文档简介

安装清单(车库),,,,,,,,,,,,,,,,

序号,工程项目描述及说明,,单位,工程量,主材价,主材损耗,辅材,人工,机械&其它,管理费,利润,税金,综合单价,合价,主材供应方式,备注

,项目名称,项目特征/工程内容,,,1,2,3,4,5,6=4*费率,7=4*费率,8=(1+1*2+3+4+5+6+7)*税率,9=(1+1*2+3+4+5+6+7+8),,,

费率》》,,,,,,,,,,5.00%,20.00%,3.48%,,,,管理费中含规费

一、给排水工程,,,,,,,,,,,,,,,,

给水工程,,,,,,,,,,,,,,,,

1,钢塑复合管DN150-1.6mpa,"钢塑复合管

1、钢塑复合管安装

2、钢塑复合管管件安装

3、支吊架制作与安装

4、支吊架除锈及刷漆

5、管网水试压试验

6、管网消毒冲洗",m,1.00,191.86,2.00%,5.50,12.50,0.68,0.63,2.50,7.57,225.07,225.07,,

2,钢塑复合管DN100-1.6mpa,"钢塑复合管

1、钢塑复合管安装

2、钢塑复合管管件安装

3、支吊架制作与安装

4、支吊架除锈及刷漆

5、管网水试压试验

6、管网消毒冲洗",m,1.00,109.18,2.00%,5.20,11.50,0.53,0.58,2.30,4.58,136.04,136.04,,

3,钢塑复合管DN80-1.6mpa,"钢塑复合管

1、钢塑复合管安装

2、钢塑复合管管件安装

3、支吊架制作与安装

4、支吊架除锈及刷漆

5、管网水试压试验

6、管网消毒冲洗",m,1.00,85.86,2.00%,5.00,10.50,0.50,0.53,2.10,3.70,109.90,109.90,,

4,钢塑复合管DN65-1.6mpa,"钢塑复合管

1、钢塑复合管安装

2、钢塑复合管管件安装

3、支吊架制作与安装

4、支吊架除锈及刷漆

5、管网水试压试验

6、管网消毒冲洗",m,1.00,65.00,2.00%,4.80,10.30,0.48,0.52,2.06,2.94,87.39,87.39,,

5,钢塑复合管DN50-1.6mpa,"钢塑复合管

1、钢塑复合管安装

2、钢塑复合管管件安装

3、支吊架制作与安装

4、支吊架除锈及刷漆

5、管网水试压试验

6、管网消毒冲洗",m,1.00,45.00,2.00%,4.70,10.00,0.47,0.50,2.00,2.21,65.78,65.78,,

6,钢塑复合管DN40-1.6mpa,"钢塑复合管

1、钢塑复合管安装

2、钢塑复合管管件安装

3、支吊架制作与安装

4、支吊架除锈及刷漆

5、管网水试压试验

6、管网消毒冲洗",m,1.00,38.16,2.00%,4.50,8.50,0.40,0.43,1.70,1.89,56.34,56.34,,

7,钢塑复合管DN32-1.6mpa,"钢塑复合管

1、钢塑复合管安装

2、钢塑复合管管件安装

3、支吊架制作与安装

4、支吊架除锈及刷漆

5、管网水试压试验

6、管网消毒冲洗",m,1.00,31.80,2.00%,4.80,8.00,0.40,0.40,1.60,1.66,49.29,49.29,,

8,钢塑复合管DN25-1.6mpa,"钢塑复合管

1、钢塑复合管安装

2、钢塑复合管管件安装

3、支吊架制作与安装

4、支吊架除锈及刷漆

5、管网水试压试验

6、管网消毒冲洗",m,1.00,25.44,2.00%,4.70,7.50,0.45,0.38,1.50,1.41,41.88,41.88,,

9,钢塑复合管DN20-1.6mpa,"钢塑复合管

1、钢塑复合管安装

2、钢塑复合管管件安装

3、支吊架制作与安装

4、支吊架除锈及刷漆

5、管网水试压试验

6、管网消毒冲洗",m,1.00,16.96,2.00%,4.50,7.00,0.45,0.35,1.40,1.08,32.08,32.08,,

10,双面热浸镀锌焊接钢管DN1501.6mpa,"双面热浸镀锌焊接钢管

1、双面热浸镀锌焊接钢管安装

2、双面热浸镀锌焊接钢管管件安装

3、支吊架制作与安装

4、支吊架除锈及刷漆

5、管网水试压试验

6、管网消毒冲洗",m,1.00,103.30,2.00%,4.80,18.50,5.50,0.93,3.70,4.83,143.62,143.62,,

11,双面热浸镀锌焊接钢管DN1001.6mpa,"双面热浸镀锌焊接钢管

1、双面热浸镀锌焊接钢管安装

2、双面热浸镀锌焊接钢管管件安装

3、支吊架制作与安装

4、支吊架除锈及刷漆

5、管网水试压试验

6、管网消毒冲洗",m,1.00,62.90,2.00%,4.80,18.00,5.50,0.90,3.60,3.37,100.33,100.33,,

12,双面热浸镀锌焊接钢管DN801.6mpa,"双面热浸镀锌焊接钢管

1、双面热浸镀锌焊接钢管安装

2、双面热浸镀锌焊接钢管管件安装

3、支吊架制作与安装

4、支吊架除锈及刷漆

5、管网水试压试验

6、管网消毒冲洗",m,1.00,48.37,2.00%,4.50,15.00,5.00,0.75,3.00,2.70,80.29,80.29,,

13,双面热浸镀锌焊接钢管DN651.6mpaa,"双面热浸镀锌焊接钢管

1、双面热浸镀锌焊接钢管安装

2、双面热浸镀锌焊接钢管管件安装

3、支吊架制作与安装

4、支吊架除锈及刷漆

5、管网水试压试验

6、管网消毒冲洗",m,1.00,38.50,2.00%,4.50,14.00,5.00,0.70,2.80,2.31,68.58,68.58,,

14,双面热浸镀锌焊接钢管DN501.6mpa,"双面热浸镀锌焊接钢管

1、双面热浸镀锌焊接钢管安装

2、双面热浸镀锌焊接钢管管件安装

3、支吊架制作与安装

4、支吊架除锈及刷漆

5、管网水试压试验

