




版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、Copyright Futuris Automotive Interiors All Rights Reservedlean manufacturing training week 3Copyright Futuris Automotive Interiors All Rights ReservedTPS Total Production ManagementVisual ManagementStable and Standardized ProcessesLeveled Production (Heijunka) Just-in-TimeRight part, right amount, r
2、ight timeTakt timeContinuous flowPull systemQuick ChangeoverIntegrated logistics Jidoka(In-station quality)Make problems visibleAutomatic stopsAndonPerson-machine separationError proofingIn-station-quality controlSolve root cause of problem (5 Whys)Best Quality Lowest Cost Shortest Lead Time Best Sa
3、fety High MoraleThrough shortening the production flow by eliminating waste lean manufacturing foundations People & Teamwork*Selection *Rigid decision making*Common goals *Cross-trained Waste Reduction*Genchi Genbutsu*Eyes for waste*5 Whys *Problem solving Continuous ImprovementCopyright Futuris
4、 Automotive Interiors All Rights Reservedone-piece flowalso known as “single piece flowideal state where items are processed and moved directly to the next process one piece at a timeeach processing step completes its work just before the next process needs the item and the transfer batch is oneTakt
5、 Time:the heart beat of one-piece flowCopyright Futuris Automotive Interiors All Rights Reservedone-piece flowbenefits of one-piece flow:builds in qualitycreates real flexibilitycreates higher productivityfrees on floor spaceimproves safetyimproves moralereduces cost of inventoryCopyright Futuris Au
6、tomotive Interiors All Rights Reservedone piece flow “If some problem occurs in one-piece-flow manufacturing then the whole production line stops. In this sense it is a very bad system of manufacturing. But when production stops everyone is forced to solve the problem immediately. So team members ha
7、ve to think, and through thinking team members grow and become better team members and people.Teruyuki Minoura, former President, Toyota Motor Manufacturing, North AmericaCopyright Futuris Automotive Interiors All Rights ReservedjidokaStopping the process to build in quality“A method to detect defec
8、ts when they occur and automatically stop production so an employee can fix the problem before the defect continues downstream.Poke Yoke Error ProofingCopyright Futuris Automotive Interiors All Rights Reservedone piece flowredesign work processes to achieve high value-added, continuous flow. strive
9、to cut back to zero the amount of time that any work project is sitting idle or waiting for someone to work on it.create flow to move material and information fast as well as to link processes and people together so that problems surface right away.make flow evident throughout your organizational cu
10、lture.Copyright Futuris Automotive Interiors All Rights Reservedone piece flowexample:Operation A supplies parts to Operation B, which supplies to Operation CFlow that is not definedOperation AOperation BOperation CCopyright Futuris Automotive Interiors All Rights Reservedone piece flowprimary cause
11、s of deviation are:imbalanced work cycles typically person with extra time will deviateintermittent work stoppages due to lack of parts or to perform additional tasksintermittent work delays due to struggles with machines or fixtures or overly difficult or complex tasksmiscellaneous issues such as “
12、building ahead to “buy time for changeover, an operator leaving the line for some reason, or to stagger breaks etcCopyright Futuris Automotive Interiors All Rights Reservedone-piece flowNot following the rules!Copyright Futuris Automotive Interiors All Rights Reservedone piece flowestablishing one p
13、iece flowdefine and dedicate the space for one piece space outlined with tape or paint to show only one piece is permitted and a sign to further clarify thisspace to be physically limited (controlled) by allowing enough room for a single pieceSingle piece flow with visually defined agreementOperatio
14、n AOperation BOperation C1 PC1 PCCopyright Futuris Automotive Interiors All Rights ReservedlevelingHeijunka is the leveling of production by both volume and product mix.benefits: flexibility to make what the customer wants when they want it. reduced risk of unsold goods. balanced use of labor and ma
15、chines. smoothed demand on upstream processes and the plants suppliers.Copyright Futuris Automotive Interiors All Rights ReservedlevelingIn general, when you try to apply the TPS, the first thing you have to do is to even out or level the production. Once the production level is more or less the sam
16、e or constant for a month, you will be able to apply pull systems and balance the assembly line. But if production levels-the output-varies from day to day, there is no sense in trying to apply other systems, because you simply cannot establish standardized work under such circumstancesFujio Cho, Pr
