1、建设工程设计合同 design contract for construction project发包人(甲方):越南和发钢股份有限公司 party awarding contract (party a): hoa phat joint stock company设计人(乙方):河北和润工程技术有限公司design contractor(party b): hebei herun engineering& research corporation,limited.甲方委托乙方承担配套传带送系统从马头到原料厂200万屯/年,工程地点为越南海阳省 ,经双方协商一致,签定本合同。party
2、b is entrusted by party a to design supporting belt-conveyor system with a capacity of 2 million ton/year from the wharf to the raw materials yard, and the construction location is haiyang province in vietnam. both the two parties herewith agree to sign the contract based on the principle of common
3、consensus. 第一条 本合同依据下列文件签订:clause 1 the contract is confirmed and signed on base of the following documents: 1.1中华人民共和国合同法和建设工程勘察设计合同条例。 contract law of the people's republic of china and contract provisions of survey and design for construction project 1.2国家及地方有关工程勘察设计管理法规和规章。 relevant manageme
4、nt laws and regulations of national and local construction survey 1.3建设工程批准文件。 documents approved by project construction.第二条 本合同设计项目的名称、阶段、规模、设计内容及设计原则:clause 2 name, phase, scale, design content and design principle of the design items in scope of the contract.2.1名称:70吨钢工程配套的原料场工程 name: raw materi
5、als yard project for 70t steel project2.2规模:运转能力达到600屯/小时(200万吨/年) scale : running capacity up to 600 ton/h (2 million ton/year)2.3阶段:施工图(三个月完成) phase: construction drawings( to be completed within 3months)2.4主要设计内容:从码头(不含码头)到原料厂运输系统的工厂设计。主要设计内容包括:main design content: plant design from wharf(but not
6、 include the wharf) to raw materials yard transferring system, including:-总平面布置图的设计,工程项目的土建设计。design for the general layout, civil work design for the project.传送带系统详细设计图。detailed design drawing for belt-conveyor system.建筑物桩基图设计design for pile base of the constructions设备制造图:料斗,称量.equipment manufactur
7、e drawing: hopper and weighing device.土建结构设计图:建筑物桩基结构,传送带系统通廊,中转站,料仓等。design drawing of civil work structure: piling base structure of the constructions, passage for belt-conveyor system, transferring station, silo, etc.配套设施的设计图:动力系统,控制系统等design drawing for supporting facilities: dynamic system, con
8、trol system, etc. 全部系统的设备安装图equipment erection drawing for all the systems要求设计的图纸保证能够制造,对于要订购的设备要求能够保证运输物料的要求,满足生产需要。the designed drawings are required to be capable of manufacturing the equipment. for the equipment to be purchased, it is required to meet the requirements of transferring material an
9、d production.第三条 甲方向乙方提交的有关资料及文件:clause 3 the relevant documents and data to be submitted by party a to party b are following:3.1厂区地形图(1:500)含电子版plant topographic drawing(1:500) including soft copy3.2工程地质报告project geologic report3.3当地气象、水文资料local atmosphere and hydrology data3.4设备订货资料(按进度分步提供)equipm
10、ent ordering data( to be submitted as per the progress schedule step by step)第四条 乙方向甲方交付的设计文件、份数及时间:clause 4 the design documents submitted by party b to party a, quantity and date:所有设计文件一式5份交付甲方,交付时间以不影响甲方施工进度为原则,分批发图。主要发图时间确定如下:all the design documents shall be delivered in quintuplicate in batch
11、based on the principle of no influence to the construction progress of party a.the main date to deliver the drawings are defined as follows:4.1合同签定后,收到预付款之日起,10日内书面提供总平面布置图,及各工艺平、断面布置图the general layout and various technical plan and section drawings shall be submitted in written form within 10 days
12、 from the date of having received the advance payment after the signing of the contract. 4.2方案设计确定后,3日内提供主要设备清单及详勘设计委托书. the list for main equipment and entrustment of detailed survey design shall be submitted within 3days after the design scheme is confirmed.4.3接到地质报告15日内,完成主要建筑物桩基图,35天内完成全部桩基及主要建筑
13、物基础图。the pile base drawings for main buildings shall be completed within 15 days, and all pile base drawings and the foundation drawings for main buildings within 35 days after receiving the geologic report.4.4在不影响施工进度前提下,65天内提供主要土建结构图, 3个月内完成全部工程施工图设计。the structure drawings for main civil work shal
14、l be submitted within 65 days, and all the construction drawings for the whole project shall be completed within 3months under the precondition of no influence to the construction progress.4.5甲方应在设备清单收到之日起,15日内返回设备订货资料(图纸及可编辑的电子版)。主要设备合同的技术附件须经设计院确认。party a shall return the equipment ordering data(d