6、管网消毒冲洗",m,1.00,28.30,2.00%,3.50,13.50,5.00,0.68,2.70,1.89,56.13,56.13,,

15,双面热浸镀锌焊接钢管DN401.6mpa,"双面热浸镀锌焊接钢管

1、双面热浸镀锌焊接钢管安装

2、双面热浸镀锌焊接钢管管件安装

3、支吊架制作与安装

4、支吊架除锈及刷漆

5、管网水试压试验

6、管网消毒冲洗",m,1.00,22.20,2.00%,3.00,13.00,5.00,0.65,2.60,1.63,48.53,48.53,,

16,双面热浸镀锌焊接钢管DN321.6mpa,"双面热浸镀锌焊接钢管

1、双面热浸镀锌焊接钢管安装

2、双面热浸镀锌焊接钢管管件安装

3、支吊架制作与安装

4、支吊架除锈及刷漆

5、管网水试压试验

6、管网消毒冲洗",m,1.00,18.15,2.00%,2.50,12.50,5.00,0.63,2.50,1.45,43.09,43.09,,

17,双面热浸镀锌焊接钢管DN251.6mpa,"双面热浸镀锌焊接钢管

1、双面热浸镀锌焊接钢管安装

2、双面热浸镀锌焊接钢管管件安装

3、支吊架制作与安装

4、支吊架除锈及刷漆

5、管网水试压试验

6、管网消毒冲洗",m,1.00,14.00,2.00%,2.50,12.30,5.00,0.62,2.46,1.29,38.45,38.45,,

18,双面热浸镀锌无缝钢管DN1501.6mpa,"双面热浸镀锌无缝钢管

1、双面热浸镀锌无缝钢管安装

2、双面热浸镀锌无缝钢管管件安装

3、支吊架制作与安装

4、支吊架除锈及刷漆

5、管网水试压试验

6、管网消毒冲洗",m,1.00,134.29,2.00%,,19.50,,0.98,3.90,5.62,166.97,166.97,,

19,双面热浸镀锌无缝钢管DN1001.6mpa,"双面热浸镀锌无缝钢管

1、双面热浸镀锌无缝钢管安装

2、双面热浸镀锌无缝钢管管件安装

3、支吊架制作与安装

4、支吊架除锈及刷漆

5、管网水试压试验

6、管网消毒冲洗",m,1.00,81.77,2.00%,,19.00,,0.95,3.80,3.73,110.88,110.88,,

20,双面热浸镀锌无缝钢管DN801.6mpa,"双面热浸镀锌无缝钢管

1、双面热浸镀锌无缝钢管安装

2、双面热浸镀锌无缝钢管管件安装

3、支吊架制作与安装

4、支吊架除锈及刷漆

5、管网水试压试验

6、管网消毒冲洗",m,1.00,62.88,2.00%,3.00,16.00,5.00,0.80,3.20,3.21,95.34,95.34,,

21,双面热浸镀锌无缝钢管DN651.6mpaa,"双面热浸镀锌无缝钢管

1、双面热浸镀锌无缝钢管安装

2、双面热浸镀锌无缝钢管管件安装

3、支吊架制作与安装

4、支吊架除锈及刷漆

5、管网水试压试验

6、管网消毒冲洗",m,1.00,50.05,2.00%,3.00,15.00,5.00,0.75,3.00,2.71,80.51,80.51,,

22,双面热浸镀锌无缝钢管DN501.6mpa,"双面热浸镀锌无缝钢管

1、双面热浸镀锌无缝钢管安装

2、双面热浸镀锌无缝钢管管件安装

3、支吊架制作与安装

4、支吊架除锈及刷漆

5、管网水试压试验

6、管网消毒冲洗",m,1.00,36.79,2.00%,3.00,14.50,5.00,0.73,2.90,2.22,65.87,65.87,,

23,双面热浸镀锌无缝钢管DN401.6mpa,"双面热浸镀锌无缝钢管

1、双面热浸镀锌无缝钢管安装

2、双面热浸镀锌无缝钢管管件安装

3、支吊架制作与安装

4、支吊架除锈及刷漆

5、管网水试压试验

6、管网消毒冲洗",m,1.00,28.86,2.00%,3.00,14.00,5.00,0.70,2.80,1.91,56.85,56.85,,

24,双面热浸镀锌无缝钢管DN321.6mpa,"双面热浸镀锌无缝钢管

1、双面热浸镀锌无缝钢管安装

2、双面热浸镀锌无缝钢管管件安装

3、支吊架制作与安装

4、支吊架除锈及刷漆

5、管网水试压试验

6、管网消毒冲洗",m,1.00,23.60,2.00%,3.00,13.50,5.00,0.68,2.70,1.70,50.65,50.65,,

25,双面热浸镀锌无缝钢管DN251.6mpa,"双面热浸镀锌无缝钢管

1、双面热浸镀锌无缝钢管安装

2、双面热浸镀锌无缝钢管管件安装

3、支吊架制作与安装

4、支吊架除锈及刷漆

5、管网水试压试验

6、管网消毒冲洗",m,1.00,18.20,2.00%,3.00,13.20,5.00,0.66,2.64,1.50,44.56,44.56,,

26,法兰闸阀DN50-1.6mpa,"1、阀门安装Z45X-1.6

2、法兰安装

3、螺栓螺母安装",个,1.00,254.00,0.00%,35.00,13.50,13.00,0.68,2.70,11.10,329.97,329.97,,

27,法兰闸阀DN65-1.6mpa,"1、阀门安装Z45X-1.6

2、法兰安装

3、螺栓螺母安装",个,1.00,312.00,0.00%,40.00,18.50,14.00,0.93,3.70,13.54,402.67,402.67,,

28,法兰闸阀DN80-1.6mpa,"1、阀门安装Z45X-1.6

2、法兰安装

3、螺栓螺母安装",个,1.00,407.00,0.00%,45.00,20.00,15.00,1.00,4.00,17.12,509.12,509.12,,

29,法兰闸阀DN100-1.6mpa,"1、阀门安装Z45X-1.6

2、法兰安装

3、螺栓螺母安装",个,1.00,100.00,0.00%,55.00,25.00,18.00,1.25,5.00,7.11,211.36,211.36,,

30,法兰闸阀DN150-1.6mpa,"1、阀门安装Z45X-1.6

2、法兰安装

