RNC-调测手册最新版.doc_第1页
RNC-调测手册最新版.doc_第2页
RNC-调测手册最新版.doc_第3页
RNC-调测手册最新版.doc_第4页
RNC-调测手册最新版.doc_第5页
已阅读5页,还剩16页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

Alcatel-Lucent RNC 9370 MOP (Method Of Procedure)Installation/CommissionSBG-TS Teamvision 1.1March 2, 2009(HuBo)1:RNC 1500 硬件介绍Passport shelf composite by two part(up/down), every RNC only need one part, so one passport shelf can install two RNC 1500.RNC 1500 card config: CPx ; PSFP(DCPS); OC3 ; GE, the following is PSFP(DCPS) PMC config: we need 4 PSFP(DCPS) for RNC I&C.Slot card type 00 1 2 3450EEmpty0CPx1CPx2PSFP(DCPS)PMC-MTMU RAB RABPCRAB3PSFP(DCPS) PMC-M TMU RAB RABPCRAB4PSFP(DCPS)RAB TMU NI RABPCOMU5PSFP(DCPS)RAB TMU NI RABPCOMU6PSFP(DCPS) RAB TMU RAB RABPCRAB7PSFP(DCPS) RAB TMU RAB RABPCRAB0EEmpty8OC39OC310PSFP(DCPS) RAB TMU RAB RABPCRAB11PSFP(DCPS) RAB TMU RAB RABPCRAB12PSFP(DCPS) RAB TMU RAB RABPCTMU13PSFP(DCPS) RAB TMU RAB RABPC TMU14GE15GE2:RNC 1500 Power map3:RNC 1500 I&C3.1Serial cablewe need a Serial cable for RNC I&C, the following is Serial cable mapfemalemale1122334455667788993.2 Hardware Configuration Using Startup: Out-BAnd OAMuse the serial cable connect PC and CP, open a serial connect with CP(SecureCRT is recommend)if the Passport is a RNC, the connect need user/password: debug/debug debug (login) debug (password)note, in this document, the ? means this parameter need you confirm and input startupYou have invoked the StartUp facility. This facility is for use during system installation and commissioning only.Use at any other time may result in a loss of provisioning information.Please enter quit or select the desired method of NMS connectivity:1. A connection to NMS through a DPN network.2. A connection to NMS through a Passport network.3. A direct connection to NMS from this Passport using Frame Relay PVC.4. A connection to NMS via Passport IP networking. 4The following type of NMS connectivity has been selected:Some time you will not see these message when startup, it is normal, just go step 1,but, you need confirm you rnc and omc are same ip subnet or not, if different ip subnet, you need take care when system ask you change mdm address! A connection to NMS via Passport IP networking.Media Type Selection:1. ATM MPE2. FRDTE3. Ethernet4. VNS5. OamEnet 5The following IP Media Type has been selected:OamEnetis NMS and Passport on the same IP subnet? no: ?Note: enter “Yes” if the Mainserver(s) and the RNC are in the same subnet & enter “No”, if the Mainserver(s) and the RNC are not in the same subnet.-1. Reset node to CP-only software.2. Create Sw lpts and load software on FPs.3. Perform on-card tests of each card in the node.4. Configure the node for MDM connectivity.5. Display the cards inserted in the node.6. Provision a spare CP.7. Create RNC software lpts, Interfaces, Internal exchanges.8. Configure RNC parameters.9. Configure InBand OAM connectivity to another node via RNC.要运行里面原有的版本,最好是最新的,否则有可能只产生8个选项10. Change selected MDM connectivity.11. Download RNC software.12. Confirm the provisioning. 1The available releases of BASE software are:RIxxxxxPlease enter the desired release name RIxxxxx ?If you continue, please confirm the following is satisfactory- A minimal provisioning file will be created and activated.- The CP will activate using release base_RI6xxxx- The node will reboot with this new provisioning file.Are you sure you want to continue? no Yes Please enter the followingCluster node? no: no Is this value correct? yes: Yes Node Id 1001 假如是十六进制要改为转换成十进制Node Name RNC1201根据CIQRegion Id 1一般默认NAMS Id 256一般是Node Id+256Are these values correct? This will activate the provisioning. yesYesNote: Wait about 7 minutes during the CP board reboot, after reboot, the LED will be YELLOW- debug (login) debug (password) startupYou have invoked the StartUp facility. This facility is for use during system installation and commissioning only.Use at any other time may result in a loss of