版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、本英文版为内部资料,仅供参考,以中文版为准。The Chinese version of standards has precedence to their English translations which are only for internal reference.国家质量监督检验检疫总局General Administration of Quality Supervision, Inspection and Quarantine of the Peoples Republic of China压力管道安装安全质量监督检验规则(2002版)Rule on Safety, Qualit
2、y Supervision and Inspection for Pressure Piping Installation(Version 2002)Boiler and Pressure Vessel Safety Supervision Bureau, General Administration of Quality Supervision, Inspection and Quarantine of the Peoples Republic of ChinaTable of ContentChapter 1General3Chapter 2Supervision and Inspecti
3、on Unit, Personnel and Duty4Chapter 3Unit Being Supervised and Inspected and its duty6Chapter 4 Content and Method of Supervision and Inspection7Chapter 5Basic Procedure of Supervision and Inspection11Chapter 6Supervision and Inspection Report13Chapter 7 Supplementary Rules14Attachment 1Declaration
4、of Safety, Quality Supervision and Inspection forInstallation of Pressure Piping16Attachment 2 Notice on supervision and inspection opinions21Attachment 3 Report of safety and quality supervision and inspection report for pressure piping installation22国家质量监督检验检疫总局文件Document by General Administration
5、 of Quality Supervision, Inspection and Quarantine of the Peoples Republic of ChinaGuo Zhi Jian Guo 2002 No. 83Notice on printing and issuing “Rule on Safety, Quality Supervision and Inspection for Pressure Piping Installation”Quality Technology Supervision Bureau of each province, autonomous region
6、, municipality directly under the Central Government, each relevant unit:In order to strengthen safety supervision work for pressure piping, regulate safety and quality supervision and inspection work for installation of pressure piping, now print and issue to you “ Rule on safety and quality superv
7、ision and inspection for pressure piping installation”, please implement and execute it earnestly. Please feedback any problems occurred during execution to Boiler & Pressure Vessel Safety Supervision Bureau, General Administration of Quality Supervision, Inspection and Quarantine of the Peoples Rep
8、ublic of China.Attachment: Rule on safety, quality supervision and inspection for pressure piping installation General Administration of Quality Supervision, Inspection and Quarantine of the Peoples Republic of ChinaMarch 21, 2002Attachment:Rule on Safety, Quality Supervision and Inspection for Pres
9、sure Piping InstallationChapter 1GeneralArticle 1 This rule is set up in order to ensure the safe operation of pressure piping, guarantee the safety of peoples lives and property, based on responsibilities of national quality supervision, inspection and quarantine administration department endowed b
10、y State Council and the “Rule on safety management and supervision of pressure piping” (hereinafter called as “Rule”).Article 2 This rule is suitable for safety, quality supervision and inspection for installation of pressure piping (including auxiliary facilities and safety protection equipment, th
11、e same below) newly-built, revamped and expanded within the applicable scope of “Rule”.Article 3 Safety, quality supervision and inspection (hereinafter called as supervision and inspection) is the supervision and verification for safety and quality of pressure piping installation, it bears legal in
12、spection nature. Supervision and inspection work shall be carried out at pressure piping installation site, and during the installation and construction. During pressure piping installation and construction, unit undertaking project, design unit, installation unit, supervision unit, inspection unit,
13、 anti-corrosion unit and other relevant units (hereinafter called as Unit Being Supervised and Inspected) must accept and cooperate supervision and inspection work, and shall undertake safety and quality responsibilities for pressure piping installation.Article 4 Supervision and inspection work for
14、pressure piping installation shall be undertaken by the qualified and authorized inspection units (hereinafter called as Supervision and Inspection Unit). Boiler and Pressure Vessel Safety Supervision Organs of Quality Technical Supervision Administration Departments at all levels (hereinafter calle
15、d as Safety Supervision Organ) must carry out safety supervision for pressure piping installation and strengthen supervision and inspection for Supervision and Inspection Unit according to the requirement of “Rule”.Article 5 General administration of Quality Supervision, Inspection and Quarantine of