3、螺栓螺母安装",个,1.00,340.00,0.00%,65.00,45.00,22.00,2.25,9.00,16.82,500.07,500.07,,

31,Y型过滤器安装DN501.6MPa,"1、过滤器安装

2、法兰安装

3、螺栓螺母安装",个,1.00,110.00,0.00%,19.00,16.00,9.31,0.80,3.20,5.51,163.82,163.82,,

32,Y型过滤器安装DN651.6MPa,"1、过滤器安装

2、法兰安装

3、螺栓螺母安装",个,1.00,147.00,0.00%,25.00,23.00,14.00,1.15,4.60,7.47,222.22,222.22,,

33,Y型过滤器安装DN801.6MPa,"1、过滤器安装

2、法兰安装

3、螺栓螺母安装",个,1.00,173.00,0.00%,48.00,26.00,18.00,1.30,5.20,9.45,280.95,280.95,,

34,Y型过滤器安装DN1001.6MPa,"1、过滤器安装

2、法兰安装

3、螺栓螺母安装",个,1.00,80.00,0.00%,55.00,32.00,20.00,1.60,6.40,6.79,201.79,201.79,,

35,Y型过滤器安装DN1501.6MPa,"1、过滤器安装

2、法兰安装

3、螺栓螺母安装",个,1.00,120.00,0.00%,64.00,42.00,23.00,2.10,8.40,9.03,268.53,268.53,,

36,遥控浮球阀DN150,"1、阀门安装

2、法兰安装

3、螺栓螺母安装",个,1.00,1626.00,0.00%,33.00,22.00,13.00,1.10,4.40,59.14,"1,758.64","1,758.64",,

37,遥控浮球阀DN100,"1、阀门安装

2、法兰安装

3、螺栓螺母安装",个,1.00,1060.00,0.00%,22.00,18.00,12.00,0.90,3.60,38.85,"1,155.35","1,155.35",,

38,持压泄压阀DN50-1.6mpa,"1、阀门安装

2、法兰安装

3、螺栓螺母安装",个,1.00,890.00,0.00%,19.00,16.00,9.31,0.80,3.20,32.65,970.96,970.96,,

39,持压泄压阀DN65-1.6mpa,"1、阀门安装

2、法兰安装

3、螺栓螺母安装",个,1.00,1044.00,0.00%,25.00,23.00,14.00,1.15,4.60,38.69,"1,150.44","1,150.44",,

40,持压泄压阀DN80-1.6mpa,"1、阀门安装

2、法兰安装

3、螺栓螺母安装",个,1.00,1261.00,0.00%,48.00,26.00,18.00,1.30,5.20,47.31,"1,406.81","1,406.81",,

41,持压泄压阀DN100-1.6mpa,"1、阀门安装

2、法兰安装

3、螺栓螺母安装",个,1.00,1450.00,0.00%,55.00,32.00,20.00,1.60,6.40,54.46,"1,619.46","1,619.46",,

42,柔性橡胶接头(KXT-1型)DN501.6MPa,"1、阀门安装

2、法兰安装

3、螺栓螺母安装",个,1.00,77.00,0.00%,25.00,12.00,2.06,0.60,2.40,4.14,123.20,123.20,,

43,柔性橡胶接头(KXT-1型)DN651.6MPa,"1、阀门安装

2、法兰安装

3、螺栓螺母安装",个,1.00,89.00,0.00%,35.00,15.00,9.00,0.75,3.00,5.28,157.03,157.03,,

44,柔性橡胶接头(KXT-1型)DN801.6MPa,"1、阀门安装

2、法兰安装

3、螺栓螺母安装",个,1.00,160.00,0.00%,45.00,19.00,14.00,0.95,3.80,8.45,251.20,251.20,,

45,柔性橡胶接头(KXT-1型)DN1001.6MPa,"1、阀门安装

2、法兰安装

3、螺栓螺母安装",个,1.00,200.00,0.00%,55.00,28.00,19.00,1.40,5.60,10.75,319.75,319.75,,

46,柔性橡胶接头(KXT-1型)DN1501.6MPa,"1、阀门安装

2、法兰安装

3、螺栓螺母安装",个,1.00,230.00,0.00%,62.00,35.00,23.00,1.75,7.00,12.48,371.23,371.23,,

47,柔性橡胶接头(KXT-1型)DN2001.6MPa,"1、阀门安装

2、法兰安装

3、螺栓螺母安装",个,1.00,285.00,0.00%,70.00,51.00,48.00,2.55,10.20,16.24,482.99,482.99,,

48,压力表,"1、压力表安装

2、压力表弯及配套、取源部件安装",套,1.00,55.00,0.00%,4.40,16.10,0.70,0.81,3.22,2.79,83.02,83.02,,

49,生活水箱(S304),"1、水箱制作与安装

2、水箱基础

3、水箱支架",m2,1.00,530.00,0.00%,5.50,12.00,3.50,0.60,2.40,19.28,573.28,573.28,,

50,自洁灭菌仪,自洁灭菌仪安装,套,1.00,9800.00,0.00%,180.00,230.00,210.00,11.50,46.00,364.62,"10,842.12","10,842.12",,

51,生活给水泵,"1、水泵安装(含电动机安装)

2、水泵电机接线检查3、二次灌浆",台,1.00,,0.00%,150.00,280.00,75.00,14.00,56.00,20.01,595.01,595.01,,

