《风电机组招标文件编制导则》( NB-T 10206-2019)英文版_第1页
《风电机组招标文件编制导则》( NB-T 10206-2019)英文版_第2页
《风电机组招标文件编制导则》( NB-T 10206-2019)英文版_第3页
《风电机组招标文件编制导则》( NB-T 10206-2019)英文版_第4页
《风电机组招标文件编制导则》( NB-T 10206-2019)英文版_第5页
已阅读5页,还剩20页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

ICS27.180

P61NB

ENERGYSECTORSTANDARD

OFTHEPEOPLE’SREPUBLICOFCHINA

NB/T10206-2019

GuideforPreparationofWindTurbineBiddingDocuments

风电机组招标文件编制导则

(征求意见稿)

IssuedonJune4,2019ImplementedonOctober1,

2019

IssuedbyNationalEnergyAdministrationofthePeople’sRepublicofChina

Introduction

ThisEnglishversionisoneofChina’senergysectorstandardseriesinEnglish.Itstranslationwas

organizedbyChinaRenewableEnergyEngineeringInstituteauthorizedbyNationalEnergy

AdministrationofthePeople’sRepublicofChinaincompliancewithrelevantproceduresand

stipulations.ThisEnglishversionwasissuedbyNationalEnergyAdministrationofthePeople’s

RepublicofChinainAnnouncement[20xx]No.xxdatedxxxx,20xx.

ThisversionwastranslatedfromtheChineseStandardNB/T10206-2019,GuideforPreparation

ofWindTurbineBiddingDocuments,publishedbyChinaWater&PowerPress.Thecopyrightis

reservedbyNationalEnergyAdministrationofthePeople’sRepublicofChina.Intheeventofany

discrepancyintheimplementation,theChineseversionshallprevail.

Manythanksgotothestafffromrelevantstandarddevelopmentorganizationsandthosewhohave

providedgenerousassistanceinthetranslationandreviewprocess.

ForfurtherimprovementoftheEnglishversion,allcommentsandsuggestionsarewelcomeand

shouldbeaddressedto:

ChinaRenewableEnergyEngineeringInstitute

No.2Beixiaojie,Liupukang,XichengDistrict,Beijing100120,China

Website:

Translatingorganization:

POWERCHINAJilinElectricPowerEngineeringCo.,Ltd.

Translatingstaff:

SHANLiangXIXiaoSHANLiangGAOYang

Reviewpanelmembers:

I

翻译出版说明

本译本为国家能源局委托水电水利规划设计总院按照有关程序和规定,统一组织翻译的

能源行业标准英文版系列译本之一。20XX年XX月XX日,国家能源局以20XX年第X号

公告予以公布。

本译本是根据中国水利水电出版社出版的《风电机组招标文件编制导则》NB/T

10206-2019翻译的,著作权归国家能源局所有。在使用过程中,如出现异议,以中文版为

准。

本译本在翻译和审核过程中,本标准编制单位及编制组有关成员给予了积极协助。

为不断提高本译本的质量,欢迎使用者提出意见和建议,并反馈给水电水利规划设计总

院。

地址:北京市西城区六铺炕北小街2号

邮编:100120

网址:

本译本翻译单位:中国电建集团吉林省电力勘测设计院有限公司

本译本翻译人员:单良席皛单良高阳

本译本审核组成员:

II

Foreword

ThisstandardhasbeendraftedinaccordancewiththerulesgiveninGB/T1.1-2009“Directivesfor

standardizationPart1:Structureanddraftingofstandards”.

NationalEnergyAdministrationofthePeople’sRepublicofChinaisinchargeofthe

administrationofthisstandard.ChinaRenewableEnergyEngineeringInstitutehasproposedthis

standardandisresponsibleforitsroutinemanagement.Sub-committeeonPlanningandDesignof

WindPowerProjectofEnergySectorStandardizationTechnicalCommitteeonWindPoweris

responsiblefortheexplanationofspecifictechnicalcontents.Commentsorsuggestionsinthe

implementationofthisspecificationshouldbeaddressedto:

ChinaRenewableEnergyEngineeringInstitute

No.2,Beixiaojie,Liupukang,XichengDistrict,Beijing,100120,China

Developmentorganization:

