管网水力计算目录1
管径确定2
水力计算案例管径确定01一、管径确定计算公式:
D-管段直径,m;q-管段流量,m3/s;υ—管中流速,m/s。
vmax<2.5~3m/s;vmin>0.6m/s(1)设计流速小,管径大,管网造价增加;水头损失减小,水泵扬程降低,电费降低。(2)设计流速大,管径就小,管网的造价就会降低,但管段水头损失增大,所需的水泵扬程将提高。管网费用与流速的关系经济流速:一定年限T年内管网造价和管理费用(主要是电费)之和最小的流速。一、管径确定管
径(mm)平均经济流速(m/s)管径(mm)平均经济流速(m/s)100~3500.6~0.9≥4000.9~1.4经济流速法经济流速法管径(mm)界限流量(L/s)管径(mm)界限流量(L/s)管径(mm)界限流量(L/s)100<935068~96700355~4901509~1540096~130800490~68520015~28.5450130~168900685~82225028.5~45500168~2371000822~112030045~68600237~355水力计算案例02某镇给水管网布置及管段长度如图所示。管网最高用水时用水量Qh=97.15L/s,各节点流量标注于图上。各点最小服务水头相同Hc=20m。各点地面高程及吸水井最低水位列于表1。试进行树状网水力计算。树状网水力计算节点01234567地面高程(m)32.032.532.131.432.734.233.1531.8节点89101112吸水井水塔地面高程(m)32.132.032.332.032.329.032.0表1节点地面高程二、水力计算案例树状网水力计算节点01234567地面高程(m)32.032.532.131.432.734.233.1531.8节点89101112吸水井水塔地面高程(m)32.132.032.332.032.329.032.0表1节点地面高程二、水力计算案例
首先选择控制点,确定干管管线。二、水力计算案例根据控制点,编写干管管段编号。表2干线水力计算管段管长L(m)流量q(L/s)管径D(m)流速υ(m/s)水力坡度1000i水头损失(m)节点水压高程(m)地面高程(m)自由水压(m)①②③④⑤⑥⑦⑧⑨⑩⑪
5~43006.951000.918.15.43554.234.220.0459.6332.726.934~320034.152500.73.450.69360.3231.428.923~236058.853000.833.71.33261.6532.129.552~145088.653500.923.711.67163.3232.530.821~041097.153501.014.371.79065.1132.033.11实际长度。表2干线水力计算管段管长L(m)流量q(L/s)管径D(m)流速υ(m/s)水力坡度1000i水头损失(m)节点水压高程(m)地面高程(m)自由水压(m)①②③④⑤⑥⑦⑧⑨⑩
⑪
5~43006.951000.918.15.43554.234.220.0459.6332.726.934~320034.152500.73.450.69360.3231.428.923~236058.853000.833.71.33261.6532.129.552~145088.653500.923.711.67163.3232.530.821~041097.153501.014.371.79065.1132.033.11二、水力计算案例管段流量指本管段后所有节点流量之和。表2干线水力计算管段管长L(m)流量q(L/s)管径D(m)流速υ(m/s)水力坡度1000i水头损失(m)节点水压高程(m)地面高程(m)自由水压(m)①②③④⑤⑥⑦⑧⑨⑩
⑪
5~43006.951000.918.15.43554.234.220.0459.6332.726.934~320034.152500.73.450.69360.3231.428.923~236058.853000.833.71.33261.6532.129.552~145088.653500.923.711.67163.3232.530.821~041097.153501.014.371.79065.1132.033.11二、水力计算案例干管:对起点水压未知的管网计算,参考经济流速确定D、流速和水力坡度Dmin=100mm表2干线水力计算管段管长L(m)流量q(L/s)管径D(m)流速υ(m/s)水力坡度1000i水头损失(m)节点水压高程(m)地面高程(m)自由水压(m)①②③④⑤⑥⑦⑧⑨⑩
⑪
5~43006.951000.918.15.43554.234.220.0459.6332.726.934~320034.152500.73.450.69360.3231.428.923~236058.853000.833.71.33261.6532.129.552~145088.653500.923.711.67163.3232.530.821~041097.153501.014.371.79065.1132.033.11水头损失一般100m不超过1m二、水力计算案例干管:对起点水压未知的管网计算,参考经济流速确定D、流速和水力坡度Dmin=100mm表2干线水力计算管段管长L(m)流量q(L/s)管径D(m)流速υ(m/s)水力坡度1000i水头损失(m)节点水压高程(m)地面高程(m)自由水压(m)①②③④⑤⑥⑦⑧⑨⑩
⑪
5~43006.951000.918.15.43554.234.220.0459.6332.726.934~320034.152500.73.450.69360.3231.428.923~236058.853000.833.71.33261.6532.129.552~145088.653500.923.711.67163.3232.530.821~041097.153501.014.371.79065.1132.033.11二、水力计算案例干管:对起点水压未知的管网计算,参考经济流速确定D、流速和水力坡度Dmin=100mm表2干线水力计算管段管长L(m)流量q(L/s)管径D(m)流速υ(m/s)水力坡度1000i水头损失(m)节点水压高程(m)地面高程(m)自由水压(m)①②③④⑤⑥⑦⑧⑨⑩
