合同段(K166+600~K179+023.967全长12.4km水土保持专项方案编审
制核
人:人:施工单位:XXX集团有限公日
期:2010月目
录
第一章
编制依据·························································································3一、编制依据·······························································································二、编制范围·······························································································第二章
工程概况·························································································3一、工程概况·······························································································二、工期要求·······························································································第三章环境保护人员组织机构········································································4一、环境保护人员准备···················································································4二、项目文明施工及环境保护组织机构框························································6第四章
环境保护施工方·············································································一、桥涵施工环境保护···················································································7二、路基土石方施工环境保··········································································(一)弃土场环境保护···················································································7(二)路基土石方环境保·············································································8三、自然森林资源保护···················································································9四、生活区环境保护·····················································································10第五章
环境保护及文明施工措施································································10一、土石方施工环境保护措·········································································11二、桥涵施工环境保护措············································································12三、消防安全保证措施··················································································14四、消防应急组织机构框············································································15五、防汛准备措施························································································17六、文明施工措施························································································17
第一章
编制依据一编依1、业主提南合同段招标文件、设计图纸和有关补遗资料及相关合同文件。2、项目业下发的典型示范实施细则及本项目业主管理有关办法。3、我国现的公路工程施工技术规范及工程质量检验评定标准、安全规范等。4、本工程所在地的社会及自然环境等条件,和现场踏勘调查所获得的有关资料。5、我公司既有的科研成果、先进施工方法和承建类似工程的施工经验。二编范合同段施工便道弃土场路基土石方桥涵工程施工中的环境保护措施、水土保持措施及敏感点的噪声防护措施。第二章
工程概况一工概XXX,与现有的XXX合同段,路线起K166+600XXXXX,ZZ,
12.424公里。主要施工项目为路基土石方、防护、排水、及桥涵工程。本合同段设互通两处,即那互通和ZZ西互通。
本项目位于市辖区范围内,沿线主要剥蚀残丘地貌,地貌形态表现为山丘连绵起伏,山体宽大,一般丘高在100~200m左右,最高约220m,自然坡度一般为15~55°,冲沟比较发育,多呈条带状分布。表层出露的基岩一般呈~中风化山坡多为厚层残积为土植被茂密主要为桉树和少量灌木山间沟谷及平地一般堆积有较厚的冲洪积土为水田或旱地,主要种植水稻、玉米、番薯等农作物。地下水主要为松散岩类孔隙水基岩裂隙水松散岩类孔隙水为本区主要的地下水类型。本标段那马互通地处公平水库北面距水库较近因此在公路施工中必须有环境保护措施及水土保持措施,保护好公平水库水源。路基土石方施工时应及时进行路堤边坡和路堑边坡防护边坡的防护以水土保持,稳定边坡为目的,防止水土流失。本工程弃土场均选择合适的乱掘坑以及低洼地本着保护环境少对自然的破坏维护景观协调美观的原则弃土场弃土后应立即进行必要的坡面防护及顶面植树植草绿化。桥涵施工时须对桩基泥浆排放脱模剂的使用机油及废油类的存放采取相对应的防护措施,且对水土流失做好相应的防护措施。二工要本合同段路基桥涵工程合同工期为24月。第三章环境保护人员组织构一环保人准1、组建精高效的项目经理部,建立健全的文明施工及环境保护领导小(见组织机构框图配验丰富技术业务精湛事业心和责任感强的工程师及工作人员,使整个项目经理部管理层人员精干,统一指挥,内外协调,全面负责和加强对该项工程的方明施工及环境保护管理工作。
2、主要人的配置序号1234567891011121314151617
姓名
担任职组长副组长副组长副组长组员组员组员组员组员组员组员组员组员组员组员组员组员
在项目任职务项目经理项目副经理技术负责人安质部长桥梁工程师桥梁工程师路基工程师路基工程师计量工程师质检工程师试验工程师测量工程师测量工程师机械工程师财务负责人资料员现场施工员
职称工程师工程师高级工程师工程师工程师工程师工程师工程师工程师工程师工程师工程师助理工程师工程师会计师助理工程师施工员
备注1819
组员组员
专职安全员专职安全员
XX二项文施及境护织构图文施及境护织构图xx高速公路xx段第二合同段环境保护组织机构组长项目经理)副组长项目副经理)出副组长项目总工)
副组长安质部长)工
质
合
物
综
工
测
试程
量
资
合技
安
约
设
办
区
量
验术
全
备
公部
部
部
部
室
室
室组组组组员员员员。桥质试机梁检验械工工工工程程程程师师师师。XXX
组员合约工程师XXX
组员计量工程师X
组员测量工程师X
组员测量工程师石X
组员资料内业工程师X
组员现场负责人赵X
组员现场负责人X电工班
机械班
汽车运
桥涵施
路基施
排水施
杂工班输班
工班
工班
工班
第四章
环境保护施方案我标段那马互通位于公平水库地段附近。为防止污染公平水库的水源施工中必须认真遵守国家有关环境保护的法律法规取措施妥善处理泥水控制施工现场的各种粉尘废气废水固体废弃物以及噪声对环境的污染和危害据本工程的实际情况我公司长期积累的经验,在施工过程中采取如下环境保护方法:一桥施环保1、对于施工机械的油料应集中贮放,废油不得随意乱倒,以免污染环境及水源。2、模板脱模剂应集中存放,涂抹时合理用料,以防止遗洒污染土地和周围环境及水源。3、对施工场地进行规范化管理。施工场地、进场道路均用石粉渣进行硬化,并挖排水沟,防止被雨水冲刷。4、钻孔灌注桩钻孔时,须挖三级泥浆沉淀池过滤,池内垫彩条布,池边用砂包围堵泥浆经沉淀后用封闭车箱的车辆运往规定地点弃置,防止泥浆外泄污染环境及水源。5桥涵基坑开挖需注意防止水土流失坑内排水需挖沉淀池进行处理,防止泥浆外泄。6、施工及生活中的废物,垃圾集中堆放,并及时处理到当地环保部门同意的地点弃置无法清运的要及时加以掩盖防扩散造成环境污染。二路土方工境护(一)土场环境保1、路基土方所用的弃土场均选择合适的乱掘以及低洼地,本着保护环境、减少对自然的破坏、维护景观协调美观的原则,弃土场弃土后,应立即进行必要的坡面防护及顶面植树植草绿化。防止水土流失污染径心水库水源。
