下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
NATIONALTRANSPORTATIONSAFETYBOARD
OfficeofResearchandEngineering
MaterialsLaboratoryDivision
Washington,D.C.20594
July31,2009
SAFETYBOARD
MATERIALSLABORATORYFACTUALREPORT
ReportNo.09-046
A.ACCIDENT
Place
:Tampa,Florida.
Date
:May9,2009.
Vehicle
1995SeaRaySundancer.
NTSBNo.
DCA09SM015.
Investigator
:LarryD.Bowling.
B.COMPONENTSEXAMINED
Gasolinecondenserassembly.
C.DOCUMENTSREVIEWED
1.WesterbekeCorporationdrawing38051.Condenser,gasoline,sub-assembly.
2.WesterbekeCorporationdrawing38127.Coil,gasolinecondenser.
3.WesterbekeCorporationdrawing38201.Gasolinecondenser,finalassembly.
D.DETAILSOFTHEEXAMINATION
Thegasoline-condenserassemblyreceivedforexaminationandleaktestingis
illustratedandidentifiedinFigure1withcoolingwaterhosesstillattached.Thecondenser
assemblyhadreportedlybeenremovedfromthefuellinethatsuppliedfueltothegasoline
enginethatpoweredthevessel'selectricalgenerator.Thegeneratorwasreportedly
manufacturedbyWesterbekeCorporation(Taunton,MA)andratedat4.5kilowatts.
Areviewofdrawings38051and38127(documents1and2respectivelyinsection
C)revealedthatthecondenserassemblyconsistsofacoppertube,1-inchdiameterx6
incheslong,withasoftcoppertube,0.31-inchdiameterandapproximately18incheslong,
coiledarounditapproximately8times.Ononeendofthecoppercoilafemalethreaded
connectorissilversolderedinplaceandontheotherendaflarenutisinstalledandthe
coppertubingisflared.Areviewofdrawing38201(document3insectionC)revealedthat
theconnectorwasattachedtothefuelsupplylineandtheflaredendwasattachedtothe
fuelpump.Thecoilwascoveredwithalengthofwaterhosethatwassplitlongitudinally,
placedonthecoilsandwrappedwithanadhesivealuminumfoiltape.Thefoiltapeandthe
hoseweretoberetainedonthecoilbytwohoseclamps.Thehose,thefoiltapeandone
NTSBNo.DCA09SM015
ReportNo.09-046
PageNo.2
remaininghoseclamparealsoidentifiedinFigure1.Itwasnotedthatthecondenser
assemblyandoneofthecoolingwaterhoseshadbeenpaintedredatonetime.
Inordertoexaminethecondenser,thecoolingwaterhosesidentifiedinFigure1
wereremovedtorevealbothendsofthecoolingwatertube.Thehoseclamponthe
condenserwasremovedandthealuminumfoilwascutalongthelongitudinalaxisofthe
waterhose.Thewaterhose,withthefoilstilladheredtoit,wasremovedtorevealthecoils
ofthecondensercoil.Theexposedcoolingwatertubeandcondensercoilareillustrated
andidentifiedinFigure2withthefuelsupplyconnectorandtheflarenut(withtheflare)
identified.Toprovideasealbetweenthecoolingwatertubeandthewaterhoses,theends
ofthetubewerecircumferentiallydeformedafterthecoilwasinstalledtoproducethe\"bib\"
identifiedinFigure2.Examinationofthecondensercoilandthecoolingwatertube
revealedthegreencorrosionproductindicatedbytheyellowarrowsinFigure2and
commonlyknownasverdigris'.
Thecondensercoilwasremovedfromthecoolingwatertubebycuttingthetube
adjacenttooneofthebibsandslidingthecoiloff.Thecoilwasmicroscopicallyexamined
andthenreexaminedaftercleaninginadetergentsolution.Inbothconditions,the
examinationrevealednosignificantlossofmaterialorholesinthetube.Theendofthecoil
adjacenttothefuelsupplyconnectorisillustrated,asremoved,intheleftimageinFigure3
withgreenarrowsindicatingtheverdigrisandaredarrowindicatingaslighttwisttothe
tubing,afeatureconsistentwiththeconnectorbeingallowedtorotateslightlywhen
connectedtothefuelsupply.Theendofthecoiladjacenttothefuelsupplyconnectoris
illustratedintherightimageinFigure3aftercleaning,withwhitearrowsindicatingthe
patinathatwasbelowtheverdigrisandyellowarrowsindicatingremainingverdigris.The
endofthecoiladjacenttotheflarenutisillustrated,asremoved,intheleftimageinFigure
4withyellowarrowsindicatingtheverdigris.Theendofthecoil,aftercleaning,is
illustratedintherightimageinFigure4withwhitearrowsindicatingthepatinathatwas
belowtheverdigrisandyellowarrowsindicatingremainingverdigris.