52,PPR管冷水DN100-1.6mpa,"PPR冷水管(热熔连接)

1、PPR冷水管安装

2、PPR冷水管管件安装

3、支架制、安、除锈、刷漆

4、管网水试压试验

5、管网消毒冲洗",m,1.00,113.42,2.00%,22.60,15.57,0.80,0.78,3.11,5.52,164.07,164.07,,

53,PPR管冷水DN80-1.6mpa,"PPR冷水管(热熔连接)

1、PPR冷水管安装

2、PPR冷水管管件安装

3、支架制、安、除锈、刷漆

4、管网水试压试验

5、管网消毒冲洗",m,1.00,76.32,2.00%,18.50,11.20,0.50,0.56,2.24,3.86,114.70,114.70,,

54,PPR管冷水DN70-1.6mpa,"PPR冷水管(热熔连接)

1、PPR冷水管安装

2、PPR冷水管管件安装

3、支架制、安、除锈、刷漆

4、管网水试压试验

5、管网消毒冲洗",m,1.00,53.00,2.00%,10.50,9.50,0.45,0.48,1.90,2.68,79.56,79.56,,

55,PPR管冷水DN50-1.6mpa,"PPR冷水管(热熔连接)

1、PPR冷水管安装

2、PPR冷水管管件安装

3、支架制、安、除锈、刷漆

4、管网水试压试验

5、管网消毒冲洗",m,1.00,10.00,2.00%,4.80,5.50,0.40,0.28,1.10,0.78,23.05,23.05,,

56,PPR管冷水DN40-1.6mpa,"PPR冷水管(热熔连接)

1、PPR冷水管安装

2、PPR冷水管管件安装

3、支架制、安、除锈、刷漆

4、管网水试压试验

5、管网消毒冲洗",m,1.00,8.00,2.00%,4.30,5.40,0.40,0.27,1.08,0.68,20.29,20.29,,

57,PPR管冷水DN32-1.6mpa,"PPR冷水管(热熔连接)

1、PPR冷水管安装

2、PPR冷水管管件安装

3、压槽、修槽、稳固

4、支架制、安、除锈、刷漆

5、管网水试压试验

6、管网消毒冲洗",m,1.00,6.00,2.00%,4.00,5.38,0.30,0.27,1.08,0.60,17.74,17.74,,

58,PPR管冷水DN25-1.6mpa,"PPR冷水管(热熔连接)

1、PPR冷水管安装

2、PPR冷水管管件安装

3、压槽、修槽、稳固

4、支架制、安、除锈、刷漆

5、管网水试压试验

6、管网消毒冲洗",m,1.00,4.00,2.00%,3.80,5.25,0.25,0.26,1.05,0.51,15.20,15.20,,

59,PPR管冷水DN20-1.6mpa,"PPR冷水管(热熔连接)

1、PPR冷水管安装

2、PPR冷水管管件安装

3、压槽、修槽、稳固

4、支架制、安、除锈、刷漆

5、管网水试压试验

6、管网消毒冲洗",m,1.00,3.50,2.00%,3.50,5.22,0.18,0.26,1.04,0.48,14.25,14.25,,

60,PPR管冷水DN15-1.6mpa,"PPR冷水管(热熔连接)

1、PPR冷水管安装

2、PPR冷水管管件安装

3、压槽、修槽、稳固

4、支架制、安、除锈、刷漆

5、管网水试压试验

6、管网消毒冲洗",m,1.00,2.00,2.00%,3.50,5.22,0.15,0.26,1.04,0.43,12.64,12.64,,

61,PPR管热水DN25-2.0mpa,"PPR热水管(热熔连接)

1、PPR热水管安装

2、PPR热水管管件安装

3、压槽、修槽、稳固

4、管网水试压试验

5、管网消毒冲洗",m,1.00,5.00,2.00%,4.00,5.38,0.25,0.27,1.08,0.56,16.63,16.63,,

62,PPR管热水DN20-2.0mpa,"PPR热水管(热熔连接)

1、PPR热水管安装

2、PPR热水管管件安装

3、压槽、修槽、稳固

4、管网水试压试验

5、管网消毒冲洗",m,1.00,4.00,2.00%,3.80,5.25,0.18,0.26,1.05,0.51,15.13,15.13,,

63,PPR管热水DN15-2.0mpa,"PPR热水管(热熔连接)

1、PPR热水管安装

2、PPR热水管管件安装

3、压槽、修槽、稳固

4、管网水试压试验

5、管网消毒冲洗",m,1.00,2.50,2.00%,3.50,5.22,0.15,0.26,1.04,0.44,13.17,13.17,,

64,截止阀DN50,阀门安装,个,1.00,77.00,1.00%,3.80,10.20,2.80,0.51,2.04,3.38,100.50,100.50,,

