艺术院校人才实训基地项
施工组织设计方案
第一率工程综述...................................................................................6
1.1编制依据.............................................................................6
1.2工程概况.............................................................................7
1.2.1,电体1既况......................................................................7
1.2.2址筑柢况......................................................................7
1.2.3结构概况......................................................................8
1.2.4气象条件......................................................................9
1.2.5场地及周境.............................................................9
1.3工程管理目标.......................................................................9
1.4工程地质条件.....................................................................10
笫二章工程总体部署............................................................................11
2.1施工部岩要点......................................................................11
2.2结构分区及流水段划分..........................................................II
2.4工程重点、姐点分析.............................................................13
2.5施工组织管理体系................................................................14
2.5.1项目组织机构...............................................................14
2.5.2项目管理人员名单.........................................................15
第三章施工总进度计划.........................................................................15
3.1工期目标............................................................................15
3.2进度计划表.........................................................................16
笫四幸,电体施工:佐备与土要资源西已受计犬,j........................................19
4.1技术准备............................................................................19
4.2经济准备............................................................................19
4.3现场资源准备......................................................................19
4.4拟投入主要机械设备表..........................................................22
4.5劳动力安排计划...................................................................24
4.5.1劳动力安排.................................................................24
4.5.2拟投入劳动力计划表......................................................24
第五病主要分部分项工程施工方案..........................................................25
5.1施工定位、测量放线方案.......................................................25
5.1.1测量仪器的选择...........................................................25
5.1.2轴线控制测量..............................................................26
5.1.3前程控制测量..............................................................26
5.1.4沉降观测....................................................................26
5.2桩基工程............................................................................26
5.3钢筋工程............................................................................31
5.3.1钢筋接头方式..............................................................31
5.3.2工艺流程....................................................................31
5.4模板工程............................................................................33
5.4.1模板的选用..................................................................33
5.4.2施工工艺....................................................................33
5.4.3主要节点详图..............................................................34
5.4.4模板施工过程中可噩发生的情况及对策.............................34
5.5混凝土工程.........................................................................35
5.5.1混凝土工程概况............................................................36
5.5.2工艺流程....................................................................36
5.5.3混凝土施工过程中可能发生的悟■况及对•策...........................36
5.6防水及屋面工程方案.............................................................37
5.6.1防水、屋面工程概况......................................................38
5.6.2防水卷材^^工艺.........................................................38
5.6.3屋面工程工艺........................................................39
5.6.4防水及屋面施工过程中可能发生的情况及对策.....................39
5.7砌体工程方案.....................................................................40
5.7.1工艺流程....................................................................40
5.7.2构造措施....................................................................40
5.7.3砌体施工过程中可能发生的情况及对策.............................44
5.8门窗工程方案......................................................................44
5.8.1工艺流程....................................................................44
