1、: Project introductionProject introductionLocation of the projectThe project of Jing Sheng Plaza Phase II locates in the secondary embassy district, Its in the north of Dong Hz Men Way Street and in the east of Gong It Road. The south is the separate green belt. The north is adjacent to the Jing She
2、ng Phase I. the area enjoys convenient transportation and superior location advantages.Scale of the projectThe land area of the project is about 4,780m2. The gross floor area is 54,600m2. There are 3 basements with floor area of 13,500m2 and thirty-two floors above ground with typical floor area of
3、1,281 m2. The highest point of the building is 105.5m.Function of the projectThis project is of an apartment building. The underground is of parking area. Property management office, reception and function area are located in the first floor. Second floor consists of health training room and apartme
4、nts. All the floors above second floor are apartments.Finish of the projectExternal facade of this building will be aluminum curtain wall. The ceiling will be plastered and painted or decorated with suspended ceiling of light-gage gypsum board, except that the ceiling of lobby will be decorated with
5、 suspended ceiling of aluminum strip board. The inside walls will be painted or tiled. The finishing of flooring will be carpet, wooden-board, harden-concrete, tiles or marble.M/E systemsThe systems of M/E are quite complex. Basically there are ventilation/air-condition system, plumbing system, fire
6、-fighting hydrant /sprinkler system, power/lighting/earthling system, fire alarm system, communication and security system.Project characteristics and geo-dataType of structureThis project is frame-shear wall structure. Foundation for the main building is composite footing, which consists of foundat
7、ion piles and raft. The foundation fbr podiums is isolated pile footing. The isolated footings are connected with 1500mm height of link beams and 500mm thickness of water-resistance slabs.Situation of the siteThe topography of the site is triangle. The maximum difference of ground Level is about 2m.
8、 The current temporary buildings on the site have to be demolished and the land has to be leveled before use. The narrow construction area is inconvenient to the site layout for construction. The north of the project is adjacent nearly to the Jing Sheng Plaza Phase I. The external wall of the baseme
9、nt is close to the red line and the relevant slop protection piles have to be located out of the red line.Geo-dataAccording to the Soil Investigation Report provided by the client, two layers of upper perched water and one layer of phreatic water shall be encountered during the underground construct
10、ion. The highest water level is 36.15m. Therefore, de-watering and slop protection measures shall be taken, which shall also ensure the safety of the Jing Sheng Plaza Phase I. For details, please find the 4tde-watering and slop protection in section 2 of chapter 4.: Reference and management targetRe
11、ference of this documentsRequirements of bidding documentation, tender drawings and technical specification and soil investigation report issued by the client.Current construction and acceptance check code and quality evaluation standards issued by the State and the Ministry of Construction.The loca
12、l regulations and specifications on construction management, municipal requirements, safety, quality management, and environmental protection, etc., issued by government.Standard procedure documents on quality management, safety, tidy construction management and working procedures have issued by our
13、 company.Quality Assurance System established in accordance with IS09002 and issued by our company. For details, please find the attached catalogue of Quality Assurance System.Situation of the Site and the surroundings.Execution goalQuality target: Quality of this project will be “Excellent grade” t
14、o be granted by Beijing City.Construction period:Construction period of this project will be 824 calendar days (27 months). The scheduled commencement date is March 15th, 1999 and the scheduled completion date is June 15th, 2001.ee: Construction ArrangementSite management organizationAccording to th
15、e contents of structure construction and considering the finishing and M/E works, the capable personal of our company, who have rich experience in construction management, spirit of hardworking and knowledge of English, will be selected to engage in the project.The chart of organization, resume of k
16、ey personal and the time schedule of working in the project are as follows.In addition, to ensure the construction quality and management level reaching international standards, during the finishing and M/E installing stage, one finishing engineer and one M/E engineer from Europe, who have rich expe
17、rience, will be employed to work on site and be in charge of the said works. This kind of practice has been executed on the project of Bank of China and Bayer Health-care and has got satisfactory result.RESUMEMr. Sean S. J. LiSenior Project ManagerSenior EngineerEducation Background:1978.91982.12: H