15、rawings, editable soft copy) within 15 days after having received the equipment list. the technical annex of contract for main equipment shall be confirmed by the design institute.第五条 甲方应支付合同项目的税后设计费为 :伍拾万元人民币(rmb)整the design fees after- tax in scope of the contract to be paid by party a : 500000 (f
16、ive hundred thousand) rmb only设计费的现金支付方法为:the design fee paid by cash:5.1本合同生效时,甲方支付设计费总额的约50%(建设部、国家工商行政管理局建设工程设计合同(示范文本)规定:为50%),即贰拾伍万元人民币(rmb)整,作为订金及设计方案确定后首付设计费。party a shall pay about 50% of the total value of the design fees(50% as per the provision in <design contract for construction proj
17、ect>(trial edition) issued by the ministry of construction department and national industry & commerce administrative bureau, that is 250000 (two hundred and fifty thousand) yuan rmb only5.2 完成全部桩基及主要建构筑物基础时,甲方支付设计费总额30%,即拾伍万元人民币(rmb)整。party a shall pay 30% of the total value of the design fe
18、es after the completion of all the pile bases design and foundation design for main buildings, that is 150000(one hundred and fifty thousand)yuan rmb only.5.3完成转运站,通廊(预计17条)等主要结构图时, 甲方支付设计费总额的约10%, 即伍万元人民币(rmb)整。 party a shall pay about 10% of the total value of the design fees after the completion
19、of design drawings for main constructions like transferring station and passage(totally17, estimated), that is 50000(fifty thousand)yuan rmb only.5.4乙方提交全部设计文件时,甲方支付设计费总额的10%,伍万元人民币(rmb)整。party a shall pay 10% of the total value of the design fees upon the submission of all the design documents by p
20、arty b, that is 50000(fifty thousand)yuan rmb only.5.5(建设部、国家工商行政管理局建设工程设计合同(示范文本)规定:施工图完成后,发包人结清设计费,不留尾款) <design contract for construction project>(trial edition) issued by the ministry of construction department and national industry &commerce administrative bureau stipulates : the part
21、y awarding contract shall pay off the design fees without any remaining charges after completion of the construction drawings. 第六条 双方责任及义务。clause 6 liability and obligation for both parties6.1.1甲方按本合同第三条规定的内容在规定的时间内向乙方提交设计有关的技术资料及文件,并对其完整性、正确性及时限负责。party a shall submit relevant technical data and do
22、cuments to party b within stipulated time according to the specification in clause 3 of the contract, and shall be responsible for its integrity, validity and time limit.甲方应提交的: 乙方设计所需的技术资料及文件超过规定期限7天以内,乙方按本合同第四条规定交付设计文件时间;规定期限超过7天以上,10天以内时,乙方按本合同第四条规定交付设计文件时间顺延。延迟超过10天时,另行商定设计周期及因甲方延误,影响乙方工程组织所增加的费
23、用。for the documents and data required by party b and submitted by party a for design work, if they are submitted by party a later than the stipulated date not more than 7days,party b shall deliver the design documents according to the stipulation in clause 4 of the contract; if more than 7days but w
24、ithin 10 days, party b shall postpone the documents delivering date accordingly as per the stipulation in clause 4 of the contract; if more than 10 days, both two parties shall define another design cycle and additional charges to party b caused by the delay of party a .6.1.2在合同履行期间,如甲方要求终止或解除合同,乙方未
25、开始工作的,不退还甲方已付的定金;已开始设计工作的,甲方应根据乙方已进行的实际工作量,不足一半时,按该阶段设计费的一半支付,超过一半时,按该阶段设计费的全部支付。during the performance of the contract, if party a requests to terminate or cancel the contract, and party b has not started, party b shall not return the advance money; if party b has started, party a shall pay to part
26、y b as per the actual working volume, in case less than half, half of the design fees for that phase shall be paid; more than half, the total design fees for that phase shall be paid.6.1.3甲方应按本合同第五条规定的金额和时间向乙方支付设计费用,每逾期支付一天,应承担应支付金额的千分之二的逾期违约金。超过30天以上时,乙方有权 暂停履行下阶段工作,并书面通知甲方。甲方上级对设计文件不审批或本合同项目暂停缓建,甲
27、方均应支付设计费。party a shall pay to party b the design fees according to the amount of the design value within the time limit stipulated in clause 5 of the contract, and shall be responsible for paying 2 demurrage liquidated damages out of the total amount of value for every single days delay. if more tha
28、n 30days beyond the time limit in the contract, party b shall have the right to stop the work for next step, and inform party a in a written form. in case that the design documents are not approved by the superiors of party a or the contract project is stopped to postpone, the design fee shall be pa