Examinationoftheflaredendofthecondensercoilrevealedthattheflaredseatwas
undamaged,uniformlycolored,anddisplayedarelativelysmoothsurfacewith
circumferentialmarks,featuresconsistentwithitprovidingasealedconnectionwhenitwas
installedinthefuelpump.Anendviewoftheflaredendisillustratedintheleftimagein
Figure5withwhitearrowsindicatingtheflaredseat.Thebluearrowsindicatemechanical
damagethatwaslocatedoutsideoftheflaredseat.
ExaminationofthefuelsupplyconnectoridentifiedinFigure2revealedpatchesof
redpaintontheoutersurfaceandagreydeposit,consistentwithathreadsealant,onthe
firsttwointernalthreads.Thethreadswereintactwithnoindicationofanydeformation
indicativeofbeingcross-threaded.Anendviewofthefuelsupplyconnectorisillustratedin
'Verdigrisisthecommonnameforthegreencoatingformedwhencopper,brassorbronzeisweatheredand
exposedtoairorseawateroveraperiodoftime.Initially,theexposurediscolorsanddarkensthesurfaceandis
oftenreferredtoas\"patina\".
NTSBNo.DCA09SM015
ReportNo.09-046
PageNo.3
therightimageinFigure5withredarrowsindicatingthegreydepositandwhitearrows
indicatingredpaintobservedonthedeposit.
Althoughthevisualexaminationrevealednoholesinthecondensercoilaleaktest
wasperformed.Bothendsofthecoilweresealedandpressurizedairwasintroduced
throughoneoftheseals.Thepressurizedcoilwasthenimmersedinwaterandtherewere
noescapingbubblesofairtoindicatealeak.
Astheflaredendofthecoilassemblydisplayedfeaturesconsistentwithagoodseal
andthefuelsupplyconnectordisplayedtheuseofasealant,thematingfuelsupply
connector(withaportionofhose)wasrequested.Thefuelsupplyhosesuppliedis
illustratedinFigure6withtheelbowthatwasreportedlyscrewedintothefuelsupply
connectoridentified.TheinsetinFigure6isacloserviewoftheelbowthreadthatwas
originallyengagedinthefuelsupplyconnector.Intheinset,theredarrowindicatessome
ofthegreythreadsealantandredpaint.Theyellowarrowindicatestheterminationofthe
sealant/paint,suggestingthatthreethreadswereengagedinthefuelsupplyconnector.
Thefuelsupplyhoseelbowwasthenscrewedintothematingthreadinthefuelsupply
connectoruntilthesealant/paintterminationcontactedthefuelsupplyconnector.The
condensercoilandfuelsupplyhosewerethensealedasbeforeandimmersedinwater
untiltheelbowwascovered.Theassemblywaspressurizedandtherewerenoescaping
bubblesofairtoindicatealeak.
DerekNash
MechanicalEngineer
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 13《桥》说课稿-2024-2025学年六年级上册语文统编版
- 增材制造与创新设计:从概念到产品 课件 第6、7章 3D打印产品创新结构设计、增材制造创新综合应用实例
- 2024技术开发合同约定的技术成果交付和保密
- 农科创新之路
- 科技引领电商新纪元
- 12 故宫博物院(说课稿)-2024-2025学年统编版语文六年级上册
- 基于信任关系产生的租赁合同范本(2篇)
- 专项活动策划委托:2024年合作合同版B版
- 2024年版混砖结构烟囱拆除操作合同版B版
- 10-1《劝学》说课稿 2024-2025学年统编版高中语文必修上册
- (自考)经济学原理中级(政经)课件 第二章 商品和货币
- ×××老旧小区改造工程施工组织设计(全面)
- 建筑展望与未来发展趋势
- “互联网+”大学生创新创业大赛计划书一等奖
- 水土保持方案投标文件技术部分
- GB/T 3324-2024木家具通用技术条件
- 专题3-6 双曲线的离心率与常用二级结论【12类题型】(原卷版)-A4
- 2024年人力资源年度工作总结参考(2篇)
- DB52T 1776.1-2023 耕地质量等别评价 第1部分:评价规范
- BIM工程师年终总结
- 钉钉OA办公系统操作流程培训
评论
0/150
提交评论