版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
一级梯级水电站可行性研究报告 1 47 64 78 92 xx河的水电规划2003年xx县水利局编规划》经xx县人民政府批复,规划有xx水电站2×1500kw、xx水经对xx河干流河段即xx水电站(也就是现正在兴建的xx水电由于多种因素,截至2003年底,xx县尚有贫困人口30万人,件。xx县境内水资源丰富,开发水电有着得补充,将xx河主河段做了三级规划分别为xx一级水电站、xx二级有寒露风、倒春寒、干旱、洪涝、冰雹等特殊天气。4423.47小时。处在北回归线上,太阳光能通过大气层直季风入境,开始多雨。少数年份受东南季风影响,5月上旬起多雨,面积Q减,地貌形态有岩溶中山峡谷。xx河呈树枝状切割地形,山体标高了陡缓相间地貌形态。灰岩为单斜地形,谷深坡陡,坡度一般在35本区地震烈度属6度以下。山体稳定性好。坡度30º~45º植被较差,水土流失较严重,老冲沟发育,新冲沟少质粉砂岩以及第四系冲洪积层推测厚度3~6.4m,残坡积层厚0.8~岩、泥质粉砂岩。岩体为强风化,岩层产状N60º~80ºW/N<25º~40º(倾向上游)岩层走向与坝轴线呈53º~73º交角,岩石节理裂隙发育有两组N65ºW/SW<45º和N15º~25ºW/SW<40º~50º,裂隙均被石英坝址岩石物理力学指标建议值:容重r=2.5g/m3,抗压强度Rc=400~600kg/㎝2,弹性模量Ea=3.3~4.4x104kg/㎝3,C=0.2~0.4Mpa,泊松比u=0.3~0.4,内摩擦角q=30º~40º,坚固系数f=3~隙发育有两组:即N15º~20ºW/SE<45º~65º和N60º~70ºW/NE<60º~xx一级水电站是一座以发电为主的水电工程。电站兴建的目的xx县有比较丰富的水力资源,全县可开发的水电资源蕴藏量为瓦,占可开发量的不足三成,还有近二十万千瓦待开发,发展潜力不xx一级水电站建成后将与南方电网联网。目前虽然国家电力的的小火电的不断淘汰(国家已经不再批准12.5万以下小火电工程上马仍然需要不断地建设新的水电站替代。提供清洁、廉价、环保水电的xx一级水电站现在筹建,是适时的必要的。本工程左水源综合考虑与上一级xx水电站尾水的衔接,由测量m可见,正常蓄水位从885.000m提高到886.000m,最后提高到886.765m时,总电量增加值明显,从单位电度投资来看,单位电度3000~4000小时之间考虑装机容量,据此拟定6400kw、8000kw、h上表表明,从年发电量和增值单位电度投资来看,选择装机容量xx一级水电站右水源水库正常蓄水位1000.00m,死水位用小时在3000~4000小时之间考虑装机容量,据此拟定8000kw、h综上所述,本电站选择总装机容量为:8000kw+10000kw号为HLA548-WJ-84,发电机型号为SFW4000-6/1730;右水源水轮1m即887.765m作为水库淹没线。水库淹没范围从坝址至库尾约250m,主要是沿河两岸陡峭的光石壁,有1亩,无移民和耕地,也无矿产和其他专业项目。右水源正常蓄水位1000.00m,加高1m即1001.00m作为水库淹没线。水库淹没范围从坝址至库尾约1000m,主要是沿河两岸陡峭的光石壁,有2.1亩,山地7.5亩,其他为天然xx一级水电站的兴建合理、充分地利用了水力资源,每年可为综上所述,xx一级水电站的兴建,从环境角度来评价,是可行xx一级水电站是以发电为主的水利水电工程,两水源正常高水545xx电站(也就是正在建设的xx水电站)到下游xx电站之间属于一根据补充的内容,xx水电站下一梯级为xx一级水电站,同时把xx一级水电站的左水源初拟坝址位于xx水电站下游约250m处,xx一级水电站的右水源初拟坝址位于三棵树自然村原河道溶洞山体雄厚,无低洼邻谷,距两岸1km以外有大致平行于河流的隔水状夹薄层泥质条带灰岩及黄色泥粉砂岩。坝基开挖深度2~3.5m,局左水源下坝址:两岸各约1km范围内无有效隔水层。正常蓄水位886.765m高程以下暗河、溶洞、岩溶泉都很有发综合比较上述因素,因本项目为小型项目,大坝高度均不到30障等优点,因此xx一级水电站挡水大坝均采用浆砌石拱坝。如果采用引水明渠方案则无论走左岸还是走右岸都约要9公里多才能到达xx村厂址,而且开挖明渠时要破坏大量植被,十多万立xx支流大冲沟,单条隧洞长,由于洞子比较小,必须开挖多条支洞右水源引水方案引水建筑物只能走右岸。概括起来可行的方案经估算,校核洪水时挑流射程L=11.4m,冲刷坑深度T=2.2m,L/Txx一级水电站工程引水系统包括水电站进水口、引水隧洞及压左水源电站进水口位于拱坝上游约30m处的岸坡上,为岸坡式首端的水平距离为6.80m,闸门孔口尺寸门槽和通气孔,横断面尺寸为3×3.5m。启闭机室地面高程为缺点:造价稍高,施工期要增加3个月,工程质量要求高。本水源压力隧洞全长6090.00m,为方便施工,采用圆拱城门形条隧洞平面上由一个转弯段连接两个直线段组成,转弯段半径为右水源电站进水口位于拱坝上游约60m处的岸坡上,为岸坡式本水源一条压力隧洞全长2480.00m,为方便施工,采用平底直考虑地形和电站集中水头的影响等因素,水电站厂房置于xx村主厂房装有单机容量4000kw的横轴混流式机组两台,单机容安装间长11米,左水源选用混流机组,机组安装高程736.80m,右水源选用冲击式机组,机组安装高程736.71m,厂房地面高程副厂房利用主厂房靠山坡一侧右水源引水压力管明挖形成的场地布置。平面尺寸18.4×14.6m(长×宽共分3层:底层高程736.00m,设高、低压配电室、工具间等;二层楼面高程740.00m,由于下游校核洪水位高于安装间及回车场地面,故厂房靠河一侧及进厂公路一段均设防洪墙。厂房的设计防洪标准为50年一遇,737.17m;校核洪水位为737.43m。根据防洪标准,确定厂房防洪堤110kv变电站置于右岸进厂公路旁靠山坡一侧。场地高程进厂公路接右岸下游方向的对外公路,电站生活区也布置在右限责任公司开发xx河梯级水电站接入南方电网公司广西电网公司的xx一级水电站接入电力系统地理接线图见本电站采用两台机组和一台主变构成的两个发-变扩大单元接此通过隔离手车柜车开关切换到厂用变,在任何一个发-变单元取得Ud%=6.3kvUd%=6.3kvxx一级水电站工程枢纽建筑物主要由浆砌石单曲拱坝、低压引本工程主体建筑物(见枢纽布置图)总计土石方开挖10.356万本工程施工用电,利用已经农网改造的下xx和三棵树村农网线路投入供施工用电。