




版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、 #大学毕业设计(论文)外文翻译题 目 混凝土构造加固设计 学 院 专 业 班 级 学 号 姓 名 指引教师 年 2 月 28 日Concrete structure reinforcement design Abstract:structure in the long-term natural environment and under the use environments function, its function is weaken inevitably gradually, our structural engineerings duty not just must finish
2、 the building earlier period the project work, but must be able the science appraisal structure damage objective law and the degree, and adopts the effective method guarantee structure the security use, that the structure reinforcement will become an important work. What may foresee will be the 21st
3、 century, the human building also by the concrete structure, the steel structure, the bricking-up structure and so on primarily, the present stage I will think us in the structure reinforcement this aspect research should also take this as the main breakthrough direction. Key word: Concrete structur
4、e reinforcement bricking-up structure reinforcement steel structure reinforcement 1 Concrete structure reinforcement Concrete structures reinforcement divides into the direct reinforcement and reinforces two kinds indirectly, when the design may act according to the actual condition and the operatio
5、n requirements choice being suitable method and the necessary technology. the direct reinforcements general method1)Enlarges the section reinforcement law Adds the concretes cast-in-place level in the reinforced concrete member in bending compression zone, may increase the section effective height,
6、the expansion cross sectional area, thus enhances the component right section anti-curved, the oblique section anti-cuts ability and the section rigidity, plays the reinforcement reinforcement the role.In the suitable muscle scope, the concretes change curved the component right section supporting c
7、apacity increase along with the area of reinforcement and the intensity enhance. In the original component right section ratio of reinforcement not too high situation, increases the main reinforcement area to be possible to propose the plateau component right section anti-curved supporting capacity
8、effectively. Is pulled in the section the area to add the cast-in-place concrete jacket to increase the component section, through new Canada partial and original component joint work, but enhances the component supporting capacity effectively, improvement normal operational performance. Enlarges th
9、e section reinforcement law construction craft simply, compatible, and has the mature design and the construction experience; Is suitable in Liang, the board, the column, the wall and the general structure concretes reinforcement; But scene constructions wet operating time is long, to produces has c
10、ertain influence with the life, and after reinforcing the building clearance has certain reduction. 2) Replacement concretes reinforcement lawThis laws merit with enlarges the method of sections to be close, and after reinforcing, does not affect buildings clearance, but similar existence constructi
11、on wet operating time long shortcoming; Is suitable somewhat low or has concretes carriers and so on serious defect Liang, column in the compression zone concretes intensity reinforcement. 3) the caking outsourcing section reinforcement lawOutside the Baotou Steel Factory reinforcement is wraps in t
12、he section or the steel plate is reinforced components outside, outside the Baotou Steel Factory reinforces reinforced concrete Liang to use the wet outsourcing law generally, namely uses the epoxy resinification to be in the milk and so on methods with to reinforce the section the construction comm
13、ission to cake a whole, after the reinforcement component, because is pulled with the compressed steel cross sectional area large scale enhancement, therefore right section supporting capacity and section rigidity large scale enhancement.This law also said that the wet outside Baotou Steel Factory r
14、einforcement law, the stress is reliable, the construction is simple, the scene work load is small, but is big with the steel quantity, and uses in above not suitably 600C in the non-protections situation the high temperature place; Is suitable does not allow in the use obviously to increase the ori
15、ginal component section size, but requests to sharpen its bearing capacity large scale the concrete structure reinforcement. 4) Sticks the steel reinforcement lawOutside the reinforced concrete member in bending sticks the steel reinforcement is (right section is pulled in the component supporting c
16、apacity insufficient sector area, right section compression zone or oblique section) the superficial glue steel plate, like this may enhance is reinforced components supporting capacity, and constructs conveniently. This law construction is fast, the scene not wet work or only has the plastering and
17、 so on few wet works, to produces is small with the life influence, and after reinforcing, is not remarkable to the original structure outward appearance and the original clearance affects, but the reinforcement effect is decided to a great extent by the gummy craft and the operational level; Is sui
18、table in the withstanding static function, and is in the normal humidity environment to bend or the tension member reinforcement.5) Glue fibre reinforcement plastic reinforcement lawOutside pastes the textile fiber reinforcement is pastes with the cementing material the fibre reinforcement compound
19、materials in is reinforced the component to pull the region, causes it with to reinforce the section joint work, achieves sharpens the component bearing capacity the goal. Besides has glues the steel plate similar merit, but also has anticorrosive muddy, bears moistly, does not increase the self-wei
20、ght of structure nearly, durably, the maintenance cost low status merit, but needs special fire protection processing, is suitable in each kind of stress nature concrete structure component and the general construction. This laws good and bad points with enlarge the method of sections to be close; I