18、aerbin Engineering Institute / Bachelor1988.61988.9: China Steel Structure Association/ study and complete a course Experience:1982.81982.12: Beijing Chemical Fiber Factory Project / EngineerIn Charge of the Construction Works for Oil Pump Station1983.11983.7: CSCEC Iraq Branch Office / Plan & Stati
19、sticIn Charge of Plan & Statistic Works for 56 Projects of CSCEC in Iraq1983.81986.1: CSCEC Yemen Branch OfficePolice Club Project / Site EngineerIn Charge of Civil Construction, Design Modification and ContractIn Charge of the Tender Work and Won the ContractsIrrigation Network Project / Aden Gymna
20、sium Project1986.21987.7: CSCEC Overseas Department / Q. S.As a member of the Tender learn and Won the Contracts as follow: Algeria Irrigation Project, Syria Military Project1987.8-1988.5: CSCEC Australia Branch Office / EstimatorIn Charge of the estimation for Surly ResidentialDevelopment Project a
21、nd Training in Laton Construction Co.1989.101993.10: Canada Feng Hua Ltd./ Estimator & Business ManagerIn Charge of Estimation for Hilton HotelDevelopment Project and Coordination Works1993.10present: CSCEC Construction Co., Ltd. / Senior Project Manager, Senior EngineerIn Charge of Tender Works and
22、 Won the ContractsAs follow: Yule Garden Project, Simens Finish Project, Bayer Healthcare Factory ProjectAs member of Tender Team and Won Contract of New Germany Embassy ProjectGreen Lake Sample Villa Project ManagerBayer Healthcare Factory Project ManagerRESUMEMr. Xu LixinSite Project ManagerEngine
23、erEducation Background1987.91991.7: Beijing Industry University/ Bachelor1992.101992.12: CSCEC Training Center / study of project management and complete a course1995.91995.10: CSCEC Training Center / study of training project manager and complete a course1996.3: Beijing ASO Quality System Consult C
24、enter / training auditor and complete a course1996.71996.12: Beijing Construction Committee / training quality supervise and complete a courseExperience:1991.81992.9: the 8th Division 2nd Construction Company / technician1992.12present: CSCEC Construction Co., Ltd./ Project Executive ManagerRESUMEMr
25、. zhao LuSite Manager (Structure)EngineerEducation Background:1988.91992.7: Tangshan Engineering College of Heibei Province / Bachelor1992.71995.4: Tianjin University / MasterExperience:1995.51996.9: CSCEC Construction Co., Ltd.Project of Germany Embassy in China / Site Management and Supervisr1996.
26、10present: CSCEC Construction Co., Ltd.Project of Germany Embassy in China / Site ManagerRESUMEMr. Qin XudongSite Manager (MEP)Senior EngineerEducation Background:19821986: major in HVAC, Construction Engineering Industry Plan and Design Research Institution.19901992: PH/ B+B and Mechanical Engineer
27、 with the Germany Project Managing Department in the Beijing Lufthansa Center.19921997: Zhongji Beijing Construction Engineering Co., Ltd.1997Present M/E site manager with the CSCEC Construction Co., Ltd. For BOC projectAchievements:Compilation of Practical Software for Industry Ventilation,Design o
28、f the Super-clean Factory in Luoyang 014projectVentilation design of Xi*an 345 projectMechanical Engineer for the O+A in Beijing Lufthansa CenterOverall planning of M/E project in the Haikou Nanyang BuildingRESUMEMr. Xu HongleiTechnical ChiefEngineerEducation Backgrounds:1996.1:Traning Class for Eng
29、lish Summary of Conversation and contact lettersStudy and complete a course1997.1: Beijing Construction Committee / Quality Control / study and complete a courseExperience:1994.71995.3: the First Division 4th Construction Company / Project for City Plaza / EngineerRESUMEMr. Song WenxunPlanningSenior
30、 EngineerEducation Background:195319956: Nanjing Construction Engineering CollegeMajor: Civil EngineeringExperience:1958.81958.10: Engineering Company of Construction Section, Heilongjiang Province / Engineer1958.101959.9: the First Division 3rd Construction Company, Sichuan Province / Technician195
31、9.9-1983.3: the First Division 4th Construction Company / Technician1983.3-1987.2: the First Division 4th Construction Company / Engineer Engineering design1987.2-1990.4: the First Division 4th Construction CompanyProject of International Trade Center / Technician in Charge1990.4-1992.2: the First D
32、ivision 4th Construction CompanyProject of Lufthansa Center / Technician in Charge1992.31994.7: the First Division Construction CompanyChina Travel Service Building / Engineering Technician in ChargeRESUMEMr. Chen GuangyuanSurveyEngineerExperience:1985.71988.10: Construction Department Comprehensive
33、 ReconnaissanceInstituteTechnician1988.101993.12: the First Division 4th Construction Company / Assistant EngineerEngineer Deputy Captain of Measure Line1993.121995.10: CSCEC Nan Yang (Development) Co., Ltd. / Survey EngineerRESUMEMr.WangYinIiSafety SupervisorEngineerEducation Background:1984.91986.
