1、地砖花岗岩地面施工方案完整(完整版资料,可直接使用可编辑,推荐下载)地面砖、花岗岩铺贴施工方案Construction Scheme of Floor tile andGranite tile Installation一、准备工作 Preparations1。弹水平线,确定室内地砖完成面士 0.00标高。The horiz on tal li ne, make sure in door floor tile fin ish surface elevati on of + /-0.00.2. 水电管线已安装完毕。Water and electricity line already deploye

2、d二、准备材料 Preparation of materials1. 425水泥及中砂,白水泥.425 ceme nt and medium sand and white ceme nt.2。800 兴 800* 25 花岗岩,600*600* 25 花岗岩,600* 600* 12 地砖。800 * 800 * 25 granite, 600 * 600 * 25 granite,600 * 600* 12 floor tile.二、施工方法:con structi on procedure1、工艺流程 construction process材料准备t弹楼地面面层标高控制线t基层处理t弹线

3、找 中找方t铺贴基准控制标筋t铺贴面层t铺贴踢脚板t养 护与成品保护Prepare materials Bomb the ground floor surface elevati on con trol li net Base treatmenTBomb lineT Lay up thebe nchmark con trol sta ndard screed lay up surface course Lay upthe baseboard Maintenance and protecti on for the final product2、铺贴顺序:Tile in stallation or

4、der(1) 、大面积施工时,应用分段顺序铺贴。Large area con structionsegme nted order pav ing(2) 、对于整个楼层,要先铺贴独立房间,再铺贴通道或走廊.For the en tire buildi ng, first tile separate rooms the n passgeways or corridors.(3) 、对于一般房间采用退步法先由房间中部向两侧铺贴.对于有独立柱的大厅,要先铺贴柱间部分,然后再向两边展开.For General rooms,use regression method by laying up from t

5、he central to both sides. For the great hall with independent column, first tile colu mn secti on, the n expa nd to both sides(4) 、所有房间先铺贴整块板材,非整块板材最后铺贴。地面铺 贴完后再铺贴踢脚板。All the roomsfirstly paved with block plate , or tile at last。Skirt ing board tiledafter the gro und.3、铺贴方法:Tile in stallation method

6、(1)、以提前做好的标筋为基准,首排板材两边挂线,首排铺贴好后可单边挂线Baseed on markingscreed made befor,e the first row plate hang line on both sides ,afterthe first raw is tiled ,it can be hang line on one side.(3) 、结合层与板材面层应分段同时铺砌。先进行试铺,将干硬 性水泥砂浆摊铺到铺贴部位刮平 , 其厚度要适宜,然后将板材平 铺到干硬性水泥砂浆上 (干硬程度以手捏成团 , 落地即散为宜), 用橡皮锤用力敲击板面, 使摊铺的干硬性水泥砂浆结合层

7、密实, 并且使板材表面低于地面标高控制线 25mm。Combined course andplate surface course should be tiled at the same time. First trial laying,flatthe rigid cement mortar to the paving part, and its thicknessshould be appropriated. Then tile theplank to dry, rigid cement morta(Advisabledegree of dry is can be kneaded toget

8、her,and scattered when dropped on land ) . Use a rubber mallet hardstrike the board to make the paving dry rigidcement mortar layercombination is closegrained, and make the surface2 5 mmbelow the ground elevation control sheet.(4)、试铺合适后,将板材揭起 , 在密实的干硬性水泥砂浆结合 层上撒布一层干水泥面并用喷壶淋水一遍,或浇一层水泥浆作 粘结,然后将板材再原位置再

9、次安放 .After appropriate trial paving , lift up the plate.Spread a layer of dry cement to the dry, rigid close grained cement morta, and wet it once by the wateri ng can or watera layer of ceme nt paste for mud bonding, the n put the plate back at the position再次安放时,板材四角要同时下落,放稳后用橡皮锤敲击板面 使其平整并与结合层能紧密年粘