2、弃方时尽量先弃石方,再弃土方;弃土场边坡处尽量弃石方,并适当码砌修整。弃土场坡脚处设浆砌片石护脚,护脚埋入地面以下不小于。堆弃完毕后,应表面土层厚度大于60cm种草绿化,坡顶、平台栽植乔木或灌木,株距行距分别为8m×6m。植物可选择刺槐、水杉、侧柏、冬青、夹竹桃。3、在弃土,通过植草、植树进行绿化,以保护、协调、美化环境。施工具体事宜按《弃土场水土保持设计图》要求实施。(二)基土石方环保护1、清表前先查清红线范围,严禁超清。路基土石方施工时,及时进行路堤边坡和路堑边坡防护,边坡的防护以水土保持,稳定边坡为目的,防止水土流失污染径心水库水源。2、开挖前先做好截水沟。路基施工时,需完成一级边坡立即进行一级边坡防护。3、路基边坡开挖一级立即防护一级。一般土质挖方路段采用客土喷播防护,客土喷播厚度≥。种子为草本、灌木(两种以上藤本等植物苗长出后藤灌密度≥10棵/m
2
第一级边坡喷播时种植少量勒杜鹃袋苗高35,冠幅25~30cm(要求成活勒杜鹃40m~60m棵当有二、三、四级边坡喷播时可掺加极少量的乔木种子(要求成活乔木50m2~60m2一棵较多较松散的土质边坡采用衬砌拱防护拱圈内采用客土喷播喷播喷厚度≥3cm质路段采用TBS岩石植被防护,喷植厚度6cm第一级边坡喷播时种植少量勒杜鹃袋苗,苗高35~40cm冠幅25~30cm(要求成活勒杜鹃40m~60m棵二、三、四级边坡喷播时可掺加极少量的乔木种子(要求成活乔木2~60m2一棵上爬植物可采用爬山虎和辟荔交替种植,间距为25cm,下吊植物可采用葛藤和五爪金龙交替种植间距为25cm花坛内填满种植土,种植的攀援植物袋苗长度应大于。4路堑边坡距土路肩边坡边缘2.2m坡面栽植灌木及攀援植物主要采用连续2株紫薇2株夹竹桃或木槿株距2.0m夹竹桃株高≥;木槿冠幅≥0.7m;紫薇株高≥0.8m,冠幅≥0.8m。攀援植物选用爬山
虎、络石、葛藤等,株距≥,苗长≥≥1.5m。5、路堤边坡:对于边坡高度小于米的土质路段采用客土直播,对于边坡高度大于8米的路段上面8米以下采用客土直播+固化剂对于填石路基,采用客土喷播。对于坡率为1:1.5,1:1.75,1:2的客土直播和喷播时种植少量的勒杜鹃袋苗苗高冠幅25(要求成活勒杜鹃一棵当有二、三、四级边坡直播和喷播时可掺加极少量的乔木种子(要求成活乔木2~60m2棵6堤边坡距土路肩边缘的坡面栽植灌木采用连续5海桐,连续5株夹竹桃或木槿,株距。夹竹桃株高1.2~1.5m;海桐:株高1.4m,冠幅≥;木槿:冠幅≥0.7m。路基土石方施工,均按以上方法及时进行防护,防止水土流失污染公平水库水源。三自森资保1、为确保径心水库水源必须保护好水库周围自然森林资源。保护森林资源人人有责。2、自然森林资源保护是以贯砌预防为主、消防结合的方针,坚持领导与群众相结合的原则,实行防火安全责任制。3、项目部所有人员严禁进入山林乱砍滥伐,保护好自然森林资源。4、项目部经常组织员工进行消防宣传教育,提高员工的消防意识,并成立义务消防队。5、所有进入山地施工的员工严禁带火种上山,严禁员工在山地吸烟,防止森林火灾。6、对生产中储存和装卸易燃易爆危险物品必须符合防火防爆要求,并妥善保管存放。7、所有作业人员应当遵守消防安全规定,并采取可应的消防安全措施。进行电焊、气焊等具有火灾危险的作业人员,必须持证上岗,并严格遵守消防安全操作规程。
8、如发生山林火灾,项目部立即组织人员全力投入应急救援工作,调集所需物资支援灭火。9项目部制订消防安全制度消防安全操作规程实行防火安全责任制,确定本单位和所属各部门、岗位的消防安全责任人;针对本工程特点对职工进行消防宣传教育;组织防火检查,及时消除火灾隐患,以免造成森林火灾。四生区境护1、办公、生活设施做到整洁卫生。办公室、宿舍干净整洁,内务整齐;食堂操作人员必须有卫生健康合格证,现场及生活开水供应充足,用具符合卫生标准,餐具有消毒、防蝇、防鼠措施;厕所设专人随时清扫。2、生活区卫生专人负责清扫和现场整理,工程完成后,认真清理现场。3、生活中的废物,垃圾集中堆放,并及时处理到当地环保部门同意的地点弃置,无法清运的要及时加以掩盖,以防扩散造成环境污染。4、生活区所用的电源线架设要符合安全用电的要求,不得乱拉电线,生活用电严格管理,不得使用电炉,电热水器烧水,严禁使用煤油炉,以免造成火灾。第五章