5.8.2门窗安装过程中可熊发生的情况及对策.............................45
5.9脚手架方案.........................................................................45
5.9.1脚手架工程概况............................................................45
5.9.2落地脚手架搭设方法.....................................................45
5.1()室内粗装饰方案................................................................47
5.10.1施工工艺.................................................................47
5.10.2顶棚抹灰施工...........................................................47
5.10.3墙面抹灰施工...........................................................48
5.10.4地面地砖铺贴施工......................................................48
5.10.5乳胶漆平顶工程施工...................................................48
5.10.6天棚吊顶工程............................................................48
5.10.7初装饰施工过程中可解发生的情况及对策.......................49
5.11机电安装工程预留预埋工程施工方案.......................................50
5.11.1电气工程的预钳预埋....................................................50
5.11.2管道工程的预留预烟...................................................51
5.12给排水、消防工程施工方案...................................................53
5.12.1给水、消防管道安装施工程序.......................................53
5.12.2排水管道安装.............................................................55
5.12.3管道附件、卫生设备安装..............................................57
5.12.4水泵安装..................................................................58
5.12.5水柿、太Bm先邑外热器安装..............................................59
5.13电气工程...........................................................................60
5.13.1电气施工程序.............................................................60
5.13.2线槽、桥架安装..........................................................61
5.13.3配电柜、箱安装..........................................................62
5.13.4电缆敷设..................................................................63
5.13.5照明灯具等末端电器的安装...........................................64
5.13.6强电动力调试方案.......................................................65
5.14通风空调系统....................................................................66
5.14.1风管制造、安装流程....................................................66
5.14.2通风设备安装............................................................67
5.14.3保温工程..................................................................68
5.14.4吸通系统调试.............................................................68
5.15节能工程...........................................................................71
第六拿施工总平面布电........................................................................72
6.1总体布J5.........................................................................................................72
6.2临设布3t........................................................................................................72
6.3交通组织............................................................................72
6.3.1场内道路交通组织措施..................................................72
6.3.2场外道路交通组织措施..................................................73
6.4垂直运输设备布找................................................................73
6.5现场临时用水用电计算..........................................................73
6.6雨水、污水、废水排放及坟圾处理...........................................73
6.6.1排水设计与布电...........................................................73
6.6.2垃圾处理....................................................................74
6.7现场平面布J5..................................................................................................74
第七章各项保证措施............................................................................80
7.1职业健康安全、环境管理策划及保证措施..................................80
7.1.1职业健康安全目标及保证措施.........................................80
7.1.2环境管理目标友保证J告施...............................................88
7.2保证工期技术措施................................................................91
7.2.1工期目标•WdiE体系........................................................91
7.2.2工期保证措施..............................................................92
7.3保证工程质量的技术措施.......................................................97
7.3.1质量管理目标..............................................................97
7.3.2质珏管理组织机构........................................................98
7.3.3质量管理体系..............................................................98
7.3.4质*保证措施..............................................................99
7.4特殊季节施工措施...............................................................103
7.4.1防汛施工措施.............................................................103