10、接牢固,板材表面与地面标高 控制线吻合便完成一块板材铺贴,再依次铺贴下一块。When placed again four corners of the pla nk should be dropped at the same times After layed dow n steadily ,use a rubber hammer to strike itto make it flat and bonded firmlywith the combined course .The plank pav ing is done whe n the pla nk surfaceis coin cide

11、d with the elevati on of the ground con tro, the n pave the n ext one。铺贴时要随时找平找直,做到四角平整,纵横缝隙对齐。When paving , be sure that it is flat and straight Make sure the four corners flat, and vertical and horizontal crack aligned.三、质量要求 Quality requirements1 大理石,花岗石 Marble, granite1.1 主控项目 Dominant item(1)面层

12、与下一层应结合牢固无空鼓.Surface course should be combined firmly with the next one , without any gap&(2) 四角平整,纵横缝隙对齐、无色差.Four corners flat, vertical and horizontal crack aligned,colorlessdiffere nee.1。2 一般项目 Ge neral item(1)大理石,花岗石面层的表面应洁净 , 平整,无磨痕,且应图 案清晰,色泽一致,接缝均匀,周边顺直,镶嵌正确 , 板块无 裂、掉角、缺棱等缺陷。The surface of Ma

13、rble and granite should be clean,fla,t no grinding mark, andclear pattern,consistent color,juncture uniform, straight surrounding, right Mosaic,plates without broken corners, no crack defects such as lack of edges.(2)踢脚线表面洁净 , 高度一致,结合牢固,出墙厚度一致。The surface of the baseboard should be clean,andconsiste

14、nt in height, firmly combined , and with consistent wall thickness。(3 )楼梯踏步和台阶板块的缝隙宽度应一致,齿角整齐,楼层 阶段相邻踏步,高度差不应大于 10mm。The stair treadand step plate should be consistent ingap wid,th and tidy tooth angles. The floor stage should be adjacent tothe tread, ang the height differe nee should be no more tha

15、 n 10 mm(4 )大理石和花岗石面层的允许偏差应符合 :The deviation of marble and granite surfaee layer should be allowed to meet:、表面平整度:1.2mm、缝格平直:1.2mm。接缝高低差:0.8mm。踢脚线上口平直:1.2mm。板块间隙宽度:1.2mmSurface evenness 1。2mmSeam case straight:1.2mrJuncture height differeneeSkirting line flat side:1。2mm Plate gap width: 1。 2mm2、地面砖

16、Floor tile2。1 主控项目:Domi nant item(1) 面层与下一层的结合(粘结)应牢固,无空鼓.Surface course should be combined firmly with the next one,without any gaps.(2 )四角平整,纵横缝隙对齐,无色差。Four corners flat, vertical and horizontal crack aligned, colorlessdiffere nee。2.2 一般项目:Ge neral item(1)砖面层的表面应洁净,图案清晰,色泽一致,接缝平整,深浅一 致,周边顺直,板块无裂纹,

17、掉角和缺损等缺陷。The surface of brick layer should be clean,flat, no grinding mark, and clear patter n , con siste nt color,j un cture uni form straight surro unding, right Mosaic,plates without broke n cor ners, no crack defects such as lack of edges(2) 面层邻接处的镶边用料及尺寸应符合设计要求,边角整齐, 光滑。The edge materials and

18、dime nsions of surface course adjace nt side should meet the design requirement, with tidy corners and smooth。(3) 地板砖间隙宽度:1.2以内伽。Floor brick gap width : less than 1 2 mm.(4) 踢脚线表面应洁净,高度一致,结合牢固,离墙厚度一致。The surface of the baseboard should be clean, andconsistent inheight, firmly combined ,and with cons

19、istent wall thickness.(5) 面层表面的坡度应符合设计要求,不倒流水,无积水,与 地漏,管道结合处应严密牢固无渗漏。The slope of surface courseshouldmeet the design requirement on inverse flow, no no stagnant wate。 The junction with floor drain , and pipe should be closely solid with no leakage五、成品保护 Maintenance and protection for the final prod