⑪
5~43006.951000.918.15.43554.234.220.0459.6332.726.934~320034.152500.73.450.69360.3231.428.923~236058.853000.833.71.33261.6532.129.552~145088.653500.923.711.67163.3232.530.821~041097.153501.014.371.79065.1132.033.11水头损失一般100m不超过1m二、水力计算案例干管:对起点水压未知的管网计算,参考经济流速确定D、流速和水力坡度Dmin=100mm管段管长L(m)流量q(L/s)管径D(m)流速υ(m/s)水力坡度1000i水头损失(m)节点水压高程(m)地面高程(m)自由水压(m)①②③④⑤⑥⑦⑧⑨⑩
⑪
5~43006.951000.918.15.43554.234.220.0459.6332.726.934~320034.152500.73.450.69360.3231.428.923~236058.853000.833.71.33261.6532.129.552~145088.653500.923.711.67163.3232.530.821~041097.153501.014.371.79065.1132.033.11二、水力计算案例水头损失(7)=
1000i(6)/1000×管长L(2)=表2干线水力计算管段管长L(m)流量q(L/s)管径D(m)流速υ(m/s)水力坡度1000i水头损失(m)节点水压高程(m)地面高程(m)自由水压(m)①②③④⑤⑥⑦⑧⑨⑩
⑪
5~43006.951000.918.15.43554.234.220.0459.6332.726.934~320034.152500.73.450.69360.3231.428.923~236058.853000.833.71.33261.6532.129.552~145088.653500.923.711.67163.3232.530.821~041097.153501.014.371.79065.1132.033.11二、水力计算案例节点表2干线水力计算管段管长L(m)流量q(L/s)管径D(m)流速υ(m/s)水力坡度1000i水头损失(m)节点水压高程(m)地面高程(m)自由水压(m)①②③④⑤⑥⑦⑧⑨⑩
⑪
5~43006.951000.918.15.43554.234.220.0459.6332.726.934~320034.152500.73.450.69360.3231.428.923~236058.853000.833.71.33261.6532.129.552~145088.653500.923.711.67163.3232.530.821~041097.153501.014.371.79065.1132.033.11二、水力计算案例地面高程题目中读取表2干线水力计算管段管长L(m)流量q(L/s)管径D(m)流速υ(m/s)水力坡度1000i水头损失(m)节点水压高程(m)地面高程(m)自由水压(m)①②③④⑤⑥⑦⑧⑨⑩
⑪
5~43006.951000.918.15.43554.234.220.0459.6332.726.934~320034.152500.73.450.69360.3231.428.923~236058.853000.833.71.33261.6532.129.552~145088.653500.923.711.67163.3232.530.821~041097.153501.014.371.79065.1132.033.11二、水力计算案例节点01234567地面高程(m)32.032.532.131.432.734.233.1531.8节点89101112吸水井水塔地面高程(m)32.132.032.332.032.329.032.0第一步:控制点自由水压直接填写要求最低压力20m;第二步:水压高程(9)=地面高程(10)+自由水压20第三步:本管段水压高程(9)43=上管段(9)54+水头损失(7)54第四步:(11)4=(9)4-(10)4表2干线水力计算管段管长L(m)流量q(L/s)管径D(m)流速υ(m/s)水力坡度1000i水头损失(m)节点水压高程(m)地面高程(m)自由水压(m)①②③④⑤⑥⑦⑧⑨⑩
⑪
5~43006.951000.918.15.43554.234.220.0459.6332.726.934~320034.152500.73.450.69360.3231.428.923~236058.853000.833.71.33261.6532.129.552~145088.653500.923.711.67163.3232.530.821~041097.153501.014.371.79065.1132.033.11二、水力计算案例
管网水力计算(支管)某镇给水管网布置及管段长度如图所示。管网最高用水时用水量Qh=97.15L/s,各节点流量标注于图上。各点最小服务水头相同Hc=20m。各点地面高程及吸水井最低水位列于表1。试进行树状网水力计算。树状网水力计算节点01234567地面高程(m)32.032.532.131.432.734.233.1531.8节点89101112吸水井水塔地面高程(m)32.132.032.332.032.329.032.0表1节点地面高程水力计算案例支管水力计算案例管段管长L(m)流量q(L/s)管径D(m)流速υ(m/s)水力坡度i参考水力坡度i水头损失(m)节点水压高程(m)地面高程(m)自由水压(m)①②③④⑤⑥⑦⑧⑨⑩⑪
⑫
