

下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、Action Plan 行动计划 (for TS16949No.第 1 of 共 2)Ref. No. 顾客3686841. Finding 审核发现to be completed by Auditor 由审核员填Standard 标准ISO/TS16949:2009Reference 条款4.2.2Pros, Area 过程,区域MP2 经营管理 Business managementSement of nonconformity: 不符合项陈述Quality manual was not implemented effectively. 质量手册未有效运行。Requirement 要求:组
2、织应编制和保持质量手册,质量手册包括:Theanization shall establish andmaain a quality manualt includes a) 质量管理体系的范围,包括任何删减的细节与理由(见 1.2)The scope of the quality management system, including details of and justification for any exclus (see 1.2).Objective evidence: 客观蘸塑和表面处理是外发的,但没有在质量手册进行识别。Plastic dip-coating and surfa
3、ce treatment are outsourced and not identifiedhe quality manual.Reasons why the nonconformity was not classified as major nonconformity 未被判定为严重不符合的原因:外发的供应商实际上得到有效的控制。The externalr is effectively controlled in fact.2. Classification 等级to be completed by Auditor 由审核员填Minor nonconformity nc2 / 一般不符合项
4、nc2Major nonconformity NC1 / 严重不符合项 NC1Sections 3) 5) shall be completed by the c nt within 60 daysAdditionally,he case of major NCs, section 4) shall be and submitted to the lead auditor, together with pleted and submitted to the lead auditor within 20 days.3-5 部分顾客应在 60 天内填写完整和一起提交另外,若是严重不符合项第 4 部
5、分应在 20 天内填写给审核组长完提交给审核组长Type of follow up:review (not charged) Section 1-6审核的类型shall be completed as agreed / 文件审核(不额外收取费用) 1-6 部分需按约定日期完成提交review (off-site audit, charged with min. daily fee) /文件审核(不在现场,最少需要 0.5 个人日费)On site audit (effort required will be charged) /是,现场(按审核人天)Date 日期 2015.04.11Lead
6、 Auditor 审核组长钟志成 Zhong Zhichengto be completed by company / 有企业填写Finding + classification are correct 审核发现+不符合项等级判定是否正确?yes 是no 否Date 日期 2015.04.11Management represenive 管理者代表3. Correction(s), immediate measure, 临时措施to be completed by company 由企业填写更改质量手册,将外程(蘸塑、表面处理等)在质量手册中予以识别。Change the Quality Ma
7、nual and identify all outsourced proses (dip moulding and surface treatment) of the companyhe Quality Manual.Othroducts and proses affected? 其他产品和过程是否受到影响?yes 是no 否If yes, please list the products or the proses:若是,请列出产品或过程4. Root cause(s) 根本原因to be completed by company 由企业填写Why 为什么质量手册换版时,删减了外程的识别Th
8、e identification of outsourced proses is deletedhe renewal of the Quality Manual.Why 为什么为避免今后新增外程带来的质量手册更改,未考虑 ISO/TS 16949:2009 标准有关质量手册的要求Relevant requirements of Quality Manual in ISO/TS16949: 2009 are not considered to avoid the change in Quality Manual brought by the new outsourced proseshe fut
9、ure.Why 为什么对 ISO/TS 16949:2009 标准有关质量手册的要求(4.2.2)不熟悉Relevant requirements of Quality Manual (4.2.2) in ISO/TS16949: 2009 are not fully understood.Why 为什么对 ISO/TS 16949:2009 标准知识的学习不够ISO/TS16949: 2009 standard knowledge is not studied sufficiently.Why 为什么be completed by Auditor 由审核员填写Only applicable
10、for major NCs (to be completed within 20 days) 仅适用于严重不符合(20 天内填写完成)Immediate action and root causeysis adequate /suitable?yes 是no 否临时措施及原因分析是否充分/合适?Date 日期Lead Auditor 审核组长7. Evidence for 100% solved / 100%解决的to be completed by Auditor / 由审核员填写Customers Plan for “closing” iitable and nonconformity i
11、s 100% solved?客户的关闭计划是否合适;不符合项是否 100%解决?Evidenfor classification as 100% solved have to be attached. 若判定为 100%解决,附上依据。yes 是no 否Date 日期Lead Auditor 审核组长Scheduled date for the spel audit/ 计划的特殊审核的日期Date 日期Lead Auditor 审核组长5. Corrective action(s) 纠正措施to be completed by company 由企业填写1、外聘师对行政管理进行 ISO/TS
12、16949:2009 标准知识培训,并进行有效性评价。Employ a consultant to train all administrators in the company on ISO/TS 16949: 2009 standard and conduct effectiveness evaluation.2、今后加强 ISO/TS 16949 标准知识学更改质量管理体系文件时,全面、严格考虑所有相关要求,确保持续满足 ISO/TS 16949 标准的所有要求。Strengthen the study on ISO/TS16949 standard and comprehensivel
13、y and strictly consider all relevant requirements when changing the quality management systems to ensure continuous compliance wi ll requirements in ISO/TS 16949 standard.Method to verify the effectiveness of the implemented corrective action验证已实施的纠正措施有效性的方法1、更改后的质量手册Changed Quality Manual2、培训后的Exam
14、ination after trainingAction will be taken by (date) 预计完成日期:2015-4-20Date 日期 2015.4.12Management represenive 管理者代表Action iitable 措施是否合适yes 是no 否Date 日期 2015.04.20Lead Auditor 审核组长6. Evidenceto be completed by Auditor 由审核员填写The immediate measures, root causesysis and Corrective actions are reviewed a
15、nd are acceptable. The evideninclude updated quality manual and training records.临时措施、根本原因分析和纠正措施可以接受,包括更新的质量手册和培训。Corrective actions have been implemented? 纠正措施是否完成?Date 日期 2015.04.20Lead Auditor 审核组长yes 是no 否If “no” please continue with section 7 / 如果“否”,请继续第 7 部分Sles audited / 审核到的样本:Criteria for the evaluation of the effectiveness (trends, KPIs or reports) /有效性评价准则 (趋势、KPI、):Confirmationt corrective actions are effectively implemented /纠正措施已经有效实施得到确认yes / 是;no / 否Date / 日期Lead Auditor / 审核组长8. Evaluation of the effectiveness of the implemented corrective
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 掌握项目管理考试的应试技巧试题及答案
- 提升项目管理技能的考试题材试题及答案
- 微生物检验技术的质量控制机制试题及答案
- 掌握学生需求与辅导员考试的策略试题及答案
- 项目执行方案提纲范本
- 内容整合2025年证券从业资格证考试试题及答案
- 高校辅导员选拔中的情境模拟考核试题及答案
- 2024年高效微生物检测技术试题及答案
- 2024年项目管理考试提分试题及答案
- 墨水生产过程中的质量监控考核试卷
- 轻钢结构大棚施工组织设计方案
- 垃圾分类垃圾箱绿色公益宣传
- 经腋窝无充气腔镜甲状腺手术
- 145完整版本.现代安全管理的六大管理体系
- 19《牧场之国》第二课时说课稿-2023-2024学年五年级下册语文统编版
- (高清版)DBJ52∕T 106-2021 桥梁锚下预应力检测技术规程
- 蜜雪冰城内部股权分配合同
- 《简单教数学》读后感范文
- 薄膜的形成过程及生长方式课件
- 丁香花培训课件
- 维修改造项目施工组织设计方案
评论
0/150
提交评论