65,截止阀DN40,阀门安装,个,1.00,48.70,1.00%,3.20,8.50,2.50,0.43,1.70,2.28,67.79,67.79,,

66,截止阀DN32,阀门安装,个,1.00,30.00,1.00%,2.80,6.80,2.10,0.34,1.36,1.52,45.22,45.22,,

67,截止阀DN25,阀门安装,个,1.00,23.00,1.00%,2.40,5.10,1.80,0.26,1.02,1.18,34.98,34.98,,

68,截止阀DN20,阀门安装,个,1.00,20.00,1.00%,1.50,4.20,0.60,0.21,0.84,0.96,28.51,28.51,,

69,截止阀DN15,阀门安装,个,1.00,24.00,1.00%,1.50,4.00,0.50,0.20,0.80,1.09,32.33,32.33,,

70,比例式减压阀DN150-1.6mpa,"1、阀门安装

2、法兰安装

3、螺栓螺母安装",个,1.00,230.00,0.00%,85.00,45.00,28.00,2.25,9.00,13.89,413.14,413.14,,

71,比例式减压阀DN100-1.6mpa,"1、阀门安装

2、法兰安装

3、螺栓螺母安装",个,1.00,180.00,0.00%,75.00,40.00,25.00,2.00,8.00,11.48,341.48,341.48,,

72,比例式减压阀DN50-1.6mpa,"1、阀门安装

2、法兰安装

3、螺栓螺母安装",个,1.00,615.00,0.00%,35.00,25.00,18.00,1.25,5.00,24.33,723.58,723.58,,

73,比例式减压阀DN40-1.6mpa,"1、阀门安装

2、法兰安装

3、螺栓螺母安装",个,1.00,480.00,0.00%,34.00,24.00,16.00,1.20,4.80,19.49,579.49,579.49,,

74,比例式减压阀DN25-1.6mpa,"1、阀门安装

2、法兰安装

3、螺栓螺母安装",个,1.00,307.00,0.00%,25.00,20.00,12.00,1.00,4.00,12.84,381.84,381.84,,

75,杠杆式浮球阀DN40,"1、阀门安装

2、法兰安装

3、螺栓螺母安装",个,1.00,445.00,0.00%,12.00,9.50,6.50,0.48,1.90,16.54,491.92,491.92,,

76,杠杆式浮球阀DN50,"1、阀门安装

2、法兰安装

3、螺栓螺母安装",个,1.00,561.00,0.00%,13.00,10.00,6.80,0.50,2.00,20.65,613.95,613.95,,

77,杠杆式浮球阀DN65,"1、阀门安装

2、法兰安装

3、螺栓螺母安装",个,1.00,732.00,0.00%,15.00,13.00,7.00,0.65,2.60,26.80,797.05,797.05,,

78,杠杆式浮球阀DN80,"1、阀门安装

2、法兰安装

3、螺栓螺母安装",个,1.00,860.00,0.00%,19.00,17.00,9.00,0.85,3.40,31.64,940.89,940.89,,

79,杠杆式浮球阀DN100,"1、阀门安装

2、法兰安装

3、螺栓螺母安装",个,1.00,1100.00,0.00%,25.60,18.80,12.20,0.94,3.76,40.41,"1,201.71","1,201.71",,

80,螺纹水表DN20(普通),"1、水表安装

2、水表附件安装",套,1.00,85.80,0.00%,0.39,11.20,0.00,0.56,2.24,3.49,103.68,103.68,,

81,螺纹水表DN25(普通),"1、水表安装

2、水表附件安装",套,1.00,114.00,0.00%,0.50,12.80,0.00,0.64,2.56,4.54,135.04,135.04,,

82,螺纹水表DN32(普通),"1、水表安装

2、水表附件安装",套,1.00,280.00,0.00%,0.70,13.90,0.00,0.70,2.78,10.37,308.45,308.45,,

83,螺纹水表DN40(普通),"1、水表安装

2、水表附件安装",套,1.00,402.80,0.00%,0.95,20.40,0.00,1.02,4.08,14.94,444.19,444.19,,

84,螺纹水表DN50(普通),"1、水表安装

2、水表附件安装",套,1.00,487.00,0.00%,1.50,24.30,0.00,1.22,4.86,18.06,536.93,536.93,,

85,螺纹水表DN65(普通),"1、水表安装

2、水表附件安装",套,1.00,800.00,0.00%,2.20,26.50,0.00,1.33,5.30,29.07,864.39,864.39,,

86,法兰水表DN80(普通),"1、水表安装

2、水表附件安装3、法兰安装",套,1.00,1409.00,0.00%,2.60,48.80,3.30,2.44,9.76,51.36,"1,527.26","1,527.26",,

87,法兰水表DN100(普通),"1、水表安装

2、水表附件安装3、法兰安装",套,1.00,1840.00,0.00%,2.85,58.50,3.50,2.93,11.70,66.80,"1,986.27","1,986.27",,

88,分水器(4路),分水器安装,套,1.00,2005.00,0.00%,18.50,35.80,2.60,1.79,7.16,72.07,"2,142.92","2,142.92",,

89,分水器(8路),分水器安装,套,1.00,3850.00,0.00%,36.50,45.20,3.20,2.26,9.04,137.33,"4,083.53","4,083.53",,

90,自动排气阀DN20,排气阀安装,个,1.00,28.00,0.00%,7.50,8.20,0.00,0.41,1.64,1.59,47.34,47.34,,

91,自动排气阀DN25,排气阀安装,个,1.00,31.00,0.00%,9.20,9.10,0.00,0.46,1.82,1.79,53.37,53.37,,

92,水龙头DN15(塑料),水龙头安装,个,1.00,2.50,1.00%,0.10,0.80,0.00,0.04,0.16,0.13,3.75,3.75,,

93,水龙头DN15(铸铁),水龙头安装,个,1.00,8.50,1.00%,0.10,0.80,0.00,0.04,0.16,0.34,10.02,10.02,,

94,角阀DN15,角阀安装,个,1.00,15.00,1.00%,0.10,0.80,0.00,0.04,0.16,0.57,16.82,16.82,,

给水工程小计,,,,,,,,,,,-,,,"46,570.22",,

排水工程,,,,,,,,,,,-,,,,,

1,柔性铸铁管DN300,"室内柔性铸铁排水管敷设DN300

1、柔性铸铁排水管DN300管道及管件不锈钢卡箍式连接

2、支架制作、安装

3、管道及支架除锈、刷漆

4、管网灌水试验;",m,1.00,298.50,0.00%,123.00,52.60,2.60,2.63,10.52,17.05,506.90,506.90,,