POWERCHINAJilinElectricPowerEngineeringCo.,Ltd

CGNNewEnergyHoldingsCo.,Ltd

CSSCHaizhuangWindpowerCo.,Ltd

Chiefdraftingstaff:LIQinweiWANGBoLIUXiaoGAOYang

ZHANGLiCHAIYangLIYeCHENKangdong

QUANYingquanRENFanghuiPENGYanjiaWANGZhaohui

LIXianghuiLIJiankeSONGXuewuZHANGFan

LANYongsenCAOPengTANGShiguiSHANLiang

LIZhi

IV

GuideforPreparationofWindTurbineBiddingDocuments

1Scope

Thisstandardspecifiesthebasiccontentanddepthofthetenderdocumentsforwindturbines.

Thisstandardappliestothepreparationoftenderdocumentsforwindturbinesforonshoreand

offshorewindfarmprojects.

2Normativereferences

Thefollowingdocumentsareessentialfortheapplicationofthisdocument.Whereareferenceis

dated,thedatedversiononlyappliestothisdocument.Whereareferenceisundated,thelatest

version(includingallchangeorders)appliestothisdocument.

GB/T18451.1Windturbinegeneratorsystems—Designrequirements

GB/T20319Codeforacceptanceofwindturbinesgeneratorsystem

GB/T31517Designrequirementsforoffshorewindturbines

3Generalprovisions

3.0.1Thescopeofthetenderforwindturbinesshallincludewindturbines,ancillaryequipment

andrelatedservices.

3.0.2Thetenderdocumentsshallimplementtheprinciplesoffairness,reasonablenessand

competition,andtherequirementsshallbeclearandprecise,andshallnotcontainanycontentthat

isbiasedtowardsorexcludespotentialbidders.

3.0.3Thetenderdocumentsshallreflectthecharacteristicsandneedsoftheprojectbeing

tendered.

3.0.4Thetenderdocumentsconsistofacommercialsectionandatechnicalsection.The

catalogueforthepreparationofthetenderdocumentsisshowninAppendixA.

1

4Businesssection

4.1Tendernoticesorinvitationstotender

4.1.1Whenopentenderingisused,atendernoticeforthepurchaseofWTGsshallbeprepared;

wheninvitingtenders,aninvitationtotenderforthepurchaseofWTGsshallbeprepared.

4.1.2Atendernoticeorinvitationtotenderfortheprocurementofwindturbinesshallcontainthe

following:

a)Basicinformationsuchasthename,address,contactpersonandcontactdetailsofthe

tenderagentortenderer.

b)Projectname,constructionlocation,projectoverview,etc.

c)Requirementsforthecapacity,maintechnicalparameters,scopeofsupplyanddelivery

timeofthetenderproject.

d)Bidderqualificationrequirements.

e)Thetime,placeandcostofthesaleofthetenderdocumentsandtherelevantsupporting

documentsrequiredforthepurchaseofthetenderdocuments.

f)Thedeadlineforthesubmissionoftenderdocuments,theplacewheretenderdocuments

aretobereceived,themanneroftenderandthetimeandplacefortheopeningof

tenders.

4.2Qualificationrequirementsforbidders

Thequalificationrequirementsforbiddersshallincludethefollowing:

a)Qualificationconditions,whichshallincludelegalpersonality,production(use)license,

productcertification,quality,environment,occupationalhealthandsafetymanagement

systemcertification,productionandsupplycapacity,etc.

b)Financialstatus,whichshallincludethebankcreditworthiness,creditrating,statusof

assets,etc.

c)Performancerequirements,whichshallincludeperformanceintheproduction,supplyand

operationofwindturbines,etc.

d)Otherqualificationmaterialsrequiredbythetenderer.

4.3InformationforBidders

4.3.1TheInstructionstoBiddersshallcontainageneraldescription,thecompositionofthe

tenderdocuments,therequirementsforthepreparationoftenderdocuments,therequirementsfor

2

thepresentationoftenderdocuments,instructionsfortheopeningandevaluationoftenders,the

awardandsigningofcontractsandascheduleprecedingtheInstructionstoBidders.

