1、Coka Cola, XiamenManual of the Krones Aseptic line CC XiamenContent内容Sterilization UHT / Bloc 3UHT杀菌系统/洁净空间Production preparation6生产准备Production14生产Type change over16产品转换End of production20生产结束Empty the disinfection bath23清空盖槽CIP caustic and acid26CIP碱酸洗N2 injector29滴氮系统Manual of the Krones Aseptic
2、lineKrones无菌生产线手册Sterilization UHT / BlocUHT杀菌系统/洁净空间MMA -> Programs程序 -> Program selection, general, U01Sterilization杀菌 -> Sterilization杀菌 -> Start开始Activating the step sequences, it is possible to follow the program启动程序步骤,才有可能进行程序操作MMA -> Step sequences -> Step sequence general U
3、01During sterilization, temperatures and flow is controlled by the PCS. These temperatures have to reach at least 121 °C minimum for 20 min. 在杀菌(SIP)期间,温度以及流体的流量由PCS控制。杀菌温度必须达到至少121 °C并且保持20分钟。At the end of the sterilization process it is necessary to reset the step sequence with the blue
4、button on the PCS (end phase).在杀菌过程完成的时候,有必要使用蓝色按钮重置步骤,Production preparation生产准备The preparation of production includes the following:生产准备包括如下步骤:- Take out the rinser CIP caps (manually)取下冲瓶机CIP洗杯(人工)- Take out the filler CIP caps 取下灌注机CIP洗杯- Preparation of PAA PAA准备- Disinfection of the filler Bloc
5、 无菌空间消毒- Fill up the filler with sterile product from Tetra-Pak 用Tetra-Pak系统提供的无菌产品充满注入机(环缸)MMA -> Programs -> Program selection general, U01Production -> Product preparation -> StartAn outside alkaline cleaning (COP) will start.外部碱清洗(COP)将开始After the COP is finished it is necessary to r
6、emove the CIP caps of the rinser.COP结束之后,必须取下洗瓶机的CIP洗杯The key at the filler touch has to be turned to position 1.注入机操作器的钥匙必须旋到一号位Use gloves to remove the CIP caps.使用手套取下CIP洗杯After removing the CIP caps returm the key to position 0. and confirm that the CIP cups are located in the touch screen.在取下CIP
7、洗杯后,把钥匙旋回0号位,MMA -> Programs -> RinserThe machine starts turning and an SIP is starting.机器开始进行SIP清洗Select the product you want to fill at the PCS在PCS上选择即将灌注的产品。Choose the product and press the folder button选择产品并按下文件夹按钮And confirm with yes!用YES确认A last“ operator intervention executed ” is neces
8、sary to confirm the product最后“操作者干预被执行”去确认产品。MMA -> Munue FC General01After finishing the production preparation it is necessary to confirm with the blue button of the PCS完成生产准备之后,按下PCS蓝色按钮确认。And start the production program.开始生产程序Production生产MMA -> Programs -> Program selection general, U0
9、1Production生产 -> Production生产 -> Start开始All functions in automatic in the filler touch所有功能在注入触摸屏内自动进行 Change of product产品更换Before filling the last xxxx liters you have to start with the following procedure:在灌装最后xxxx升饮料之前,必须开始下列步骤Stop the production sequence by pressing this button:按下此按钮来停止生产步骤
10、 And reset the program with the blue button.以及用蓝色按钮重置程序Starting of the program “Type change over with IR”开始程序“产品类型更改?” MMA -> Programs -> Type change over -> Start) When the step sequence asks for the product change over, change the product in the PCS and confirm it.当程序步骤要求产品更换时,在PCS上更换产品并确
11、认Choose the new product:选择新产品Choose the new product and confirm with the folder button选择新产品以及按下文件夹按钮确认And confirm with yes!用YES确认End of production生产结束MMA -> FunctionsAfter reseting the program with the blue button (end phase) start the production program again see page 14.在用蓝色按钮重置程序(阶段结束)后,重新启动生产
12、程序(请参见第14页)Stop the production sequence:停止生产步骤And reset the sequence (end phase) with the blue button.使用蓝色按钮重置步骤(阶段结束)MMA -> Programs -> Program selection general, U01Production生产 -> End of production生产结束 -> Start开始After terminating the production you have to clean the whole filler. Take
13、 out bottles, caps etc.最终生产之后,必须清洗整个灌注机。清理瓶子盖子等The program to empty the disinfection bath: 程序清空洗盖槽MMA -> Programs -> Cap disinfection systemTurn off the external start关掉外部开始 Select the program “Empty disinfection bath选择清空洗盖槽选项Move the closure guidance back and Open the closure outlet.一开盖引导器 以及
14、打开取盖出口After taking out the closures the external start has to be activated again, the outlet has to be closed and the close guidance put back in the initial position.在取出盖子之后,外部开始必须重新启动,取样口必须关上以及盖引导器必须恢复初始位置CIP caustic / caustic and acidCIP碱洗/碱酸洗Before starting the caustic cleaning (caustic and acid
15、CIP is only necessary once a week) check if the CIP cups at the rinser are placed.开始碱洗之前(碱酸洗CIP只需要每周进行一次),检查洗瓶机CIP洗杯是否已安置完毕Then you start the program:然后可以开始程序Cleaning -> Caustic (Or caustic & acid) -> StartAt the end of the CIP (end phase of the step sequence) you always have to reset the
16、step sequence by pressing the blue button.在CIP结束的时候(步骤阶段结束),必须一直用蓝色按钮来重置步骤N2 injector滴氮系统Before being able to use the N2 injector it is necessary to sterilize the machine and fill it with N2.在可以使用滴氮系统之前,有必要对其进行杀菌,并且将其注满液氮All functions of the injector can be operated at the PCS. 所有滴氮系统的功能都可以在PCS上进行操作
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2024年电力保护设备项目综合评估报告
- 餐饮店全部让给朋友经营该个合同书
- 财税管理服务合同
- 保险合同服务条款
- 2024-2025学年安徽省合肥市庐江县八年级(上)期中历史试卷
- 隧道照明设计方案
- 防止异物入体安全教育
- 糖尿病的预防和控制
- 2024年女职工维权行动月活动总结模版(3篇)
- 2024年赠与协议例文(3篇)
- 医院药品目录(很好的)
- 地方国有数据公司发展现状初探 20240228 -远东资信
- 波形梁护栏质量检测
- 小学生趣味科普
- 初中心理健康教育课件《做一个有责任的人》
- 《耳针疗法》课件
- 掘进机维修培训课件
- 玻璃制造中的能源消耗与节能技术研究
- 2024年羽毛球项目建设方案
- 船舶大学生职业生涯规划
- 年度销售额增长分析
评论
0/150
提交评论