16、 China and Quality Technical Supervision Administration Departments at provincial level shall carry out qualification certification for Supervision and Inspection Unit according to their scope of work. Boiler and Pressure Vessel Safety Supervision Organ of General administration of Quality supervisi
17、on, Inspection and Quarantine of China (hereinafter called as National Safety Supervision Organ) is responsible for authorization of supervision and inspection work and tasks for long transfer piping crossing provinces, autonomous regions and municipalities directly under the Central Government; Boi
18、ler and Pressure Vessel Safety Supervision Organ of Quality Technical Supervision Administration Department at provincial level or its entrusted Boiler and Pressure Vessel Safety Supervision of Quality Technical supervision Administration Department at regional (municipal) level (hereinafter called
19、as Local Safety Supervision Organ) are responsible for authorization of supervision and inspection work and tasks for pressure piping within their administration area.Chapter 2Supervision and Inspection Unit, Personnel and DutyArticle 6 Supervision unit can carry out supervision and inspection work
20、only after he must get the supervision and inspection qualification certification and get the authorization for corresponding supervision and inspection work and tasks.Article 7 Supervision and Inspection Unit must accept supervision, inspection, and business guidance delivered by Safety Supervision
21、 Organ.Article 8 Personnel doing supervision and inspection work (hereinafter called as “Supervision and inspection personnel”) can carry out supervision and inspection work within the allowable scope of their inspection qualification certificates only after they accept professional training and exa
22、mination on pressure piping safety inspection techniques, and get inspection qualification certificates issued by Quality Supervision, Inspection and quarantine Administration Department.Article 9 Quality and Inspection Unit shall guarantee the authenticity of supervision and inspection records, sup
23、ervision and inspection reports issued during supervision and inspection work, the correctness of supervision and inspection confirmation, and supervision and inspection result; shall be responsible for quality of supervision and inspection work.Article 10 Supervision and Inspection Unit and Supervi
24、sion and inspection personnel must fulfill their obligations, closely observe disciplines, adhere to professional ethics, and guarantee scientificalness and fairness of their work, keep technical and commercial secret relevant to supervision and inspection work.Article 11 When Supervision and Inspec
25、tion Unit find Unit Being Supervised and Inspected have behaviors violating the rule or have safety and quality problems, shall require him to rectify and improve, when the problem is serious, shall report to the safety and supervision organ who authorizes supervision and inspection work, and let hi
26、m deal with it according to relevant national regulations.Article 12 Supervision and Inspection Unit who has the following problem during his supervision and inspection work, shall be asked to rectify and improve within time limit, to stop supervision and inspection work temporarily and be given eco
27、nomic penalty by the Quality Technical Supervision Administration Department at the location of Safety Supervision Organ for authorization of supervision and inspection task according to relevant regulations; If the circumstances are serious, General Administration of Quality Supervision, Inspection
28、 and Quarantine of China or Quality Technical Supervision Administration Department at provincial level for qualification certification will revoke its supervision and inspection qualification.1Supervision and inspection capability is not enough, and can not be duly enhanced, and hard to execute sup
29、ervision and inspection task according to the regulation of this rule;2Neglect of duty for supervision and inspection is occurred for several times, and no treatment is made in time; no practical measures are taken to correct the neglect of duty.3Safety and quality accidents for pressure piping inst
30、allation are resulted from the duty of supervision and inspection unit;4Provide supervision and inspection certifying document to the unit without “Pressure Piping Installation License” and the pressure piping installation unit exceeding the scope of license.Article 13 Supervision and inspection per
31、sonnel are considered as neglect of duty when they have one of the following problems. Safety Supervision Organ or Supervision and Inspection Unit for authorization of supervision and inspection task will give them circulate a notice of criticism, and stop supervision and inspection work temporarily
