2-1条Y(jSWR验算,结构的重要性系数*作用效应的组合设计最大值W构件

承载力设计值,满足规范要求;

按照《桥规》第5.2.11条进行抗剪截面验算,满足规范要求;

12

6.2.2.3支反力计算

表3支反力计算表

FxFyFzMxMyMz

支座节点荷载

(kN)(kN)(kN)(kN.m)(kN.m)(kN.m)

22应力50.0000.0001493.9150.0000.0000.000

2应力80.0000.0001493.9150.0000.0000.000

6.2.3持久状况正常使用极限状态

6.2.3.1正截面抗裂验算

全预应力混凝土构件,在作用(荷载)频遇效应组合下,应符合下列条件:

预制构件:。st-0.85。pcWO

分段浇筑或砂浆接缝的纵向分块构件:Os「0.80O/W0

A类预应力混凝土构件,在作用(荷载)频遇效应组合下,应符合下列条件:

。st-opc^O.7ftk

A类预应力混凝土构件,在作用(荷载)准永久效应组合下,应符合下列条件:

oit-。pcWO

B类预应力混凝土构件,在结构自重作用下控制截面受拉边缘不得消压:

o-opcWO

H一

W

4.77542

256528-

-1.855

03691215182124273033

距构件祖起始点距离向)

-Sig_TMAX(疑效底)---Sig_ALW(原效应)

图表3使用阶段正截面抗裂验算(频遇-顶)包络图

13

图表4使用阶段正截面抗裂验算(频遇-底)包络图

结论:

按照《桥规》第6.3.1-3条公式。st-。pcW0.7ftk验算:

顶缘。st-。pc=3.216MPa(压应力)WO.7ffk=1.855MPa(拉应力),满足规范要求;

底缘。st-。pc=2.659MPa(压应力)WO.7ftk=1.855MPa(拉应力),满足规范要求;

-

dp

KE

H国

379232

189616

0-

03691215182124273033

距构件期起始点距离(E)

™Sig_TMAX唯永久效应)------Sig_ALW唯永久效应)

图表5使用阶段正截面抗裂验算(准永久-顶)包络图

14

19

683

£

2

K

-

276

273

33

30

27

24

21

18

15

12

9

6

3

离(m)

点距

起始

件犯

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

最新文档

评论

0/150

提交评论