21、s suitable reinforcement which is insufficient in the concrete structure component oblique section supporting capacity, or must exert the crosswise binding force to the compressional member the situation. 6) Reeling law This laws good and bad points with enlarge the method of sections to be close; I
22、s suitable reinforcement which is insufficient in the concrete structure component oblique section supporting capacity, or must exert the crosswise binding force to the compressional member the situation. 7) Fang bolt anchor law This law is suitable in the concretes intensity rank is the C20C60 conc
23、retes load-bearing member transformation, the reinforcement; It is not suitable for already the above structure which and the light quality structure makes decent seriously. The indirect reinforcements general methodPre-stressed reinforcement law(1)Thepre-stressed horizontal tension bar reinforces c
24、oncretes member in bending,because the pre-stressed and increases the exterior load the combined action, in the tension bar has the axial tension, this strength eccentric transmits on the component through the pole end anchor (, when tension bar and Liang board bottom surface close fitting, tension
25、bar can look for tune together with component, this fashion has partial pressures to transmit directly for component bottom surface), has the eccentric compression function in the component, this function has overcome the bending moment which outside the part the load produces, reduced outside the l
26、oad effect, thus sharpened components anti-curved ability. At the same time, because the tension bar passes to components pressure function, the component crack development can alleviate, the control, the oblique section anti-to cut the supporting capacity also along with it enhancement. As a result
27、 of the horizontal lifting stems function, the original components section stress characteristic by received bends turned the eccentric compression, therefore, after the reinforcement, components supporting capacity was mainly decided in bends under the condition the original components supporting c
28、apacity 。(2) After the reinforced concrete component uses under the pre-stressed to support the type tension bar reinforcement decides, forms one by to reinforce the component and under supports the compound ultra statically determinate structure system which the type tension bar is composed, under
29、the outside load and the pre-stressed combined action, in the tension bar has the axial force and through (next supports and pole end anchor spot) with components combining site transmits for is reinforced the component, has counter-balanced outside the part the load, changed the original component
30、section endogenic force characteristic, thus sharpened components bearing capacity. This law can reduce is reinforced components stress level, not only causes the reinforcement effect to be good, moreover can also the great scope enhance the structure overall supporting capacity, but after reinforci
31、ng, has certain influence to the original structure outward appearance; Is suitable as well as is under the high stress, the high strained condition concretes components reinforcement in the great span or the heavy structure reinforcement, but in the non-protections situation, cannot use in the temp
32、erature above 600C in the environment, is also not suitable uses in the concrete shrinkage continuous variation big structure. 2)Increases the supporting reinforcement lawThe addition pivot reinforcement law is through the reduced member in bending effective span, achieves the reduced function, in i
33、s reinforced on the component to carry the effect, raises the structure load bearing level the goal. This law simple reliable, but easy to harm buildings original condition and the use function, possibly and reduces uses the space; Is suitable in the concrete term permission concrete structure reinf
34、orcement. 1.3 Has generally with the concrete structure reinforcement transformation necessary uses technology 1) The request trades the technology It is the joist (either truss) opens the column (or wall), the joist terminal and the joist trades technologies and so on column to call generally; Belo
35、ngs to one kind of comprehensive technology, by the related structure reinforcement, the superstructure goes against rises with to reposition as well as abandons technologies and so on component demolition to be composed; Is suitable in had buildings reinforcement transformation; Compares with the t
36、raditional practices, has the construction time to be short, the expense low, affects and so on merits slightly to the life and the production, but is high to the specification, must complete by the skilled worker, can ensure the security. 2)Plants the muscle technology It is one item is simple and
37、direct to the concrete structure, the effective connection and the anchor technology; May implant the ordinary steel bar, may also implant the bolt type anchor muscle; Has widely applied in had buildings reinforcement improvement project, for example: In the construction leaks buries the steel bar o
38、r the steel bar deviation designs the position the recovery, the component increases the section reinforcement to make up the muscle, the superstructure expands cross, goes against rises to Liang, columns lengthening by joining, the house superimposed layer terminal and the high-rise construction ad
39、dition shearing force wall plants the muscle and so on. 3)Crack patching technology According to the concretes cracks cause, the character and the size, use seal differently protect the method to carry on patching, one kind of skill which causes the structure because to crack reduces the use functio
40、n which and the durability can restore; Is suitable in had in the building each kind of crack processing, but to the stress crack, besides patching, still should use the corresponding reinforcement measure. The internal patching law is with the forcing pump the cementing material pressure concretes
41、crack, renders the young or up and coming generation to sew up the function, and makes the original structure through its cementation to restore the integrity, this method is suitable for the crack opening is big, and durable and so on is influential to the structure integrity and the security, or h