34、7: Beijing Broadcast Television Secondary School Education/ study and complete a courseExperience:1986.71997.7: the First Division 2nd Construction Company / management material1997.7present: CSCEC Construction Co., Ltd. / Safety EngineerRESUMEMr. Wang JiandongStructure Engineer (Concrete)EngineerEx
35、perience:19801994: the 1 llh Construction Company of Shanxi province / engineer; captain; section chief19941996: Supervise Consultative Company of Foreign Constnaction / Deputy General Supervision19961997: CSCEC Construction Co., Ltd.RESUMEMr. Ma JunStructure Engineer (Re-bar)EngineerEducation: Mast
36、erMajor: Construction Economy and ManagementTitle: EngineerEducation Background:1989.91993.7: Qing Dao Construction Engineering Institute / Bachelor1993.91996.4: Science and Technology University of Xi An/ Master1997.61997.7: Beijing Statistics Bureau / study and complete a courseCertification of St
37、atisticianExperience:1996.7present: CSCEC Construction Co., Ltd.RESUMEMr. Zhang JianguoStructure Engineer (Formwork)EngineerExperience:1979.12-1986.7: the First Division 4th Construction Company1986.71988.7: the First Division 4th Construction Company/Assistant Engineer1988.7-1992.10: the First Divi
38、sion 4lh Construction Company/engineer1992.101994.8: the First Division 4th Construction Company/technician engineerRESUMEMr. Yu YongxiangFinishing EngineerSenior EngineerEducation Background:1952.91954.6: Shanghai Construction Engineering College / study and complete a courseExperience:1954.71955.5
39、: Changchun the First Motor Vehicle Plant / Technician in Practice1955.51959.4: Fulaiji the First Heavy-duty Machine Plant / Engineer and Technician1959.41975.5: the First Division 5th Construction Company of Sichuan Province / Engineer1975.51995.12: the First Division 4th Construction CompanyProjec
40、t of Lufthansa Center/ Capital International Airport / Chairman of Engineer Assistant of Manager of Project1996.4present: CSCEC Construction Co., Ltd. / Senior EngineerRESUMEMr. Zhang ZhanheM/E Engineer (HVAC)EngineerEducation Background:1989.81993.7: Major in thermal department, Tong Ji UniversityE
41、xperience:1993.81995.7: the fifth Design Research Institute of Weaponry Industry Department1995.81996.2: Xi Ai Xi construction research institute, Beijing1997.4: Beijing Admiralty Finishing Co., Ltd.Achievements:HVAC design work and construction coordination for industry and civil project, such as S
42、M Department Store, Yin Jian Financial Center, Guo Bin Garden.Site coordination and technical support for Hanghua Commercial Center and Bank of China Project.RESUMEMr. ShenXiangyuM/E Engineer (Electrical)EngineerEducation Background:1994: Graduated from information and Electronic Science Department,
43、 HeiLongjiang UniversityExperience:1994.71996.1: BeiFang Building project, CSCEC Construction Co., Ltd.1996.3-1996.12: Bayer Healthcare Factory Project, CSCEC Co., Ltd.1997.12-present: BOC Project, CSCEC Construction Co., Ltd.RESUMEMr. Zhong PengM/E Engineer (P + FP)EngineerEducation Background:1984
44、.91988.7: major in HVAC, TaiYuan Industry UniversityExperience:1988.71997.2 Superintendent and estimation engineer in the fifth Construction EngineerCompany, ShanXi1997.2-present: HVAC engineer for BOC project in CSCEC Construction Co., Ltd. Achievements:1988.71993.5: participated in the ShanXi inte
45、rnational Building Project, ShanXi Polyester Factory Printing and Dyeing Mill1993.51997.2: Estimator and Estimation Engineer for thee tendering works for several projects.RESUMEMr. Li YaofengM/E Engineer (BMS+Elevator)EngineerEducation Background:1987.71991.7: Metallurgical Institute, East of ChinaE
46、xperience:1993.5: Tianjin Da Seamless Project, Division 6 of Shisan Metallurgical1995.12: Taigang Jianshan Iron Ore Project, Division 6 of Shisan Metallurgical1996.12: Xinda Iron and Steel Company Project, Division 6 of Shisan Metallurgical1997.3: Taigang Tandem Project, Division 6 of Shisan Metallu
47、rgical1997.12: 6000 Oxygen Station project of Chanye Iron and Steel Mill, Division 6 of Shisan Metallurgicalpresent: BOC project, CSCEC Construction Co. Ltd.RESUMEMr. Guo JingwenDesign CoordinatorSenior EngineerEducation Background:1959: graduated from HVAC major in Tsinghua UniversityExperience:195