29、id party a.6.1.4甲方要求乙方比合同规定时间提前交付设计文件时,甲方应支付赶工费。party a shall pay extra charges for requesting party b to deliver the design documents prior to the stipulated data in the contract.6.1.5甲方负责乙方派驻现场服务人员的食宿party a shall take charge of the foods and accommodation for the site representative from party b6
30、.1.6甲方应保护乙方的设计版权,未经乙方同意,甲方对乙方交付的设计文件不得复制或向第三者转让或用于本合同外项目的建设,如发生以上情况,乙方有权进行索赔。 party shall protect the design copyright, and shall not copy design documents or transfer to third party for the construction beyond the contract project without consent of party b. party b shall have the right to apply fo
31、r claim provided the above situations occur.6.2乙方责任:liability for party b 6.2.1乙方按本合同第四条规定的内容、时间及份数向甲方交付设计文件。 因乙方原因延期交付图纸,每延期一天,应承担应支付金额的千分之二的逾期违约金。party b shall deliver the design documents to party a according to the content, date and number of copies stipulated in clause 4 in the contract, and sh
32、all be responsible for paying 2 demurrage liquidated damages out of the total amount of value for every single days demurrage due to the delay for drawing delivery caused by party b. 6.2.2乙方对设计文件出现的遗漏或错误负责修改和补充,由于乙方设计错误造成工程质量事故损失,乙方除负责采取补救措施外,应减收或免收损失部分的设计费,并根据损失程度向甲方偿付赔偿金,赔偿金最多与免收的设计费金额相等。party b s
33、hall be responsible for modifying and supplementing the missing and incorrect parts in the design documents, and shall reduce or exempt the design fees for the parts of loss, besides adopting remedy measures, provided that project quality accidents is caused by party b due to design mistakes. party
34、b shall be responsible for paying compensation to party a according to the caused loss, and maximum compensation amount is equivalent to the design fees exempted.6.2.3乙方在交付设计文件后,参加有关上级审查及根据审查结论负责不超出原定计划任务书范围内的必要调整补充。乙方按合同规定时限交付设计文件一年内项目开始施工,负责处理有关设计问题。在一年内项目尚未开始施工,乙方负责上述工作,可按所需量向甲方适当收取咨询费。party b sh
35、all responsible for participating relevant superior examination , and making necessary adjusting and supplementing not beyond the original plan task, after delivering the design documents. after the delivery of design documents as per the time limit stipulated in the contract, party b shall be respo
36、nsible for handling the relevant design problems in case that the project has started within one year. otherwise party b shall charge the consultant fee to party a properly for the above work, provided that the project has not started within the one year. 6.2.4乙方不得向第三方扩散、转让甲方提交的产品图纸等技术经济资料,否则甲方有权进行索
37、赔。party b shall not spread and/or transfer to third party the technical and economic documents and data such as product drawings ect, otherwise, party a has the right to claim. 第七条 其他 clause 7 others 7.1甲方要求乙方派专人长期驻施工现场进行配合其解决设计问题时,双方应另行签定技术咨询服务合同。both the parties shall sign the technical consultati
38、on contract, provided that party a requests party b to assign professional staff for coordinating and solving design problems on site. 7.2乙方为本合同项目所采用的国家或地方标准图,由甲方自费向有关出版部门购买。本合同第四条规定乙方交付的设计文件份数超过工程设计收费标准规定的份数,乙方另收工本费。party a shall take the charges for purchasing the national or local standard drawin
39、g adopted by party b under the contract project issued by relevant authorities. clause 4 stipulates that party b shall charge extra for the additional copies out of the stipulations in <project design charge standard> for party b to deliver design documents.7.3本工程项目中,建筑材料、设备的加工定货,甲方需要乙方设计人员配合时,所需费用由甲方承担。party a shall take all the charges for construction materials, equipment manufacture and ordering, and also the coordination provided by the party b when requested by party a under the contract project.7.4甲方发包乙方配合引进项
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 洛阳理工学院《VB语言程序设计》2023-2024学年第一学期期末试卷
- 单位人事管理制度范文选集
- 单位人力资源管理制度集粹选集
- 饮料生产降水施工合同
- 高端别墅区房屋转让租赁协议
- 2024年标准餐饮服务合同模板版
- 商务写字楼外墙改造合同
- 造纸工程分包协议
- 矿区生态恢复复垦承诺书
- 瑜伽馆门头施工合同
- 第2课+古代希腊罗马【中职专用】《世界历史》(高教版2023基础模块)
- 金属屋面工程防水技术规程
- 《福建省安全生产条例》考试复习题库45题(含答案)
- 人工智能增强战略规划
- 无机材料与功能化学
- 110kV变电站及110kV输电线路运维投标技术方案(第一部分)
- 消防设施安全检查表
- 餐厅用电安全承诺书
- 吉林省延边州2023-2024学年高一上学期期末学业质量检测数学试题(解析版)
- 2024年全国两会精神主要内容
- 小学六年级数学上册应用题100道(全)-及答案
评论
0/150
提交评论