1、1 目 的 O b j e c t i v e 对原材料、协配件、半成品、成品进行检验和试验,防止不合格的原材料、协配件非预期使 用,不合格半成品转序,不合格成品出厂。This is to inspect and test the raw material, components, semi-finished and finished products to avoid the nonconforming raw materials and components from unexpected usage, to avoid the defective semi-finished produc

2、t from flowing into the next process and to avoid the defective finished product from releasing out of the factory.2 适用范围 Applicable Scope适用于本公司的原材料、协配件、半成品、成品的检验和试验控制。This is applicable to the control over the inspection and test of the raw materials, components, semi-finished and finished products

3、 of the company.3 职责 Responsibility3.1 质量部负责原材料、协配件 、半成品 、成品的入库检验和验证的归口管理。The Quality Department is responsible for the incoming inspection and test of the raw material, components, semi-finished and finished products.3.2 技术工程部负责制订和发放原材料、 协配件、 半成品、 成品的图样、 检验规程及 相关接收标准。The Engineering Department is r

4、esponsible to formulate and release the drawings, inspection procedures and relevant receiving standards applicable to the raw materials, components, semi-finished and finished products.4 工作程序 Work Procedures4.1 检验和试验前的准备 Preparation Prior to the Inspection and Test4.1.1 由质量部根据控制计划和检验指导书,在开始检验工作之前,复

5、查是否已经对每项重要检 验项目的方式和方法做出规定,其内容包括:检验方法、检验工具及精度、抽样方法、评定 方法、记录方法,注明可能需要提供的质量保证书/自检报告、要求和验证方式。Prior to inspection, the Quality Department shall refer to the“ Control Plan ” and InspectionInstruction, checking if the inspection way and method for each important item have been regulated, including: inspect

6、ion approach, inspection tools and their precision, sampling method, assessment approach and recording method, as well as the remarks on necessary quality warranty/self-inspection report, requirements and verification way.C=0 抽样计划4.1.2 在制订计数特性数据接收抽样计划时,接收准则必须是When formulating the sampling plan for t

7、he receipt of counting characteristic data, the principle of receipt must be C = 0 sampling plan.4.1.3 检验方式 Inspection Approach 抽检:检验员对原辅料、协配件、半成品、成品的抽样检查。Sampling Inspection: It means that the inspector conducts the inspection of raw materials, components, semi-finished and finished products on sam

8、pling basis. 全检:指检验员对加工过程中的产品进行的全部逐个检查。Full Inspection: It means that the inspector conducts the inspection of all the products in machining process one by one.“三检制” :自检、互检、专检。3-Inspection System: Self-inspection, Reciprocal Inspection and Special Inspection.4.2 进货检验和试验 Incoming Inspection and Test4

9、.2.1 原材料、协配件到货后,仓库保管员填写产品送检单和随货的质量证明文件一同送交质量 部,特殊产品必须附有质量证明文件。At the arrival of raw materials and components, the storekeeper shall fill up the Product Inspection Form, and submit it to the Quality Department along with the quality certificates.Special products must be attached with quality certific

10、ates.4.2.2 质量部接到产品送检单后,由检验员对其送检产品按规定进行抽检,需要时,原材料进行 化验分析,并作好原始记录。After receipt of the “ Product Inspection Notice ”by the Quality Department, the inspector shall sample inspect the delivered products according to the regulations, while the raw material is sent to the laboratory for analysis. Make the

11、 original records properly.4.2.3 对无手段和能力进行检验的产品, 质量部通知制造部进行小批量试装或加工, 并作好标识和记 录。原材料可依据随货质量证明文件进行判断。For the products beyond AICQ inspection capabilities, the Quality Department shall inform,由制造部向总经理办公室申请紧急转序,填the Manufacturing Department to conduct small batch trial assembly or machining, and make lab

12、els and records properly. The raw materials can be judged per the quality certificates attached.4.2.4 对因生产急需来不及检验的且可以追回的协配件 写紧急例外放行申请单 ,经总经理办公室审批同意方可放行,同时作好标识和记录并进行 跟踪,经检验员后续及时抽检,发现不合格,立即追回。For the components that are not inspected due to the urgency of production yet can be called back, they can be