1-112002.01000.260.001940.05660.39163.3232.530.821162.9332.030.932-102605.11000.660.01040.0362.70261.6532.129.551058.9532.326.652-124009.91250.830.01170.02344.68261.6532.129.551256.9732.324.673-92502.51000.320.002880.03330.72360.3231.428.92959.632.027.64-616019.41501.120.01610.04052.58459.6332.726.93657.0533.1523.93-737010.31250.850.01220.01394.51360.3231.428.92755.8131.824.017-82202.51000.320.002880.01390.63855.1832.123.08表
支管水力计算管段树状网水力计算支管水力计算案例管段管长L(m)流量q(L/s)管径D(m)流速υ(m/s)水力坡度i参考水力坡度i水头损失(m)节点水压高程(m)地面高程(m)自由水压(m)①②③④⑤⑥⑦⑧⑨⑩⑪
⑫
1-112002.01000.260.001940.05660.39163.3232.530.821162.9332.030.932-102605.11000.660.01040.0362.70261.6532.129.551058.9532.326.652-124009.91250.830.01170.02344.68261.6532.129.551256.9732.324.673-92502.51000.320.002880.03330.72360.3231.428.92959.632.027.64-616019.41501.120.01610.04052.58459.6332.726.93657.0533.1523.93-737010.31250.850.01220.01394.51360.3231.428.92755.8131.824.017-82202.51000.320.002880.01390.63855.1832.123.08表
支管水力计算实际长度树状网水力计算支管水力计算案例管段管长L(m)流量q(L/s)管径D(m)流速υ(m/s)水力坡度i参考水力坡度i水头损失(m)节点水压高程(m)地面高程(m)自由水压(m)①②③④⑤⑥⑦⑧⑨⑩⑪
⑫
1-112002.01000.260.001940.05660.39163.3232.530.821162.9332.030.932-102605.11000.660.01040.0362.70261.6532.129.551058.9532.326.652-124009.91250.830.01170.02344.68261.6532.129.551256.9732.324.673-92502.51000.320.002880.03330.72360.3231.428.92959.632.027.64-616019.41501.120.01610.04052.58459.6332.726.93657.0533.1523.93-737010.31250.850.01220.01394.51360.3231.428.92755.8131.824.017-82202.51000.320.002880.01390.63855.1832.123.08表
支管水力计算根据节点流量计算树状网水力计算支管水力计算案例管段管长L(m)流量q(L/s)管径D(m)流速υ(m/s)水力坡度i参考水力坡度i水头损失(m)节点水压高程(m)地面高程(m)自由水压(m)①②③④⑤⑥⑦⑧⑨⑩⑪
⑫
1-112002.01000.260.001940.05660.39163.3232.530.821162.9332.030.932-102605.11000.660.01040.0362.70261.6532.129.551058.9532.326.652-124009.91250.830.01170.02344.68261.6532.129.551256.9732.324.673-92502.51000.320.002880.03330.72360.3231.428.92959.632.027.64-616019.41501.120.01610.04052.58459.6332.726.93657.0533.1523.93-737010.31250.850.01220.01394.51360.3231.428.92755.8131.824.017-82202.51000.320.002880.01390.63855.1832.123.08表
支管水力计算节点树状网水力计算支管水力计算案例管段管长L(m)流量q(L/s)管径D(m)流速υ(m/s)水力坡度i参考水力坡度i水头损失(m)节点水压高程(m)地面高程(m)自由水压(m)①②③④⑤⑥⑦⑧⑨⑩⑪
⑫
1-112002.01000.260.001940.05660.39163.3232.530.821162.9332.030.932-102605.11000.660.01040.0362.70261.6532.129.551058.9532.326.652-124009.91250.830.01170.02344.68261.6532.129.551256.9732.324.673-92502.51000.320.002880.03330.72360.3231.428.92959.632.027.64-616019.41501.120.01610.04052.58459.6332.726.93657.0533.1523.93-737010.31250.850.01220.01394.51360.3231.428.92755.8131.824.017-82202.51000.320.002880.01390.63855.1832.123.08表
支管水力计算题目中读取节点01234567地面高程(m)32.032.532.131.432.734.233.1531.8节点89101112吸水井水塔地面高程(m)32.132.032.332.032.329.032.0管段管长L(m)流量q(L/s)管径D(m)流速υ(m/s)水力坡度i参考水力坡度i水头损失(m)节点水压高程(m)地面高程(m)自由水压(m)①②③④⑤⑥⑦⑧⑨⑩⑪