4.3.2Ageneraldescriptionshouldcontainthefollowing:

a)Projectname,geographicallocation,installedcapacity,investor,bidder,biddingagent,

etc.

b)Sourcesoffunding.

c)Scopeofthetender,deliverydate,modeofdelivery,qualityassuranceperiod,etc.

d)Requirementsforwindturbines,ancillaryequipmentandrelatedservices.

e)Technicalsolutionrequirements.

f)Sitesurveyrequirements.

g)Tendercosts.

4.3.3Thecompositionofthetenderdocumentsshalldescribethegeneralstructureofthetender

documents,clarifications,supplementsandmodificationstothedocuments.

4.3.4Therequirementsforthepreparationoftenderdocumentsshallincludethefollowing:

a)Languagerequirementsforthepreparationoftenderdocuments.

b)Compositionofthetenderdocuments.

c)Tenderofferandformatrequirements.

d)Tendercurrency.

e)Durationofthetender.

f)Bidbond.

g)Theformatandsignatureoftenderdocuments.

h)Appendix.

4.3.5TheInstructionstoBiddersshalldescribetherequirementsforthesubmissionoftender

documents,includingthemannerofmarkingandsealing,thenumberofcopiestobesubmitted,the

deadlineforsubmission,modificationandwithdrawaloftenderdocuments.

4.3.6TheInstructionstoBiddersshalldescribethespecificmannerandcontentofbidopening

andbidevaluation,includingthetimeofbidopening,bidopeningprocedures,bidevaluation

proceduresandbidevaluationrules,aswellastherequirementsofintegrityandconfidentiality.

4.3.7Tenderevaluationrulesshallincludethefollowing:

a)Thebasis,principlesandmannerofevaluationofthetenders.

b)Supervisoryauthority.

c)Theformationofthetenderevaluationcommittee.

3

d)Tenderevaluationspecifications.

4.4Contracttermsandcontractforms

Thecontractdocumentsfortheprocurementofwindturbinesshallconsistofacontractbook,

contracttermsandcontractannexes,andshallbepreparedinaccordancewiththeContractLawof

thePeople’sRepublicofChinaandotherrelevantlawsandregulations,followingtheprinciplesof

fairnessandimpartialityandclarifyingtherightsandobligationsofbothpartiestothecontract.

4.5Formatsandschedules

Thetenderdocumentsshallsetouttheformatandrequirementsforthetenderletter,proofof

identityofthelegalrepresentativeorauthorizationletterofthelegalrepresentative,tenderoffer,

qualificationdocumentsofthetenderer,businessdeviationform,bidbond,integrityundertaking,

performancetable,deliveryscheduleandotherdocuments.

4

5Technicalsection

5.1Generalrequirements

5.1.1Thetechnicalsectionshallmainlyconsistofthefollowing:

a)Generaldescription.

b)Projectoverview.

c)Scopeofsupplyanddeliveryschedule.

d)Technicalstandards.

e)Technicalperformancerequirements.

f)Technicaldata.

g)Qualitycontrol,performanceassessmentandacceptance.

h)Technicalservices.

i)Packaging,transport,installationofwindturbines.

j)Therequirementsoftherelevantappendices.

5.1.2Requirementsfortechnicalresponsestotenderdocumentsshallbeproposed.

5.1.3Explanationsshallbegiventowhatrequiresaspecialresponseinthetenderdocuments.

5.1.4Requirementsshallbemadefortechnicalsolutionstotenderdocuments.

5.2Generaldescription

Thepurposeofthepreparation,thescopeofapplication,theprinciplesofpreparation,thebasisof

preparationandotherthingsshallbestated.

5.3Projectoverview

5.3.1Theinstalledcapacity,geographiclocation,topography,trafficconditions,geological

conditions,gridaccessconditions,etc.ofthewindfarmshallbedescribed,foroffshorewindfarms,

marineenvironmentalconditionssuchasoceanhydrology,marineengineeringgeology,submarine

topographyandsaltsprayshallalsobeincluded.

5.3.2Dataonweatherstations,windenergyresourcesinthewindfarmareashallbedescribed.