2,柔性铸铁管DN250,"室内柔性铸铁排水管敷设DN250

1、柔性铸铁排水管DN250管道及管件不锈钢卡箍式连接

2、支架制作、安装

3、管道及支架除锈、刷漆

4、管网灌水试验;",m,1.00,232.00,0.00%,108.00,43.50,1.80,2.18,8.70,13.79,409.96,409.96,,

3,柔性铸铁管DN200,"室内柔性铸铁排水管敷设DN200

1、柔性铸铁排水管DN200管道及管件不锈钢卡箍式连接

2、支架制作、安装

3、管道及支架除锈、刷漆

4、管网灌水试验;",m,1.00,118.00,0.00%,90.00,37.20,1.20,1.86,7.44,8.90,264.60,264.60,,

4,柔性铸铁管DN150,"室内柔性铸铁排水管敷设DN150

1、柔性铸铁排水管DN150管道及管件不锈钢卡箍式连接

2、支架制作、安装

3、管道及支架除锈、刷漆

4、管网灌水试验;",m,1.00,79.50,0.00%,78.08,28.80,1.50,1.44,5.76,6.79,201.87,201.87,,

5,柔性铸铁管DN100,"室内柔性铸铁排水管敷设DN100

1、柔性铸铁排水管DN100管道及管件不锈钢卡箍式连接

2、支架制作、安装

3、管道及支架除锈、刷漆

4、管网灌水试验;5、不含特殊管件(旋流三通)",m,1.00,46.60,0.00%,75.90,25.50,1.56,1.28,5.10,5.43,161.36,161.36,,

6,柔性铸铁管DN75,"室内柔性铸铁排水管敷设DN75

1、柔性铸铁排水管DN75管道及管件不锈钢卡箍式连接

2、支架制作、安装

3、管道及支架除锈、刷漆

4、管网灌水试验;5、不含特殊管件(旋流三通)",m,1.00,40.28,0.00%,53.70,15.90,1.53,0.80,3.18,4.02,119.40,119.40,,

7,柔性铸铁管DN50,"室内柔性铸铁排水管敷设DN50

1、柔性铸铁排水管DN50管道及管件不锈钢卡箍式连接

2、支架制作、安装

3、管道及支架除锈、刷漆

4、管网灌水试验;5、不含特殊管件(旋流三通)",m,1.00,29.68,0.00%,27.98,10.80,1.66,0.54,2.16,2.53,75.35,75.35,,

8,螺旋消声UPVC塑料排水管DN200,"室内螺旋消声UPVC排水管(承插锁紧连接)DN200

1、管道、管件安装

2、管网灌水试验

3、支架制、安及除锈、刷漆",m,1.00,42.00,0.00%,31.50,22.80,0.00,1.14,4.56,3.55,105.55,105.55,,

9,螺旋消声UPVC塑料排水管DN150,"室内螺旋消声UPVC排水管(承插锁紧连接)DN150

1、管道、管件安装

2、管网灌水试验

3、支架制、安",m,1.00,34.00,0.00%,25.50,17.50,0.00,0.88,3.50,2.83,84.21,84.21,,

10,螺旋消声UPVC塑料排水管DN100,"室内螺旋消声UPVC排水管(承插锁紧连接)DN100

1、管道、管件安装

2、管网灌水试验

3、支架制、安",m,1.00,17.00,0.00%,13.50,10.50,0.00,0.53,2.10,1.52,45.14,45.14,,

11,U-PVC排水管DN200,"室内普通UPVC塑料排水管DN200(粘接)

1、UPVC承插塑料排水管DN200

2、UPVC承插塑料排水管件DN200

3、管网灌水试验

4、支架制、安",m,1.00,33.00,0.00%,8.50,18.80,0.00,0.94,3.76,2.26,67.26,67.26,,

12,U-PVC排水管DN150,"室内普通UPVC塑料排水管DN150(粘接)

1、UPVC承插塑料排水管DN150

2、UPVC承插塑料排水管件DN150

3、管网灌水试验

4、支架制、安",m,1.00,35.00,0.00%,5.50,12.80,0.00,0.64,2.56,1.97,58.47,58.47,,

13,U-PVC排水管DN100,"室内普通UPVC塑料排水管DN100(粘接)

1、普通UPVC承插塑料排水管DN100

2、普通UPVC承插塑料排水管件DN100

3、管网灌水试验

4、支架制、安",m,1.00,15.00,0.00%,3.50,8.80,0.00,0.44,1.76,1.03,30.53,30.53,,

14,U-PVC排水管DN75,"室内普通UPVC塑料排水管DN75(粘接)

1、普通UPVC承插塑料排水管DN75

2、普通UPVC承插塑料排水管件DN753、管网灌水试验

4、支架制、安",m,1.00,8.00,0.00%,2.80,7.90,0.00,0.40,1.58,0.72,21.39,21.39,,

15,U-PVC排水管DN50,"室内普通UPVC塑料排水管DN50(粘接)

1、普通UPVC承插塑料排水管DN50

2、普通UPVC承插塑料排水管件DN503、管网灌水试验

4、支架制、安",m,1.00,4.00,0.00%,1.90,5.90,0.00,0.30,1.18,0.46,13.74,13.74,,

16,PVC地漏DN50,"地漏DN50

1、PVC地漏DN50安装",个,1.00,6.60,1.00%,2.75,8.00,0.00,0.40,1.60,0.68,20.09,20.09,,

17,PVC地漏DN50,"地漏DN50

1、PVC地漏DN50安装2、P型存水弯制作、安装",个,1.00,6.60,1.00%,4.80,12.00,0.00,0.60,2.40,0.92,27.39,27.39,,