施工及生活用水,设抽水泵站直接抽xx河水或分别设置首选石料场和备用石料场,土料主要用于修筑尼龙袋土围堰,就近选用土料;本工程用砂量约1万余m3,本工程总工期为两年,包括准备期、主体工程建筑工程:执行电水规(1997)031号文颁发的《水力发电建筑工程概算定额》;设备安装工程执行电水规(1997)031号/m3;文颁发的《水力发电设备安装工程概算定额》;施工机械台班费:执行电水规(1997)031号文《水力发电工程施工机械台时费定额》。人工预算单价由基本工资、辅助工资、工资附加费和劳动保护费组成。基本工资按六类工资区标准,年有效工作日工资附加费和劳动保护费按编制办法规定计取。根据以上原则计算,本工程施工人工预算单价如下:高级熟练工:6.58元/工时;熟练工:5.49元/工时;半熟练工:4.73元/工时;普工:4.26元/工时。本工程主要材料考虑从县城购买,原价为市场价,计入运杂费和采购保管费。砂石料单价根据施工组织设计提供的设备、容量和开采加工工艺计算单价。/kwh;施工用水:根据施工组织设计提供的资料计算0.6元/m3。建筑安装工程单价的取费标准4、取费标准执行《水力发电工程可行性研究报告设计概算编制办法及费用标准》,具体取费如下:建筑工程其他直接费率按基本直接费的4.6%;安装工程其他直接费率按基本直接费的6.1%;建筑安装工程间接费率:土石方工程按直接费的混凝土工程按直接费的9%;基础处理工程按直接费的10%;其他工程按直接费的安装工程按人工费的85%;建筑安装工程的企业利润率按直接费和间接费之和的7%;税金税率按(直接费+间接费+企业利润)之和的3.22%;⑵、运杂费按设备原价的5%计算,采购及保管按执行《水力发电工程可行性研究报告设计概算编制办法及费用标准》的有关规定。8、预备费基本预备费按工程项目划分一至五部分投资合计数的4.5%计算。9、送出工程程费中。10、建设期还贷利息根据施工组织设计提出的建设工期,一至五部分分年度投资,基本预备费按资金来源和相应贷款利率计算序号工程项目或费用名称工程费(万元)建筑安装工程费设备购置费其他预备费独立费合计12第二部分机电设备3第三部分金属结构456一二三1304.041520.211216.172154.54772.715618.173第三部分金属结构设备及安装工程67.77338.86271.09434.37171.83137.46570.77353.865283.0928.42662.83314.16251.33722.853614.252891.4029.20752.053760.253008.20xx一级水电站地处偏僻山区,人烟稀少。工程的其他效益现在%,(%)年利率(%)8年%%%%,11632.2万元;作投资增减10%和20%、效益不变以及效益增减10%和20%、投资不变的敏感性分析,则经济内部收益率在2941%之间,经济净现值在7936~13480.3万元之间;各项指标都满足要目前小水电是县财政扩展财政收入的支柱产业。xx一级水电站装机开发水电资源的5%。它的修建,对增强xx县的经济实力将起举足xx一级水电站的自然条件比较优越。该处河段落差大,水量充无大量淹没问题,无航运、防洪要求,环境影因此建设xx一级水电站在技术上和经济上都是可行的。2、下阶段,要对枢纽布置方案、坝和厂房等主要建筑物、施工3、下一设计阶段应进行枢纽的水工模型试验,为枢纽布置、堰一122324年56m3/s7m3/s8m3/s9m3/sm3/sm3/sP=33.3%5二1校核洪水位(P=33.3%)m设计洪水位(P=2%)mmm2223㎞46三1m3/sm2m3/sm3m3/sm四1h五1亩2人无3亩六1度66mmm七mmm3/sm3/sm3/s八1m3/sm3/samm2m吨九mm十十一1台22HLA548-WJ-84CJA237-W-140/2×16mmmm3/s2台22右水源31吨台224台25回1七1tmm22m3tt3人人4㎡5678亩9月4月年2八123%%年12xx河是山区型河流,汛期水流湍急,洪水陡涨陡落;枯水季节有寒露风、倒春寒、干旱、洪涝、冰雹等特殊天气。4423.47小时。处在北回归线上,太阳光能通过大气层直根据xx河流域附近的董湖雨量站及邻近流域的雨量站实测资料统计,流域多年平均雨量为1548.4㎜,按董季多吹北风和偏北风。历年最大风速为26m/s,相应风向为NW,多xx河流域水内没有水文资料,从地理位置、气候条件及地质情布全境,故设计主要以南利河流域的董湖水文站的观测资料为参证由于xx河流域内没有水文资料,邻近流域有南利河按董湖站32年历年流量各月分配情况,三十多年的观测日平均径流年内分配(以日为单位按选定的丰、平、枯三个典型年日期2月4月129.5298.237.239.80.935.224.69.47.9229.3427.258.81.134.524.09.17.8346.4415.200.78.833.224.18.77.5479.1302.209.73.732.723.98.7586.5236.0203.71.432.723.39.36217.69.631.723.19.620.7297.67.731.123.122.875.1295.67.031.123.136.957.4253.66.930.423.136.49.3207.62.929.823.728.52.492.9229.60.529.323.922.43.091.958.629.322.938.887.057.129.022.435.591.455.128.522.431.494.954.428.522.422.29.487.254.128.522.432.29.792.453.128.522.432.41.990.551.727.822.429.77.050.627.722.49.925.20230.71.3346.49.827.321.99.425.21396.66.2268.48.726.821.79.322.22285.66.2324.47.326.821.09.120.2369.7427.46.326.820.49.12463.9630.45.026.820.39.12557.9788.43.726.320.38.620.2680.476.1608.99.194.090.787.384.242.726.120.38.564.2771.374.0462.40.925.620.38.559.2867.7403.40.225.420.38.544.2959.2315.38.824.78.535.75.8258.36.924.68.529.226.36.29.825.