17、esident, Toyota Motor CorporationCopyright Futuris Automotive Interiors All Rights Reservedleveling leveling by volumecase study:demand varies between 800 and 1200 units manufacture at long term average and carry inventory to ensure stability of the production process in this case production would b
18、e 1000 units with minimum of 200 inventory to meet weekly targetsbenefits: reduce process inventories and simplify processes which reduces costsCopyright Futuris Automotive Interiors All Rights Reservedlevelingleveling by productreduce the time and cost of changeovers so that smaller and smaller bat
19、ches are not prohibitive and lost production time and quality costs are not significantSMEDhigh runners predictable demandlow runners high value unpredictable demandCopyright Futuris Automotive Interiors All Rights Reservedlevelingprovide your down line customers in the production process with what
20、they want, when they want it, and in the amount they want. Just in time approachminimize your work in process and warehousing of inventory by stocking small amounts of each product and frequently restocking based on what the customer actually takes awaybe responsive to the day-by-day shifts in custo
21、mer demand rather than relying on computer schedules and systems to track wasteful inventory. Copyright Futuris Automotive Interiors All Rights Reservedpull systempull dictates when material is moved and who (customer) determines that it is to be moveduse “pull systems to avoid overproductionCopyrig
22、ht Futuris Automotive Interiors All Rights Reservedpull systempull versus push systems: defined agreement with specified limits pertaining to volume of product, model mix and the sequence of model mix between the two parties- supplier and customer no defined agreement between the supplier and the cu
23、stomer regarding the quantity of work to be supplied and when. The supplier works at his own pace and completes work according to his own schedule.Copyright Futuris Automotive Interiors All Rights Reservedpull systempull versus push system:items that are shared between the two parties must be dedica
24、ted to them, this includes resources, locations, storage, containers etc and a common reference time (TAKT Time) locations are not defined and dedicated, and material is placed where there is an opening. Copyright Futuris Automotive Interiors All Rights Reservedpull systempull versus push system:sim
25、ple control methods which are visually apparent and physically constraining, maintain the defined agreement. since there is no definition, or dedication, there is no clear way to understand what to control or how to control it.Copyright Futuris Automotive Interiors All Rights Reservedpull systemprov
26、ide customers what they want, when they want it, and in the amount they want. Material replenishment initiated by consumption is the basic principle of just-in-time.minimize WIP and warehousing of inventory by stocking small amounts of each product and frequently restocking based on what the custome
27、r actually takes away.responsive to the day-by-day shifts in customer demand rather than relying on computer schedules and systems to track wasteful inventory. Copyright Futuris Automotive Interiors All Rights Reservedpull systemsJIT Just in time inventory materials or supplies to arrive at a facili
28、ty just when they are needed to reduce storage costscustomer must specify what will be needed, when and in what amountsSupplier must ensure supplies arrive at the agreed time and locationCopyright Futuris Automotive Interiors All Rights Reservedkanbankan means “card and ban means “signalA signaling
29、system which historically used cards to signal the need for an item other devices such as trolleys, boxes, empty spaces serve as Kanbana pull system that determines the supply, or production according to actual customer demand limits amount of inventory in the process by acting as an authorisation to produce more inventoryCopyright Futuris Automotive Interiors All Rights Reservedkanbanrules:cus
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 《媒介策略研究》课件
- 中秋节日促销方案范文(4篇)
- 2025房产抵押合同范本(20篇)
- 《研究生心血管异常》课件
- 毕业班主任发言稿(20篇)
- 工地项目经理的述职报告(15篇)
- 孩子幼儿园大班家长如何和老师沟通(4篇)
- 2025控制测量实习心得(18篇)
- 2025-2026年妇幼保健院(所、站)发展全景与展望
- 2025-2026年电影和影视节目发行趋势与展望
- 2024年初级药师考试历年真题试题及答案
- 浙江省杭州市萧山区高桥初中教育集团2024学年第二学期4月份素养调研九年级语文试卷题卷
- 二级造价师水利工程考试真题卷(2025年)
- 2024年云南省气象部门事业单位招聘考试真题
- 幼儿园牛奶知识普及课件
- 2025中美关税大战“对等关税”政策解读课件
- 4.3.2发生在肺内的气体交换 课件 人教2024版七年级生物下册
- 中国电影史知到课后答案智慧树章节测试答案2025年春华东师范大学
- 对外经济贸易大学自主招生个人陈述写作实例
- 教学设计-1.6 函数的连续性
- 微训练 一文多考 备考高效之小说《理水》 - 鲁迅(教师版)
评论
0/150
提交评论