18,PVC地漏DN75,"地漏DN75

1、PVC地漏DN75安装",个,1.00,9.00,1.00%,2.85,8.90,0.00,0.45,1.78,0.80,23.87,23.87,,

19,PVC地漏DN100,"地漏DN100

1、PVC地漏DN100安装",个,1.00,12.00,1.00%,2.88,12.50,0.00,0.63,2.50,1.07,31.69,31.69,,

20,洗衣机地漏DN50,"地漏DN50

1、PVC洗衣机地漏DN50安装",个,1.00,6.60,1.00%,2.75,12.80,0.00,0.64,2.56,0.88,26.30,26.30,,

21,铸铁地漏DN50,安装,个,1.00,20.00,1.00%,2.75,10.50,0.00,0.53,2.10,1.26,37.33,37.33,,

22,铸铁地漏DN75,安装,个,1.00,25.00,1.00%,2.85,11.80,0.00,0.59,2.36,1.49,44.34,44.34,,

23,铸铁地漏DN100,安装,个,1.00,30.00,1.00%,2.88,13.50,0.00,0.68,2.70,1.74,51.80,51.80,,

24,防爆波地漏DN75,安装,个,1.00,28.00,1.00%,2.85,14.10,0.00,0.71,2.82,1.70,50.45,50.45,,

25,防爆波地漏DN100,安装,个,1.00,35.00,1.00%,2.88,14.80,0.00,0.74,2.96,1.97,58.70,58.70,,

26,铸铁清扫口DN200,安装,个,1.00,56.00,1.00%,1.30,3.30,0.00,0.17,0.66,2.16,64.14,64.14,,

27,铸铁清扫口DN150,安装,个,1.00,43.00,1.00%,1.30,3.30,0.00,0.17,0.66,1.70,50.56,50.56,,

28,铸铁清扫口DN125,安装,个,1.00,38.00,1.00%,1.30,3.30,0.00,0.17,0.66,1.52,45.33,45.33,,

29,铸铁清扫口DN100,安装,个,1.00,32.00,1.00%,0.98,2.90,0.00,0.15,0.58,1.28,38.21,38.21,,

30,UPVC清扫口DN200,安装,个,1.00,22.00,1.00%,1.30,3.30,0.00,0.17,0.66,0.96,28.61,28.61,,

31,UPVC清扫口DN150,安装,个,1.00,18.00,1.00%,1.30,3.30,0.00,0.17,0.66,0.82,24.43,24.43,,

32,UPVC清扫口DN100,安装,个,1.00,15.00,1.00%,0.98,2.90,0.00,0.15,0.58,0.69,20.44,20.44,,

33,UPVC清扫口DN75,安装,个,1.00,10.00,1.00%,0.78,3.50,0.00,0.18,0.70,0.53,15.79,15.79,,

34,UPVC清扫口DN50,安装,个,1.00,8.00,1.00%,0.58,2.70,0.00,0.14,0.54,0.42,12.45,12.45,,

35,阻火圈安装DN75,阻火圈安装,个,1.00,7.42,2.00%,3.20,4.20,0.00,0.21,0.84,0.56,16.58,16.58,,

36,阻火圈安装DN100,阻火圈安装,个,1.00,10.60,2.00%,3.50,7.08,0.00,0.35,1.42,0.81,23.97,23.97,,

37,阻火圈安装DN150,阻火圈安装,个,1.00,21.20,2.00%,3.62,7.09,0.00,0.35,1.42,1.19,35.29,35.29,,

38,阻火圈安装DN200,阻火圈安装,个,1.00,53.00,2.00%,4.80,7.20,0.00,0.36,1.44,2.36,70.22,70.22,,

