开发成本预算汇总表,,,,,,,,,,,,,,,,,,,,,,,
,,,,,,,,,,,,,,,,,,,,,,,,
表格编号:,PUD7,,,,,,,,,,,,,,,,,,,,,,
编制单位:,深圳金地房地产开发有限公司,,,,,,,,,,,,,,,,,,,,,预算日期:,1899年12月
编制部门:,预算部、财务部,,,,,,,,,,,,,,,,,,,,,金额单位:,人民币元
,,,,,,,,,,,,,,,,,,,,,,,,
业务类型,科目编码,预计总支出,以前年度累计发生数,"上年实际
数据",预算年度数据,一月,二月,三月,一季度,四月,五月,六月,二季度,七月,八月,九月,三季度,十月,十一月,十二月,四季度,以后年度预算数据,备注
土地征用及拆迁补偿费预算,40101,-,-,-,"60,000,000",-,-,-,-,-,-,"20,000,000","20,000,000",-,"40,000,000",-,"40,000,000",-,-,-,-,"(10,000,000)",
前期工程费预算,40102,-,-,-,"800,000",-,-,"300,000","300,000",-,-,-,-,-,"200,000","300,000","500,000",-,-,-,-,"(800,000)",
基础设施配套费预算,40103,-,-,-,"8,200,000","900,000","400,000","600,000","1,900,000","900,000","400,000","600,000","1,900,000","900,000","400,000","600,000","1,900,000","1,500,000","400,000","600,000","2,500,000","(8,200,000)",
建筑安装工程费预算,40104,-,-,-,"104,000,000","9,000,000","7,000,000","7,000,000","23,000,000","9,000,000","7,000,000","7,000,000","23,000,000","11,000,000","9,000,000","9,000,000","29,000,000","11,000,000","9,000,000","9,000,000","29,000,000","(104,000,000)",
公共配套设施费预算编,40105,-,-,-,"600,000","100,000","100,000","100,000","300,000","100,000","100,000","100,000","300,000",-,-,-,-,-,-,-,-,"(600,000)",
工程物资预算(甲供材料),40106,-,-,-,"7,024,400","723,100","516,500","516,500","1,756,100","723,100","516,500","516,500","1,756,100","723,100","516,500","516,500","1,756,100","723,100","516,500","516,500","1,756,100",-,
开发间接费用预算,40107,*,*,-,"8,146,000","1,168,000","598,000","598,000","2,364,000","598,000","598,000","698,000","1,894,000","698,000","698,000","698,000","2,094,000","598,000","598,000","598,000","1,794,000",-,
合计,*,-,-,-,"188,770,400","11,891,100","8,614,500","9,114,500","29,620,100","11,321,100","8,614,500","28,914,500","48,850,100","13,321,100","50,814,500","11,114,500","75,250,100","13,821,100","10,514,500","10,714,500","35,050,100","(123,600,000)",
,,,,,,,,,,,,,,,,,,,,,,,,
编报说明:,,,,,,,,,,,,,,,,,,,,,,,
1、本表填报依据为各《单项开发成本预算》。,,,,,,,,,,,,,,,,,,,,,,,
2、本表为《项目成本预算—存货预算、开发成本分配表》提供依据。,,,,,,,,,,,,,,,,,,,,,,,
,,,,,,,,,,,,,,,,,,,,,,,,
,,,,,,,,,,,,,,,,,,,,,,,,
,,,,,,,,,,,,,,,,,,,,,,,,
编制人:,,,,,,,,,,,,,,,,,,,,,,,
编制日期:
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 妊娠期急性胆囊炎的代谢紊乱纠正策略
- 妊娠期妇科手术患者心理支持的循证策略
- 妊娠期RA合并肺部感染的安全治疗策略
- 车辆维修类专业试题及答案
- 安监员考试题库及答案
- 妇幼人群气候健康脆弱性及干预策略
- 头颈鳞癌免疫治疗后的免疫重建策略
- 大数据在职业传染病风险预测中的应用
- 大数据分析围术期患者体验的影响因素
- 排球考试专业题库及答案
- 消防救援预防职务犯罪
- 毕业论文答辩的技巧有哪些
- 酒店安全风险分级管控和隐患排查双重预防
- 2018年风电行业事故锦集
- 一体化泵站安装施工方案
- 《重点新材料首批次应用示范指导目录(2024年版)》
- 防水班组安全晨会(班前会)
- 全国职业院校技能大赛高职组(研学旅行赛项)备赛试题及答案
- 广州数控GSK 980TDc车床CNC使用手册
- ISO27001信息安全管理体系培训资料
- 校区打印店合作服务 投标方案(技术方案)
评论
0/150
提交评论