20、uct1。铺好的地面3天后方可上人。The paved ground can be Ian ded 3 days later2。新铺的房间应临时进行封闭,操作人员和检查人员进入房间踩 踏时,要轻踏在一块木板上。The new paved room should be closed temporarily,whe n operators and inspectors enter rooms please step on a piece of wood lightly.3。地面完工后,房间应封闭,粘贴完达到强度后,其他工种插入作 业时,应在表面加筑浇板保护.墙角门窗口处应加木板防护以防碰 撞。Wh

21、en the ground is finished, the room should be closed After thepaste reachesthe strength other kinds of workers join to the work,it needs to build slab column for protection.Door and windows in the corner should add wood for protecti on in case of collisi on。地面地砖施工工艺及技术组织措施(1 )操作程序基层处理R地砖镶贴J质量验收(2)操作

22、要点1 )施工准备A、基层处理:铺贴地面地砖,通常是在混凝土楼面或地 面上施工。对地基层表面进行清理,表面残留的砂浆、尘 土和油渍等应用钢丝刷刷洗干净,并用水冲洗地面.B、将面砖湿润备用:浸水后的瓷砖片应阴干备用,阴干 的时间视表面有潮湿感、但手按无水迹为准。C、弹线、分格、定位:弹线时,以房间中心点为中心, 弹邮相互垂直的两条定位线。在定位线上按瓷砖尺寸进行 分格,如整个房间可排偶数块瓷砖,则中心线就是地砖的接 缝;如排奇数块,则中心线在地心位置上,分格、定位时, 应距墙边留出200 300mm作为调整区间。另 外应注意,若 房间内外的铺地材料不同,其交接线应设在门板下的中间 位置。同时,地

23、面铺贴的收边位置不应在门口处,也就是说 不要使门口处出现不完整的瓷砖块.地面铺贴的收边位置 应安排在不显眼的墙边。D、预排:地砖镶贴前应预排。预排要注意同一墙面的横 竖排列,均不得胆一行以上的非整砖。非整砖行应排在次 要部位或阴角处,其方法是:对有间隔缝的铺贴,用间隔缝 的宽度来调整。对缝铺贴瓷砖,主要靠次要部位的宽度来调 整。2)地面砖镶贴:A、用尼龙线棉线绳在墙面标高点上拉出地面标高线,以 及垂直交叉的定位线。B、按定位线的位置铺贴瓷砖。用陶瓷面用粘合剂摊在瓷 砖背面上,再 将地砖与地面铺贴,并用 橡皮敲击瓷砖面,使 其与地面压实,并使线高度与地面标高线吻合。铺贴8块以 上时应用水平尺检查

24、平整度,对 高的 部分用 橡皮锤敲平, 低 的部分应起出 地用水泥浆垫高。地 砖的铺贴程序, 对于小房 间来说(面积小于4 0平方米),通常是做T字型标准高度 面. 对于房间面积较大时, 通常按房间中心十字型做出 标准 高度面, 这样, 可便于多人同时施工.C、铺贴大面:铺贴大面是以铺好的标准高 度面为标基进 地施工,铺 贴时紧靠已铺好的标准高 度面开始施工, 并用拉 出 的 对缝平直线来控制瓷砖对缝的 平直. 水泥砂浆应饱满 地抹于瓷砖背面, 并用 橡皮锤敲实 , 以 防止空鼓现象. 并且 一边铺贴一边用 水平尺检查校正。 并即刻擦去表面的 水泥 浆。老 大需做泛水的表面, 铺贴时按图纸设计