表2-2日期2月4月139.471.335.7238.065.734.1325.934.9233.60.731.7429.4367.57.729.9528.685.6406.55.028.9632.949.575.4383.52.628.5749.9278.49.127.49.3888.2223.46.126.48.89241.43.725.89.88.444.025.59.78.390.543.325.59.88.265.790.941.325.59.87.965.976.2278.39.224.37.620.93.165.5255.38.424.19.87.820.60.4205.36.823.58.420.75.953.735.923.58.458.746.8208.95.534.823.557.539.288.634.323.59.842.136.8220.33.623.62033.8252.33.223.52128.8281.32.522.89.222.2259.732.322.38.732.2368.0209.282.32.322.08.447.2448.3295.31.720.98.036.2540.5232.31.721.07.235.2634.996.892.284.778.873.987.430.720.57.225.2730.768.130.320.48.566.2826.382.531.020.121.48.2937.066.664.635.47.357.744.628.53.839.839.表2-32月4月126.0131.062.946.125.835.3221.9111.081.350.825.833.6336.796.9193.048.225.828.4472.887.4182.045.225.024.3553.879.8136.043.224.323.5640.4166.0128.042.023.522.8732.9209.0115.040.623.522.0844.4178.0101.039.422.821.2938.5144.090.539.122.820.530.725.5128.080.637.222.020.525.528.489.5111.080.335.622.020.522.024.1185.096.383.634.621.225.529.2164.088.181.733.621.222.032.1110.094.3155.031.921.224.79.892.790.8127.0158.031.322.028.49.865.581.3137.0119.031.421.227.423.89.848.580.4118.0101.030.620.524.79.840.168.9106.087.131.820.523.89.234.262.5109.076.231.321.22031.8119.092.970.137.22131.3175.085.166.340.92230.2179.077.262.934.051.02328.3154.069.760.331.527.443.32425.5260.066.056.730.425.530.22525.5197.064.754.529.522.022.02627.6164.063.952.350.451.152.648.228.72725.1151.064.028.92824.1148.079.627.92922.0193.075.527.625.020.420.5178.076.126.922.020.4152.066.926.6表2-4日期2月4月12.1521.75.902.570.80.60.522.1431.15.912.510.90.80.60.533.3830.25.742.420.90.80.60.545.7622.05.372.380.90.80.60.856.305.202.380.90.80.665.072.310.90.80.777.8021.64.932.270.90.985.4721.54.882.270.90.82.694.188.534.882.220.90.90.92.63.597.434.582.170.90.90.92.03.826.774.412.140.90.93.136.704.272.140.90.92.839.046.344.162.110.90.90.92.597.806.664.022.080.90.90.80.92.296.928.533.962.080.90.90.72.146.369.403.942.080.90.90.72.32.166.738.093.872.080.80.72.33.056.608.023.772.030.90.72.18.605.619.983.692.020.90.7205.2025.23.630.90.62128.84.823.550.90.62220.74.8223.69.843.450.90.80.6235.0831.19.043.370.90.70.6249.334.6645.98.163.280.90.70.6257.434.2257.47.733.180.90.70.6265.865.5544.37.223.110.90.70.64.7275.205.3933.66.852.980.80.70.64.3288.964.9329.36.612.930.80.70.63.2298.894.3122.96.362.830.80.70.62.59.915.526.142.690.70.62.19.182.640.7表2-5日期2月4月10.862.877.735.202.600.80.90.922.778.894.792.490.90.80.90.832.548.894.422.310.90.80.80.842.147.3626.74.212.180.90.80.80.852.086.2429.54.012.110.90.80.70.862.403.615.5027.93.832.080.90.70.70.878.753.648.3120.23.582.000.90.70.60.888.249.916.433.360.90.70.60.898.533.180.90.70.60.89.473.210.90.70.60.76.608.828.313.160.90.70.64.796.629.043.010.90.70.54.805.5520.22.860.90.70.56.794.772.800.80.70.58.094.408.382.680.80.70.65.533.917.582.620.80.70.64.