provisioning information.You have not confirmed your current provisioning view.Shall I issue the confirm prov command for you? yes YesThe available releases of BASE software are:RI6xxxx.After this step the LEDs of all inserted cards becomes greenThe currently selected NMS connectivity is:A connection to NMS via Passport IP networking.The currently selected media type is:OamEnet.NMS and Passport are on different IP subnets.Please enter quit or select one of the following:1. Reset node to CP-only software.2. Create Sw lpts and load software on FPs.3. Perform on-card tests of each card in the node.4. Configure the node for MDM connectivity.5. Display the cards inserted in the node.6. Provision a spare CP.7. Create RNC software lpts, Interfaces, Internal exchanges.8. Configure RNC parameters.9. Configure InBand OAM connectivity to another node via RNC10. Change selected MDM connectivity.11. Download RNC software.12. Confirm the provisioning. 2StartUp: Waiting for all inserted FPs to be online.It can take up to 5 minutes.StartUp: All inserted FP cards are online.The available releases of BASE software are:RI*Please enter the desired release name RI60047 ?Do you want to enable IP security? no No currently we not act the ip security if no customer requestYou have selected the following software releases:Some command about modify pr will be print, please confirm no error or KO is occurredAnd after reboot, the Led will be greenbase_RIxxxxx ip_RIxxxxx Are you sure? yes Yes StartUp: Waiting for all inserted FPs to be online.It can take up to 5 minutes.(Screen response Cut off)-you have invoked the Startup facility. This facility isfor use during system installation and commissioning only.Use at any other time may result in a loss of provisioning information.The currently selected NMS connectivity is:A connection to NMS via Passport IP networking.The currently selected media type is:OamEnetNMS and Passport are on the same IP subnet.For this case, system inform you the NMS and passport is same ip subnet, please confirm, if not same ip subnet, please select “YES”Do you wish to change the selected NMS connectivity? no NoPlease enter quit or select one of the following:1. Reset node to CP-only software.2. Create Sw lpts and load software on FPs.3. Perform on-card tests of each card in the node.4. Configure the node for MDM connectivity.5. Display the cards inserted in the node.6. Provision a spare CP.7. Create RNC software lpts, Interfaces, Internal exchanges.After RNC reboot, the startup progress should be print auto, if not, maybe need re-do the 1 and 2, check system print inform8. Configure RNC parameters.9. Configure InBand OAM connectivity to another node via RNC.10. Change selected MDM connectivity.11. Download RNC software.12. Confirm the provisioning. 4IP Connection configurationEnter the Startup configuration information as prompted or enter quitVirtual router name 0 0IP port address (aa.bb.cc.dd) ?.?.?.? CIQ:RNC IP for outband OAMIP port Network Mask (aa.bb.cc.dd) ?.?.?.? CIQ:RNC IP Subnet mask for outband OAMIP broadcast address (aa.bb.cc.dd) ?.?.?.? 自己算(rncip+14)Next hop IP address (aa.bb.cc.dd) ?.?.?.?CIQ:RNC IP Gateway to outband OAM Serverif WNMS and RNC have same IP subnet that you select before, the next hop ip will not request.Configure SNMP Network Management (i.e. for OMS/P yes no are these values correct? This will activate the provisioning yes yes-Please enter quit or select one of the following:1. Reset node to CP-only software.2. Create Sw lpts and load software on FPs.3. Perform on-card tests of each card in the node.4. Configure the node for MDM connectivity.5. Display the cards inserted in the node.6. Provision a spare CP.7. Create RNC software lpts, Interfaces, Internal exchanges.8. Configure RNC parameters.9. Configure InBand OAM connectivity to another node via RNC.10. Change selected MDM connectivity.You will see the RNC HW config11. Download RNC software.12. Confirm the provisioning. 