下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、P1/3(original) Contract No: CONTRACT Date: Revised Date:THE BUYER: TEL: FAX:THE SELLER: TEL: FAX: The Seller agrees to sell and the Buyer agrees to buy the under mentioned goods on the terms and conditions stated below:1.Description of Commodity, Specifications ,2 Quantity(pcs)3Unit Price (USD/PC)4T
2、otal AmountUSD 5 Delivery time: After the order in effect via sea freight direct to seaport, and arriving at seaport on or before: XXX. Final destination of Products: 6Term of payment: The sellers bank information卖方的银行信息 Beneficiary: Bank Name: ACCOUNT: SWIFT NO.: ADD.: 7 Packing:The packing of the
3、goods shall be preventive from dampness, rust, moisture, erosion and shock, and shall be suitable for ocean transportation/ multiple transportation. The Seller shall be liable for any damage and loss of the goods attributable to the inadequate or improper packing. The measurement, gross weight, net
4、weight and the cautions such as Do not stack up side down, Keep away from moisture, Handle with care shall be stenciled on the surface of each package with fadeless pigment. 8 Shipping Marks:9 Insurance: To be covered by the seller for 110% of invoice value against all risks and war risk as per theC
5、lause of the People Insurance Co. of China./To be covered by the Buyers.P2/3 10 Ownership and Risk: The ownership and risk transferred when the buying parties receiving and unpacking inspection. But if the buying parties reject or rescind the contract, the risks of damage and loss should be borne by
6、 the supplier.11I Inspection:(1) The manufacturers shall, before delivery, make a precise and comprehensive inspection of the goods with regard to its quality, specifications, performance and quantity/weight, and issue inspection certificates certifying the technical data and conclusion of the inspe
7、ction.(2) The Seller shall have the goods inspected by 7 days before the shipment and have the Inspection Certificate issued by China Commodity Inspection Bureau.12 Guarantee: The Seller shall guarantee that the goods are made of good materials, with standard process, brand new unused and correspond
8、 in all respects with the quality, specifications and performance as stipulated in this Contract. The Sellers shall also guarantee that the goods, when correctly mounted and properly operated and maintained, will give satisfactory performance for a period of 15 months starting from the date on which
9、 the goods arrive at the site. If the goods have quality issue at _ months, the seller should take all responsibility to replace rework or return the rejects free of charge.13. Claim: If the seller provide the goods can not meet the requirements based on the data sheet and the drawing in the contrac
10、t mentioned, The buyer shall make a claim against the Seller to replace the goods or reject the goods and the Seller shall bear twice times the penalty payment as much as the amount of contract。The claims mentioned above shall be regarded as being accepted if the Seller fail to reply within _days af
11、ter the Seller received the Buyers claim. 13. Late delivery and Penalty: Should the Seller fail to make delivery on time as stipulated in the Contract, with the exception of Force Majeure causes specified in Clause 14 of this Contract, the Buyer shall agree to postpone the delivery on the condition
12、that the Seller agree to pay a penalty. The rate of penalty is charged at_% for every _ days, odd days less than _days should be counted as _ days. But the penalty, however, shall not exceed_% of the total value of the goods involved in the delayed delivery. In case the Seller fail to make delivery
13、_ days later than the time of shipment stipulated in the Contract, the Buyer shall have the right to cancel the Contract and the Seller, in spite of the cancellation, shall nevertheless pay the aforesaid penalty to the Buyer without delay. The buyer shall have the right to lodge a claim against the
14、Seller for the losses sustained if any. 14 Force Majeure: The Seller shall not be held responsible for failure or delay in delivery of the entire or portion of the goods under this contract in consequence of any Force Majeure incidents.15 Confidentiality obligations: The seller shall not disclose or
15、 make public any confidential information to a third party. If disclose, the seller should burden all the lost resulting from it.16Arbitration: All disputes in connection with this Contract or the execution thereof shall be settled through friendly negotiations. If no settlement can be reached, the
16、case shall then be submitted to the Foreign Trade Arbitration Commission of the China Council for the Promotion of International Trade, Beijing, for settlement by arbitration in accordance with the Commissions Provisional Rules of Procedure. The award rendered by the Commission shall be final and binding on both parties. The arbitration expenses shall be borne by t
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026浙江台州黄岩区民政局招聘驾驶员1人备考考试试题附答案解析
- 2026福建南平政和县劳动人事争议仲裁院就业见习岗位招聘3人参考考试试题附答案解析
- 2026广西防城港市文旅集团有限公司(第1期)招聘5人备考考试试题附答案解析
- 2026山东菏泽学院招聘高层次人才8人(第一批)参考考试试题附答案解析
- 2026山东临沂罗庄区部分事业单位招聘综合类岗位17人备考考试试题附答案解析
- 2026四川内江市隆昌市黄家镇人民政府招聘2人备考考试试题附答案解析
- 2026年烟台栖霞市事业单位公开招聘工作人员(63人)备考考试试题附答案解析
- 2026年荆州市公安县事业单位人才引进52人参考考试试题附答案解析
- 2026陕西西北工业大学材料学院功能密封材料团队招聘1人备考考试试题附答案解析
- 2026山东事业单位统考枣庄市滕州市招聘初级综合类岗位60人参考考试试题附答案解析
- CJ/T 24-1999城市绿化和园林绿地用植物材料木本苗
- T/CECS 10378-2024建筑用辐射致冷涂料
- 潮玩行业研究报告:IP起万物生
- 部编版小学语文四年级上册习作《我的心儿怦怦跳》精美课件
- 湖南省永州市2025届高一上数学期末学业质量监测模拟试题含解析
- 房屋过户提公积金合同
- CJJT 164-2011 盾构隧道管片质量检测技术标准
- 婚礼中心工作总结
- 《数字贸易学》教学大纲、二维码试题及答案
- 严仁词人生创作背景考述
- 大锁孙天宇小品《时间都去哪了》台词剧本完整版-一年一度喜剧大赛
评论
0/150
提交评论