13、 released only after the Manufacturing Department fills in urgent application for process transfer and submits it to the GM Office for approval. Meanwhile, make labels and records properly, and conduct tracking. The inspector shall duly conduct follow-up sampling inspection, and any unacceptable pro

14、ducts shall be immediately called back.4.2.5 抽检合格,由检验员开出 产品合格通知单 入相应仓库。If the sample inspection is acceptable, the inspector shall issue the Acceptance Parts Certificate, and admit the goods to the corresponding warehouse.4.3 过程检验和试验 Process Inspection and Test4.3.1 首件检验 initial inspection每班开班前或转换产品

15、类型 /工装时,必须进行首件检验。操作者自检必须合格后,交检验员 检验并作好检验记录。首件检验合格后,才可进行批量生产。It is required to take initial inspection before the first shift starts orthe type of production /tooling changes. After the self-inspection by operators is acceptable, inspectors should take inspection and record. The mass-production shoul

16、d be started if the initial inspection is acceptable.4.3.2 在生产过程中,操作者应按照 SOP 要求作好自检。并对上道工序作好互检。The inspector must conduct the self-inspection strict accordance with the requirements of SOP, and take mutual-inspection for the last working procedure.4.3.3 检验员须按规定要求作好巡检工作。The inspector should inspect d

17、uring around the workshop based on the requirement.4.3.4 每批产品加工完后,在转到下道工序前,必须报检验员检验合格后,才能留转到下到工序。After every batch product processing, they must be sent to inspectors for inspection beforethe next working procedure.4.4 最终检验和试验 Final Inspection and Test4.4.1 最终检验由制造部检验工序操作员负责,并作好检验记录。质量部检验员按通用检验规程规定进

18、行监控。The operator of Manufacture Department, who in charge of working procedure inspection, is responsible for final inspection and recording the results. Inspectors of the Quality Department should supervise based on the General Inspection Regulation.4.4.2 检验员根据抽检和试验结果,合格才签发合格证,车间将产品入成品库,并办理入库手续。The

19、 inspector shall issue the acceptance certificate forthe acceptable parts based ontheresults of spot-check andtest. Workshop should put products into the finishedparts stockand conduct the incoming procedure.4.4.3 全尺寸检验和功能试验 Full Dimension Inspection and Functional Test 每年由质量部按规定的要求并根据顾客规定的频次(顾客无要求时

20、,一年一次)对产品进行 全尺寸检验和功能试验,试验报告顾客要求时须提供评审。Every year the Quality Department shall conduct the full dimension inspection and functional test according to the prescribed requirements and at an interval set by the customer (Once a year if the customer has requests). The test report will be provided to cust

21、omer for review upon request.4.4.4 产品最终审核 Final Audit of the Product 每个季度一次或根据顾客要求的频次,质量部按对已包装的产品进行产品质量审核,以验证 符合所有规定的要求(如产品、包装、标签) 。Once a quarter or at an interval requested by the customer, the Quality Department shall audit the quality of already packed products, in order to verify the conformanc

22、e of all prescribed requirements (e.g. product, package and label).4.5 所有抽样、检验和试验及报告工作均应在相应规定的时间内完成, 并如实规范填写记录, 由专 人负责管理,执行质量记录控制程序 。All sampling, inspection, test and report should be completed within the specified time limit.The record should be kept factually in standard form, and be kept by a sp

23、ecial person. Implement the “ Quality Record Control Procedures ”.4.6 检验和试验全过程发现的不合格,执行不合格品控制程序 。Implement “ Nonconforming Product Control Procedures ” in case any nonconformance is found in the whole process of inspection and test.4.7 检验和试验过程中,要作好各类状态标识,执行检验和试验状态控制程序 。In inspection and test process, make all necessary status labels properly and implementInspection & Test Status Control Procedures所有检验人员都要求经过

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论