283.416.962.540.80.70.84.192.866.462.500.80.70.73.072.689.402.450.80.8202.468.382.420.70.8212.1020.49.042.370.70.90.6224.357.872.350.70.80.62.3234.9620.59.842.350.70.80.63.4243.5221.58.672.310.70.80.52.6252.959.047.512.310.70.80.52.5262.547.056.722.240.70.80.5272.244.966.172.210.90.70.80.64.8286.019.775.742.260.70.83.5292.704.858.315.394.710.82.53.454.217.806.373.250.82.03.928.092.900.82.9表2-62月4月19.554.583.362.5728.095.933.702.450.9632.677.0614.073.512.070.960.9645.316.3713.263.290.960.960.9653.925.829.913.150.920.920.9262.9412.109.333.060.870.870.8772.4015.238.382.960.810.870.8783.2412.977.362.870.830.830.8792.8110.496.602.850.790.872.249.335.872.710.980.790.832.076.528.095.852.590.960.790.7913.487.026.092.520.960.830.792.1311.956.425.952.450.960.790.752.348.026.8711.302.320.960.790.716.766.629.2611.522.280.962.070.714.775.939.988.672.292.000.713.535.868.607.362.230.712.925.027.736.352.320.672.494.567.945.552.280.79202.328.676.775.112.710.79212.2812.756.204.832.980.96222.2013.055.634.582.480.963.72232.0611.225.084.392.300.962.003.162418.954.814.132.222.202514.364.723.972.150.96262.0111.954.663.812.090.922711.014.663.672.110.872810.795.803.722.030.872914.075.503.832.010.8712.975.553.510.9611.084.88表2-7日期19.849.923.360.70.50.40.30.327.683.370.70.50.40.30.336.318.313.270.70.50.40.30.343.288.687.183.060.990.70.50.50.30.453.599.808.436.312.960.970.70.50.50.30.867.319.017.065.902.890.960.70.50.50.40.874.446.066.772.810.960.70.50.50.90.683.125.867.062.780.960.70.50.50.692.384.867.602.780.960.70.50.50.52.058.014.248.602.610.980.70.50.50.52.186.853.869.512.510.990.70.50.50.70.95.863.827.972.430.950.70.50.50.60.75.153.617.312.370.930.70.50.50.50.64.443.806.982.290.930.60.50.50.40.53.944.867.182.260.930.60.50.50.40.93.625.367.142.250.930.60.50.50.43.844.616.982.210.930.60.50.50.43.764.576.272.150.930.60.50.50.44.903.207.895.692.100.930.60.50.50.49.552.966.982.070.910.60.50.50.32.756.352.020.900.60.50.50.30.92.755.610.870.60.50.40.30.87.562.895.150.850.60.50.40.30.75.322.6526.14.650.840.60.50.40.30.74.242.4032.74.400.840.60.50.40.30.83.343.1625.24.120.840.60.50.40.32.62.963.073.900.840.60.50.40.32.45.112.813.770.840.60.40.40.35.072.463.630.820.60.40.40.35.653.153.500.810.50.40.35.239.380.810.50.4表2-810.496.774.402.960.810.630.570.460.520.5620.726.155.072.730.810.630.560.460.520.5135.079.682.520.800.630.560.480.500.4640.814.1915.242.400.780.640.560.490.470.4750.703.5516.862.280.780.630.550.470.440.4762.063.1315.902.180.780.610.540.440.420.4874.982.074.7311.542.040.780.630.540.440.390.4784.695.653.669.260.780.640.520.420.370.4698.2210.014.867.560.780.630.510.410.350.466.737.275.406.480.770.620.520.400.340.453.765.024.736.390.760.610.510.410.340.642.733.775.155.810.760.630.510.410.330.582.743.1611.546.060.760.610.510.420.320.873.872.7210.595.730.740.590.500.410.320.834