5.3.3Windfarmwindmeasurementdata,topographicmaps,siteboundariesanddevelopment

restrictionsshallbedescribedorprovided,andoffshorewindfarmsshallalsobedescribedor

providedwithinformationonwaterdepth,offshoredistances,constructionrequirementsforports

orwharves,boosterstations,waterwayconditions,siteareasandsurroundingnauticalcharts.

5.3.4Extremenaturalconditionsofthewindfarmshallbedescribed,includingcorrosion,low

5

temperatures,thunderstorms,dust,ice,highaltitude,typhoons,etc.

5.3.5Thepresenceofsensitivefactorsinthewindfarmshallbedescribed,includingnature

reserves,heritagefacilities,militarysensitiveareas,aircontrolareas,waterconservationareas,bird

migrationroutes,etc.

5.4Scopeofsupplyanddeliveryschedule

5.4.1ThescopeofsupplyshouldincludeWTGequipment,specialtools,sparepartsand

consumablesunderwarranty,technicaldata,relatedservices,etc.

5.4.2Thescopeofsupplyforwindturbineequipmentshouldincludethefollowing:

a)Leafblades.

b)Pitchingsystems.

c)Nacelles,includingcanopies,undercarriages,deflectors,etc.

d)Transmissionsections,includinghubs,spindles,mainbearings,gearboxes,etc.

e)Yawsystem.

f)Brakingsystems.

g)Hydraulicsystems.

h)Generators.

i)Converters.

j)Centralandinsitucontrolandmonitoringsystems.

k)Lubricationsystems.

l)Windspeedanddirectionacquisitionsystems.

m)Auxiliarypowersupplysystemsforwindturbines.

n)Lightningprotectiondevices.

o)Fastenerssuchascouplingbolts.

p)Specialequipmentforoffshorewindturbinessuchasstep-uptransformers,emergency

powersupplies,etc.

q)Otherrequirementsofthetenderer.

5.4.3Requirementsforthesupplyofwindturbinemonitoringsystemsandpowercontrolsystems

shallbeproposed.

5.4.4Requirementsforthesupplyofspecialtoolsforinstallation,operationandmaintenance

shallbeproposed.

5.4.5Requirementsforsparepartsandconsumablesshallbeproposed.

5.4.6Thecontentoftechnicalservicesandtechnicaldatashallbedescribed.

6

5.4.7Theboundariesofthescopeofsupplyandserviceshallbedefinedandshallincludethe

following:

a)Electricalprimary.

b)Electricalsecondary.

c)Lightningprotectionandgrounding.

d)Roads.

5.4.8Requirementsfordeliveryofbatches,time,place,manner,etc.shallbeproposed.

5.5Technicalstandards

5.5.1Therequirementsoftherelevanttechnicalstandardstobefollowedforthedesign,

manufacture,gridconnectionandacceptanceofwindturbinesshallbeproposed.

5.5.2Therequirementsapplicabletotheupdatesoftechnicalstandardsversionsshallbestated.

5.6Technicalperformancerequirements

5.6.1TechnicalperformanceshallcomplywiththerequirementsofGB/T18451.1andGB/T

31517forthedesignoftheunit,andthetechnicalperformancerequirementsshallincludethe

following:

a)Unitcapacity,hubheight,windturbinediameter,designlife,etc.

b)Environmentaladaptability.

c)Certificationandtestreports.

d)Gridconnectionperformancerequirements.

e)Requirementsforavailability,powercurveguarantees,etc.

f)Pylonandfoundationrequirements.

g)Operationandmaintenancerequirements.

h)Materialrequirements.

i)Signs,markings,coloursandnameplatesofwindturbinesandancillaryequipment.

5.6.2Theperformanceandtechnicalrequirementsofthewindturbinebladesshallbedescribed.

5.6.3Theperformanceandtechnicalrequirementsofthewindturbine'spitchsystemshallbe

described,includingpitchcontrol,pitchbearings,pitchdrive,etc.

5.6.4Theperformanceandtechnicalrequirementsofthewindturbinenacelleshallbedescribed,

includingthenacellecover,undercarriage,deflector,etc.

5.6.5Theperformanceandtechnicalrequirementsofthewindturbinedrivesectionshallbe

described,includinghubs,mainshafts,mainbearings,gearboxes,etc.

7

5.6.6Theperformanceandtechnicalrequirementsofthewindturbineyawsystemshallbe

described,includingyawcontrol,yawbearing,yawdrive,etc.