环境保护及明施工措施环境保护是我国的一项基本国策,我公司将与当地政府环保部门联合协作控制施工中的环境污染减少污水空气粉尘及噪声污染,严格控制水土流失和砂化,扎扎实实抓好环境保护工作。成立以项目经理任组长的环境保护领导小组备一定数量的环境保护设施和技术人员,并组织所有施工人员认真学习《中华人民共和国水土保持法环境保护设计规范》及交通部颁发的技术标准和规范、规程等法律法规,共同搞好环境保护工作。环境保检查机构框(见下图)
境保检机构图南宁外环公路No.5合同段环境保护检查机构组长(项目经理副组长(项目副经理安质部长:BBB
安全副主任(总工工程部
安全部
质检部
设备材料部
综合办公室各施工队环境保护一土方工境护施1、路基施宜以挖作填,减少土地占用和环境污染。2、路基施前应先做好截水沟、排水沟等排水设施,特别是深圳多雨地区和雨季施工更应加强这方面的工作。排水沟的出口应通至桥涵进出口处;排、截水沟挖出的废土应堆置在沟与路堑边坡顶一侧,并予以夯实。3、路基施排水应采取疏导、堵截、隔离等工程措施,防止水土流失。4、路基土方施工期间应修建临时排水设施,并视土质情况作好防渗工作。5、临时排设施应与永久性排水设施相结合,流水不得随意排放,也不得引起淤积和冲刷边坡,污染自然水源。
6、路基施一级边坡必须进行一级边坡防护,雨季施工时,边坡必须进行覆盖处理,以免雨水冲刷边坡污染水源。7、公路施所产生的垃圾和废物,如清理场地的表层腐殖土、砍伐的荆棘丛林,工程剩余的废料,应根据各自不同的情况,分别处理,不得任意裸露弃置。8存放油料必须对库房进行防渗漏处理存和使用应防止油、冒、滴、漏污染水源。9清洗施工机械设备及工具的废水废油等有害物质以及生活中污水,不得任意排放,也不得倾泻于饮用水源附近的土地上,以免污染土壤和水源。10不得使用工业废渣填筑公路路基如废渣中含有可溶性有害物质可能造成土质、水质污染。10施工现场临时道路必须定期维修和养护,每天洒水2~4次,减少扬尘污染。大风天气不得进行灰土作业。11为避免风蚀和雨水冲刷路基边坡路基完成后及时进行粘土包边绿化和维护工作。12细颗粒散体材料应尽可能在库内存放或严密遮盖及土方运输时采用封闭措施以减少扬尘,保护周围环境。13在施工现场的出入口施工便道与社会道的交叉口铺设一层碎石或草袋等截留泥尘,或设清洁池清洗车辆轮胎。对现场的存土堆、裸露的地表采用防尘网覆盖、喷洒抑尘剂或进行临时绿化处理。二桥施环保措1、桥梁钻孔灌注桩钻孔施工时,须挖三级泥浆沉淀池过滤,池内垫采条布,池边用砂包围堵,防止泥浆外泄污染环境及水源。2泥浆外运要按规定封闭清运防止遗洒弃置到有关部门指定的地方,以免污染环境及水源。3桥涵基坑开挖需注意防止水土流失坑内排水需挖沉淀池进行处理,防止泥浆外泄。
4、土方施工在城区内运输时,必须封闭、覆盖,不得沿途遗洒;运土车辆出工地时,应对轮胎进行清洗,防止污染周围环境及社会道路。4存放油料必须对库房进行防渗漏处理存和使用应防止油、冒、滴、漏污染水源。5清洗施工机械设备及工具的废水废油等有害物质以及生活中污水,不得任意排放,也不得倾泻于饮用水源附近的土地上,以免污染土壤和水源。6、施工所的发电机等强噪声机械应安置在工作棚内,工作棚四周应严密围挡。7、模板脱剂应集中存放,涂抹时合理用料,以防止遗洒污染钢筋和周围环境及水源。8、混凝土车退场前,要在指定地点清洗料斗,防止遗洒和污染环境及水源。9生用的塑料布在使用时防止被风吹跑使用完毕后要及时回收处理。10凝土凿毛和清理杯口时采取降尘措施止粉尘污染周围环境。11运输水泥和其它易飞扬的细颗粒散体材料和建筑垃圾时,必须封闭、包扎、覆盖、不得沿途泄漏遗洒。、运输车辆不得超量运载。运载工程土方最高点不得超过槽帮上沿500mm边缘低于车辆槽帮上沿100mm装载建筑渣土或其他散装材料不得超过槽帮上沿。13、施工现场由专人负责清理,模板加工下脚料、锯末等不得随处乱扔;保持施工现场整齐清洁。14、预应力孔道压浆后应将现场被灰浆污染部位,用清水冲洗干净。15应力孔道压浆后剩余的水泥不得随意倾倒中到指定地点消纳。16混凝土施工机械、风镐发电机等强噪声机械施工尽可能安排在白天施工。如必要在夜间施工时应采取降噪措施。17桥涵施工中有毒、易燃物品应盛入密闭容器内并入库存放严禁露天堆施。18施工下脚料、废料、余料要进行分类、及时清理回收。