5 (Screen response Cut off)-Please enter quit or select one of the following:1. Reset node to CP-only software.2. Create Sw lpts and load software on FPs.3. Perform on-card tests of each card in the node.4. Configure the node for MDM connectivity.5. Display the cards inserted in the node.6. Provision a spare CP.7. Create RNC software lpts, Interfaces, Internal exchanges.8. Configure RNC parameters.9. Configure InBand OAM connectivity to another node via RNC10. Change selected MDM connectivity.11. Download RNC software.12. Confirm the provisioning. 12You have not confirmed your current provisioning view.Shall I issue the confirm prov command for you? yes yes start -force prov . okconfirm prov . okend prov . okConfirmation succeeded-Please enter quit or select one of the following:1. Reset node to CP-only software.2. Create Sw lpts and load software on FPs.3. Perform on-card tests of each card in the node.4. Configure the node for MDM connectivity.5. Display the cards inserted in the node.6. Provision a spare CP.7. Create RNC software lpts, Interfaces, Internal exchanges.8. Configure RNC parameters.9. Configure InBand OAM connectivity to another node via RNC.No need insert the spare CP card, this step just add spare card in pr. about the spare cp, I suggest insert it after WO act. And if you insert two CP during WO act, both CP need Ethnet cable from WNMS, because IN act will trigger CP switch and if no ethnet cable in spare cable, session will hold.10. Change selected MDM connectivity.11. Download RNC software.12. Confirm the provisioning. 6 (Screen response Cut off)-Please enter quit or select one of the following:1. Reset node to CP-only software.2. Create Sw lpts and load software on FPs.3. Perform on-card tests of each card in the node.4. Configure the node for MDM connectivity.5. Display the cards inserted in the node.6. Provision a spare CP.7. Create RNC software lpts, Interfaces, Internal exchanges.8. Configure RNC parameters.9. Configure InBand OAM connectivity to another node via RNC10. Change selected MDM connectivity.11. Download RNC software.12. Confirm the provisioning. 12You have not confirmed your current provisioning view.Shall I issue the confirm prov command for you? yes yes start -force prov . okconfirm prov . okend prov . okConfirmation succeeded-Please enter quit or select one of the following:1. Reset node to CP-only software.2. Create Sw lpts and load software on FPs.3. Perform on-card tests of each card in the node.4. Configure the node for MDM connectivity.5. Display the cards inserted in the node.6. Provision a spare CP.7. Create RNC software lpts, Interfaces, Internal exchanges.8. Configure RNC parameters.9. Configure InBand OAM connectivity to another node via RNC10. Change selected MDM connectivity.11. Download RNC software.12. Confirm the provisioning. quitYou have not committed your current provisioning viewShall I issue the commit prov command for you? yes YESstart -force prov . okcheck prov . oksave -f(startup) prov . okcommit prov . okend prov . okRNC ip addressCommit succeededstart pr PROV delete Vr/0 Pp/OAMENET0 IpPort LogicalIf/x.y.z.w RipIfVr/0 Ip RipIfA total of 1 components have been deleted.okPROV ch pr PROV act pr PROV conf pr PROV save file(*) pr PROV commit pr PROV end pr Creation of SDS Server for RNC SW DLAny FTP server is ok, please point the DL route to Software(please check the RNC load)This step please note:1: here DL is new RNC DL, so you need select the RNC version base on RNC load.2: the ipsec, secureShell and RNCCiph normal is need and the three load maybe can not DL use this step, it should be dl by DL command.After FTP server is ok, please go startup commandPlease enter quit or select one of the following:1. Reset node to CP-only software.2. Create Sw lpts and load software on FPs.3. Perform on-card tests of each card in the node.4. Configure the node for MDM connectivity.5. Display the cards inserted in the node.6. Provision a spare CP.7. Create RNC software lpts, Interfaces, Internal exchanges.8. Configure RNC parameters.9. Configure InBand OAM connectivity to another node via RNC.10. Change selected MDM connectivity.11. Download RNC software.12. Confirm the provisioning. 