.612.518.514.780.980.740.610.490.430.350.833.152.236.644.320.980.740.590.480.440.350.762.448.643.970.980.760.580.470.450.460.772.396.603.680.980.760.580.470.450.410.775.369.140.980.740.580.460.590.460.696.444.7810.460.980.740.580.450.610.490.7511.675.158.220.950.710.580.440.530.380.952.488.184.486.480.930.720.590.450.500.362.828.6811.715.610.910.710.610.440.490.352.016.8912.254.940.870.710.610.440.470.335.159.634.280.870.710.590.420.470.304.027.523.830.850.710.570.430.490.302.836.603.520.850.710.550.430.490.352.753.435.563.270.830.700.580.450.490.902.032.774.733.072.680.820.700.570.490.762.404.443.630.810.680.570.490.692.234.610.650.590.51表2-910.805.442.610.720.570.570.600.5720.910.774.613.382.110.720.570.570.570.5530.794.028.012.000.720.600.550.570.5543.020.813.637.560.720.600.550.550.5552.230.823.315.650.980.680.600.520.520.5260.826.895.320.980.950.680.600.500.500.5070.818.684.780.980.910.680.600.460.500.5080.797.394.190.950.880.680.570.470.470.5090.795.983.760.950.850.660.570.450.740.505.323.350.910.850.660.560.450.473.724.613.330.910.850.620.550.450.910.457.684.003.470.880.820.620.550.470.456.813.663.390.880.820.620.550.450.910.434.573.926.440.880.790.620.550.450.413.853.775.276.560.910.790.620.550.720.412.723.385.694.940.880.760.620.660.990.412.013.344.904.190.850.760.620.630.810.412.864.403.620.850.760.600.620.720.990.382.604.533.160.820.730.600.600.660.880.454.943.862.910.820.730.600.600.600.780.457.273.532.750.820.730.600.600.550.720.747.433.212.610.820.760.600.600.550.662.126.392.892.500.790.760.620.600.5510.802.742.350.760.760.600.570.578.182.692.260.760.730.600.570.550.910.916.812.652.170.760.730.600.570.520.780.786.272.662.090.730.730.570.570.500.680.666.153.312.120.760.730.570.570.500.660.660.918.013.142.180.700.570.500.600.850.857.393.162.000.910.700.570.550.600.856.312.780.670.570.600.72由于xx一级站上游未设任何观测站,故设计洪水采用暴雨洪水查算F右坝址=98.00km2;厂房径流面积:F厂房=280km2;河床平均坡降:j=0.056;将上述参数输入计算机通用程序,得各频率的设计洪峰流量如下表表2-10洪水地点径流面积(km2)各种频率洪峰流量(m3/s)2.03.35左坝址344.0282.7246.7205.9右坝址9886.0厂址280560.0460.6401.7335.1245.7本工程为V等工程,主要建筑物为5级,相应导流建筑物为5级根据《水利水电工程施工组织设计规范》SL303-2004规定,导流表2-11p=33.3%洪峰流量(m3/s)表2-12左坝水位(m)876877878879880流量(m3/s)0.090.90301.54604.30989.58右坝水位(m)979980981982983流量(m3/s)0.020.9884.38200.59379.71表2-13水位(m)735736737738739流量(m3/s)0.00117.28392.34791.501303.14根据云南省水利厅与天津水利规划设计院出版的2000年《云南 河上游,取水坝地理位置东经xx,北纬xx,向东流入越南。电站坝址距xx电站厂房约250m,有为四级路面到里达毛草坪,交通方便。减,地貌形态有岩溶中山峡谷。xx河呈树枝状切割地形,山体标高了陡缓相间地貌形态。灰岩为单斜地形,谷深坡陡,坡度一般在35①、博菜田组(∈3b分布于木代、xx河、田湾、坝址工程区②、唐家坝组(∈3t分布于坝址左岸山梁,岩性为灰③、歇场组(∈3x分布于坝址区的北西部,岩性为灰黑色中厚层状白云质灰岩,泥质条带白云岩时夹黄绿色泥质粉砂岩,厚l分布于坝址工程区北西穿洞一带,岩性为深灰测区位于山巨型环状构造带之一,xx巨型环状构造,处于云南山字型和广西山字型构造之间,为两户山字型构造反射弧的共同砥构造破碎岩,角砾岩、方解石脉极发育,性测区地质构造不复杂,断裂较大,地震频繁,但震级小。根据测区地貌属岩溶中山峡谷,河流呈树枝状切割地形,山体标高1436~752m,相对高差684m。碳xx河为测区最低侵蚀基准面,区内下水的赋与分布,以岩性为1、岩溶水:发育于碳酸盐岩之中,主要分布于测区的西部和北2、裂隙水:赋存于碎屑岩和碳酸盐岩的节理裂隙之中,水量微3、孔隙水(潜水和上层滞水)潜水埋藏于河漫滩地带的砂卵砾⑵、本区地震烈度属6度以下。