⑫
1-112002.01000.260.001940.05660.39163.3232.530.821162.9332.030.932-102605.11000.660.01040.0362.70261.6532.129.551058.9532.326.652-124009.91250.830.01170.02344.68261.6532.129.551256.9732.324.673-92502.51000.320.002880.03330.72360.3231.428.92959.632.027.64-616019.41501.120.01610.04052.58459.6332.726.93657.0533.1523.93-737010.31250.850.01220.01394.51360.3231.428.92755.8131.824.017-82202.51000.320.002880.01390.63855.1832.123.08表
支管水力计算支管属于起点水压已知的管网支管水力计算案例管段管长L(m)流量q(L/s)管径D(m)流速υ(m/s)水力坡度i参考水力坡度i水头损失(m)节点水压高程(m)地面高程(m)自由水压(m)①②③④⑤⑥⑦⑧⑨⑩⑪
⑫
1-112002.01000.260.001940.05660.39163.3232.530.821162.9332.030.932-102605.11000.660.01040.0362.70261.6532.129.551058.9532.326.652-124009.91250.830.01170.02344.68261.6532.129.551256.9732.324.673-92502.51000.320.002880.03330.72360.3231.428.92959.632.027.64-616019.41501.120.01610.04052.58459.6332.726.93657.0533.1523.93-737010.31250.850.01220.01394.51360.3231.428.92755.8131.824.017-82202.51000.320.002880.01390.63855.1832.123.08表
支管水力计算对于起点水压已知的管网,计算时,参考允许的水力坡度确定D和实际水力坡度。例如:管段4~6,末点6最小服务水头20m,则要求的水压高程最小为20+33.15=53.15m,起点4的水压高程为59.63m,则管段4~6允许的最大水头损失为59.63-53.15=6.48m,允许的最大水力坡度为6.48/160=0.0405,将该值填入第7栏参考水力坡度。其它管段以此类推。支管水力计算案例支管水力计算案例管段管长L(m)流量q(L/s)管径D(m)流速υ(m/s)水力坡度i参考水力坡度i水头损失(m)节点水压高程(m)地面高程(m)自由水压(m)①②③④⑤⑥⑦⑧⑨⑩⑪
⑫
1-112002.01000.260.001940.05660.39163.3232.530.821162.9332.030.932-102605.11000.660.01040.0362.70261.6532.129.551058.9532.326.652-124009.91250.830.01170.02344.68261.6532.129.551256.9732.324.673-92502.51000.320.002880.03330.72360.3231.428.92959.632.027.64-616019.41501.120.01610.04052.58459.6332.726.93657.0533.1523.93-737010.31250.850.01220.01394.51360.3231.428.92755.8131.824.017-82202.51000.320.002880.01390.63855.1832.123.08
支管水力计算支管水力计算案例查水力计算表确定管径,并使其对应的水力坡度最接近参考水力坡度而又不大于参考水力坡度。如管段4~6选用150mm管径,流速1.12m/s,已超出经济流速范围,但对应的水力坡度0.0161并未超出参考水力坡度,因此可行。
支管水力计算案例
根据实际水力坡度0.0161求水头损失:h4-6=0.016(i)×160(L)=2.58m,填入第⑧栏;计算末点水压高程:末端水压高程=起端水压高程-管段水头损失6点的水压高程=4点的水压高程(59.63)-h4-6(2.58)=57.05m,填入第⑩6点的自由水压=6点水压高程(57.05)-地面高程(33.15)=23.9m,填入⑫栏。
按照上述方法,管段1~11、3~9、7~8可以选用比100mm更小的管径,但要求干管的最小管径为100mm,故仍选用l00mm管径。支管水力计算案例管段管长L(
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 拆迁合同的修改与终止
- 2024【变压器租赁合同范本】变压器安装合同范本
- 市场租赁合同纠纷处理指南
- 2024年家政服务合同协议书
- 2024技术顾问聘用合同书范文
- 办公家具项目合作意向书
- 2024年房屋分配合同模板
- 劳动合同解除与经济补偿
- 数据录入与维护服务合同范本
- 二手工作服购销合同
- 道德与法治八上八上8.2《坚持国家利益至上》教学设计
- 2024年全国各地中考试题分类汇编:作文题目
- 工程代收款付款协议书范文模板
- GB/T 19274-2024土工合成材料塑料土工格室
- 全套教学课件《工程伦理学》
- 2024-2030年中国青霉素行业深度调研及投资前景预测研究报告
- GB/T 42455.2-2024智慧城市建筑及居住区第2部分:智慧社区评价
- 2024年认证行业法律法规及认证基础知识
- 2024广西专业技术人员继续教育公需科目参考答案(97分)
- YYT 0653-2017 血液分析仪行业标准
- 刑事受害人授权委托书范本
评论
0/150
提交评论