25、做出泛水坡度. 整幅地面铺贴完毕, 养护几天后,再进行抹缝施工。抹缝时, 将白水泥调成干性团, 在缝隙上擦抹, 使地砖的 对缝内填 满白水泥, 再将瓷砖表面擦净。(3 )质量保证措施及要求1)材料面层相邻两块料间的高差,缺砖不应超过1 . 5 m m。2)各层厚度对设计厚度的偏差, 公允许个别地方存在, 但不得超过该层厚度的 10%。3)块料行列(缝隙)对直线的偏差,在1 0 m m长度内的 允 许 值 铺 地 砖 不 得 超 过 8mm。4 )地面各层(面层、垫层)的表面是否平整,应用2mm直 尺在各个方向加以检查, 如为斜面时, 则应用水平尺和样 尺检查。5)地面各层表面对水平面或对设计坡

26、度的允许偏差, 不 应大于房间相应尺寸的0 . 2 %,但最大偏差不应大于3 0 m m。要求表面洁净,图案清晰,色泽一致,接缝隙均匀, 周边顺直, 板块无裂纹、 掉角和缺楞等现象。1、适用范围本方案适用于陕西师范大学新校区图书馆工程室内地砖施工。2、施工准备2。 1 材料及主要机具:2。1。1 水泥: 硅酸盐水泥、普通硅酸盐水泥;其标号不应低于 425号,并严禁 混用不同品种、不同标号的水泥 .2。1。2砂:中砂或粗砂,过8mmfL径筛子,其含泥量不应大于3%2。 1.3 地砖应有出厂合格证,抗压、抗折及规格品种均符合设计要求,外观颜 色一致、表面平整、边角整齐、无翘曲及窜角。2。 1。 4

27、 草酸、火碱、建筑胶等均有出厂合格证。2。 1.5 主要机具 : 小水桶、半截大桶、笤帚、平锹、铁抹子、大木杠、小木杠、 筛子、手推车、钢丝刷、喷壶、锤子、橡皮锤子、凿子、方尺、粉线包、切割 机。2。 2 作业条件:2。2。1内墙+50cm水平标高线已弹好,并校核无误。2。2.2 墙面抹灰、门框已安装完。 地面垫层以及预埋在地面内各种管线已做完。穿过楼面的坚管已安完,管洞已 堵塞密实 . 有地漏的房间应找好泛水。2.2 。 4 提前做好选砖的工作,预先用木条钉方框(按砖的规格尺寸)模子 , 拆 包后块块进行套选、长、宽、厚不得超过土 lmm,平整度用直尺检查,不得超过 0.5mm外观有裂缝、掉

28、角和表面上有缺陷的板剔出,并按花型、颜色挑选后 分别堆放。2.2。5在施工前应绘制施工大样图进行排版,并做出样板间 ,经检查合格后 , 方 可大面积施工。3、操作工艺3.1 工艺流程:勾缝、擦缝f养护踢脚板安装找标咼、弹线f抹找平层砂浆铺砖3。1。1基层处理:将混凝土基层上的杂物清理掉,并用錾子剔掉砂浆落地灰, 用钢丝刷刷净浮浆层。如基层有油污时,应用 10%火碱水刷净,并用清水及时 将其上的碱液冲净。3.1。2找标高、弹线:根据墙上的+50cm水平标高线,往下量测出面层标高, 并弹在墙上.抹找平层砂浆:。1洒水湿润:在清理好的基层上,用喷壶将地面基层均匀洒水一遍。3.1。3.2抹灰饼和标筋:

29、从已弹好的面层水平线下量至找平层上皮的标高(面层标高减去砖厚及粘结层的厚度),抹灰饼间距1.5m,灰饼上平就是水泥 砂浆找平层的标高,然后从房间一侧开始抹标筋(又叫冲筋)。有地漏的房间, 应由四周向地漏方向放射形抹标筋,并找好坡度。抹灰饼和标筋应使用干硬性砂 浆,厚度不宜小于2cm.3.1。3。3装档(即在标筋间装铺水泥砂浆):清净抹标筋的剩余浆渣,涂刷一 遍水泥浆(水灰比为0。40.5)粘结层,要随涂刷随铺砂浆。然后根据标筋的 标高,用小平锹或木抹子将已拌合的水泥砂浆(配合比为1 : 31 : 4)铺装在标 筋之间,用木抹子摊平、拍实,小木杠刮平,再用木抹子搓平,使其铺设的砂 浆与标筋找平,