39,无缝钢管Φ273*7,"室内无缝钢管Φ273*7

1、无缝钢管Φ273*7安装

2、无缝钢管Φ273*7管件安装

3、支架制作及安装4、管道及支架除锈及刷红丹防锈漆和调和漆各两道

5、管网水试压试验",m,1.00,208.00,2.00%,32.60,36.80,25.70,1.84,7.36,11.01,327.47,327.47,,

40,无缝钢管Φ219*6,"室内无缝钢管Φ219*6

1、无缝钢管Φ219*6安装

2、无缝钢管Φ219*6管件安装3、支架制作及安装4、管道及支架除锈及刷红丹防锈漆和调和漆各两道

5、管网水试压试验验",m,1.00,142.00,2.00%,27.49,26.50,19.82,1.33,5.30,7.84,233.11,233.11,,

41,无缝钢管Φ159*4.5,"室内无缝钢管Φ159*4.5

1、无缝钢管Φ159*4.5安装

2、无缝钢管Φ159*4.5管件安装3、支架制作及安装4、管道及支架除锈及刷红丹防锈漆和调和漆各两道

5、管网水试压试验",m,1.00,78.00,2.00%,17.50,18.90,7.30,0.95,3.78,4.45,132.44,132.44,,

42,无缝钢管Φ108*4,"室内无缝钢管Φ108*4

1、无缝钢管Φ108*4安装

2、无缝钢管Φ108*4管件安装3、支架制作及安装4、管道及支架除锈及刷红丹防锈漆和调和漆各两道

5、管网水试压试验",m,1.00,47.00,2.00%,10.50,14.80,6.50,0.74,2.96,2.90,86.34,86.34,,

43,镀锌钢管DN150,"室内镀锌钢管DN150

1、镀锌钢管DN150管道及管件安装

2、管道刷漆

3、支架制作及安装4、支架除锈及刷红丹防锈漆和调和漆各两道

5、管网水试压试验",m,1.00,84.00,2.00%,7.50,11.10,5.80,0.56,2.22,3.93,116.78,116.78,,

44,镀锌钢管DN100,"室内镀锌钢管DN100

1、镀锌钢管DN100管道及管件安装

2、管道刷漆

3、支架制作及安装4、支架除锈及刷红丹防锈漆和调和漆各两道

5、管网水试压试验",m,1.00,51.00,2.00%,10.50,14.80,6.50,0.74,2.96,3.05,90.57,90.57,,

45,镀锌钢管DN80,"室内镀锌钢管DN80

1、镀锌钢管DN80管道及管件安装

2、管道刷漆

3、支架制作及安装4、支架除锈及刷红丹防锈漆和调和漆各两道

5、管网水试压试验",m,1.00,39.24,2.00%,7.50,11.10,5.80,0.56,2.22,2.34,69.54,69.54,,

46,镀锌钢管DN70,"室内镀锌钢管DN70

1、镀锌钢管DN70管道及管件安装

2、管道刷漆

3、支架制作及安装4、支架除锈及刷红丹防锈漆和调和漆各两道

5、管网水试压试验",m,1.00,32.00,2.00%,6.50,9.10,5.20,0.46,1.82,1.94,57.65,57.65,,

47,镀锌钢管DN50,"室内镀锌钢管DN50

1、镀锌钢管DN50管道及管件安装

2、管道刷漆

3、支架制作及安装4、支架除锈及刷红丹防锈漆和调和漆各两道

5、管网水试压试验",m,1.00,23.00,2.00%,4.50,8.10,3.80,0.41,1.62,1.46,43.34,43.34,,

48,焊接钢管DN150,"室内焊接钢管DN150

1、焊接钢管DN150管道及管件安装

2、支架制作及安装3、管道及支架除锈及刷红丹防锈漆和调和漆各两道

4、管网水试压试验验",m,1.00,81.80,2.00%,17.50,18.90,7.30,0.95,3.78,4.59,136.45,136.45,,

49,焊接钢管DN100,"室内焊接钢管DN100

1、焊接钢管DN100管道及管件安装

2、支架制作及安装3、管道及支架除锈及刷红丹防锈漆和调和漆各两道

4、管网水试压试验",m,1.00,49.00,2.00%,10.50,14.80,6.50,0.74,2.96,2.97,88.45,88.45,,

50,焊接钢管DN80,"室内焊接钢管DN80

1、焊接钢管DN80管道及管件安装

2、支架制作及安装3、管道及支架除锈及刷红丹防锈漆和调和漆各两道

4、管网水试压试验",m,1.00,38.00,2.00%,7.50,11.10,5.80,0.56,2.22,2.29,68.23,68.23,,

51,焊接钢管DN70,"室内焊接钢管DN70

1、焊接钢管DN70管道及管件安装

2、支架制作及安装3、管道及支架除锈及刷红丹防锈漆和调和漆各两道

4、管网水试压试验",m,1.00,32.00,2.00%,6.50,9.10,5.20,0.46,1.82,1.94,57.65,57.65,,

52,焊接钢管DN50,"室内焊接钢管DN50

1、焊接钢管DN50管道及管件安装

2、支架制作及安装3、管道及支架除锈及刷红丹防锈漆和调和漆各两道

4、管网水试压试验",m,1.00,24.00,2.00%,4.50,8.10,3.80,0.41,1.62,1.49,44.40,44.40,,

53,蝶阀DN501.6MPa,"1、阀门安装

2、法兰安装",个,1.00,49.00,0.00%,24.50,13.50,11.00,0.68,2.70,3.53,104.90,104.90,,

54,蝶阀DN651.6MPa,"1、阀门安装

2、法兰安装",个,1.00,130.00,0.00%,25.80,15.60,12.50,0.78,3.12,6.54,194.34,194.34,,

55,蝶阀DN801.6MPa,"1、阀门安装

2、法兰安装",个,1.00,78.00,0.00%,28.70,30.20,14.90,1.51,6.04,5.55,164.90,164.90,,

56,蝶阀DN1001.6MPa,"1、阀门安装

2、法兰安装",个,1.00,180.00,0.00%,30.50,36.20,16.50,1.81,7.24,9.47,281.72,281.72,,

57,蝶阀DN1501.6MPa,"1、阀门安装

2、法兰安装",个,1.00,210.00,0.00%,37.80,59.90,19.70,3.00,11.98,11.91,354.29,354.29,,

58,止回阀DN501.6MPa,"1、阀门安装

2、法兰安装",个,1.00,179.00,0.00%,18.50,13.50,12.80,0.68,2.70,7.91,235.08,235.08,,

59,止回阀DN651.6MPa,"1、阀门安装

2、法兰安装",个,1.00,65.00,0.00%,25.80,15.60,13.50,0.78,3.12,4.31,128.11,128.11,,

60,止回阀DN801.6MPa,"1、阀门安装

2、法兰安装",个,1.00,234.00,0.00%,26.70,29.20,14.90,1.46,5.84,10.86,322.96,322.96,,

61,止回阀DN1001.6MPa,"1、阀门安装

2、法兰安装",个,1.00,100.00,0.00%,29.50,37.60,16.50,1.88,7.52,6.72,199.72,199.72,,

62,止回阀DN1501.6MPa,"1、阀门安装

2、法兰安装",个,1.00,180.00,0.00%,36.80,59.90,19.70,3.00,11.98,10.84,322.21,322.21,,

63,橡胶柔性橡胶接头(KXT-1型)DN501.6MPa,"1、阀门安装

2、法兰安装",个,1.00,77.00,0.00%,25.00,12.00,2.06,0.60,2.40,4.14,123.20,123.20,,

64,橡胶柔性橡胶接头(KXT-1型)DN651.6MPa,"1、阀门安装

2、法兰安装",个,1.00,89.00,0.00%,35.00,15.00,9.00,0.75,3.00,5.28,157.03,157.03,,

65,橡胶柔性橡胶接头(KXT-1型)DN801.6MPa,"1、阀门安装

2、法兰安装",个,1.00,160.00,0.00%,45.00,19.00,14.00,0.95,3.80,8.45,251.20,251.20,,

66,橡胶柔性橡胶接头(KXT-1型)DN1001.6MPa,"1、阀门安装

2、法兰安装",个,1.00,200.00,0.00%,55.00,28.00,19.00,1.40,5.60,10.75,319.75,319.75,,

67,橡胶柔性橡胶接头(KXT-1型)DN1501.6MPa,"1、阀门安装

2、法兰安装",个,1.00,230.00,0.00%,62.00,35.00,23.00,1.75,7.00,12.48,371.23,371.23,,

68,过滤器安装DN501.6MPa,"1、过滤器安装

2、法兰安装",个,1.00,110.00,0.00%,19.00,16.00,9.31,0.80,3.20,5.51,163.82,163.82,,

69,过滤器安装DN651.6MPa,"1、过滤器安装

2、法兰安装",个,1.00,147.00,0.00%,25.00,23.00,14.00,1.15,4.60,7.47,222.22,222.22,,

70,过滤器安装DN801.6MPa,"1、过滤器安装

2、法兰安装",个,1.00,173.00,0.00%,48.00,26.00,18.00,1.30,5.20,9.45,280.95,280.95,,

71,过滤器安装DN1001.6MPa,"1、过滤器安装

2、法兰安装",个,1.00,80.00,0.00%,55.00,32.00,

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论