48、91990:Naval Engineer Design and Research Bureau19901992: designing work with Beijing HongKong Da Heng Company for theLufthansa Project19921995: Air Conditioning Engineer in Chenglong Company, Dayawan, Canton1995-1996: designing work with Da Heng Company for the Jingguang Office Building, Boshilun Le
49、ns Building and Bayer Pharmaceutical Factory projects1997-present: Designing work with CSCEC Construction Co., Ltd.Achievements:HVAC design of Naval Dongku and barracksAwarded the third grade ofn China Work Excellence for twiceResearch on Naval Swimming Pool Temperature and Moisture Test Analysis wa
50、s awarded the fourth grade of Science Advance of Chinese Peoples Army”Participated in designing works for some grand projects.Knowledge of the latest development of Air Conditioning tradeRESUMEMs. Li NanCommercial ChiefAccoutantEducation Backgrounds:1992.91996.7: Foreign Economic Trade University199
51、7.8: Training Class for English Summary of Conversation and contact letters / study and complete a courseExperience:1996.8: CSCEC Construction Co., Ltd./ CommercialRESUMEMr. Li BaosuoPurchasingEconomistEducation Backgrounds:1994.91996.1: Beijing Materials College / study and complete a course1990.12
52、1992.12: Beijing Town and Country Construction Committee / study and complete a courseExperience:1980.121993.2: the First Division 4 Construction Company / Goods and Materials in Charge1993.2present: CSCEC Construction Co., Ltd. / Purchase in ChargeRESUMEMr. Xia JiangContract ChiefEngineerEducation
53、Background:1990.91994.7: Haerbin Civil Engineering Institute / BachelorExperience:1994.7present: CSCEC Construction Co., Ltd. / EngineerConstruction site layoutIntroductionThe construction site of this project is very limited. There is no space for setting up construction facilities on the north sid
54、e of the foundation pit. On the West Side, there is a space of 10m width from slop protection piles, which can mainly be used for temporary road the HV power cable lies outside. There is only one place on south side of the foundation pit to be used for site installation, where are approximately 17m
55、wide. The processing of re-bars would be carried out in out of site.Site installation arrangementTemporary offices, tool-rooms and warehouse will be set up along the bank of Liangma River. The 3-floor of temporary site office building will be built with steel container and the other temporary buildi
56、ngs will be built with red brick. The container offices for subcontractors of finishing and M&E works would be set up on the ground floor slab, which shall be subject to the approval of the client.Materials storageMaterials will be stored on west of the foundation pit, where there is an area of 3m.
57、South side of the foundation pit will be used both for site installation and material storage.Temporary road and drainage systemTemporary road located at the distance of 10m to the west and south of the foundation pit to be cast with 150mm thickness of C15 concrete to minimize the impact of raining
58、season. On the side of the temporary road there shall be a drainage trench of 500*500mm to be built, which will be covered with 100mm thickness of pre-cast concrete slabs and reinforcement grilles every 15m long.Vertical transport equipmentTwo sets of tower crane are proposed for this project. One s
59、et with 70m arm (K40/21B) shall be erected from west north corner of the foundation slab for main building construction, another one with 50 m arm (F023B) shall be set outside of the foundation pit for sub structure construction. This crane will be dismantled after the completion of substructure. Fo
60、r details, please find in thesite layout.Temporary water/power facilities shall be embedded. The connection point of 150 water supply and 500KAV power supply are required to be provided be the client. For details, please find the layout of temporary water/power.All temporary site installation locate
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 北师大版平均数培养学生独立思考的能力
- 2024年不锈钢日用制品项目发展计划
- 2024年汽车车身、挂车合作协议书
- 六年级上北师大版数学专项练习
- 小学语文苏教版教案宝盖秃宝盖的书法练习要点
- 苏教版七年级数学下册知识点详实解析
- 离骚苏教版详解
- 北师大版一年级上册数学科普
- 探索苏教版课件的多元声音现象
- 苏教版四年级下册习作四高效习作
- Unit 2What time is it?BLet’s talk(教案) 英语四年级下册
- 成都市社会保险人员减少表 - 成都市劳动保障局
- 如何提高成本意识(课堂PPT)
- 劳动教育特色学校创建计划
- 级配砂石换填专项施工方案(可编辑)
- 幼儿园伙食费管理制度
- 做纸桥(课堂PPT)
- 中国结艺编织ppt课件
- 柯桥市场研究报告对柯桥城市、市场、客户需求(将近400份的问卷调查和20份的深度访谈)和项目进行了可观细致的分析
- 喷锚施工作业记录表(范本)
- 教育科研课题制度
评论
0/150
提交评论