32、 according to relevant regulation; when the circumstances are serious, General Administration of Quality Supervision, Inspection and Quarantine of China or Quality Technical Supervision Administration Department at provincial level for qualification certification will revoke their supervision and in
33、spection qualification certificates.1Unit Being Supervised and Inspected who has serious quality problem has been found during supervision and inspection but not being given opinion or reported in time;2Installation Unit has the problem of exceeding the installation scope specified in “Pressure Pipi
34、ng Installation License”, which is not found or found but not reported during supervision and inspection.3Items confirmed after being supervised and inspected have serious quality problems affecting the safe operation of pressure piping.4Do not carry out supervision and inspection according to this
35、rule, but affix ones signature for confirmation or provide fake certificate.5Normal construction of pressure piping installation is affected because Supervision and inspection personnel do not show at site at specified time for supervision and inspection work without prior notice to installation uni
36、t.Chapter 3Unit Being Supervised and Inspected and its dutyArticle 14 Safety quality management behavior, technical document, safety and quality of installation relevant to pressure piping of the Unit Being Supervised and Inspected shall all be inspected and examined by the Supervision and Inspectio
37、n Unit.Article 15 Unit undertaking project is the administrator of the safety and quality of pressure piping, he shall:1Implement and execute earnestly national laws, regulations and technical specifications and standards relevant to safety and quality of pressure piping, and take measures to ensure
38、 that safety and quality of pressure piping meet the requirement of relevant national regulations and standards;2Before installation of pressure piping is started, fill “Safety, Quality Supervision and Inspection Declaration for Installation of Pressure Piping” (for form, see attachment 1), long tra
39、nsfer piping crossing provinces, autonomous regions, and municipalities directly under the Central Government shall be filed with National Safety Supervision Organ; Other pressure piping shall be filed with Local Safety Supervision Organ;3Submit corresponding design document and relevant information
40、 to Supervision and Inspection Unit, and go through relevant supervision and inspection formalities;4During supervision and inspection work, unit undertaking project and its representative shall be responsible for providing necessary work conditions to Supervision and Inspection Unit for their perfo
41、rming supervision and inspection work including Supervision and inspection personnel consult relevant information and enter into site for inspection, and cooperate Supervision and inspection personnel coordinating relevant work, etc;5Provide full-time or part-time people in charge of coordination an
42、d witnessing the supervision and inspection work.Article 16 Pressure piping installation unit, supervision unit, inspection unit and anti-corrosion unit shall:1Implement and execute earnestly national laws, regulations and technical specifications and standards relevant to safety and quality of pres
43、sure piping, and take measures to ensure that quality of pressure piping installation and provided materials, equipment and services meet the requirement of relevant national regulations and standards;2Set up project quality guarantee system and organize the implementation, set up and properly keep
44、necessary construction record and witnessing documents;3Accept the supervision and inspection of the Supervision and Inspection Unit;4Cooperate Supervision and Inspection Unit to perform supervision and inspection work, provide necessary conditions for normal performance of supervision and inspectio
45、n work, including Supervision and inspection personnel consult relevant documents and enter into site for inspection, and inform the Supervision and inspection personnel the construction progress in time, etc.5Before construction of pressure piping, installation unit and supervision unit shall file
46、it with Safety Supervision Organ. Long transfer piping crossing provinces, autonomous regions, and municipalities directly under the Central Government shall be filed with National Safety supervision Organ; other pressure piping shall be filed with Local Safety Supervision Organ.Article 17 When Supe