7.4.2防台施工措施.............................................................104
7.4.3雨季施工措施.............................................................104
7.4.4冬季施工措施.............................................................106
7.4.5商温季节施工措施.......................................................107
7.5总承包管理措施..................................................................107
7.5.1总承包管理的目标.......................................................107
7.5.2总承包工作的主要内容.................................................108
7.5.3总承包管理体系..........................................................108
7.5.4结构施工阶段总承包与各专业分包的职贲划分...................110
7.5.5总承包配合与服务措施.................................................110
7.6施工成本及计划保证措施......................................................115
7.6.1合同管理...................................................................115
7.7节能降耗管理策划及保证措施................................................120
7.7.1节能降耗管理措施.......................................................120
7.7.2材料和资源措施..........................................................124
7.7.3节水与水资源利用.......................................................126
7.7.4节徒与黄巨源利用..........................................................127
7.7.5保证措施...................................................................128
笫八幸新技术应用计划.......................................................................131
笫九章施工方案编制计划....................................................................131
第一章工程综述
1.1编制依据
1、招标文件
1)本工程的招标文件;
2)招标图纸及招标答疑文件;
3)总承包合同。
2、主要法律法规及标准
1)中华人民共和国、行业和**市政府颁布的有关法律、法规及规定;
2)中华人民共和国、行业和**市政府颁布的现行有效的延筑规范、规程及验评
标准;
3)1S09000质计管理标准、ISO14000环境管理标准、OSHMS18000职业安全健
康管理标准。
1.2工程概况
1.2.1总体概况
1、地理位置
本工程位于**市**区*
2、工程延设概况
工程建设概况一览表
序号项目内容
1工程名称某艺术院校人才实训基地项目项目
2应设他点*求市**区**
3业主单位**
4设计单位**
5监理单位**
6施工单位
7招标代理单位*♦
8质量标海一次验收合格率100%,**区优质结构,争创“白玉丝”
9工期要求549B历天
1.2.2建筑概况
建筑柢况表
总戏筑面积21965.98m2占地面积18059m2
1#楼(研■讨楼):9201.33nf,2#楼(专家用房楼):10688.63nf,3#楼(展示接待厅
建筑面积
楼):2076.02山。
使用年限50年安全苓级二级
在度1#楼:37.05m,2#楼:38.45m,3#楼:18.85m。
1#楼:一层5.6m、二层一六层4.2m、七层4.15m、屋顶4.05m,地下室3.8m,局部工
作室两层通布8.41H;
层商2#楼:一层5.6m、二、三层4.2m、四层一七层3.5m、八层3.45m、屋顶4.15m.地下
室3.8m;
3#楼:一、二层5.5m、三层5.55m,中央展示厅11.2m。
墙体外墙300mm厚加气混凝土砌块。
内墙100mm,150mm,200mm厚加气混坡土实心砌块埼。
黄县地面防水:1.5+1.5厚两道三元乙丙防水卷材、
地下交防水等级:一级
2厚合成高分子防水涂料。
防水
反面防水材料:1.5+1.5厚两道三元乙丙防水卷材、
屋面防水书•级:一级
2厚合成前分子防水涂料。
楼地面水泥基自流平地面、地含地面、防沿炖砖、防炒电架空活动地板。
普通内墙涂料、铝板墙面、限燃织物软包吸声埼面、埼面校、防霉防潮
内J褥面
装饰装修
内埼涂料、穿乳FC板吸声墙面。
轻取铝格栅吊顶、乳胶漆平顶、轻钠FC板吸声保温吊顶、轻钿防潮矿
顶棚
林板吊顶、防霉防潮涂料平顶、轻钏装饰铝板吊顶。
门由铝合金玻晡由、钢质门、硬木普通门、不锈钢门由。
采用300厚加气混凝土实心砌块+外侧抹25mm厚无机保温砂浆、内河
夕卜墙
30mm厚泡沐玻镭板。
屋顶135mm泡沐玻璃保温板。
1.2.3结构概况
结构概况表
抗震设防烈度7度
基础基础形式采用柱下桩承台基础。
1#楼、2#楼采用钢筋混凝土框架・核心筒结构体系;3#采用框架结构
结构形式
体系。
250x1000.250x800,300x1000、300x1050、300x900,
350x1000.350x800、400x1000、400x1100,400x800、
梁
主体400x850、400x900、500x1000.500x1100、500x850、
主尊结桢
500x900分
尺寸(mm)
板110、120、130,150等
800x900、800x800、800x700、700x800、700x700、650
柱
X850、600x600节
墙350、250
垫层(基础、防水混凝土结构底板)C15
承台、基础梁1#、2#楼C35,3#楼C30
3#楼柱、梁、板C30
一〜三层剪刀墙、柱
混凝土强度等C45
级及抗渗要求
1#楼、2#楼三层以上墙柱C30
梁板C30
楼梯C30
图梁、过梁、构老柱、压造槛>C20
钢筋类别HPB300、HRB335、HRB400
1.2.4气象条件
**属亚热带季风气候,雨量充沛,年降水1200名米,四季分明,年平均温
度15.4°C,年极端气温原高39.7°C,坡低-13.1°C,年平均降水量1106毫米。
春季风和日丽;梅雨时节,又阴雨绵绵;夏季炎热;秋天干燥凉爽;冬季寒冷、
干燥;**春秋短、冬夏长,冬夏温差显著。
1.2.5场地及冏边环境
甚地东侧为校区现状运动择,力;西侧为校内,•观源门H,河■世西侧及基地北侧
贴邻校园围墙;南侧接邻校区内既有道路,可宜通校区次入口。
1.3工程菅理目标
项目目标奖旬措施
工期549B历天
如因我公司原因造成的工期延
拟开工日期为2012年07月19日(共
工期误,花■延误一天我公司愿承担合同
体开工日期以工程开工令为准)
总造价的0.02%向软,
竣工日期为2D14年01月18日
Jta因我公司原.因未达到一次性
一次性验收合格率100%;,达到**市物收合格率100%,我旬愿接受合同
质量
优质结构标准、争创“白玉兰”奖。总造价的2%违约处罚;
若未达到**市优质结构标准,
我司愿接受合同总造价1%处而。
达到市级安全文明施工标化工地,达我司愿自行豕担由于首理不
安全文到就市人艮政府第18号令《**市双设工程善,3起政府有关部门罚款、停工
明文明施工管理现定》的要求,并且施工期整改苓处罚,其发生的损失由我单
间无0■大安全事故发生。位自行承担。
确保达到沪戏建管|2010)28号《关于加
强本市戏,设工程渣土装运管理工作的通
知》的要水:在施工工地内,块规定低;H.加违反胡定,业■主有机从应讨
海土管车俩清洗设施、泥浆沉淀设施以及配套的工程•款项中亢接扣除违约金.违约
理排水设施;运蚓车辆应在装载渣土完毕经金为不少于合同电造价的1%的金
除施、冲洗干二全后方可驶出施工工地;装额,我可愿承担相应罚款。
战法士启发应西与运输车辆箱体上沿口保
持平整,并保证平闭箱盖。
1.4工程地质条件
工会s也质恢况差
土星号土层名称层■厚(m)特性
地行,夹三合土,含碎石、砖块
①1杂填土
建筑垃圾、夹杂物。
组市,夹杂质,土质松效。该层
①2券■填土土土质不均,结构松散.强度不均,
一级不立a接作为天然3电基势力层°
局部有较厚填土处块失,层宸平
②灰黄〜灰色构质粘土1.47缄,星可塑状,中压缩性,可作为天
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 专车司机劳动合同范本
- 下水漏水维修合同范本
- 二手房签订合同协议书
- 蜂窝织炎护理常规
- 专家劳务总包合同范本
- 职业俱乐部球员合同范本
- 白内障术后健康管理要点
- 装饰公司与客户合同范本
- 疑难疾病诊断指南解读
- 2025届高三地理知识体系复习计划
- 采购螺丝合同协议
- GB/T 45481-2025硅橡胶混炼胶医疗导管用
- 公司电子屏管理制度
- 采购询价制度
- 2025年上海高考英语复习必背考纲词汇手册默写
- GB/T 1634.1-2025塑料负荷变形温度的测定第1部分:通用试验方法
- 肩袖修补术护理
- 月子中心员工手册管理制度
- DB37-T 1933-2022 氯碱安全生产技术规范
- 2025中考数学专项复习:最值问题之瓜豆原理模型(含答案)
- 2025年浙江宁波北仑热力有限公司招聘笔试参考题库含答案解析
评论
0/150
提交评论