11 please check the notePlease enter the desired Base release name RI6xxxx ?Do you want to download secure software packages(ipsec, secureShell andRNCCiph)? yes?(enter Yes if OAM security feature is selected or No if it is not needed)Please enter the desired Patch release name RI6xxxxxxxxxxx?Please enter SDS IP address: (aa.bb.cc.dd) ?.?.?.?Please enter the username for SDS ?Please enter the password for SDS ?Are these values correct? This will start downloading the software no yesWhen you try step7 with new sw, these three sw should be act, if system inform you it not dl, please dl it use following command: ipsec, secureShell and RNCCiph use following command.set sw dld avl ipsec_RI60071 secureShell_RI60071 RNCCiph_RI60071084802start -h(ftp sever ip) -u(ftp username) -p(ftp passward) sw dldst prset sw avl ipsec_RI60071 secureShell_RI60071 RNCCiph_RI60071084802after finished DL, please use the command: d sw avl or d s av/*, confirm all software is dl and include the three above software.When check finished, go startup command and do the RNC I&C again with new SW version, just no need do the step 11.After step 6 is done with new SW, please going on startup as following:Please enter quit or select one of the following:1. Reset node to CP-only software.2. Create Sw lpts and load software on FPs.3. Perform on-card tests of each card in the node.4. Configure the node for MDM connectivity.5. Display the cards inserted in the node.6. Provision a spare CP.7. Create RNC software lpts, Interfaces, Internal exchanges.8. Configure RNC parameters.9. Configure InBand OAM connectivity to another node via RNC.10. Change selected MDM connectivity.11. Download RNC software.12. Confirm the provisioning. 7The available releases of BASE software are:RI42402 RI52108 RI52411 RI60036Please enter the desired release name RI60036 ? here should be new swNote: Enter the name of the foundation software release downloaded in step 1.The available releases of apcBase software are:RI52108061030 RI52411RI60036064401 RI60036 RI60036064401Please enter the desired release name RI60036064401 ? the patch name need copy form loadNote: Enter the name of the patch software release downloaded in step 1.Do you want to add secure software packages(ipsec, secureShell andRNCCiph)?yes (Enter Yes if you have download the software in the previous step or No ifnotThe available releases of RNCCiph software are:RI42108061030 RI42411 RI60036064401 RI60036 RI60036064401Please enter the desired release name RI60036064401 ?You have selected the following software releases:base_RI60036 ip_RI60036atmNetworking_RI60036 genericUtilities_RI60036iRNC_RI60036 networking_RI60036ss7_RI60036RI60036 wanDte_RI60036wirelessCommon_RI60036 apcBase_RI60036baseExt_RI60036 iRNCApc_RI60036baseExt_RI60036 iRNCApc_RI60036ss7Apc_RI60036 cnp_RI60036cRNCApc_RI60036Are these values correct? This will activate provisioning no yesstart -force prov . okcopy prov . okScreen Response. (cut off)-Please enter quit or select one of the following:1. Reset node to CP-only software.2. Create Sw lpts and load software on FPs.3. Perform on-card tests of each card in the node.4. Configure the node for MDM connectivity.5. Display the cards inserted in the node.6. Provision a spare CP.7. Create RNC software lpts, Interfaces, Internal exchanges.The localmedia ip in CIQ is : IN and IN/CN IP (default provided)8. Configure RNC parameters.9. Configure InBand OAM connectivity to another node via RNC.10. Change selected MDM connectivity.11. Download RNC software.12. Confirm the provisioning. 8Please

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论