山体稳定性好。坡度30º~45º植被较差,水土流失较严重,老冲沟发育,新冲少见,工程区地震基本烈度为VI度,属相对稳定区,无发地震构造分质粉砂岩以及第四系冲洪积层推测厚度3~6.4m,残坡积层厚0.8~岩、泥质粉砂岩。岩体为强风化,岩层产状N60º~80ºW/N<25º~40º(倾向上游)岩层走向与坝轴线呈53º~73º交角,岩石节理裂隙发育有两组N65ºW/SW<45º和N15º~25ºW/SW<40º~50º,裂隙均被石英坝址岩石物理力学指标建议值:容重r=2.5g/m3,抗压强度Rc=400~600kg/㎝2,弹性模量Ea=3.3~4.4x104kg/㎝3,C=0.2~0.4Mpa,泊松比u=0.3~0.4,内摩擦角q=30º~40º,坚固系数f=3~隙发育有两组:即N15º~20ºW/SE<45º~65º和N60º~70ºW/NE<60º~º~55º和N65ºE/SE<45º,微张至宽张,裂隙间距0.3~1.4m不等,因隧溶洞沿线上有F1压扭性断层通过,岩石物理力学指标参数建议值:容重r=2.5g/m3,极限抗压强度Rc=400~600Kg/㎝2,坚固系数f=3~4,岩石抗力系数Ko=40~80Kg/cm3,弹性模量Ed=3.3~4.4×绿、辉长岩。岩石节理裂隙主要发育有两组:N40º~60ºW/NW<60º~不等,延伸长0.6~2.8m,岩体具块状结构,结构面间结合力较差,坡积层粘土、亚粘土夹少量碎块石厚度1.0~3.6m,地形坡度35º~岩,夹浅黄色泥质粉砂岩。岩石中等坚硬,岩层产状N15º~70ºW/NE<25º~30º,岩层走向与遂洞方向呈44º~99º交角,洞室围岩基40ºW/SW<40º~45º和N15ºW/NE<52º,微张至宽张,裂隙间距0.3~辉辉绿、辉长岩。岩石节理裂隙主要发育有两组N42º~55ºW/NE<58º~78º和N25º~45ºE/SW<46º~66º,微张至宽张,裂隙间距0.3~2.6m不等,延伸长1.0~3.2m,岩体具块状结构,结⑴、坝区岩体稳定,岩石中等坚硬、性脆、在Ⅱ坝址左岸有F3xx河的水电规划2003年xx县水利局编规划》经xx县人民政府批复,规划有xx水电站2×1500kw、xx水经对xx河干流河段即xx水电站(也就是现正在兴建的xx水电305米。根据规划测量的成果,结合xx河流域的地形地貌和地质条项目单位备注xx一级xx二级集水面积km2172+98380430正常蓄水位m886.77/1000735.00660死水位m883/985725.00650尾水位m735.00660.00580坝高m7565库容万m310.5/204600设计水头m145/25070设计流量m3/s6.92/5.328.631.25装机容量kw8000+100001600020000多年平均发电量万kwh550050006300年平均利用小时h305531253150淹没耕地亩7.5253迁移人口人000施工期限年222xx县在云南省东南部,xx州边陲,全县总面积5352km2,共有xx县是经济基础差,底子薄的“老、少、山、边、穷”县,长期是财政困难等。要赶上全省的经济发展水平,xx县面临的任务还十分xx县主要工业有电力、酿酒、建材和采矿。特产有猕猴桃、三xx一级水电站主要供电对象是南方电网区域。随着西部大开发xx县在“十一五”期间要实现社会发展的奋斗目标,任务是艰巨的,xx县是经济基础差,底子薄的“老、少、山、边、穷”县,严重,前几个五年计划时期建设的一些企业(或项目没有正常运xx县有比较丰富的水力资源,全县水电资源理论蕴藏量为三十xx河在xx一级水电站坝址以上,河道弯曲狭窄,坡降陡峻,且1、正常蓄水位:根据xx河梯级开发规划,拟定xx河主流分三2、死水位:由于xx一级水电站至xx水电站之间,河道狭窄,4、出力计算:在正常蓄水位、死水位方案比较时,参考一般水H净——净水头(m)本工程左水源综合考虑与上一级xx水电站尾水的衔接,由测量成果表明,xx水电站尾水底板高程为88不影响上游电站安全,正常运行期间不影响上游电站正常发电。将xx水电站尾水水深作为xx电站厂房到xx一级水电站左水源大坝左岸进水口之间的水力坡度,因此选择左水源正常蓄水位886.765m、m可见,正常蓄水位从885.00m提高到886.00m,最后提高到886.765m时,总电量增加值明显,从单位电度投资来看,单位电度按每天运行5.5h计,则水库满足日调节所必需的日调节库容定为4m3。2、溢洪道水位~泄流关系曲线:根据水工布置,选用开敞式溢洪道的泄洪建筑物,左水源堰顶高程为886.765m。右水源堰顶高程xx一级水电站左水源水库正常蓄水位为886.765m,死水位为平均水头为145m,最小水头为144.675m。保证出力P=85%时为xx一级水电站右水源水库正常蓄水位为1000.00m,死水位为装机容量,据此拟定装机容量为8000kw、10000kw、12000kw三个单位容量分别为:左水源4000kw;右水源5000kw,总装机容量18000kw。左水源水轮发电机组选用卧式混流机组,水轮机型号为冲击式机组,水轮机型号为CJA273-W-140/2×16,发电机型号为3000~4000小时之间考虑装机容量,据此拟定6400kw、8000kw、10000kw三种装机容量方案进行比h上表表明,从年发电量和增值单位电度投资来看,选择装机容量xx一级水电站右水源水库正常蓄水位1000.00m,死水位用小时在3000~4000小时之间考虑装机容量,据此拟定8000kw、h上表表明,从年发电量和增值单位电度投资来看,选择装机容量综上所述,本电站选择总装机容量为:8000kw+10000kwxx一级水电站是以发电为主要目的,水库库容相对很小,对下行,每天发电5h左右。来水流量较大时可多发电,避免弃水。枯水123456789xx一级水电站是以发电为主的枢纽工程,正常蓄水位相应库容为5级。考虑到水电站装机容量较小,属IV等工程的规模545xx电站(也就是正在建设的xx水电站)到下游xx电站之间属于一根据补充的内容,xx水电站下一梯级为xx一级水电站,同时把xx一级水电站的右水源初拟坝址位于三棵树自然村原河道溶洞质粉砂岩以及第四系冲洪积层推测厚度3~6.4m,残坡积层厚0.8~岩、泥质粉砂岩。岩体为强风化,岩层产状N60º~80ºW/N<25º~40º(倾向上游)岩层走向与坝轴线呈53º~73º交角,岩石节理裂隙发育有两组N65ºW/SW<45º和N15º~25ºW/SW<40º~50º,裂隙均被石英山体雄厚,无低洼邻谷,距两岸1km以外有大致平行于河流的隔水状夹薄层泥质条带灰岩及黄色泥粉砂岩。