42、as request and so on waterproof anti-seepage crack patching. 4)Carbonized concretes repair technology It is refers to through restores the concretes the alkalinity (inactivation) or increases its impedance to enable the steel bar corrosion which the carbonization creates to obtain the containment te
43、chnology.5)Concretes surface treatment technology It is refers to uses cleaning up concretes surface stains, the oil mark, the residual as well as the other attachment and so on chemistry method, mechanical method, sand blasting method, vacuum cleaning method, injection method skill. 6)Coagulation m
44、antle of soil seal technologyIt is refers to uses flexible methods and so on aquaseal backfill, polymer grouting, paint film to carry on the waterproofing to the concretes, moisture-proof and against crack processing technology. Like the structure, the component shift the technology, the adjustment
45、structure base frequency technology and so on. 7)Other technologies Like the structure, the component shift the technology, the adjustment structure base frequency technology and so on. Bricking-up structure Bricking-up structure reinforcement method: The bricking-up structures reinforcement divides
46、 into when the direct reinforcement and reinforces two kinds indirectly, the design, may act according to the actual condition and the operation requirements choice being suitable method. suitable for the bricking-up structure direct reinforcement methodoutside reinforced concrete superimposed layer
47、 reinforcement lawThis law belongs to the compound section reinforcement method one kind. Its merit is the construction craft simple, compatible, after the bricking-up reinforcement, the supporting capacity has enhances greatly, and has the mature design and the construction experience; Is suitable
48、in the column, the belt wall wall reinforcement; Its shortcoming is the scene construction wet operating time is long, to produces has certain influence with the life, and after reinforcing the building clearance has certain reduction. outside reinforced concrete mortar superimposed layer reinforcem
49、ent law This law belongs to the compound section reinforcement method one kind. Its merit and outside the reinforced concrete the superimposed layer reinforcement law is close, but enhances the supporting capacity to be inferior to the former; Is suitable in the bricking-up wall reinforcement, somet
50、imes also uses in outside the reinforced concrete when the superimposed layer reinforcement belt engaged column wall the both sides put on the wall stirrup the seal.the addition holds the engaged column reinforcement law This law belongs enlarges the section reinforcement method one kind. Its merit
51、the superimposed layer reinforcement law is also close with the reinforced concrete outside, but the supporting capacity enhances limitedly, and difficult to satisfy the earthquake resistance request, generally only in peneseismic country application. suitable for the bricking-up structure indirect
52、reinforcement method 1)non-caking outsourcing section reinforcement lawThis law belongs to the traditional reinforcement method, its merit is the construction is simple, the scene work load and the wet work are few, the stress is more reliable; Is suitable in does not allow to increase the original
53、component section size, actually requests to enhance the section supporting capacity large scale the bricking-up columns reinforcement; Its shortcoming is high for the reinforcement expense, and must use the similar steel structure the protective measure. 2) pre-stressed stay rod reinforcement law T
54、his law can the great scope sharpen the bricking-up columns bearing capacity, and the reinforcement effect is reliable; Is suitable processes the high stress, the high strained condition bricking-up structure reinforcement in the reinforcement; Its shortcoming cannot use in the temperature in the 60
55、0C above environment. 2.3 bricking-up structure constructivity reinforcement and patching1) addition grid reinforcement When the grid establishment does not meet the present design code requirement, either the vertical cross wall interface point nips rubs has the obvious flaw, when either the house
56、integrity is bad, should additionally build the grid to carry on the reinforcement 2)additionally builds the Liang pad reinforcement When under the summer beam the brick setting the wall presents by under the partial squash or the summer beam the partial vertical split, should additionally build Lia
57、ng the pad to carry on the reinforcement. 3)the bricking-up opens partially builds When house partial breakage but after investigating thoroughly its breakage reason when not yet affects load-bearing and the security, may burst the wall partial demolition, and according to enhances the mortar streng
58、th first-level to fill in with the full sized brick builds. 4)bricking-up crack patching Before carrying on crack patching, should act according to bricking-up components stressful condition and crack factors and so on characteristic, determined that creates the bricking-up crack the reason, with th
59、e aim of carrying on crack patching target-oriented or using the corresponding reinforcement measure. 3 steel structures Steel structure reinforcement method: The steel structure reinforcements main method includes: Reduces the load, the change structure computation graph, to enlarge the original st
60、ructural unit section and the joint strength, the impediment fracture growth and so on. When has the mature experience, may also use other reinforcement method. 1) changes the structure computation graph The change structure computation graphs reinforcement method is refers to uses the change load s
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025届四川省绵阳市部分校中考生物对点突破模拟试卷含解析
- 农户铲车出售合同范例
- 代理劳务派遣工合同范例
- 出租单价合同范例
- 第三单元 第1节 温度 教学设计- 2024-2025学年人教版物理 八年级上册
- 劳务总包合同范本
- 因材施教的个性化教育计划
- 城建行业保安工作总结计划
- 前台文员的职业培训与发展路径计划
- 分析不同财务工具的适用场景计划
- 临时工雇佣合同范本2025年度
- (二调)武汉市2025届高中毕业生二月调研考试 地理试卷
- “艾梅乙”感染者消除医疗歧视制度-
- 2024-2025学年八年级地理下册第七章《南方地区》检测卷(人教版)
- 森林防火知识
- 2025年黑龙江林业职业技术学院单招职业适应性测试题库带答案
- 2025-2030年中国测序仪市场运行态势及发展规划分析报告
- 第二单元第1课《精彩瞬间》第2课时 课件-七年级美术下册(人教版2024)
- 《物理前沿科学》课件
- 2025年公共营养师三级理论试题及答案
- 煤矿防治水安全质量标准化评分表
评论
0/150
提交评论