47、rvision and Inspection Unit, and Supervision and inspection personnel have behaviors violating laws and regulations during their supervision and inspection work, Unit Being Supervised and Inspected may directly put forward to him/them, or reflect or appeal to safety Supervision Organ who authorizes
48、supervision and inspection task.Article 18 For pressure piping safety and quality problems or problems possibly affecting pressure piping safety and quality raised by supervision and Inspection Unit and Supervision and inspection personnel during their supervision and inspection work, the Unit Being
49、 Supervised and Inspected shall rectify and improve them in time according to requirement.Chapter 4 Content and Method of Supervision and Inspection Article 19 Supervision and inspection work shall be carried out in the whole course of pressure piping installation, the key points of supervision and
50、inspection work shall be defined according to characteristics of different Units Being Supervised and Inspected, and safety and quality requirement. Article 20 Content of supervision and inspection on safety and quality management behaviors of unit undertaking project shall include:1Whether the proj
51、ect reporting, construction examination and approval, and filing formalities are complete;2Whether design explanation is arranged and construction drawings are reviewed according to regulation;3Whether necessary management for construction of pressure piping installation is made, including setting u
52、p management organization, providing full-time, part-time managing people, setting up quality management system, and defining safety and quality management duties, etc;4Whether management over pressure piping installation and construction is effectively implemented;5Whether the selected design unit,
53、 supervision unit, pressure piping installation unit, inspection unit, anti-corrosion unit and manufacturers for corresponding materials, elements and auxiliary facilities have corresponding qualification;6Whether purchased materials, elements and auxiliary facilities and equipment meet design docum
54、ent and quality requirement;7Whether there are any other safety and quality management behaviors violating laws, regulations and neglecting duties. Article 21 Content of supervision and inspection on safety and quality management behaviors of installation unit and anti-corrosion unit shall include:1
55、Whether installation unit and anti-corrosion unit have the corresponding installation qualification and certificates;2Whether installation unit goes through filing procedure according to regulation specified in Item 5, Article 16 of this Rule;3Whether quality management system is set up, completed,
56、and put into effective implementation;4Whether professional people and managing people such as project manager, person in charge of techniques, project quality guarantee engineer and discipline engineer are matching each other, if they have corresponding qualifications and such qualifications are co
57、rresponding to work they undertake;5Whether welding management system, welding procedure appraisal, welding work guidance sheet, welders bearing certificate and items specified in certificate, etc, meet installation requirement;6Whether there is approved construction arrangement design or constructi
58、on plan and they can implemented and executed;7Whether materials and equipment provided by unit undertaking project, or materials purchased by own unit, etc are inspected according to design and standard requirement;8Whether various inspection and test are made to pressure piping installation work a
59、ccording to relevant regulation and standard, If the safety and quality problems occurred are reported to the superior and treated seriously in time according to relevant document requirement;9Whether there are behaviors of subcontracting and sub-subcontracting pressure piping installation work whic
60、h violate regulations;10Whether there are any other safety and quality management behaviors violating laws, regulations and neglecting duties.Article 22 Content of supervision and inspection on safety and quality management behaviors of supervision unit shall include:1Whether he undertakes supervisi
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 眼镜行业销售工作总结
- 酒水饮料行业员工激励措施
- 2024年电大电子商务概论考试综合手册
- 创意设计服务协议书(2篇)
- 易错点12 抗日战争时期的主要史实与时间-备战2023年中考历史考试易错题(原卷版)
- 黄金卷6-【赢在中考·黄金八卷】(解析版)
- DB33T 2195-2019 家庭医生签约服务居家护理工作规范
- 以社區為基礎之糖尿病個案管理與疾病管理
- 2022-2023学年山东省聊城市高一上学期期末考试地理试题(解析版)
- 阜阳热熔胶项目可行性研究报告
- 【部编版】三年级语文上册全册《单元统整备课》教案
- 02S501-2 双层井盖图集标准
- 广东省湛江市寸金培才学校2022-2023学年下学期七年级数学期末试卷
- 顽固性高血压的基因治疗新进展
- (正式版)JTT 1495-2024 公路水运危险性较大工程安全专项施工方案审查规程
- 停车场管理系统说明书
- 医院药剂科年终总结
- (2024年)AED(自动体外除颤器)使用指南
- 麻醉药品精神药品管理
- 抽错血标本护理不良事件
- 科技成果转化培训资料
评论
0/150
提交评论