三消安保措1、消防工作是以贯砌预防为主、消防结合的方针,坚持领导与群众相结合的原则,实行防火安全责任制。2、项目部经常组织员工进行消防宣传教育,提高员工的消防意识,并成立义务消防队。3、项目部每个人都有维护消防安全,保护消防设施、预防火灾、报告火警的义务。4项目部制订消防安全制度消防安全操作规程实行防火安全责任制,确定本单位和所属各部门、岗位的消防安全责任人;针对本工程特点对职工进行消防宣传教育;组织防火检查,及时消除火灾隐患。5、按照国家有关规定配置消防设施和器材、设置消防安全标志,并定期组织检验、维修,确保消防设施和器材完好、有效。6、建立防火档案,确定消防安全重点部位,设置防火标志,实行严格管理实行每日防火巡查并建立巡查记录对职工进行消防安全培训;制定灭火和应急疏散预案,定期组织消防演练。7、禁止在具有火灾、爆炸危险的场所使用明火。作业人员应当遵守消防安全规定,并采取相应的消防安全措施。进行电焊、气焊等具有火灾危险的作业的人员和自动消防系统的操作人员,必须持证上岗,并严格遵守消防安全操作规程。8、消防产品的质量必须符合国家标准或者行业标准。禁止使用不符合国家标准或者行业标准的配件或者灭火剂维修消防设施和器材。9、所有进入山地施工的员工严禁带火种上山,严禁员工在山地吸烟,防止森林火灾。10对生产中储存和装卸易燃易爆危险物品必须符合防火防爆要求并妥善保管存放。11如发生山林火灾项目部立即组织人员全力投入应急救援工作调集
所需物资支援灭火。12目部制订消防安全制度防安全操作规程行防火安全责任制,确定本单位和所属各部门、岗位的消防安全责任人;针对本工程特点对职工进行消防宣传教育;组织防火检查,及时消除火灾隐患,以免造成森林火灾。四消应组机框
消防应急组机构框图南宁外环公路No.5合同段消防应急组织机构组长(项目经理副组长(项目副经理安质部长:NNN
安全副主任(总工组员应急分队队
组员路基工程师
组员路基工程师
组员桥梁工程师
组员桥梁工程师
组员试验工程师
组员测量工程师
组员机械工程师
组员质检工程师
组员合约工程师
组员现场负责人长
杨NN
NNN
NNN
NN
VV
JJJ
J强
UUU
UUTTT
TTTN
川
N
V应急救
电工班
机械班
运输班
路基施
钢筋班
木工班
砼浇筑
杂工班
后勤班援队
工班
班
五防准措为确保汛期南宁外环公路建设的施工安全,我标段所作的预防措施如下:1、建立健防汛工作责任制。本项目成立防汛组织指挥机构,建立健全防汛工作责任制认真吸取历年来防汛工作的经验和教训加强领导,统一指挥分级负责广泛宣传公路建设防汛工作要做到思想到位、指挥到位,责任到位,措施到位。2实到好本项目的防汛工作项目部要切实加强在建项目的汛管理,合理安排施工计划,重点防范在建工程重点部位。对路基工程,要尽快完善排水设施或设置临时排水设施;高填深挖路段的路基边坡应及时防护,避免集中降雨造成边坡冲刷和坍塌等;对涵洞工程,应加强洞口防护和洞内排水,避免引起塌方;对桥梁工程,下部结构施工要力争在汛前完成,边坡上存放机械设施及材料必须在汛前清理完毕。对其他工程,也要认真落实防汛措施,制订抢险预案。3、项目部要立即对公路建设项目进行防汛工作检查,重点检查沿路沿溪路段,高填方、高挡墙、高护坡路段以及现有危险路段,发现问题及时处理,消除隐患。对一些危及行车安全的路段要增设必要的警示标志。4、各部门要坚持防汛值班,加强汛期巡查,及时收集并上报本标段汛期情况和突发事故。六文施措1、建立文明施工领导小组,对全体员工进行广泛深入的动员,使每个员工明白文明施工的重要性和自己在文明施工中的责任义务,使文明施工的标准人人皆知。2、施工现场必须设置明显的标牌,标明工程项
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 劳动合同签订前的员工福利制度
- 临时客服人员聘用合同样本
- 足球场膜结构施工合同
- 超分子水杨酸换肤治疗
- 2022年大学水利专业大学物理下册期末考试试卷C卷-附解析
- 商业空地租赁合同范本
- 2022年大学电气信息专业大学物理二模拟考试试题A卷-含答案
- 餐厅包间地砖铺设合同
- IT行业销售精英聘用合同
- 通信工程监理聘用合同样本
- GB/T 10259-2013液体闪烁计数器
- 数字视频技术5
- 第12课《渔家傲 秋思》课件(30张PPT) 部编版语文九年级下册
- 《向世界最好的医院学管理》读书报告课件
- 游泳训练理论与方法技术要点课件
- 上海版小学英语牛津词汇表(带音标)
- 苏教版四年级数学上册校级公开课《不含括号的三步计算式题》课件
- 提高患者口服药服用的准确率品管圈成果汇报模板课件
- pressfit设计高级技巧课件
- 能力陷阱分享模板课件
- 小学二年级数学德育渗透教案范文
评论
0/150
提交评论