坝基开挖深度2~3.5m,局左水源下坝址:两岸各约1km范围内无有效隔水层。正常蓄水位886.765m高程以下暗河、溶洞、岩溶泉都很暗河通过,坝址下游750m范围内有3条暗河的出口,坝址上下游300m范围内有5处泉水、溶洞出露。建坝蓄水后将可能产生严重的经以上分析比较,确定上坝址为xx一级水电站左水源挡水大坝经以上分析比较,确定上坝址为xx一级水电站右水源挡水坝坝综合比较上述因素,因本项目为小型项目,大坝高度均不到30障,因此xx一级水电站挡水大坝均采用浆砌石拱坝。如果采用引水明渠方案则无论走左岸还是走右岸都约要9公里多才能到达xx村厂址,而且开挖明渠时要破坏大量植被,十多万立xx支流大冲沟,单条隧洞长,由于洞子比较小,必须开挖多条支洞右水源引水方案引水建筑物只能走右岸。概括起来可行的方案按基本组合,以设计洪水计算,坝顶高程应为1002.19m;按特殊组合,以校核洪水位计算,坝顶高程应为1002.46m。最后取坝顶按照《浆砌石坝设计规范SL25-91》和《混凝土拱坝设计规范年一遇校核洪水泄流量344m3/s,单宽流量8.6m3/s。堰面曲线采用%,经估算,校核洪水时挑流射程L=11.4m,冲刷坑深度T=2.2m,L/T年一遇校核洪水泄流量196m3/s,单宽流量5.6m3/s。堰面曲线采用%,现有的资料,一般在10m左右深度以下岩石的单位吸水量即小于这主厂房:装有单机容量4000KW的混流式机组两台和单机容量副厂房:利用主厂房靠岸坡引水侧压力钢管明挖形成的场地布由于下游校核洪水位高于安装间及回车场地面,侧及进厂公路一段均设防洪墙。厂房的防洪标准为50年一遇,相应流量为460.6m3/s,确定厂房河堤护岸防洪高程为737.90m,高出最喇叭形收缩段长度为6m。闸门段的闸门中心线与进口段首端的水平距离为6.8m,闸门孔口尺寸为3.5×3.5m。竖井包括闸门槽和通气孔,横断3.5m。启闭机室地面高程为890m。闸门段后接渐变段,渐变段长度喇叭形收缩段长度为6m。闸门段的闸门中心线与进口段首端的水平距离为6.8m,闸门孔口尺寸为3.0×3.0m。竖井包括闸门槽和通气孔,横断面尺破碎及隧洞接口处采用钢筋混凝土衬砌,隧洞过水断面底宽3m,直上由一个转弯段连接两个直线段组成,转弯段半径为15m,转角压力钢管主管长345.00m,管径2.0m。压力钢管管内最大流速破碎及支洞接口处采用钢筋混凝土衬砌,隧洞过水断面底宽2.5m,压力钢管主管长734.00m,管径1.8m。压力钢管管内最大流速110KV变电站置于右岸进厂公路旁靠山坡一侧。场地高程1、一般性观测:包括上下游水位、气温、水温、漏水量及外表观测等,并可利用已有的地质钻孔来观测绕2、坝体和拱座的变形观测:包括坝体挠度观测、坝体垂直及水3、水力观测:主要是观测下游挑距离、冲刷坑深度、淤积情况1m32m33m34m35砼m36T7T8m9mm26机电及金属结构1234厂家提供数据可见HLA548转轮单位转速高,单位流量较小,而五至八个百分点,故本阶段初选HLA548转轮。暂定机组台数为2工程水头范围的冲击式机型不多,现阶段推荐采用冲击式水轮机每台机组配置一台CYWT-2型调速器和HYZ-1.6组合式油压xx一级水电站位于xx县xx镇境内,是xx河梯级开发的xx水4000kw的水轮发电机组;右水源引水源拟安装2台单机容量为限责任公司开发xx河梯级水电站接入南方电网公司广西电网公司的xx一级水电站接入电力系统地理接线图,见图:LH-D在发-变单元上取得,也比方案Ⅱ可靠;缺点是接线和继电保护较复备间隔,主要的电气设备投资比方案Ⅱ多78.5万左右,相应也比方灵活,便于水资源的充分利用;并且由于本电站附近无可外引的厂中看出,本电站为主力电站(约占梯级开发总容量的33%其运行本电站采用左右两台机组分别和相应的一台主变构成的两个发-两台厂用变压器,分别接于1#和3#机组主引出线。此通过厂变,用隔离手车柜开关切换,在任何一个发-变单元取得电9-400/6.3左水源混流机组安装高程736.80m,右水源冲击式机组安装高程变电站布置右岸进厂公路旁靠山坡一侧,离主厂房直线距离约占地面积45.45m×26.0m,110kV出线方向与厂房纵轴方向平行,xx一级水电站金属结构,包括左右引水系统的闸门和启闭机设本电站消防对象主要是主副厂房内的机电设备、户外的主变压消防设计依据国家标准GBJ16-87《建筑设计防火规范》和主副厂房、开关站和油处理室等地在适当地方设置手提式12111N=4210kwn=1000r/min2N=4000Kwn=1000r/min3456123451设备一台1二台1二9-400/10400kvA台2四台2五XGN2-12(发电机出线柜)块4XGN2-12(主变低压柜)块2XGN2-12(厂用电进线柜)块2XGN2-12(发电机励磁柜)块4块2XGN2-12(母线联络柜)块1序号项目名称型式孔口尺寸(宽×高)(m)设计水头(m)操作要求数量埋件重量重量小计备注备总重(t)一左水源进水口48.31进水口拦污栅焊接式3.0×6.04.02/24.79.42.82进水口拦污栅启闭机50KN手拉葫芦2台0.050.13进水口事故闸门平面滑动式3.5×3.56.0动闭静启9.69.67.87.84进水口事故闸门启闭机2×250KN固定式8.28.2包括拉杆重二右水源进水口48.31进水口拦污栅焊接式3.0×6.04.02/24.79.42.82进水口拦污栅启闭机50KN手拉葫芦2台0.050.13进水口事故闸门平面滑动式3.0×3.0动闭7.47.44进水口事故闸门启闭机2×250KN固定式静启静启8.28.2包括拉杆重合计三总面积(SLJ705-81梯级电站可设立管理处,下设调度室及生产技术、一精神,本节xx一级水电站的管理作出初步预计。参考的文件还有1、生产技术股,主管计划、生产、统计、技术、安全、车辆运2、办公室,主管人事、保卫、劳资、行政、工青妇、食堂、医1、管理人员:6人。其中厂长1人,股室车间主任3人、技术员和办事员2人。本电站的库区,河谷狭窄,岸坡陡峭,成库后水面不宽,仅淹由于库区不大,库区管理人员隶属于电站(水工车间)即可,不必右水源上至三棵树村,下至坝轴线以下500m,左右为河岸以外各123xx一级水电站枢纽建筑物主要由浆砌石单曲拱坝、低压引水隧本工程主体建筑物(见枢纽布置图)总计土石方开挖10.356万本工程施工用电,利用已经农网改造的下xx和三棵树村农网线路投入供施工用电。施工用水,设抽水泵站直接抽xx河水或引用山xx一级水电站坝址两岸山高陡峭,高程均大于1000m,左水源xx河是山区河流、汛期洪水陡涨陡落,枯水季节浅滩多。