30、并用大木杠横竖检查其平整度,同时检查其标高和泛水坡度是否正确,24h后浇水养护。3。1.4弹铺砖控制线:当找平层砂浆抗压强度达到1.2MPa时,开始上人弹砖的控制线.预先根据设计要求和砖板块规格尺寸,确定板块铺砌的缝隙宽度,缝隙宽度控制在5mm左右。在房间分中、从纵、横两个方向排尺寸,当尺寸不足 整砖倍数时,将非整砖用于边角处,横向平行于门口的第一排应为整砖,将非 整砖排在靠墙位置,纵向(垂直门口)应在房间内分中,非整砖对称排放在两墙边 处。根据已确定的砖数和缝宽,在地面上弹纵、横控制线(每隔 4 块砖弹一根 控制线).3。1。5铺砖:为了找好位置和标高,应从门口开始,纵向先铺 23行砖,以

31、此为标筋拉纵横水平标高线 , 辅时应从里向外退着操作 ,人不得踏在刚铺好的砖 面上,每块砖应跟线,操作程序是:3。 1 。 5.1 铺砌前将砖板块放入半截水桶中浸水湿润 , 晾干后表面无明水时, 方 可使用。.2 找平层上洒水湿润 , 均匀涂刷素水泥浆 (水灰比为 0。 40.5),涂刷面积不要 过大, 铺多少刷多少。3结合层的厚度:采用水泥砂浆铺设,厚度为 10mm左右3。结合层组合材料拌合:水泥砂浆结合层配合比为1 : 2。5(水泥: 砂)干硬性砂浆 . 亦应随拌随用,初凝前用完,防止影响粘结质量。 5 铺砌时,砖的背面朝上抹粘结砂浆 , 铺砌到已刷好的水泥浆找平层上,砖上 楞略高出水平标

32、高线,找正、找直、找方后,砖上面垫木板,用橡皮锤拍实, 顺序从内退着往外铺砌,做到加砖砂浆饱满、相接紧密、坚实, 与地漏相接处,用砂轮锯将砖加工成与地漏相吻合 . 铺地砖时最好一次铺一间 , 大面积施工时, 应采取分段、分部位铺砌。3。 1.5.6 拨缝、修整:铺完 2至 3行,应随时拉线检查缝格的平直度,如超出 规定应立即修整,将缝拨直,并用橡皮锤拍实。此项工作应在结合层凝结之前 完成。3.1。6勾缝:面层铺贴应在24h内进行勾缝、勾缝用1 : 1水泥细砂浆勾缝,缝 内深度宜为砖厚的 1/3, 要求缝内砂浆密实、平整、光滑。随勾随将剩余水泥砂 浆清走、擦净。3。1。7养护:铺完砖24h后,洒

33、水养护,时间不应少于 7d。 镶贴踢脚板:踢脚板用砖 , 与地面块材相同,踢脚板的立缝应与地面缝对齐,铺 设时应在房间墙面两端头阴角处各镶贴一块砖,出墙厚度为8mm高度120 mm以此砖上楞为标准挂线,开始铺贴,砖背面朝上抹粘结砂浆(配合比为1 : 2水泥砂浆),使砂浆粘满整块砖为宜,及时粘贴在墙上,砖上楞要跟线并立即拍实, 随之将挤出的砂浆刮掉,将面层清擦干净(在粘贴前,砖块材要浸水晾干,墙面刷水湿润).3.1。9冬期施工:室内操作温度不低于+5C。室外操作时,应按气温的变 化掺防冻剂,但必须注试验室试验后才能操作.4、质量标准4.1主控项目:4.1 o 1各种面层所用的板块品种、质量必须符

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论