5.6.7Theperformanceandtechnicalrequirementsofthewindturbinebrakingsystemshallbe

described,includingthetype,quantityandperformanceofthebrakingsystem.

5.6.8Theperformanceandtechnicalrequirementsofthewindturbinehydraulicsystemshallbe

described.

5.6.9Theperformanceandtechnicalrequirementsofthewindturbinegeneratorsshallbe

described.

5.6.10Theperformanceandtechnicalrequirementsofthewindturbinegeneratorconvertershall

bedescribed.

5.6.11Theperformanceandtechnicalrequirementsofthecentralandlocalcontroland

monitoringsystemsforwindturbinesshallbeexplained,includingthecomposition,

implementationforms,functionmodulesandoutputrequirementsofthecentralandremote

monitoringsystem,andthecomposition,implementationforms,functionmodulesandoutput

requirementsofthelocalcontrolsystem.

5.6.12Theperformanceandtechnicalrequirementsofthewindturbinelubricationsystemshall

bedescribed.

5.6.13Theperformanceandtechnicalrequirementsofthewindspeedanddirectionacquisition

systemforwindturbinesshallbedescribed.

5.6.14Theperformanceandtechnicalrequirementsoftheauxiliarypowersystemforwind

turbinesshallbedescribed.

5.6.15Theperformanceandtechnicalrequirementsoflightningprotectiondevicesforwind

turbinesshallbedescribed.

5.6.16Theperformanceandtechnicalrequirementsforfastenerssuchaswindturbinecoupling

boltsshallbeexplained.

5.6.17Theperformanceandtechnicalrequirementsofspecialequipmentsuchasoffshorewind

turbineboostertransformersandemergencypowersuppliesshallbeexplained.

5.6.18Theperformanceandtechnicalrequirementsofthewindturbinepowertransmission

systemshallbedescribed,includingtheformoftransmission(cables,busbars,etc.),protection

performance,layoutregulations,performanceandtechnicalrequirements.

5.6.19Theperformanceandtechnicalrequirementsofthewindturbinetowershallbedescribed,

includingthetowerformandthecompositionofaccessories.

8

5.6.20Thetechnicalrequirementsofthewindturbinefoundationsshallbedescribed.

5.6.21Thetechnicalrequirementsforotherrelevantcomponentsofthewindturbineshallbe

described.

5.6.22Therequirementsofspecialenvironmentalconditionsforwindfarmssuchascorrosion,

lowtemperatures,thunderstorms,sandanddust,freezing,highaltitude,typhoons,etc.shallbe

proposed.

5.6.23Therequirementsforwindturbinesnoiseshouldbeproposed.

5.6.24Otherspecialrequirementsforwindturbinesshallbestated.

5.7Technicaldata

5.7.1Requirementsfortechnicaldatashallbemadetotheextent,atthetimeandinthemannerin

whichitisprovided.

5.7.2Specificrequirementsforthelanguage,form,quantity,content,etc.oftheinformationtobe

providedshallbespecified.

5.7.3Bindingconditionssuchasconfidentiality,copyright,etc.shallbestipulatedforthe

informationprovided.

5.8Qualitycontrol,performanceassessmentandacceptance

5.8.1Requirementsforqualitycontrolofequipmentshallbeproposed.

5.8.2Therequirementsforthesupervisionoftheequipmentshallbestated,includingtheformof

supervision,thecontentofthesupervision,etc.

5.8.3Therequirementsfortheequipmentduringtheproduction,delivery,installationand

commissioningphasesshallbeproposed.

5.8.4Themannerandrequirementsforassessingtheavailabilityoftheequipmentshallbe

proposed.

5.8.5Thewayinwhichthepowercurveistobeassessedandtherequirementsshallbeproposed.

5.8.6Therequirementsforfactoryacceptance,acceptanceonarrival,pre-acceptanceandfinal

acceptanceoftheequipmentshallbeproposedandshallbeinaccordancewiththerequirementsfor

acceptanceinaccordancewithGB/T20319.

5.9Technicalservices

5.9.1Requirementsshallbemadefortechnicalservicesduringthedesign,constructionand

operationphasesofthetender.