坝址经初步查勘,天然建筑材料如表8-1所列:Ⅰ本工程主体工程与导流工程的砼与砌石工程共需要石料2.6万本工程为V等工程,主要建筑物为5级,相应导流建筑物为5级根据《水利水电工程施工组织设计规范》SL303-2004规定,导流期允许坝面过水,所以本工程施工导流采用从表8-2可以看出,9~3月、10~4月、11~4月时段虽然有t根t闸t7m明渠导流方案的优点是:导流工程投资较省,比隧洞导流节省置在右岸,渠道断面采用矩型,断面尺寸为2×3.0m,进口高程水源冲砂管底高程为981.00m,务必保证施工期坝体不出现大于2.5坝体砼浇筑:选用的0.75m3砼拌和机设于右岸下游侧,距坝轴厂房砼浇筑:砼水平运输采用胶轮车自拌和机运至厂房卸转料斗;砼垂直运输采用钢井架提升机。厂房下部砼浇筑用:砼转料斗-从第一年11月开始,主要完成场内交通、风水电系统、场地平10月底完成,压力管槽开挖安排在第二年9月开始开挖,第三年3完成。第三年5月安装吊车,6月开始第一台机组安装,第三年10本工程施工高峰人数计划350人;xx一级水电站位于xx县xx镇境内,站址距xx县城55km,是水源水库正常蓄水位为886.765m,右水源水库正常蓄水位为1m即887.765m作为水库淹没线。水库淹没范围从坝址至库尾约250m,主要是沿河两岸陡峭的光石壁,有1亩,无移民和耕地,也无矿产和其他专业项目。右水源正常蓄水位1000.00m,加高1m即1001.00m作为水库淹没线。水库淹没范围从坝址至库尾约1000m,主要是沿河两岸陡峭的光石壁,有2.1亩,山地7.5亩,其他为天然xx河的水电规划2003年xx县水利局编制的《xx县水电站开发规划》经xx县人民政府批复,规划有xx水电站2×1500kw、xx水xx一级水电站上游的流域植被良好,污染源极少,水质良好,1、电站的兴建,合理并充分地利用了水力资源,每年可为该地区提供清洁的电能5500万kwh,为当地带来直接的经济和间接的社2、电站的施工需要大量的施工人员,电站的运行需适量的管理3、电站建成后上游形成水库,可改善周围的气候条件,有利于1、期间施工人员及管理人员产生的生活污水、砼搅拌和砂石料2、电站施工期间,施工人员较多,居住卫生条件相对较差,易3、施工的占地会破坏现有的部分植被及耕地,工程完工后要给设无害化厕所(即二级化粪池施工期间平均施工数均250人,按或工程竣工后平整土地,恢复植被(绿化特别对施工临时占地,xx一级水电站的建设,就电站本身而言,并不产生污染物,不把影响降低到最小,所以,xx一级水电站的兴建从环境角度评价是项目进行水质监测,监测频率暂按每年两次(丰、枯水期视水质11.2.1编制办法及费用标准11.2.2定额依据11.2.3.1人工预算单价11.2.3.2施工用风、水、电预算单价11.2.3.3主要材料预算价格11.2.3.4砂石料单价11.2.3.5建筑安装工程单价的取费标准11.1工程概况xx一级水电站位于云南省xx县境内,是一个以发电为主,兼有防洪、灌溉的综合利用的水利水电工程。电站工程装机2台4000kw和2台5000kw机组,总装机容量18MW,采用引水隧洞方案,建筑物由挡水大坝、引水隧洞、压力钢管、厂房组成:主要工程量:土石方开挖:22886m3石方洞挖:80676m3混凝土工程:18417m3钢筋:263.16t浆砌石:5440m311.2编制依据11.2.1编制办法及费用标准执行原电力工业部电水规[1997]123号文颁发的“关于试行《水力发电工程可行性研究报告设计概算编制办法及费用标准》的通知”。11.2.2定额依据建筑工程:执行电水规(1997)031号文颁发的《水力发电建筑工程概算定额》;设备安装工程执行电水规(1997)031号文颁发的《水力发电设备安装工程概算定额》;施工机械台班费:执行电水规(1997)031号文《水力发电工程施工机械台时费定额》。11.2.3.1人工预算单价:人工预算单价由基本工资、辅助工资、工资附加费和劳动保护费组成。基本工资安六类工资区标准,年有效工作日工资附加费和劳动保护费按编制办法规定计取。根据以上原则计算,本工程施工人工预算单价如下:高级熟练工:6.58元/工时;熟练工:5.49元/工时;半熟练工:4.73元/工时;普工:4.26元/工时。11.2.3.2施工用风、水、电预算单价:/kwh;/m3;施工用水:根据施工组织设计提供的资料计算0.6元/m3。11.2.3.3主要材料预算价格本工程主要材料考虑从县城购买,原价为市场价,计入运杂费和采购保管费后,综合预算价格为:钢筋综合:3989.44元/吨钢板综合:4405.44元/吨普通硅酸盐水泥PO.32.5:370.24元/吨汽油90#:6.5元/kg柴油0#:5.85元/kg炸药综合:9.14元/kg11.2.3.4砂石料单价砂石料单价根据施工组织设计提供的设备、容量和开采加工工艺计算单价。人工砂:45.33元/m3人工碎石:38.98元/m311.2.3.5建筑安装工程单价的取费标准执行《水力发电工程可行性研究报告设计概算编制办法及费用标准》,具体取费如下:建筑工程其他直接费率按基本直接费的4.6%;安装工程其他直接费率按基本直接费的6.1%;建筑安装工程间接费率:土石方工程按直接费的混凝土工程按直接费的9%;基础处理工程按直接费的10%;其他工程按直接费的安装工程按人工费的85%;建筑安装工程的企业利
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 有关合作协议书模板集合
- 电子设计基础与创新实践教程-课件 【ch02】常用元器件介绍
- 土方工程劳务分包合同
- 食用油供货合同范本
- 外研英语课件参考
- 小程序商店用户协议
- 基于大数据的2024年度市场调研与分析合同
- 2024年度工程安全评价合同3篇
- 《商业帝国腾讯》课件
- 2024年度钢筋工程招投标代理合同
- 《重庆物流发展状况》课件
- 《精细化管理》课件
- DB36- 1149-2019 工业废水铊污染物排放标准
- 开心六年级上册 Unit 4 Keeping Clean 单元测试 含听力书面材料及答案 1
- 亚洲及太平洋跨境无纸贸易便利化框架协定
- 园艺与健康智慧树知到期末考试答案2024年
- 第10课时-小人物-大情怀-单元总结-七年级语文下册(部编版)
- (正式版)HGT 22820-2024 化工安全仪表系统工程设计规范
- 网站推广引流优化方案
- MOOC 财务会计Ⅰ-中国石油大学(北京) 中国大学慕课答案
- 人教版小学数学计算去括号练习100题及答案
评论
0/150
提交评论