9

5.9.2Requirementsshallbemadeforthecontentoftechnicaltrainingtobeprovidedbythe

tenderer,bothinthefactoryandonsite.

5.9.3Requirementsshallbemadefordesignliaisonmeetingtopics,personnel,time,location,etc.

5.10Packaging,transport,installationofwindturbines

5.10.1Requirementsshallbemadeforthepackagingofwindturbines.

5.10.2Requirementsshallbemadeforthetransportofwindturbines.

5.10.3Requirementsshallbemadefortheinstallationofwindturbines.

5.10.4Issuesofauthorityandresponsibilitysuchassafetyduringtransportandinstallation,

eliminationofequipmentdefectsshallbeclarified.

5.10.5Specialrequirementsforpackaging,transportandinstallationshallbespecified.

5.11Requirementsforrelevantappendices

5.11.1Thetechnicalparametersoftheequipmentshallbedescribed,indicatingtherequired

diagrams,andshallincludethefollowing:

a)Technicaldatasheetsfortheunit.

b)Tableofvibrationdesigncriteriaforunits.

c)Tableofunitpowercurves.

d)Standardizedtowerparameterstablesanddrawingsfortheunit.

e)Standardizedbaseparametertablesanddrawingsfortheunit.

f)Othercontentrequiredbythetenderer.

5.11.2Therequirementsandformstobeprovidedbybiddersinconnectionwiththe

implementationoftheprojectshallbespecifiedandshallincludethefollowing:

a)Supplylist.

b)Scheduleofworks.

c)Deliveryschedules.

d)Tableoftransportparametersforlargeparts.

5.11.3Technicaldeviationtable.

10

AppendixA(NormativeAppendix)Catalogueforthe

preparationoftenderdocumentsforwindturbines

VolumeⅠBusinesssection

ⅠInformationforbidders

1Generaldescription

2Compositionoftenderdocuments

3Preparationoftenderdocuments

4PresentationofTenderDocuments

5Tenderopeningandevaluation

6Awardandsigningofcontracts

ⅡContracttermsandcontractforms

1Contracts

2Contractterms

3Technicalspecificationsandrequirements

4Contractannexes

ⅢFormatsandschedules

1Tenderletter

2Proofofidentityoflegalrepresentativeorauthorizationletteroflegalrepresentative

3Tenderoffer

4Bidders’qualificationdocuments

5BusinessDeviationTable

6BidBond

7IntegrityCommitment

8Performancetables

9Deliveryschedule

10Otherrequirements

VolumeⅡTechnicalsection

ⅠGeneraldescription

ⅡProjectoverview

ⅢScopeofsupplyanddeliveryschedule

ⅣTechnicalstandards

ⅤTechnicalperformancerequirements

11

ⅥTechnicaldata

ⅦQualitycontrol,performanceassessmentandacceptance

ⅧTechnicalservices

ⅨWindturbinepackaging,transport,installation

ⅩRequirementsforrelevantappendices

12

Content

1Scope.............................................................................................................................................................1

2Normativereferences..................................................................................................................................1

3Generalprovisions......................................................................................................................................1

4Businesssection...........................................................................................................................................2

4.1Tendernoticesorinvitationstotender...................................................................................................2

4.2Qualificationrequirementsforbidders..................................................................................................2

4.3InformationforBidders..........................................................................................................................2

4.4Contracttermsandcontractforms.........................................................................................................4

4.5Formatsandschedules...........................................................................................................................4

5Technicalsection..........................................................................................................................................5

5.1Generalrequirements.............................................................................................................................5

5.2Generaldescription................................................................................................................................5

5.3Projectoverview.....................................................................................................................................5

5.4Scopeofsupplyanddeliveryschedule..................................................................................................6

5.5Technicalstandards................................................................................................................................7

5.6Technicalperformancerequirements.....................................................................................................7

5.7Technicaldata.........................................................................................................................................9

5.8Qualitycontrol,performanceassessmentandacceptance.....................................................................9

5.9Technicalservices..................................................................................................................................9

5.10Packaging,transport,installationofwindturbines............................................................................10

5.11Requirementsforrelevantappendices...............................................................................................10

AppendixA(NormativeAppen

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论